Letter Sequence RAI |
---|
TAC:ME0274, Elimination of Hydrogen Recombiners and Change to Hydrogen and Oxygen Monitors (Approved, Closed) |
Results
Other: 3F1109-06, State of Florida Department of Environmental Protection, Conditions of Certification, 3F1209-04, Response to Follow-up to Progress Energy RAI Responses on CR-3 SAMA Evaluation, ML090090233, ML090210171, ML090350657, ML090420362, ML090780840, ML091200415, ML091660559, ML091820465, ML092600889, ML092610309, ML093200023, ML093520079, ML100050166, ML100980517, ML100980519, ML100980520, ML100980523, ML100980524, ML100980525, ML100980526, ML100980528, ML101110235, ML101320401, ML101460577, ML110250183, ML110410597, ML110460629, ML110820185, ML110880294, ML11137A009, ML11140A100, ML11180A275, ML11343A639, ML12117A260, ML12213A058, ML12346A011
|
MONTHYEARHNP-09-016, Application for Technical Specification Improvement to Eliminate Requirements for Hydrogen Recombiners and Hydrogen Monitors2009-02-26026 February 2009 Application for Technical Specification Improvement to Eliminate Requirements for Hydrogen Recombiners and Hydrogen Monitors Project stage: Request ML0902101712009-02-27027 February 2009 Notice of Opportunity for Hearing Regarding Renewal of Facility Operating License No. DPR-72 for an Additional 20-year Period Florida Power Corporation Corporation Crystal River Unit 3 Nuclear Generating Plant Docket No. 50-302 Project stage: Other ML0900902332009-02-27027 February 2009 Determination of Acceptability and Sufficiency for Docketing, and Opportunity for a Hearing Regarding the Application from Florida Power Corp., for Renewal of the Operating License for Crystal River Unit 3 Nuclear Generating Plant Project stage: Other ML0907808402009-03-31031 March 2009 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process for License Renewal for the Crystal River Unit 3 Nuclear Generating Plant (TAC No ME0278) FRN Project stage: Other ML0903506572009-03-31031 March 2009 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process for License Renewal for the Crystal River Unit 3 Nuclear Generating Plant Project stage: Other ML0908501762009-04-20020 April 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application Project stage: RAI ML0913800232009-05-11011 May 2009 Response to Request for Additional Information for the Review of the License Renewal Application Project stage: Response to RAI ML0912004152009-05-22022 May 2009 Proposed Review Schedule Regarding the Application from Florida Power Corporation for Renewal of the Operating License for Crystal River Unit 3 Nuclear Generating Plant Project stage: Other ML1013204012009-05-31031 May 2009 093-89529, Environmental Support Document South Cooling Tower Laydown Area Citrus County, Florida Project stage: Other ML0904203622009-06-10010 June 2009 Nuclear Generating Plant License Renewal Review Project stage: Other ML0915900062009-07-0202 July 2009 License Amendment, Adoption of Technical Specifications Taskforce (TSTF) Standard Technical Specification Change Traveler TSTF-447, Elimination of Hydrogen Recombiners & Change to Hydrogen & Oxygen Monitors. Project stage: Acceptance Review ML0918204652009-07-0808 July 2009 Plan for the Aging Management Program Regulatory Audit Regarding the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application Review Project stage: Other ML0916605592009-07-30030 July 2009 Audit Report Regarding the LRA for the Crystal River, Unit 3 Project stage: Other ML0917400702009-08-0303 August 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application Project stage: RAI ML0919700682009-08-10010 August 2009 Request for Additional Information Regarding Severe Accident Mitigation Alternatives for Crystal River Unit 3 Nuclear Generating Plant License Renewal Application Project stage: RAI ML0920302082009-08-14014 August 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application Project stage: RAI ML0920800452009-08-14014 August 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application Project stage: RAI ML0920200122009-08-20020 August 2009 RAI, License Renewal Application Project stage: RAI ML0922507012009-08-20020 August 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application Project stage: RAI 3F1109-06, State of Florida Department of Environmental Protection, Conditions of Certification2009-08-28028 August 2009 State of Florida Department of Environmental Protection, Conditions of Certification Project stage: Other ML0923300072009-08-31031 August 2009 RAI for the Review of the Crystal River Unit 3 Nuclear Generating Plant, LRA Project stage: RAI ML0923303432009-08-31031 August 2009 Nuclear Generating Plant, RAI, License Renewal Application