ML110600406

From kanterella
Jump to navigation Jump to search

Response to Request for Additional Information Associated with Open Item 3.5-1 from the Safety Evaluation Report with Open Items Related to the License Renewal
ML110600406
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 02/25/2011
From: Franke J
Progress Energy Florida
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
3F0211-03, TAC ME0274
Download: ML110600406 (6)


Text

Progress Energy Crystal River Nuclear Plant Docket No. 50-302 Operating License No. DPR-72 Ref: 10 CFR 54 February 25, 2011 3F0211-03 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Crystal River Unit 3 - Response to Request for Additional Information Associated with Open Item 3.5-1 from the Safety Evaluation Report with Open Items Related to the License Renewal of Crystal River Unit 3 Nuclear Generating Plant (TAC NO. ME0274)

References:

(1) CR-3 to NRC letter, 3F1208-01, dated December 16, 2008, "Crystal River Unit 3 - Application for Renewal of Operating License" (2) NRC to CR-3 letter, dated December 14, 2010, "Safety Evaluation Report with Open Items Related to the License Renewal of Crystal River Unit 3 Nuclear Generating Plant (TAC NO. ME0274)"

Dear Sir:

On December 16, 2008, Florida Power Corporation (FPC), doing business as Progress Energy Florida, Inc. (PEF), requested renewal of the operating license for Crystal River Unit 3 (CR-3) to extend the term of its operating license an additional 20 years beyond the current expiration date (Reference 1). Subsequently, the Nuclear Regulatory Commission (NRC), by letter dated December 14, 2010, issued a Safety Evaluation Report (SER) with open items related to the license renewal of CR-3 (Reference 2). On January 27, 2011, a telephone conference was held between the NRC staff and PEF license renewal personnel to discuss Open Item 3.5-1, Reactor Building Delamination. The discussion focused on the CR-3 schedule of monitoring and testing that will be performed to ensure that the Reactor Building concrete delamination has been adequately repaired. CR-3 agreed to provide the current schedule for the Reactor Building testing activities. The Enclosure to this submittal contains the requested summary schedule.

No new regulatory commitments are contained in this submittal. The current summary schedule for Reactor Building testing, monitoring and examination contained in the Enclosure to this submittal is being provided for information only and is subject to change.

If you have any questions regarding this submittal, please contact Mr. Mike Heath, Supervisor, License Renewal, at (910) 457-3487, e-mail at mike.heath@pgnmail.com.

cere Y

J 6~a n e ice President Crystal River Unit 3 JAF/dwh

Enclosure:

Crystal River Unit 3 - Current Schedule for Reactor Building Testing, Monitoring, and Examination (as of 02/22/2011) xc: NRC CR-3 Project Manager NRC License Renewal Project Manager NRC Regional Administrator, Region II Senior Resident Inspector Progress Energy Florida, Inc. AC '/

Crystal River Nuclear Plant 15760 W. Power Line Street Crystal River, FL 34428

U. S. Nuclear Regulatory Commission Page 2 of 2 3F0211-03 STATE OF FLORIDA COUNTY OF CITRUS Jon A. Franke states that he is the Vice President, Crystal River Nuclear Plant for Florida Power Corporation, doing business as Progress Energy Florida, Inc.; that he is authorized on the part of said company to sign and file with the Nuclear Regulatory Commission the information attached hereto; and that all such statements made and matters set forth therein are true and correct to the best of his knowledge, information, and belief.

Jo . Franke ice President Crystal River Nuclear Plant The foregoing document was acknowledged before me this ____- day of R _5__________ 2011, by Jon A. Franke.

Signature of Notary Public State of Florida NOTARY PUBLIC-STATE OF FLORIDA Sheryl M. McCullough Commission # EE011293

. Expires: JULY 25, 2014 BONDED TtiRU ATLANnIC BONDING CO., INC, (Print, type, or stamp Commissioned Name of Notary Public)

Personally Produced Known _ / -OR- Identification

PROGRESS ENERGY FLORIDA, INC.

CRYSTAL RIVER UNIT 3 DOCKET NUMBER 50 - 302 / LICENSE NUMBER DPR - 72 ENCLOSURE CRYSTAL RIVER UNIT 3 - CURRENT SCHEDULE FOR REACTOR BUILDING TESTING, MONITORING, AND EXAMINATION (AS OF 02/22/2011)