Letter Sequence Other |
---|
TAC:ME0278, Elimination of Hydrogen Recombiners and Change to Hydrogen and Oxygen Monitors (Approved, Closed) |
Results
Other: 3F1109-06, State of Florida Department of Environmental Protection, Conditions of Certification, 3F1209-04, Response to Follow-up to Progress Energy RAI Responses on CR-3 SAMA Evaluation, ML090090233, ML090210171, ML090350657, ML090420362, ML090780840, ML091200415, ML091660559, ML091820465, ML092600889, ML092610309, ML093200023, ML093520079, ML100050166, ML100980517, ML100980519, ML100980520, ML100980523, ML100980524, ML100980525, ML100980526, ML100980528, ML101110235, ML101320401, ML101460577, ML110250183, ML110410597, ML110460629, ML110820185, ML110880294, ML11137A009, ML11140A100, ML11180A275, ML11343A639, ML12117A260, ML12213A058, ML12346A011
|
MONTHYEARHNP-09-016, Application for Technical Specification Improvement to Eliminate Requirements for Hydrogen Recombiners and Hydrogen Monitors2009-02-26026 February 2009 Application for Technical Specification Improvement to Eliminate Requirements for Hydrogen Recombiners and Hydrogen Monitors Project stage: Request ML0902101712009-02-27027 February 2009 Notice of Opportunity for Hearing Regarding Renewal of Facility Operating License No. DPR-72 for an Additional 20-year Period Florida Power Corporation Corporation Crystal River Unit 3 Nuclear Generating Plant Docket No. 50-302 Project stage: Other ML0900902332009-02-27027 February 2009 Determination of Acceptability and Sufficiency for Docketing, and Opportunity for a Hearing Regarding the Application from Florida Power Corp., for Renewal of the Operating License for Crystal River Unit 3 Nuclear Generating Plant Project stage: Other ML0907808402009-03-31031 March 2009 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process for License Renewal for the Crystal River Unit 3 Nuclear Generating Plant (TAC No ME0278) FRN Project stage: Other ML0903506572009-03-31031 March 2009 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process for License Renewal for the Crystal River Unit 3 Nuclear Generating Plant Project stage: Other ML0908501762009-04-20020 April 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application Project stage: RAI ML0913800232009-05-11011 May 2009 Response to Request for Additional Information for the Review of the License Renewal Application Project stage: Response to RAI ML0912004152009-05-22022 May 2009 Proposed Review Schedule Regarding the Application from Florida Power Corporation for Renewal of the Operating License for Crystal River Unit 3 Nuclear Generating Plant Project stage: Other ML1013204012009-05-31031 May 2009 093-89529, Environmental Support Document South Cooling Tower Laydown Area Citrus County, Florida Project stage: Other ML0904203622009-06-10010 June 2009 Nuclear Generating Plant License Renewal Review Project stage: Other ML0915900062009-07-0202 July 2009 License Amendment, Adoption of Technical Specifications Taskforce (TSTF) Standard Technical Specification Change Traveler TSTF-447, Elimination of Hydrogen Recombiners & Change to Hydrogen & Oxygen Monitors. Project stage: Acceptance Review ML0918204652009-07-0808 July 2009 Plan for the Aging Management Program Regulatory Audit Regarding the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application Review Project stage: Other ML0916605592009-07-30030 July 2009 Audit Report Regarding the LRA for the Crystal River, Unit 3 Project stage: Other ML0917400702009-08-0303 August 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application Project stage: RAI ML0919700682009-08-10010 August 2009 Request for Additional Information Regarding Severe Accident Mitigation Alternatives for Crystal River Unit 3 Nuclear Generating Plant License Renewal Application Project stage: RAI ML0920302082009-08-14014 August 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application Project stage: RAI ML0920800452009-08-14014 August 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application Project stage: RAI ML0920200122009-08-20020 August 2009 RAI, License Renewal Application Project stage: RAI ML0922507012009-08-20020 August 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application Project stage: RAI 3F1109-06, State of Florida Department of Environmental Protection, Conditions of Certification2009-08-28028 August 2009 State of Florida Department of Environmental Protection, Conditions of Certification Project stage: Other ML0923300072009-08-31031 August 2009 RAI for the Review of the Crystal River Unit 3 Nuclear Generating Plant, LRA Project stage: RAI ML0923303432009-08-31031 August 2009 Nuclear Generating Plant, RAI, License Renewal Application Project stage: RAI