Project stage: RAI ML0923308312009-08-31031 August 2009 Request for Additional Information Regarding License Renewal Application Project stage: RAI ML0923309042009-09-0202 September 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application Project stage: RAI ML0925800952009-09-11011 September 2009 Response to Requests for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application (TAC No. ME0274) and Amendment #2 Project stage: Response to RAI ML0921602132009-09-11011 September 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application Project stage: RAI ML0926008882009-09-11011 September 2009 Response to Request for Additional Information for the Review of the License Renewal Application Project stage: Response to RAI ML0926008892009-09-11011 September 2009 Areva Np, Inc., 51-9057252-001, Rev. 1, CR3 Reconciliation of 60-Year Fluence Projections Used in Reactor Vessel Beltline Embrittlement Calculations for License Renewal, Enclosure Attachment 3 Project stage: Other ML0926502722009-09-18018 September 2009 Response to Requests for Additional Information for the Review of the License Renewal Application and Amendment #3 Project stage: Response to RAI ML0923706692009-09-22022 September 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Unit Plant, License Renewal Application Project stage: RAI ML0926103092009-09-29029 September 2009 Scoping and Screening Audit Report Regarding the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application Project stage: Other ML0927901502009-09-30030 September 2009 Response to Requests for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application (TAC ME0274) and Amendment #4 Project stage: Response to RAI ML0927901542009-10-0202 October 2009 Response to Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application (TAC No. ME0274) - Sections B.2.37-1, 3.3.2.2, and XI.S8 Project stage: Response to RAI 3F1009-03, Response to Request for Additional Information Regarding Severe Accident Mitigation Alternatives2009-10-0909 October 2009 Response to Request for Additional Information Regarding Severe Accident Mitigation Alternatives Project stage: Response to RAI ML0928901552009-10-13013 October 2009 Response to Request for Additional Information for the Review of Unit 3 Nuclear Generating Plant License Renewal Application and Amendment #5 Project stage: Response to RAI ML0926405542009-10-15015 October 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application Project stage: RAI ML0930005052009-10-22022 October 2009 Response to Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application (TAC No. ME0274) - and Amendment #6 Project stage: Response to RAI ML0929606602009-10-27027 October 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application Project stage: RAI ML0929403222009-11-0303 November 2009 Request for Additional Information for the Review of the Crystal River, Unit 3 Nuclear Generating Plant, License Renewal Application Project stage: RAI ML1009805172009-11-0505 November 2009 License Renewal Revised Environmental Site Audit Needs List Hydrology (Additional Reference 8 Through 16) Project stage: Other ML1009805192009-11-0505 November 2009 Nuclear Generating Plant License Renewal, Revised Environmental Site Audit Needs List, Air, Meteorology, Climate Project stage: Other ML1009805282009-11-0505 November 2009 License Renewal Revised Environmental Site Audit Needs List, Non-Radiological Waste Radiation Protection, Socioeconomics Terrestrial Ecology Project stage: Other ML0931704872009-11-0505 November 2009 Response to Request for Additional Information Re Review of License Renewal Application for Environmental Review Project stage: Response to RAI ML1009805202009-11-0505 November 2009 License Renewal Environmental Site Audit Needs List, Aquatic Ecology (Except AQ-3), Archaeology Project stage: Other ML1009805232009-11-0505 November 2009 License Renewal Environmental Site Audit Needs List, Aquatic Ecology, Additional References, Through AR-3, Page 7 Project stage: Other ML1009805242009-11-0505 November 2009 License Renewal Revised Environmental Site Audit Needs List, Aquatic Ecology AQ-3 Project stage: Other ML1009805182009-11-0505 November 2009 Response to Request for Additional Information Regarding the Review of the License Renewal Application - Revised Environmental Site Audit Needs List Project stage: Response to RAI ML1009805252009-11-0505 November 2009 Plant Operating Manual AI-571, Sea Turtle Rescue and Handling Guidance Project stage: Other ML1009805262009-11-0505 November 2009 License Renewal Revised Environmental Site Audit Needs List, Hydrology (Through Additional Reference 6) Project stage: Other ML1011102352009-11-0505 November 2009 License Renewal Environmental Site Audit Needs List, Aquatic Ecology, AR-3 Page 8 Through AR-6 Project stage: Other 2009-06-10
