Letter Sequence RAI |
|---|
TAC:ME0274, Steam Generator Tube Integrity (Approved, Closed) |
Results
Other: 3F0111-04, Comments on the Safety Evaluation Report with Open Items Related to the License Renewal and Amendment 18, 3F0412-03, Revised Commitment for the Reactor Vessel Internals Aging Management Program for License Renewal and License Renewal Application Amendment 24, 3F1208-02, Systems Drawings Supporting License Renewal, 3F1209-06, License Renewal Application 10 CFR Part 54.21(b) Annual Update, 3F1211-01, License Renewal Application 10 CFR Part 54.21(b), Annual Update, 3F1212-01, License Renewal Application 10 CFR Part 54.21(b) Annual Update, ML090090233, ML090210171, ML091200415, ML091660559, ML091820465, ML092600889, ML092610309, ML093200023, ML100050166, ML110410597, ML11137A009, ML12213A058
|
MONTHYEAR3F1208-02, Systems Drawings Supporting License Renewal2008-12-16016 December 2008 Systems Drawings Supporting License Renewal Project stage: Other ML0900902332009-02-27027 February 2009 Determination of Acceptability and Sufficiency for Docketing, and Opportunity for a Hearing Regarding the Application from Florida Power Corp., for Renewal of the Operating License for Crystal River Unit 3 Nuclear Generating Plant Project stage: Other ML0902101712009-02-27027 February 2009 Notice of Opportunity for Hearing Regarding Renewal of Facility Operating License No. DPR-72 for an Additional 20-year Period Florida Power Corporation Corporation Crystal River Unit 3 Nuclear Generating Plant Docket No. 50-302 Project stage: Other ML0908501762009-04-20020 April 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application Project stage: RAI 3F0509-01, Response to Request for Additional Information for the Review of the License Renewal Application2009-05-11011 May 2009 Response to Request for Additional Information for the Review of the License Renewal Application Project stage: Response to RAI ML0912004152009-05-22022 May 2009 Proposed Review Schedule Regarding the Application from Florida Power Corporation for Renewal of the Operating License for Crystal River Unit 3 Nuclear Generating Plant Project stage: Other 3F0509-07, License Amendment Request 303, Revision 1, Supplement 1: Revision to Final Safety Analysis Report Sections 5.4.3, Structural Design Criteria, and 5.4.5.3, Missile Analysis, Response to Request for Additional Information2009-05-22022 May 2009 License Amendment Request 303, Revision 1, Supplement 1: Revision to Final Safety Analysis Report Sections 5.4.3, Structural Design Criteria, and 5.4.5.3, Missile Analysis, Response to Request for Additional Information Project stage: Supplement ML0918204652009-07-0808 July 2009 Plan for the Aging Management Program Regulatory Audit Regarding the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application Review Project stage: Other ML0916605592009-07-30030 July 2009 Audit Report Regarding the LRA for the Crystal River, Unit 3 Project stage: Other ML0917400702009-08-0303 August 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application Project stage: RAI ML0920800452009-08-14014 August 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application Project stage: RAI ML0920302082009-08-14014 August 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application Project stage: RAI ML0922507012009-08-20020 August 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application Project stage: RAI ML0920200122009-08-20020 August 2009 RAI, License Renewal Application Project stage: RAI ML0923303432009-08-31031 August 2009 Nuclear Generating Plant, RAI, License Renewal Application Project stage: RAI ML0923308312009-08-31031 August 2009 Request for Additional Information Regarding License Renewal Application Project stage: RAI ML0923300072009-08-31031 August 2009 RAI for the Review of the Crystal River Unit 3 Nuclear Generating Plant, LRA Project stage: RAI ML0923309042009-09-0202 September 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application Project stage: RAI 3F0909-02, Response to Request for Additional Information for the Review of the License Renewal Application2009-09-11011 September 2009 Response to Request for Additional Information for the Review of the License Renewal Application Project stage: Response to RAI ML0926008892009-09-11011 September 2009 Areva Np, Inc., 51-9057252-001, Rev. 1, CR3 Reconciliation of 60-Year Fluence Projections Used in Reactor Vessel Beltline Embrittlement Calculations for License Renewal, Enclosure Attachment 3 Project stage: Other ML0921602132009-09-11011 September 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application Project stage: RAI 3F0909-03, Response to Requests for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application (TAC No. ME0274) and Amendment 22009-09-11011 September 2009 Response to Requests for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application (TAC No. ME0274) and Amendment 2 Project stage: Response to RAI 3F0909-04, Response to Requests for Additional Information for the Review of the License Renewal Application and Amendment 32009-09-18018 September 2009 Response to Requests for Additional Information for the Review of the