ML0923308312009-08-31031 August 2009 Request for Additional Information Regarding License Renewal Application Project stage: RAI ML0923309042009-09-0202 September 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application Project stage: RAI ML0925800952009-09-11011 September 2009 Response to Requests for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application (TAC No. ME0274) and Amendment #2 Project stage: Response to RAI ML0921602132009-09-11011 September 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application Project stage: RAI ML0926008882009-09-11011 September 2009 Response to Request for Additional Information for the Review of the License Renewal Application Project stage: Response to RAI ML0926008892009-09-11011 September 2009 Areva Np, Inc., 51-9057252-001, Rev. 1, CR3 Reconciliation of 60-Year Fluence Projections Used in Reactor Vessel Beltline Embrittlement Calculations for License Renewal, Enclosure Attachment 3 Project stage: Other ML0926502722009-09-18018 September 2009 Response to Requests for Additional Information for the Review of the License Renewal Application and Amendment #3 Project stage: Response to RAI ML0923706692009-09-22022 September 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Unit Plant, License Renewal Application Project stage: RAI ML0926103092009-09-29029 September 2009 Scoping and Screening Audit Report Regarding the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application Project stage: Other ML0927901502009-09-30030 September 2009 Response to Requests for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application (TAC ME0274) and Amendment #4 Project stage: Response to RAI ML0927901542009-10-0202 October 2009 Response to Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application (TAC No. ME0274) - Sections B.2.37-1, 3.3.2.2, and XI.S8 Project stage: Response to RAI 3F1009-03, Response to Request for Additional Information Regarding Severe Accident Mitigation Alternatives2009-10-0909 October 2009 Response to Request for Additional Information Regarding Severe Accident Mitigation Alternatives Project stage: Response to RAI ML0928901552009-10-13013 October 2009 Response to Request for Additional Information for the Review of Unit 3 Nuclear Generating Plant License Renewal Application and Amendment #5 Project stage: Response to RAI ML0926405542009-10-15015 October 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application Project stage: RAI ML0930005052009-10-22022 October 2009 Response to Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application (TAC No. ME0274) - and Amendment #6 Project stage: Response to RAI ML0929606602009-10-27027 October 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application Project stage: RAI ML0929403222009-11-0303 November 2009 Request for Additional Information for the Review of the Crystal River, Unit 3 Nuclear Generating Plant, License Renewal Application Project stage: RAI ML1009805172009-11-0505 November 2009 License Renewal Revised Environmental Site Audit Needs List Hydrology (Additional Reference 8 Through 16) Project stage: Other ML1009805192009-11-0505 November 2009 Nuclear Generating Plant License Renewal, Revised Environmental Site Audit Needs List, Air, Meteorology, Climate Project stage: Other ML1009805282009-11-0505 November 2009 License Renewal Revised Environmental Site Audit Needs List, Non-Radiological Waste Radiation Protection, Socioeconomics Terrestrial Ecology Project stage: Other ML0931704872009-11-0505 November 2009 Response to Request for Additional Information Re Review of License Renewal Application for Environmental Review Project stage: Response to RAI ML1009805202009-11-0505 November 2009 License Renewal Environmental Site Audit Needs List, Aquatic Ecology (Except AQ-3), Archaeology Project stage: Other ML1009805232009-11-0505 November 2009 License Renewal Environmental Site Audit Needs List, Aquatic Ecology, Additional References, Through AR-3, Page 7 Project stage: Other ML1009805242009-11-0505 November 2009 License Renewal Revised Environmental Site Audit Needs List, Aquatic Ecology AQ-3 Project stage: Other ML1009805182009-11-0505 November 2009 Response to Request for Additional Information Regarding the Review of the License Renewal Application - Revised Environmental Site Audit Needs List Project stage: Response to RAI ML1009805252009-11-0505 November 2009 Plant Operating Manual AI-571, Sea Turtle Rescue and Handling Guidance Project stage: Other ML1009805262009-11-0505 November 2009 License Renewal Revised Environmental Site Audit Needs List, Hydrology (Through Additional Reference 6) Project stage: Other ML1011102352009-11-0505 November 2009 License Renewal Environmental Site Audit Needs List, Aquatic Ecology, AR-3 Page 8 Through AR-6 Project stage: Other 2009-06-10