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000302/20240012024-09-23023 September 2024 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3, NRC Inspection Report No. 05000302/2024001 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24226B2392024-08-27027 August 2024 Application for License Amendment Request to Add License Condition to Include License Termination Plan Requirements – Acknowledgement of Withdrawal ML24179A0702024-07-26026 July 2024 SHPO S106 Completion Crystal River Unit 3 ML24205A2192024-07-24024 July 2024 Tribal S106 Completion Crystal River Unit 3: Muscogee Nation ML24205A2182024-07-24024 July 2024 Tribal S106 Completion Crystal River Unit 3: Seminole Nation of Oklahoma ML24179A0912024-07-24024 July 2024 Tribal S106 Completion Crystal River Unit 3: Seminole Tribe of Florida ML24205A2202024-07-24024 July 2024 Tribal S106 Completion Crystal River Unit 3_Miccosukee Tribe of Florida ML24190A1912024-07-0808 July 2024 Fws Concurrence for Crystal River Unit 3 ML24172A2552024-06-20020 June 2024 Fws to NRC Species List: Florida Ecological Services Field Office 06/20/2024 ML24170A9242024-06-18018 June 2024 024-0023697 Crystal River License Termination Plan Unit 3 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24114A2262024-04-24024 April 2024 Amended Special Package Authorization for the Cr3 Middle Package (Crystal River 3 Middle Package - Docket No. 71-9393) IR 05000302/20230022024-04-17017 April 2024 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report No. 05000302/2023002 ML24054A0612024-04-0202 April 2024 Request to Initiate Section 106 Consultation Regarding the License Termination Plan for Crystal River Unit 3 in Citrus County, Florida ML24079A2492024-04-0202 April 2024 Tribal S106 Initiation Crystal River Unit 3-Johnson, Lewis Johnson ML24054A0582024-04-0202 April 2024 Achp S106 Initiation Crystal River Unit 3 - Letter 1 ML24079A2472024-04-0202 April 2024 Tribal S106 Initiation Crystal River Unit 3-Cypress, Talbert ML24079A2482024-04-0202 April 2024 Tribal S106 Initiation Crystal River Unit 3-Hill, David Hill ML24054A0812024-04-0202 April 2024 Tribal S106 Initiation Crystal River Unit 3-Osceola, Marcellus ML24089A0362024-03-29029 March 2024 Response to Audit Plan in Support of Accelerated Decommissioning Partners and Request to Add License Condition to Include License Termination Plan Requirements. W/Enclosures 1 to 5 ML24073A1922024-03-11011 March 2024 Fws to NRC, List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project ML24054A6452024-02-29029 February 2024 Letter - Reply to Request for RAI Extension Related to the Crystal River License Termination Plan ML24030A7482024-02-12012 February 2024 Audit Report Cover Letter and Report - Crystal River Unit 3 Nuclear Generating Plant LTP ML23342A0942024-01-0909 January 2024 – Independent Spent Fuel Storage Installation Security Inspection Plan ML23354A0632023-12-22022 December 2023 Cover Letter - Crystal River License Termination Plan Request for Additional Information ML23345A1882023-12-0606 December 2023 Fws to NRC Crystal River Species List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project ML23320A2592023-11-17017 November 2023 STC-23 077 Notification of the Crystal River Unit 3 Generating Plant License Termination Plan Public Meeting and Federal Register Notice ML23313A1322023-11-15015 November 2023 Request for Additional Information for the Environmental Assessment of the License Termination Plan for Crystal River Unit 3 Nuclear Generating Plant ML23310A0712023-11-0707 November 2023 Audit Plan Cover Letter - Crystal River Unit 3 Nuclear Generating Plant LTP ML23187A1112023-07-25025 July 2023 Acceptance of Requested Licensing Action License Request to Add License Condition to Include License Termination Plan Requirements ML23107A2722023-06-13013 June 2023 Letter Transmitting NRC Survey Results for East Settling Pond ML23160A2962023-06-0909 June 2023 Response to Crystal River, Unit 3 – Supplemental Information Needed for Acceptance on the Application for a License Amendment Regarding Approval of the License Termination Plan ML23107A2732023-06-0707 June 2023 Orise Independent Survey Report Dcn 5366-SR-01-0 IR 05000302/20220032023-05-25025 May 2023 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report No. 05000302/2022003 ML23103A1902023-04-19019 April 2023 Request for Supplemental Information Cover Letter ML23058A2532023-03-22022 March 2023 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River, Unit 3 - NRC Inspection