License Renewal Application and Amendment 3 Project stage: Response to RAI ML0923706692009-09-22022 September 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Unit Plant, License Renewal Application Project stage: RAI ML0926103092009-09-29029 September 2009 Scoping and Screening Audit Report Regarding the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application Project stage: Other 3F0909-06, Response to Requests for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application (TAC ME0274) and Amendment 42009-09-30030 September 2009 Response to Requests for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application (TAC ME0274) and Amendment 4 Project stage: Response to RAI 3F1009-06, Response to Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application (TAC No. ME0274) - Sections B.2.37-1, 3.3.2.2, and XI.S82009-10-0202 October 2009 Response to Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application (TAC No. ME0274) - Sections B.2.37-1, 3.3.2.2, and XI.S8 Project stage: Response to RAI 3F1009-07, Response to Request for Additional Information for the Review of Unit 3 Nuclear Generating Plant License Renewal Application and Amendment 52009-10-13013 October 2009 Response to Request for Additional Information for the Review of Unit 3 Nuclear Generating Plant License Renewal Application and Amendment 5 Project stage: Response to RAI ML0926405542009-10-15015 October 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application Project stage: RAI 3F1009-08, Response to Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application (TAC No. ME0274) - and Amendment 62009-10-22022 October 2009 Response to Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application (TAC No. ME0274) - and Amendment 6 Project stage: Response to RAI ML0929606602009-10-27027 October 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application Project stage: RAI ML0929403222009-11-0303 November 2009 Request for Additional Information for the Review of the Crystal River, Unit 3 Nuclear Generating Plant, License Renewal Application Project stage: RAI 3F1109-05, Response to Request for Additional Information for Review of License Renewal Application, Section 2.32009-11-12012 November 2009 Response to Request for Additional Information for Review of License Renewal Application, Section 2.3 Project stage: Response to RAI ML0932305592009-11-30030 November 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application Project stage: RAI ML0930301472009-12-0101 December 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Review Application Project stage: RAI 3F1209-03, Response to Request for Additional Information for the Review of the License Renewal Application2009-12-0303 December 2009 Response to Request for Additional Information for the Review of the License Renewal Application Project stage: Response to RAI ML0932704962009-12-10010 December 2009 Areva Np, Inc. - Request for Withholding Information from Public Disclosure for Crystal River Unit 3 Nuclear Generating Plant Project stage: Withholding Request Acceptance ML0933102952009-12-10010 December 2009 Areva Np, Inc.- Request for Withholding Information from Public Disclosure for Crystal River Unit 3 Nuclear Generating Plant Project stage: Withholding Request Acceptance 3F1209-06, License Renewal Application 10 CFR Part 54.21(b) Annual Update2009-12-14014 December 2009 License Renewal Application 10 CFR Part 54.21(b) Annual Update Project stage: Other ML0932000232009-12-14014 December 2009 AMP Audit Report Regarding the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application Project stage: Other 3F1209-11, 10 CFR 50.46 Loss-of-Coolant Accident Evaluation Model Change and Peak Cladding Temperature Change Report2009-12-16016 December 2009 10 CFR 50.46 Loss-of-Coolant Accident Evaluation Model Change and Peak Cladding Temperature Change Report Project stage: Request 3F1209-12, Response to Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application (TAC No. ME0274) and Amendment 82009-12-30030 December 2009 Response to Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application (TAC No. ME0274) and Amendment 8 Project stage: Response to RAI ML1000501662010-01-25025 January 2010 Revised Review Schedule Regarding the Application from Florida Power Corporation for Renewal of the Operating License for Crystal River Unit 3 Nuclear Generating Plant Project stage: Other 3F0110-04, Response to Request for Additional Information for the Review of the License Renewal Application & Amendment 92010-01-27027 January 2010 Response to Request for Additional Information for the Review of the License Renewal Application & Amendment 9 Project stage: Response to RAI ML1001000102010-02-0202 February 2010 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application Project stage: RAI 3F0310-01, Response to Request for Additional Information for Review of License Renewal Application and Amendment 102010-03-0303 March 2010 Response to Request for Additional Information for Review of License Renewal Application and Amendment 10 Project stage: Response to RAI ML1011302232010-05-21021 May 2010 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application Project stage: RAI ML1014105122010-06-0202 June 2010 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application Project stage: RAI 3F0610-02, Response to Requests for Additional Information for the Review of License Renewal Application (TAC No. ME0274) and Amendment 112010-06-21021 June 2010 Response to Requests for Additional Information for the Review of License Renewal Application (TAC No. ME0274) and Amendment 11 Project stage: Response to RAI ML1017404972010-07-0808 July 2010 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application Project stage: RAI 2009-07-30