[Table View] |
|
---|
Category:Federal Register Notice
MONTHYEARML21159A0522021-06-29029 June 2021 VY and CR Indirect License Transfer Order FRN ML21064A1392021-03-29029 March 2021 Nuclear Generating Plant (License DPR-72, Docket Nos. 50-302 and 72-1035) - Notice of Consideration, Request for Indirect License Transfer ML19248C1412019-10-0808 October 2019 FRN Notice of Consideration, Crystal River License Transfer Request ML19140A4562019-05-28028 May 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 06/04/2019 ML18173A1792018-08-0707 August 2018 OEDO-17-00070 - Notice of Issuance of Director'S Decision, 2.206 Petition for Emergency Enforcement Action Per 10 CFR 2.206 at Listed U.S. Reactors with Forged Components and Parts Manufactured at France'S AREVA-Le Creusot Forge and Japan C NRC-2018-0140, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 7/17/20182018-07-0505 July 2018 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 7/17/2018 ML18180A2182018-07-0505 July 2018 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 7/17/2018 ML16355A2612016-12-21021 December 2016 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations; Publication Date: January 3, 2017 NRC-2016-0273, Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations; Publication Date: January 3, 20172016-12-21021 December 2016 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations; Publication Date: January 3, 2017 ML16273A4502016-11-30030 November 2016 Exemption from Record Keeping Requirements NRC-2016-0253, Exemption from Record Keeping Requirements2016-11-30030 November 2016 Exemption from Record Keeping Requirements ML16173A0242016-09-0101 September 2016 Order Approving Transfer of License, Crystal River, Unit 3 NRC-2016-0161, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 16, 20162016-08-0303 August 2016 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 16, 2016 ML16215A2272016-08-0303 August 2016 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 16, 2016 ML16084A8912016-03-31031 March 2016 Replacement FRN - Exemption from 10 CFR 50.54(w) (1) for Crystal River, Unit 3 - Federal Register Notice ML16020A4632016-03-16016 March 2016 Exemption from 10 CFR 50.54(w)(1) for Crystal River, Unit 3 - Federal Register notice ML15356A5992015-12-29029 December 2015 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: January 5, 2016 ML15238B4952015-12-23023 December 2015 FRN Consideration NRC-2011-0024, Crystal River FRN Consideration2015-12-23023 December 2015 Crystal River FRN Consideration ML15121A5982015-05-29029 May 2015 Nuclear Generating Plant - FRN Order Approving Transfer of Licenses and Conforming Amendment ML15146A2912015-05-29029 May 2015 Nuclear Generating Plant - Order Approving Transfer of License and Conforming Amendment ML15121A5702015-05-29029 May 2015 Letter, Safety Evaluation for Order Approving Transfer of Licenses and Conforming Amendments ML14183B3382015-04-27027 April 2015 LTR Exemption from Requirements of 10 CFR 140.11(a)(4), to Allow Reduction in Offsite Primary Liability Insurance and Withdrawal from Participation in Secondary Retrospective Premium Pool for Deferred Premium Charges NRC-2015-0115, FRN, Exemption from Requirements of 10 CFR 140.11(a)(4), to Allow Reduction in Offsite Primary Liability Insurance and Withdrawal from Participation in Secondary Retrospective Premium Pool for Deferred Premium Charges2015-04-27027 April 2015 FRN, Exemption from Requirements of 10 CFR 140.11(a)(4), to Allow Reduction in Offsite Primary Liability Insurance and Withdrawal from Participation in Secondary Retrospective Premium Pool for Deferred Premium Charges ML14183B4772015-04-27027 April 2015 FRN, Exemption from Requirements of 10 CFR 140.11(a)(4), to Allow Reduction in Offsite Primary Liability Insurance and Withdrawal from Participation in Secondary Retrospective Premium Pool for Deferred Premium Charges ML15111A4552015-04-22022 April 2015 Nuclear Generating Plant - Letter and Notice of Consideration of Approval of Application for Proposed Merger of Facility Operating License and Conforming Amendment, and Opportunity for a Hearing ML15111A3802015-04-22022 April 2015 Nuclear Generating Plant - Notice of Consideration of Approval of Application for Proposed Merger of Facility Operating License and Conforming Amendment, and Opportunity for a Hearing NRC-2015-0042, Nuclear Generating Plant - FRN for Exemptions on Emergency Plan and Emergency Action Level Scheme.2015-03-30030 March 2015 Nuclear Generating Plant - FRN for Exemptions on Emergency Plan and Emergency Action Level Scheme. ML15058A9062015-03-30030 March 2015 