Report No. 05000302/2022003 ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML22265A0192022-09-26026 September 2022 Nuclear Generating Plant - U.S. Nuclear Regulatory Commissions Analysis of ADP CR3, LLCs Decommissioning Funding Status Report (License No. DPR-72, Docket Nos. 50-302 and 72-1035) IR 05000302/20220022022-08-0909 August 2022 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report 05000302/2022002 IR 05000302/20220012022-05-0303 May 2022 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report 05000302/2022001 ML22116A1752022-04-27027 April 2022 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3- Independent Spent Fuel Storage Installation Security Inspection Report 07201035/2022401 ML22105A3992022-04-18018 April 2022 Nuclear Generating Plant - Change in NRC Project Manager ML22011A1362022-01-31031 January 2022 Independent Spent Fuel Storage Installation Security Inspection Plan ML22024A2142022-01-24024 January 2022 Nuclear Generating Plant - NMFS NRC Letter - Crystal River Energy Complex Biological Opinion Status (License No. DPR-72, Docket Nos. 50-302 and 72-1035) IR 05000302/20210042022-01-24024 January 2022 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report No. 05000302/2021004 ML21351A0052021-12-20020 December 2021 NRC Analysis of ADP CR3, LLC Decommissioning Funding Status Report for the Crystal River Unit 3 Nuclear Generating Plant (License No. DPR-72, Docket Nos. 50-302 and 72-1035) ML21322A2702021-11-24024 November 2021 Nuclear Generating Plant - Issuance of Amendment No. 260 Approving the Independent Spent Fuel Storage Installation Only Security Plan, Rev 3 IR 05000302/20210032021-11-0909 November 2021 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report Nos. 05000302/2021003 and 07201035/2021001 ML21288A4292021-10-18018 October 2021 Letter - Crystal River Unit 3 Nuclear Generating Plant - Correction to Safety Evaluation Related to the Issuance of Amendment No. 259 Approving the Independent Spent Fuel Storage Installation Only Emergency Plan 2024-09-23
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23354A0632023-12-22022 December 2023 Cover Letter - Crystal River License Termination Plan Request for Additional Information ML23354A0642023-12-22022 December 2023 Enclosure - Crystal River License Termination Plan Request for Additional Information ML23313A1322023-11-15015 November 2023 Request for Additional Information for the Environmental Assessment of the License Termination Plan for Crystal River Unit 3 Nuclear Generating Plant ML23103A1922023-04-19019 April 2023 Request for Supplemental Information Enclosure ML21182A1032021-07-0606 July 2021 Request for Additional Information (RAI) Related to the ISFSI-Only Emergency Plan ML16032A1772016-02-0404 February 2016 J. Hickman, NRC, Letter to T. Hobbs, Crystal River 3, Request for Additional Information for Emergency Plan Change ML15026A4162015-02-0202 February 2015 Request for Additional Information Regarding the 10 CFR 50.54(p) Changes to the Security Plans ML14274A1392015-01-0808 January 2015 Request for Additional Information, License Amendment Request to Revise Technical Specifications and License Conditions to Create Permanently Defueled Technical Specifications ML14133A5032014-05-14014 May 2014 Correction, Request for Additional Information on the Post Shutdown Decommissioning Activities Report ML14104A0392014-04-28028 April 2014 Request for Additional Information on the Post Shutdown Decommissioning Activities Report ML13175A2152013-06-28028 June 2013 Request for Additional Information Regarding Request to Rescind Fukushima-Related Orders ML13018A3072013-02-0101 February 2013 Request for Additional Information for Extended Power Uprate License Amendment Request ML12355A6592012-12-21021 December 2012 Nuclear Generating Plant - RAI 9.3 of the Near-Term Task Force Fukushima Dai-ichi.. ML12333A0892012-12-19019 December 2012 Request for Additional Information for Extended Power Uprate License Amendment Request ML12310A2912012-11-15015 November 2012 Request for Additional Information for Changes to Security Plan ML12240A0152012-08-28028 August 2012 Request for Additional Information for Extended Power Uprate License Amendment Request ML12219A1912012-08-16016 August 2012 Request for Additional Information for Extended Power Uprate License Amendment Request ML12213A3032012-08-0303 August 2012 Request for Additional Information for Extended Power Uprate License Amendment Request (Srxb) ML12202A0602012-08-0202 August 2012 Request for Additional Information for Extended Power Uprate License Amendment Request ML12125A1622012-08-0101 August 2012 Nuclear Generating Plant - Request for Additional Information for Extended Power Uprate License Amendment Request ML12194A4172012-07-17017 July 2012 Generating Plant - Request for Additional Information for Extended Power Uprate License Amendment Request ML12174A2922012-07-0505 July 2012 Request for Additional Information for Extended Power Uprate License Amendment Request ML12171A3472012-07-0505 July 2012 Request for Additional Information for Extended Power Uprate License Amendment Request ML12102A0442012-05-0404 May 2012 Request for Additional Information for Extended Power Uprate License Amendment Request ML12056A0492012-03-12012 March 2012 Enclosure 3 - Recommendation 2.3: Seismic ML12056A0512012-03-12012 March 2012 Enclosure 5 - Recommendation 9.3: Emergency Preparedness ML12056A0502012-03-12012 March 2012 Enclosure 4 - Recommendation 2.3: Flooding ML12056A0482012-03-12012 March 2012 Enclosure 2 - Recommendation 2.1: Flooding ML12056A0472012-03-12012 March 2012 Enclosure 1 - Recommendation 2.1: Seismic ML12052A1302012-03-0202 March 2012 Request for Additional Information for Extended Power Uprate License Amendment Request ML12003A2172012-02-0808 February 2012 Nuclear Generating Plant - Request for Additional Information for Extended Power Uprate License Amendment Request ML11326A2312011-12-0707 December 2011 Request for Additional Information for Extended Power Uprate License Amendment Request ML11308A6592011-11-17017 November 2011 Generating Plant - Request for Additional Information Regarding 60-Day Response to Bulletin 2011-01, Mitigating Strategies ML11301A1142011-11-0808 November 2011 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application ML1128602942011-10-12012 October 2011 IR 05000302-11-005; 11/14-18/2011; Crystal River Unit 3, Notification of Inspection and Request for Information ML11175A1512011-06-30030 June 2011 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application ML11137A1742011-06-22022 June 2011 Nuclear Generating Plant; H. B. Robinson Steam Electric Plant, 2; and Shearon Harris Nuclear Power Plant, Unit 1 Request for Additional Information Regarding 2011 Decommissioning Funds ML1115403412011-06-0202 June 2011 Nuclear Generating Plant - Notification of Inspection and Request for Information 05000302/2011501 ML11122A0002011-05-26026 May 2011 Request for Additional Information for the Review of the Crystal River, Unit 3, License Renewal Application ML1112501592011-05-0505 May 2011 Notice of Inspection and Request for Information 05000302/2011003 ML1108202262011-03-31031 March 2011 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application ML1031402722010-11-16016 November 2010 Request for Additional Information for the Review of the Crystal Review Unit 3 Nuclear Generating Plant, License Renewal Application ML1029503292010-11-0808 November 2010 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application ML1030202942010-10-28028 October 2010 Nuclear Generating Plant - Notification of Inspection and Request for Information IR 05000302-10-005 ML1027100652010-10-19019 October 2010 09/27/10 Summary of Telephone Conference Call Held Between NRC and Florida Power Corp., Concerning Draft Request for Information Related to Crystal River, Unit 3, License Renewal Application ML1026002432010-10-14014 October 2010 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application ML1022800102010-08-11011 August 2010 Nuclear Generating Plant - Draft RAIs Regarding Crystal River Unit 3 Part 26 Exemption Request ML1017404972010-07-0808 July 2010 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application ML1015303972010-07-0808 July 2010 RAI for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application ML1014105122010-06-0202 June 2010 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application 2023-04-19
[Table view] |
Text
August 14, 2009 Mr. Jon Franke, Vice President Crystal River Nuclear Plant (NA1B)
ATTN: Supervisor, Licensing & Regulatory Programs 15760 W. Power Line Street Crystal River, FL 34428-6708
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT LICENSE RENEWAL APPLICATION (TAC NO. ME0274)
Dear Mr. Franke:
By letter dated December 16, 2008, Florida Power Corporation submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54, to renew the operating license for Crystal River Unit 3 Nuclear Generating Plant, for review by the U.S. Nuclear Regulatory Commission (NRC or the staff). The staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review. Further requests for additional information may be issued in the future.
Items in the enclosure were discussed with Mr. Michael Heath, and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-3733 or by e-mail at Robert.Kuntz@nrc.gov.