[Table View] |
Text
0'1.;
t."'~ REGlj<..,
UNITED STATES NUCLEAR REGULATORY COMMISSION
"~"'~;'O1
~
WASHINGTON, D.C. 20555-0001 g
I-
~
<J)
~
~
June 30, 2011 y:
~
0'"
~
JII.***i' Mr. Jon Franke, Vice President Crystal River Nuclear Plant (NA 1 B)
ATTN: Supervisor, licensing & Regulatory Programs 15760 W. Power Line Street Crystal River, FL 34428-6708
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT, LICENSE RENEWAL APPLICATION (TAC NO. ME0274)
Dear Mr. Franke:
By letter dated December 16, 2009, Florida Power Corporation submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54, to renew the operating license for Crystal River Unit 3 Nuclear Generating Plant. The U.S. Nuclear Regulatory Commission staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review. Further requests for additional information may be issued in the future.
Items in the enclosure were discussed with Mr. Michael Heath, and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-3733 or bye-mail robert.kuntz@nrc.gov.
~
Robert F. Kuntz, Sr. Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-302
Enclosure:
As stated cc w/encl: Listserv
REQUEST FOR ADDITIONAL INFORMATION LICENSE RENEWAL APPLICATION FOR CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT DOCKET NO. 50-302 RAI8.1.4-1
Background
Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 54.21(a)(3), a license renewal applicant is required to demonstrate that the effects of aging on structures and components subject to an aging management review are adequately managed so that their intended functions will be maintained consistent with the current licensing basis for the period of extended operation. Section 3.0.1 of NUREG-1800, "Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants," Revision 2 (SRP-LR), defines an aging management review as the identification of the materials, environments, aging effects, and aging management programs (AMPs) credited for managing the aging effects. In turn, SRP-LR Section A.1.2.3 defines an acceptable AMP as consisting of ten elements. Element 10, "Operating Experience," in part, is described in SRP-LR Section A.1.2.3.1 0, paragraph 1, as follows:
Consideration of future plant-specific and industry operating experience relating to aging management programs should be discussed. Reviews of operating experience by the applicant in the future may identify areas where aging managernent programs should be enhanced or new programs developed. An applicant should commit to a future review of plant-specific and industry operating experience to confirm the effectiveness of its aging management programs or indicate a need to develop new aging management programs (emphasis added). This information should provide objective evidence to support the conclusion that the effects of aging will be managed adequately so that the structure and component intended function(s) will be maintained during the period of extended operation.
In addition, 10 CFR 54.21 (d) requires the application to contain a final safety analysis report (FSAR) supplement. This supplement must contain a summary description of the programs and activities for managing the effects of aging and the evaluation of time-limited aging analyses for the period of extended operation.
Based on its review of the Crystal River Unit 3 Nuclear Generating Plant license renewal application (LRA), the U.S. Nuclear Regulatory Commission (NRC or the staff) determined that Section B.1.4 provides a general description of how Florida Power Corporation (the applicant) gathered and considered operating experience in preparing its LRA, and Sections B.2.1 through B.2.38, B.3.1, and B.3.2 summarize the specific operating experience considered for each AMP.
ENCLOSURE
- 2 Issue:
Although LRA Sections B.1.4, B.2.1 through B.2.38, B.3.1, and B.3.2 describe how the applicant incorporated operating experience into its AMPs, they do not fully describe how the applicant will use future operating experience to ensure that the AMPs will remain effective for managing the aging effects during the period of extended operation. Many of the program descriptions contain statements indicating that future operating experience will be used to adjust the programs as appropriate; however, the details of this process are not fully described. Also, some program descriptions contain no such statements and, for these AMPs, it is not clear whether the applicant currently has or intends to implement actions to monitor operating experience on an ongoing basis and use it to ensure the continued effectiveness of the AMPs.