Letter, Exemptions from Certain Emergency Planning Requirements and Related Safety Evaluation ML15040A0902015-03-30030 March 2015 Nuclear Generating Plant - FRN for Exemptions on Emergency Plan and Emergency Action Level Scheme. ML15013A1812015-02-23023 February 2015 Letter with Environmental Assessment and Finding of No Significant Impact Related to Request for Exemptions from Certain Emergency Planning Requirements ML15013A1732015-02-23023 February 2015 Environmental Assessment and Finding of No Significant Impact Exemptions from Certain Emergency Planning Requirements ML14247A5452015-01-26026 January 2015 Letter, Exemption from the Requirements of 10 CFR Sections 50.75 Related to Use of the Decommissioning Trust Fund for Irradiated Fuel Management and Site Restoration NRC-2015-0010, Crystal River Unit - FRN, Exemption from the Requirements of 10 CFR Sections 50.82 and 50.75 Related to Use of the Decommissioning Trust Fund for Irradiated Fuel Management and Site Restoration2015-01-26026 January 2015 Crystal River Unit - FRN, Exemption from the Requirements of 10 CFR Sections 50.82 and 50.75 Related to Use of the Decommissioning Trust Fund for Irradiated Fuel Management and Site Restoration ML14247A5582015-01-26026 January 2015 Unit - FRN, Exemption from the Requirements of 10 CFR Sections 50.82 and 50.75 Related to Use of the Decommissioning Trust Fund for Irradiated Fuel Management and Site Restoration ML14246A2132015-01-15015 January 2015 FRN, Finding of No Significant Impact and Associated Environmental Assessment Related to Use of the Decommissioning Trust Fund for Irradiated Fuel Management and Site Restoration ML14246A1982015-01-14014 January 2015 Letter, Finding of No Significant Impact and Associated Environmental Assessment Related to Use of the Decommissioning Trust Fund for Irradiated Fuel Management and Site Restoration NRC-2014-0266, Nuclear Generating Plant - FRN, Exemption from Requirements of 10 CFR 73.55(p)(1)(i) and (Ii) Related to Suspension of Security Measures in an Emergency or During Severe Weather2014-12-0909 December 2014 Nuclear Generating Plant - FRN, Exemption from Requirements of 10 CFR 73.55(p)(1)(i) and (Ii) Related to Suspension of Security Measures in an Emergency or During Severe Weather ML14176B0862014-12-0909 December 2014 Nuclear Generating Plant - FRN, Exemption from Requirements of 10 CFR 73.55(p)(1)(i) and (II) Related to Suspension of Security Measures in an Emergency or During Severe Weather ML14205A3142014-07-28028 July 2014 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations- Published July 22, 2014 ML14097A2202014-05-0606 May 2014 G20090690/EDATS:OEDO-2009-0758/Notice of Issuance of Director'S Decision, 2.206 - Enforcement Action Against the Progress Energy Company, Crystal River Nuclear Plant NRC-2010-0096, G20090690/EDATS:OEDO-2009-0758/Notice of Issuance of Director'S Decision, 2.206 - Enforcement Action Against the Progress Energy Company, Crystal River Nuclear Plant2014-05-0606 May 2014 G20090690/EDATS:OEDO-2009-0758/Notice of Issuance of Director'S Decision, 2.206 - Enforcement Action Against the Progress Energy Company, Crystal River Nuclear Plant ML14099A2172014-04-28028 April 2014 FRN on Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing SUNSI and Order Imposing Procedures for Access to SUNSI ML13339A6642013-12-22022 December 2013 Nuclear Generating Plant - Federal Register Notice for Post Shutdown Activity Report ML13225A5572013-08-12012 August 2013 Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit NRC-2011-0301, Federal Register Notice - Withdrawal of an Amendment Request2013-03-0707 March 2013 Federal Register Notice - Withdrawal of an Amendment Request ML13063A5272013-03-0707 March 2013 Federal Register Notice - Withdrawal of an Amendment Request ML13063A5242013-03-0707 March 2013 Letter and FRN - Withdrawal of an Amendment Request ML13052A6062013-02-28028 February 2013 Withdrawal of Application for Renewed Operating License ML12314A0652013-01-0808 January 2013 Nuclear Generating Plant - Letter - Draft Environmental Assessment and Draft Finding of No Significant Impact Related to the Proposed Extended Power Uprate 2021-06-29
[Table view] |
Text
7590-01-P UNITED STATES NUCLEAR REGULATORY COMMISSION CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT NOTICE OF INTENT TO PREPARE AN ENVIRONMENTAL IMPACT STATEMENT AND CONDUCT SCOPING PROCESS DOCKET NO. 50-302
[NRC-2009-0039]
Florida Power Corporation (FPC) has submitted an application for renewal of Facility Operating License No. DPR-72 for an additional 20 years of operation at the Crystal River Unit 3 Nuclear Generating Plant (CR-3). CR-3 is located approximately 35 miles southwest of Ocala, Florida.