Sincerely,
/RA/
Robert F. Kuntz, Sr. Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-302
Enclosure:
As stated cc w/encl: See next page
ML092080045 OFFICE PM:RPB2:DLR LA:DLR BC:SBPB:DSS BC:RPB2:DLR PM:RPB2:DLR DWrona RKuntz NAME RKuntz IKing GCasto (LRegner for) (Signature)
DATE 07/30/09 07/30/09 07/30/09 08/12/09 08/14/09
Letter to Jon Franke from Robert F. Kuntz dated August 14, 2009
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT LICENSE RENEWAL APPLICATION (TAC NO. ME0274)
DISTRIBUTION:
HARD COPY:
DLR RF E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRer1 Resource RidsNrrDlrRer2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsNrrDciCvib Resource RidsNrrDciCpnb Resource RidsNrrDciCsgb Resource RidsNrrDraAfpb Resource RidsNrrDraApla Resource RidsNrrDeEmcb Resource RidsNrrDeEeeb Resource RidsNrrDssSrxb Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMailCenter Resource
________
RKuntz DBrittner AJones, OGC LLake, RII MSykes, RII TMorrissey, RII RReyes, RI
Crystal River Unit 3 Nuclear Generating Plant cc:
Mr. R. Alexander Glenn Mr. Daniel R. Westcott Associate General Counsel (MAC-BT15A) Supervisor, Licensing & Regulatory Florida Power Corporation Programs P.O. Box 14042 Crystal River Nuclear Plant St. Petersburg, FL 33733-4042 15760 W. Power Line Street Crystal River, FL 34428-6708 Mr. James W. Holt Plant General Manager Senior Resident Inspector Crystal River Nuclear Plant (NA2C) Crystal River Unit 3 15760 W. Power Line Street U.S. Nuclear Regulatory Commission Crystal River, FL 34428-6708 6745 N. Tallahassee Road Crystal River, FL 34428 Mr. William A. Passetti, Chief Department of Health Ms. Phyllis Dixon Bureau of Radiation Control Manager, Nuclear Assessment 2020 Capital Circle, SE, Bin #C21 Crystal River Nuclear Plant (NA2C)
Tallahassee, FL 32399-1741 15760 W. Power Line Street Crystal River, FL 34428-6708 Attorney General Department of Legal Affairs Mr. David T. Conley The Capitol Associate General Counsel II - Legal Dept.
Tallahassee, FL 32304 Progress Energy Service Company, LLC P.O. Box 1551 Mr. Ruben D. Almaguer, Director Raleigh, NC 27602-1551 Division of Emergency Preparedness Department of Community Affairs Mr. Daniel L. Roderick 2740 Centerview Drive Vice President, Nuclear Projects &
Tallahassee, FL 32399-2100 Construction Crystal River Nuclear Plant (SA2C)
Chairman 15760 W. Power Line Street Board of County Commissioners Crystal River, FL 34428-6708 Citrus County 110 North Apopka Avenue Mr. Mark Rigsby Inverness, FL 34450-4245 Manager, Support Services - Nuclear Crystal River Nuclear Plant (SA2C)
Mr. Stephen J. Cahill 15760 W. Power Line Street Engineering Manager Crystal River, FL 34428-6708 Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Mr. Robert J. Duncan II Crystal River, FL 34428-6708 Vice President, Nuclear Operations Progress Energy P.O. Box 1551 Raleigh, NC 27602-1551
Crystal River Unit 3 Nuclear Generating Plant cc:
Mr. Brian C. McCabe Manager, Nuclear Regulatory Affairs Progress Energy P.O. Box 1551 Raleigh, NC 27602-1551
REQUEST FOR ADDITIONAL INFORMATION CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT LICENSE RENEWAL APPLICATION DOCKET NUMBER 50-302 RAI 2.2-01 General Scoping Items
Background:
10 CFR 54.4(a) provides criteria for determining whether systems or components are in scope for license renewal.
Issue:
The Hydrogen Monitoring System is mentioned in the Crystal River Unit 3 Nuclear Generating Plant (CR-3) Final Safety Analysis Report (FSAR) in Section 9.11.2.1.2 and in the CR-3 license renewal application (LRA) in Section 2.3.3.61 under the Post Accident Containment Atmospheric Sampling System (PASS) discussion. In both references, the Hydrogen Monitoring System is noted to share two sampling points with the PASS. No separate scoping discussion or scoping result regarding the Hydrogen Monitoring System is presented in the LRA.
Request:
Explain the exclusion of the Hydrogen Monitoring System from scope of license renewal per 10 CFR 54.4.
RAI 2.2-02 General Scoping Items
Background:
10 CFR 54.4(a) provides criteria for determining whether systems or components are in scope for license renewal.
Issue:
The Auxiliary Feedwater (AFW) System is discussed in the CR-3 FSAR in Section 10.6.
Scoping drawing 302-081-LR, Sheet 4 shows the entire AFW System in scope. LRA Table 2.3.4-8 indicates that the AFW pump, AFW pump bearing cooler housing, and AFW pump bearing cooler tubes are all included in the aging management review (AMR), however no separate discussion for the AFW System is presented in the LRA.
In the CR-3 FSAR, Section 10.6.1, the AFW pump is designed to provide an additional non-safety grade source of secondary cooling to the once-through steam generators (OTSGs),
should a loss of all main and emergency feedwater (EFW) occur. This "AFW source" was added in response to U.S. Nuclear Regulatory Commission (NRC) concerns on the issue of EFW reliability (Generic Issue 124 and SRP Section 10.4.9).
Request:
Provide clarification if the AFW system should or should not be in scope for license renewal. If the AFW system is in scope, provide a discussion of the AFW system similar to those provided in LRA Section 2.3 for other systems including the specific license renewal intended functions in accordance with 10 CFR 54.4 that the AFW system is credited with performing.
ENCLOSURE
RAI 2.2-03 General Scoping Items
Background:
10 CFR 54.4(a) provides criteria for determining whether systems or components are in scope for license renewal.
Issue:
On LRA Figure 2.2-1, CR-3 Plant Structures, the applicant shows structures in light lines, denoting the structure is not in scope of license renewal. Among the structures the applicant depicts as not in scope are the Reactor Building (RB) Maintenance Building and the Health Physics (HP) Office structures. In FSAR Chapter 5, Section 5.1.1.1, the applicant lists Class I structure, system, and components (SSCs). Among the list is the EFW Tank Enclosure, which corresponds to the Dedicated EFW Tank Enclosure Building on LRA Figure 2.2-1. Shown next to this Class I structure, are the RB Maintenance Building and the HP Office. However these structures are shown as not in scope of license renewal. Due to their proximity, these structures could have the potential to interact with the adjacent Class I structure; and if so would be included in scope of license renewal under 10 CFR 54.4(a)(2).
Request:
Explain the exclusion of the RB Maintenance Building and HP Office structures from scope of license renewal per 10 CFR 54.4.
RAI 2.2-04 General Scoping Items
Background:
10 CFR 54.4(a) provides three criteria for determining whether systems or components are in scope for license renewal. The applicant follows their stated methodology to ensure that this regulation is met.
Issue:
In FSAR, Chapter 1, Figure CR3-G86-D, shows an Outage Support Building adjacent to the Borated Water Storage Tank. However, LRA Figure 2.2-1, CR-3 Plant Structures, does not show this structure. Since this structure is adjacent to the Borated Water Storage Tank, which is a Class I structure, it has the potential to interact with the adjacent Class I structure; and if so would be included in scope of license renewal under 10 CFR 54.4(a)(2).
Request:
Explain the exclusion of the Outage Support Building from scope of license renewal per 10 CFR 54.4.
RAI 2.2-05 General Scoping Items
Background:
10 CFR 54.4(a) provides criteria for determining whether systems or components are in scope for license renewal.
Issue:
On LRA Figure 2.2-1, CR-3 Plant Structures, the applicant shows structures in light lines, denoting the structure in not in scope of license renewal. Among the structures the applicant depicts as not in scope are the Traveling Screens. In FSAR Chapter 5, Section 5.1.1.1, Class I, the applicant list Class I SSCs. Among the list is the Nuclear Steam Supply Systems intake structure, which corresponds to the Circulating Water Intake structure on LRA Figure 2.2-1. The traveling screens are a part of this Class I structure; however, they are shown as not in scope of license renewal. Due to their proximity, these traveling screens have the potential to interact with the adjacent Class I structure. Therefore, the traveling screens should be included in the scope of license renewal under 10 CFR 54.4(a)(2). In addition, the travel screens may have a filtering function, which may require them to be in the scope of license renewal.
Request:
Explain the exclusion of the traveling screens from scope of license renewal per 10 CFR 54.4.
RAI 2.2-06 General Scoping Items
Background:
10 CFR 54.4(a) provides criteria for determining whether systems or components are in scope for license renewal.
Issue:
On LRA Figure 2.2-1, CR-3 Plant Structures, the applicant shows structures in dark lines, denoting the structure is in scope of license renewal. Among the structures the applicant depicts as in scope is the Machine Shop. LRA Section 2.4.1.14, Machine Shop, states that the Machine Shop structure intended function is to Provide structural support and/or functional support to non-safety related components. Also, the Machine Shop structure is shown next to Class I structures, Control Building, Auxiliary Building, and Diesel Generator Building. Due to the proximity, the Machine Shop structure has the potential to interact with the adjacent Class I structure; and if so would be included in the scope of license renewal under 10 CFR 54.4(a)(2).
During the CR-3 plant audit on June 23, 2009, the applicant discussed a portion of the machine shop being in scope for license renewal to support the Appendix R equipment on the roof. The applicants reasoning for excluding the remaining support structure of the machine shop from the scope of license renewal is because the failure of the supporting steel would be hypothetical in nature. However, this explanation conflicts with industry operating experience.
In addition, in the FSAR, Section 2.4.2.4, Facilities Required for Flood Protection, the applicant describes equipment required to remain functional during a postulated hurricane to assure maintenance of the reactor in a safe condition. The applicant describes five large doors that have an inflatable-type seal that serves as a back-up in the unlikely event of a compression-type seal failure, one of which describes a water-tight door into the Hot Machine Shop. CR-3 FSAR Figure 2.30 shows water-tight doors, but not the machine shop. It is not clear if this component is physically located in the machine shop structure or other structure.
Request:
Explain the exclusion of portions of the Machine Shop, as discussed during the June 23, 2009 audit, and the Hot Machine Shop structures from scope of license renewal per 10 CFR 54.4.
RAI 2.2-07 General Scoping Items
Background:
10 CFR 54.4(a) provides criteria for determining whether systems or components are in scope for license renewal.
Issue:
In LRA Section 2.2, Table 2.2-1, the applicant lists systems in the scope of license renewal.
The Reactor Building Pressure Sensing and Testing System was listed as not in the scope of license renewal. The applicant does not provide an explicit explanation of what components comprise this system. The applicant did include the Leak Rate Test System in the scope of license renewal, which seems to have the same function as the Reactor Building Pressure Sensing and Testing System. Therefore, the Reactor Building Pressure Sensing and Testing System should be included in scope of license renewal under 10 CFR 54.4.
Request:
Explain the exclusion of the Reactor Building Pressure Sensing and Testing System from scope of license renewal per 10 CFR 54.4.
RAI 2.3.3.33-01 Emergency Diesel Generator System
Background:
10 CFR 54.4(a) provides criteria for determining whether systems or components are in scope for license renewal.
Issue:
The applicant identifies the AFW Pump as being in scope of license renewal and is highlighted as such on LRA drawing 302-081-SH-004. However, the power sources for the AFW pump, the Alternate AC (AAC) diesel and building, are not identified as in scope per LRA Section 2.3.3.33 and structures Table 2.2-2. In the CR-3 FSAR, Section 10.6.1, the AFW pump is designed to provide an additional non-safety grade source of secondary cooling to the OTSGs, should a loss of all main and EFW occur. This "AFW source" was added in response to NRC concerns on the issue of EFW reliability (Generic Issue 124 and SRP Section 10.4.9).
In addition, the AAC may be credited as backup power supply to the emergency diesel generator (EDG) in the event of a loss of all AC. License Amendment 207, regarding technical specification change request for EDG allowed outage time extension (from 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to 14 days), issued June 13, 2003, indicates that AAC Diesel is intended to provide defense in depth during EDG online maintenance and other times when it is available. The AAC Diesel will be capable of carrying the loads required for safe shutdown, including maintaining adequate voltage and frequency such that the performance of safety systems is not degraded. The technical evaluation for this licensing amendment included a probabilistic safety assessment evaluation which incorporated the availability of the AAC Diesel. License Amendment 228, issued on December 26, 2007, by the NRC, involved the measurement uncertainty recapture power uprate, which referenced the AAC Diesel. The applicant noted that the AAC Diesel can be aligned to either safety-related AC distribution bus.
Though it is noted in the CR-3 FSAR that the AAC Diesel does not have a Station Blackout function, it is evidently relied upon in subsequent license amendment requests to provide defense in depth for the Emergency Diesel Generator System. Also, in LRA Figure 2.2-1, CR-3 Plant Structures, the applicant shows structures in light lines, denoting the structure in not in scope of license renewal. Among the structures the applicant depicts as not in scope is the AAC Diesel Generator Building.
Request:
Explain the exclusion of the AAC Diesel System and AAC Diesel Generator Building from scope of license renewal per 10 CFR 54.4.
RAI 2.3.3.35-01 Fuel Handling System
Background:
10 CFR 54.21(a)(1) requires the applicant to provide a list of structures and components subject to an AMR. The staff reviews the LRA, FSAR, and license renewal boundary drawings to verity that list of components provided for each system is complete.
Issue:
LRA Section 2.3.3.35, Fuel Handling System, states: There are no License Renewal scoping drawings that depict the Fuel Handling System. LRA drawing 302-621 depicts the fuel transfer canal (B-2). The CR-3 LRA Table 2.3.3-35 lists piping and components for the Fuel Handling system.
Request:
Verify that LRA drawing 302-621 depicts all the components for the fuel handling system that are in scope and excluded from scope.