In addition, the LRA does not state whether new AMPs will be developed, as necessary.
Further, none of the AMP descriptions provide the staff reasonable assurance that ongoing operating experience reviews will continue to inform AMP updates for license renewal.
Request:
Describe the programmatic activities that will be used to continually identify aging issues, evaluate them, and, as necessary, enhance the AMPs or develop new AMPs for license renewal. In this description, address the following:
- Describe the sources of plant-specific and industry operating experience that are monitored on an ongoing basis to identify potential aging issues. Indicate whether these plant-specific sources require monitoring: corrective action program, system health reports, licensee event reports (LERs), and the results of inspections performed under the AMPs. Similarly, indicate whether these industry sources require monitoring: vendor recommendations, revisions to industry standards on which the AMPs are based, LERs from other plants, NRC Bulletins, Generic Letters, Regulatory Issue Summaries, Information Notices, Regulatory Guides, License Renewal Interim Staff Guidance, and revisions to NUREG-1801, "Generic Aging Lessons Learned (GALL) Report." Describe the criteria used to classify a particular piece of information as aging related and outline the training provided to plant personnel so that they can adequately make such classifications.
- Describe how the identified aging issues are further evaluated to determine their potential impact on the plant aging management activities. Indicate whether the affected structures and components and their materials, environments, aging effects, aging mechanisms, and AMPs are identified and documented consistent with the methods used to prepare the LRA. Describe how the results of AMP inspections are considered to adjust the frequency of future inspections, establish new inspections, and ensure an adequate depth and breadth of component, material, environment, and aging effect combinations. Describe the records of these evaluations and indicate whether they are maintained in an auditable and retrievable form.
- Describe the process and criteria used to ensure that the identified enhancements are implemented in a timely manner.
- 3 Describe the administrative controls over these programmatic activities.
Provide a summary description of these activities for the FSAR supplement required by 10 CFR 54.21(d). If enhancements for license renewal are necessary, also provide the updates for the FSAR supplement.
If such an operating experience program is determined to be unnecessary, provide a detailed explanation of the bases for this determination.
June 30, 2011 Mr. Jon Franke, Vice President Crystal River Nuclear Plant (NA 1 B)
ATTN: Supervisor, Licensing & Regulatory Programs 15760 W. Power Line Street Crystal River, FL 34428-6708
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT, LICENSE RENEWAL APPLICATION (TAC NO. ME0274)
Dear Mr. Franke:
By letter dated December 16, 2009, Florida Power Corporation submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54, to renew the operating license for Crystal River Unit 3 Nuclear Generating Plant. The U.S. Nuclear Regulatory Commission staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review. Further requests for additional information may be issued in the future.
Items in the enclosure were discussed with Mr. Michael Heath, and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-3733 or bye-mail robert.kuntz@nrc.gov.
Sincerely, IRA! by Lisa M. Regner for Robert F. Kuntz, Sr. Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-302
Enclosure:
As stated cc w/encl: Listserv DISTRIBUTION: See next page ADAMS Accession No.: ML11175A151
- concurrence via e-mail OFFICE LA: DLR*
PM: DLR/RPB2 BC:DLR/RPB2 LA: DLR*
PM:DLRlRPB2 NAME SFigueroa RKuntz DWrona SFigueroa RKuntz (LRegner for)
DATE 06/27/2011 06/29/2011 06/29/2011 06/29/2011 06/30/2011 OFFICIAL RECORD COpy
Letter to Jon Franke from Robert F. Kuntz dated June 30,2011
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT, LICENSE RENEWAL APPLICATION (TAC NO. ME0274)
DISTRIBUTION:
HARDCOPY:
DLR RtF E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRapb Resource RidsNrrDlrRerb Resource RidsNrrDIrRpob Resource RidsNrrDciCvib Resource RidsNrrDciCpnb Resource RidsNrrDciCsgb Resource RidsNrrDraAfpb Resource RidsNrrDraApla Resource RidsNrrDeEmcb Resource RidsNrrDeEeeb Resource RidsNrrDssSrxb Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMailCenter Resource EKeegan AJones,OGC LLake, RII MSykes, RII TMorrissey, RII RReyes, RI