The operating license for CR-3 expires on December 3, 2016. The application for renewal, dated December 16, 2008, was submitted pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Part 54. A notice of receipt and availability of the application, which included the environmental report (ER), was published in the Federal Register on February 4, 2009 (74 FR 6060). A notice of acceptance for docketing of the application for renewal of the facility operating license was published in the Federal Register on March 9, 2009. The purpose of this notice is to inform the public that the U.S. Nuclear Regulatory Commission (NRC) will be preparing an environmental impact statement (EIS) related to the review of the license renewal application and to provide the public an opportunity to participate in the environmental scoping process, as defined in 10 CFR 51.29. In addition, as outlined in 36 CFR 800.8, ACoordination with the National Environmental Policy Act,@ the NRC plans to coordinate compliance with Section 106 of the National Historic Preservation Act in meeting the requirements of the National Environmental Policy Act of 1969 (NEPA).
In accordance with 10 CFR 51.53(c) and 10 CFR 54.23, FPC submitted the ER as part of the application. The ER was prepared pursuant to 10 CFR Part 51 and is publicly available at the NRC Public Document Room (PDR), located at One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852, or from the NRC=s Agencywide Documents Access and Management System (ADAMS). The ADAMS Public Electronic Reading Room is accessible at http://adamswebsearch.nrc.gov/dologin.htm. The Accession Number for the ER is ML090080053. Persons who do not have access to ADAMS, or who encounter problems in accessing the documents located in ADAMS, should contact the NRC=s PDR reference staff by telephone at 1-800-397-4209, or 301-415-4737, or by e-mail at pdr.resource@nrc.gov. The ER may also be viewed on the Internet at www.nrc.gov/reactors/operating/licensing/renewal/applications/crystal-river.html. In addition, the ER is available for public inspection near the CR-3 at the public library: Coastal Region Library, 8619 W. Crystal St., Crystal River, FL 34428-4468.
This notice advises the public that the NRC intends to gather the information necessary to prepare a plant-specific supplement to the Commission=s AGeneric Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants,@ (NUREG-1437) related to the review of the application for renewal of the CR-3 operating license for an additional 20 years. Possible alternatives to the proposed action (license renewal) include no action and reasonable alternative energy sources. The NRC is required by 10 CFR 51.95 to prepare a supplement to the GEIS in connection with the renewal of an operating license. This notice is being published in accordance with NEPA and the NRC=s regulations found in 10 CFR Part 51.
The NRC will first conduct a scoping process for the supplement to the GEIS and, as soon as practicable thereafter, will prepare a draft supplement to the GEIS for public comment.
Participation in the scoping process by members of the public and local, State, Tribal, and
Federal government agencies are encouraged. The scoping process for the supplement to the GEIS will be used to accomplish the following:
- a. Define the proposed action which is to be the subject of the supplement to the GEIS.
- b. Determine the scope of the supplement to the GEIS and identify the significant issues to be analyzed in depth.
- c. Identify and eliminate from detailed study those issues that are peripheral or that are not significant.
- d. Identify any environmental assessments and other ElSs that are being or will be prepared that are related to, but are not part of, the scope of the supplement to the GEIS being considered.
- e. Identify other environmental review and consultation requirements related to the proposed action.
- f. Indicate the relationship between the timing of the preparation of the environmental analyses and the Commission's tentative planning and decision-making schedule.
- g. Identify any cooperating agencies and, as appropriate, allocate assignments for preparation and schedules for completing the supplement to the GEIS to the NRC and any cooperating agencies.
- h. Describe how the supplement to the GEIS will be prepared, and include any contractor assistance to be used.
The NRC invites the following entities to participate in scoping:
- a. The applicant, Florida Power Corporation.
- b. Any Federal agency that has jurisdiction by law or special expertise with respect to any environmental impact involved, or that is authorized to develop and enforce relevant environmental standards.
- c. Affected State and local government agencies, including those authorized to develop and enforce relevant environmental standards.
- d. Any affected Indian tribe.
- e. Any person who requests or has requested an opportunity to participate in the scoping process.
- f. Any person who has petitioned or intends to petition for leave to intervene.
In accordance with 10 CFR 51.26, the scoping process for an EIS may include a public scoping meeting to help identify significant issues related to a proposed activity and to determine the scope of issues to be addressed in an EIS. The NRC has decided to hold public meetings for the CR-3 license renewal supplement to the GEIS. The scoping meetings will be held at the Plantation Inn, 9301 W Fort Island Trail, Crystal River, FL 34429, on April 16, 2009.
There will be two sessions to accommodate interested parties. The first session will convene at 2:00 p.m. and will continue until 5:00 p.m., as necessary. The second session will convene at 7:00 p.m. with a repeat of the overview portions of the meeting and will continue until 10:00 p.m., as necessary. Both meetings will be transcribed and will include: (1) an overview by the NRC staff of the NEPA environmental review process, the proposed scope of the supplement to the GEIS, and the proposed review schedule; and (2) the opportunity for interested government agencies, organizations, and individuals to submit comments or suggestions on the environmental issues or the proposed scope of the supplement to the GEIS. Additionally, the NRC staff will host informal discussions one hour prior to the start of each session at the same location. No formal comments on the proposed scope of the supplement to the GEIS will be accepted during the informal discussions. To be considered, comments must be provided either at the transcribed public meetings or in writing, as discussed below. Persons may register to attend or present oral comments at the meetings on the scope of the NEPA review by
contacting the NRC Project Manager, Elaine Keegan, by telephone at 1-800-368-5642, extension 8517 or by e-mail at elaine.keegan@nrc.gov no later than April 9, 2009. Members of the public may also register to speak at the meeting within 15 minutes of the start of each session. Individual oral comments may be limited by the time available, depending on the number of persons who register. Members of the public who have not registered may also have an opportunity to speak, if time permits. Public comments will be considered in the scoping process for the supplement to the GEIS. Elaine Keegan will need to be contacted no later than April 9, 2009, if special equipment or accommodations are needed to attend or present information at the public meeting, so that the NRC staff can determine whether the request can be accommodated.
Members of the public may send written comments on the environmental scope of the CR-3 license renewal review to: Chief, Rulemaking and Directives Branch, Division of Administrative Services, Office of Administration, Mailstop TWB 5B-01M, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, and should cite the publication date and page number of this Federal Register notice. To be considered in the scoping process, written comments should be postmarked by May 15, 2009. Electronic comments may be sent by e-mail to the NRC at crystalrivereis@nrc.gov, and should be sent no later than May 15, 2009, to be considered in the scoping process. Comments will be available electronically and accessible through ADAMS at http://adamswebsearch.nrc.gov/dologin.htm.
Participation in the scoping process for the supplement to the GEIS does not entitle participants to become parties to the proceeding to which the supplement to the GEIS relates.
Notice of opportunity for a hearing regarding the renewal application is also included in this
Federal Register. Matters related to participation in any hearing are outside the scope of matters to be discussed at this public meeting.
At the conclusion of the scoping process, the NRC will prepare a concise summary of the determination and conclusions reached, including the significant issues identified, and will send a copy of the summary to each participant in the scoping process. The summary will also be available for inspection in ADAMS at http://adamswebsearch.nrc.gov/dologin.htm. The staff will then prepare and issue for comment the draft supplement to the GEIS, which will be the subject of separate notices and separate public meetings. Copies will be available for public inspection at the above-mentioned addresses, and one copy per request will be provided free of charge. After receipt and consideration of the comments, the NRC will prepare a final supplement to the GEIS, which will also be available for public inspection.
Information about the proposed action, the supplement to the GEIS, and the scoping process may be obtained from Elaine Keegan at the aforementioned telephone number or e-mail address.
Dated at Rockville, Maryland, this 31st day of March, 2009 FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
David J. Wrona, Chief Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation