Letter Sequence Other |
|---|
TAC:ME0274, Steam Generator Tube Integrity (Approved, Closed) |
Results
Other: 3F0111-04, Comments on the Safety Evaluation Report with Open Items Related to the License Renewal and Amendment 18, 3F0412-03, Revised Commitment for the Reactor Vessel Internals Aging Management Program for License Renewal and License Renewal Application Amendment 24, 3F1208-02, Systems Drawings Supporting License Renewal, 3F1209-06, License Renewal Application 10 CFR Part 54.21(b) Annual Update, 3F1211-01, License Renewal Application 10 CFR Part 54.21(b), Annual Update, 3F1212-01, License Renewal Application 10 CFR Part 54.21(b) Annual Update, ML090090233, ML090210171, ML091200415, ML091660559, ML091820465, ML092600889, ML092610309, ML093200023, ML100050166, ML110410597, ML11137A009, ML12213A058
|
MONTHYEAR3F1208-02, Systems Drawings Supporting License Renewal2008-12-16016 December 2008 Systems Drawings Supporting License Renewal Project stage: Other ML0900902332009-02-27027 February 2009 Determination of Acceptability and Sufficiency for Docketing, and Opportunity for a Hearing Regarding the Application from Florida Power Corp., for Renewal of the Operating License for Crystal River Unit 3 Nuclear Generating Plant Project stage: Other ML0902101712009-02-27027 February 2009 Notice of Opportunity for Hearing Regarding Renewal of Facility Operating License No. DPR-72 for an Additional 20-year Period Florida Power Corporation Corporation Crystal River Unit 3 Nuclear Generating Plant Docket No. 50-302 Project stage: Other ML0908501762009-04-20020 April 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application Project stage: RAI 3F0509-01, Response to Request for Additional Information for the Review of the License Renewal Application2009-05-11011 May 2009 Response to Request for Additional Information for the Review of the License Renewal Application Project stage: Response to RAI ML0912004152009-05-22022 May 2009 Proposed Review Schedule Regarding the Application from Florida Power Corporation for Renewal of the Operating License for Crystal River Unit 3 Nuclear Generating Plant Project stage: Other 3F0509-07, License Amendment Request 303, Revision 1, Supplement 1: Revision to Final Safety Analysis Report Sections 5.4.3, Structural Design Criteria, and 5.4.5.3, Missile Analysis, Response to Request for Additional Information2009-05-22022 May 2009 License Amendment Request 303, Revision 1, Supplement 1: Revision to Final Safety Analysis Report Sections 5.4.3, Structural Design Criteria, and 5.4.5.3, Missile Analysis, Response to Request for Additional Information Project stage: Supplement ML0918204652009-07-0808 July 2009 Plan for the Aging Management Program Regulatory Audit Regarding the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application Review Project stage: Other ML0916605592009-07-30030 July 2009 Audit Report Regarding the LRA for the Crystal River, Unit 3 Project stage: Other ML0917400702009-08-0303 August 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application Project stage: RAI ML0920800452009-08-14014 August 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application Project stage: RAI ML0920302082009-08-14014 August 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application Project stage: RAI ML0922507012009-08-20020 August 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application Project stage: RAI ML0920200122009-08-20020 August 2009 RAI, License Renewal Application Project stage: RAI ML0923303432009-08-31031 August 2009 Nuclear Generating Plant, RAI, License Renewal Application Project stage: RAI ML0923308312009-08-31031 August 2009 Request for Additional Information Regarding License Renewal Application Project stage: RAI ML0923300072009-08-31031 August 2009 RAI for the Review of the Crystal River Unit 3 Nuclear Generating Plant, LRA Project stage: RAI ML0923309042009-09-0202 September 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application Project stage: RAI 3F0909-02, Response to Request for Additional Information for the Review of the License Renewal Application2009-09-11011 September 2009 Response to Request for Additional Information for the Review of the License Renewal Application Project stage: Response to RAI ML0926008892009-09-11011 September 2009 Areva Np, Inc., 51-9057252-001, Rev. 1, CR3 Reconciliation of 60-Year Fluence Projections Used in Reactor Vessel Beltline Embrittlement Calculations for License Renewal, Enclosure Attachment 3 Project stage: Other ML0921602132009-09-11011 September 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application Project stage: RAI 3F0909-03, Response to Requests for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application (TAC No. ME0274) and Amendment 22009-09-11011 September 2009 Response to Requests for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application (TAC No. ME0274) and Amendment 2 Project stage: Response to RAI 3F0909-04, Response to Requests for Additional Information for the Review of the License Renewal Application and Amendment 32009-09-18018 September 2009 Response to Requests for Additional Information for the Review of the License Renewal Application and Amendment 3 Project stage: Response to RAI ML0923706692009-09-22022 September 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Unit Plant, License Renewal Application Project stage: RAI ML0926103092009-09-29029 September 2009 Scoping and Screening Audit Report Regarding the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application Project stage: Other 3F0909-06, Response to Requests for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application (TAC ME0274) and Amendment 42009-09-30030 September 2009 Response to Requests for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application (TAC ME0274) and Amendment 4 Project stage: Response to RAI 3F1009-06, Response to Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application (TAC No. ME0274) - Sections B.2.37-1, 3.3.2.2, and XI.S82009-10-0202 October 2009 Response to Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application (TAC No. ME0274) - Sections B.2.37-1, 3.3.2.2, and XI.S8 Project stage: Response to RAI 3F1009-07, Response to Request for Additional Information for the Review of Unit 3 Nuclear Generating Plant License Renewal Application and Amendment 52009-10-13013 October 2009 Response to Request for Additional Information for the Review of Unit 3 Nuclear Generating Plant License Renewal Application and Amendment 5 Project stage: Response to RAI ML0926405542009-10-15015 October 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application Project stage: RAI 3F1009-08, Response to Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application (TAC No. ME0274) - and Amendment 62009-10-22022 October 2009 Response to Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application (TAC No. ME0274) - and Amendment 6 Project stage: Response to RAI ML0929606602009-10-27027 October 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application Project stage: RAI ML0929403222009-11-0303 November 2009 Request for Additional Information for the Review of the Crystal River, Unit 3 Nuclear Generating Plant, License Renewal Application Project stage: RAI 3F1109-05, Response to Request for Additional Information for Review of License Renewal Application, Section 2.32009-11-12012 November 2009 Response to Request for Additional Information for Review of License Renewal Application, Section 2.3 Project stage: Response to RAI ML0932305592009-11-30030 November 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application Project stage: RAI ML0930301472009-12-0101 December 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Review Application Project stage: RAI 3F1209-03, Response to Request for Additional Information for the Review of the License Renewal Application2009-12-0303 December 2009 Response to Request for Additional Information for the Review of the License Renewal Application Project stage: Response to RAI ML0932704962009-12-10010 December 2009 Areva Np, Inc. - Request for Withholding Information from Public Disclosure for Crystal River Unit 3 Nuclear Generating Plant Project stage: Withholding Request Acceptance ML0933102952009-12-10010 December 2009 Areva Np, Inc.- Request for Withholding Information from Public Disclosure for Crystal River Unit 3 Nuclear Generating Plant Project stage: Withholding Request Acceptance 3F1209-06, License Renewal Application 10 CFR Part 54.21(b) Annual Update2009-12-14014 December 2009 License Renewal Application 10 CFR Part 54.21(b) Annual Update Project stage: Other ML0932000232009-12-14014 December 2009 AMP Audit Report Regarding the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application Project stage: Other 3F1209-11, 10 CFR 50.46 Loss-of-Coolant Accident Evaluation Model Change and Peak Cladding Temperature Change Report2009-12-16016 December 2009 10 CFR 50.46 Loss-of-Coolant Accident Evaluation Model Change and Peak Cladding Temperature Change Report Project stage: Request 3F1209-12, Response to Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application (TAC No. ME0274) and Amendment 82009-12-30030 December 2009 Response to Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application (TAC No. ME0274) and Amendment 8 Project stage: Response to RAI ML1000501662010-01-25025 January 2010 Revised Review Schedule Regarding the Application from Florida Power Corporation for Renewal of the Operating License for Crystal River Unit 3 Nuclear Generating Plant Project stage: Other 3F0110-04, Response to Request for Additional Information for the Review of the License Renewal Application & Amendment 92010-01-27027 January 2010 Response to Request for Additional Information for the Review of the License Renewal Application & Amendment 9 Project stage: Response to RAI ML1001000102010-02-0202 February 2010 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application Project stage: RAI 3F0310-01, Response to Request for Additional Information for Review of License Renewal Application and Amendment 102010-03-0303 March 2010 Response to Request for Additional Information for Review of License Renewal Application and Amendment 10 Project stage: Response to RAI ML1011302232010-05-21021 May 2010 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application Project stage: RAI ML1014105122010-06-0202 June 2010 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application Project stage: RAI 3F0610-02, Response to Requests for Additional Information for the Review of License Renewal Application (TAC No. ME0274) and Amendment 112010-06-21021 June 2010 Response to Requests for Additional Information for the Review of License Renewal Application (TAC No. ME0274) and Amendment 11 Project stage: Response to RAI ML1017404972010-07-0808 July 2010 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application Project stage: RAI 2009-07-30
[Table View] |
Text
July 30, 2009 Mr. Dale E. Young, Vice President Crystal River Nuclear Plant (NA1B)
ATTN: Supervisor, Licensing & Regulatory Programs 15760 W. Power Line Street Crystal River, FL 34428-6708
SUBJECT:
AUDIT REPORT REGARDING THE LICENSE RENEWAL APPLICATION FOR THE CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT (TAC NO.
ME0274)
Dear Mr. Young:
By letter dated December 16, 2008, Florida Power Corporation, submitted an application for review by the U.S. Nuclear Regulatory Commission (NRC) pursuant to Title 10 of the Code of Federal Regulations Part 54 (10 CFR Part 54) to renew the operating license for the Crystal River Unit 3 Nuclear Generating Plant (CR-3). On May 18, 2009, the NRC completed an audit of the CR-3 fluence calculations summarized in the license renewal application. The audit report is enclosed.
If you have any questions, please contact me at 301-415-3733 or by e-mail at robert.kuntz@nrc.gov.
/RA/
Robert F. Kuntz, Sr. Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulations Docket No. 50-302
Enclosure:
As stated cc w/encl: See next page
ML091660559 OFFCIE PM:RPB2:DLR LA:DLR BC:RPB2:DLR PM:RPB2:DLR NAME RKuntz IKing DWrona RKuntz (Signaure)
DATE 06/18/09 06/18/09 07/29/09 07/30/09
Letter to D. Young from R. Kuntz, dated July 30, 2009 DISTRIBUTION:
SUBJECT:
AUDIT REPORT REGARDING THE LICENSE RENEWAL APPLICATION FOR THE CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT (TAC NO.
ME0274)
HARD COPY:
DLR RF E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRer1 Resource RidsNrrDlrRer2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsNrrDciCvib Resource RidsNrrDciCpnb Resource RidsNrrDciCsgb Resource RidsNrrDraAfpb Resource RidsNrrDraApla Resource RidsNrrDeEmcb Resource RidsNrrDeEeeb Resource RidsNrrDssSrxb Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMailCenter RKuntz DBrittner AJones, OGC LLake, RII MSykes, RII TMorrissey, RII RReyes, RI
Crystal River Nuclear Generating Plant, Unit 3 cc:
Mr. R. Alexander Glenn Associate General Counsel (MAC-BT15A)
Florida Power Corporation P.O. Box 14042 St. Petersburg, FL 33733-4042 Mr. James W. Holt Plant General Manager Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, FL 34428-6708 Mr. William A. Passetti, Chief Department of Health Bureau of Radiation Control 2020 Capital Circle, SE, Bin #C21 Tallahassee, FL 32399-1741 Attorney General Department of Legal Affairs The Capitol Tallahassee, FL 32304 Mr. Craig Fugate, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, FL 32399-2100 Chairman Board of County Commissioners Citrus County 110 North Apopka Avenue Inverness, FL 34450-4245 Mr. Stephen J. Cahill Engineering Manager Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, FL 34428-6708 Mr. Daniel R. Westcott Supervisor, Licensing & Regulatory Programs Crystal River Nuclear Plant 15760 W. Power Line Street Crystal River, FL 34428-6708 Mr. Jon A. Franke Director Site Operations Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, FL 34428-6708 Senior Resident Inspector Crystal River Unit 3 U.S. Nuclear Regulatory Commission 6745 N. Tallahassee Road Crystal River, FL 34428 Ms. Phyllis Dixon Manager, Nuclear Assessment Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, FL 34428-6708 Mr. David T. Conley Associate General Counsel II - Legal Dept.
Progress Energy Service Company, LLC P.O. Box 1551 Raleigh, NC 27602-1551 Mr. Daniel L. Roderick Vice President, Nuclear Projects &
Construction Crystal River Nuclear Plant (SA2C) 15760 W. Power Line Street Crystal River, FL 34428-6708 Mr. Mark Rigsby Manager, Support Services - Nuclear Crystal River Nuclear Plant (SA2C) 15760 W. Power Line Street Crystal River, FL 34428-6708 Mr. Robert J. Duncan II Vice President, Nuclear Operations Progress Energy P.O. Box 1551 Raleigh, NC 27602-1551 Mr. Brian C. McCabe Manager, Nuclear Regulatory Affairs Progress Energy P.O. Box 1551 Raleigh, NC 27602-1551
ENCLOSURE U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION - DIVISION OF LICENSE RENEWAL AUDIT REPORT REGARDING THE LICENSE RENEWAL APPLICATION FOR CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT Docket No:
50-302 License No:
DPR-72 Licensee:
Florida Power Corporation Location of Audit:
AREVA Offices Bethesda, MD Dates:
May 18, 2009 NRC Staff:
B. Parks, Reactor System Engineer, DSS Licensee Staff:
M. Heath, License Renewal Project Manager, Progress Energy C. Mallner, Progress Energy G. Elliot, AREVA M. Miller, AREVA Approved By:
David J. Wrona, Chief Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Introduction By letter dated December 16, 2008, Florida Power Corporation, doing business as Progress Energy Florida, submitted a request for a renewed operating license for Crystal River Unit 3 Nuclear Generating Plant. Section 4.2 of the license renewal application discusses calculations performed to estimate the neutron fluence on the reactor vessel throughout the period of extended operation. The applicant stated that fluence calculations were performed using an NRC-approved methodology that is in adherence to the guidelines set forth in Regulatory Guide (RG) 1.190, Calculational and Dosimetry Techniques for Determining Pressure Vessel Neutron Fluence.
The NRC staff audited the applicants fluence calculations to verify that the calculations were performed as described.
Regulatory Audit Bases The NRC has promulgated regulations that govern the issuance of renewed operating licenses and renewed combined licenses for nuclear power plants licensed pursuant to Sections 103 or 104b of the Atomic Energy Act of 1954, as amended, and Title II of the Energy Reorganization Act of 1974. These regulations are contained in Part 54 of Title 10 of the Code of Federal Regulations (10 CFR 54). Specifically, 10 CFR 54.21(c) requires an evaluation of time-limited aging analyses (TLAAs) to be provided. 10 CFR 54.3 defines the TLAAs, and 10 CFR 54.21(c) further provides the requirements for the TLAAs.
Among the categories of applicable TLAAs, the applicant has identified reactor vessel neutron embrittlement as one such category. The neutron embrittlement analyses are supported by unit-specific fluence calculations, which are discussed in Section 4.2.1 of the license renewal application. The licensee states that the calculations are performed to be consistent with the guidance contained in RG 1.190.
RG 1.190 describes methods and assumptions acceptable to the NRC staff for determining the pressure vessel neutron fluence with respect to the General Design Criteria (GDC) contained in Appendix A to 10 CFR 50. By considering the applicable GDC, the NRC staff establishes that the neutron fluence calculation adequately supports the reactor vessel neutron embrittlement analyses, such that compliance with 10 CFR 54.21(c)(1) can be determined. In this case, the audit establishes that the licensees neutron fluence calculations, which provide input to the neutron embrittlement-related, TLAAs, remain valid for the period of extended operation, thus demonstrating compliance with 10 CFR 54.21(c)(1)(i) as it pertains to the reactor vessel fluence calculation.
In consideration of the guidance set forth in RG 1.190, the following are applicable: GDC 14, Reactor Coolant Pressure Boundary, GDC 30, Quality of Reactor Coolant Pressure Boundary, and GDC 31, Fracture Prevention of Reactor Coolant Pressure Boundary. GDC 14 requires the design, fabrication, erection, and testing of the reactor coolant pressure boundary so as to have an extremely low probability of abnormal leakage, of rapidly propagating failure, and of gross rupture. GDC 30 requires, among other things, that components comprising the reactor coolant pressure boundary be designed, fabricated, erected, and tested to the highest quality standards practical. GDC 31, which pertains to the design of the reactor coolant pressure boundary, states that:
The reactor coolant pressure boundary shall be designed with sufficient margin to assure that when stressed under operating, maintenance, testing, and postulated accident conditions, (1) the boundary behaves in a nonbrittle manner and (2) the probability of rapidly propagating fracture is minimized. The design shall reflect consideration of service temperatures and other conditions of the boundary material under operating maintenance, testing and postulated accident conditions and the uncertainties in determining (1) material properties, (2) the effects of irradiation on material properties, (3) residual, steady state and transient stresses, and (4) size of flaws.
Regulatory Audit Scope The scope of this audit activity was limited to an examination of the calculation notebook that documents the reactor vessel neutron fluence calculations performed to support the period of extended operation.
Summary of Regulatory Audit The NRC staff reviewed AREVA proprietary document 86-9048187, Crystal River 3 Analysis Report for License Renewal. The NRC staff did not identify any information contained in the document to suggest that the calculation was prepared inconsistent with the guidance in RG 1.190, or with the methodology described in BAW-2241(P), Fluence Methodology and Uncertainties.
No open items or issues were identified during the audit.
The staffs review of Section 4.2, Reactor Vessel Neutron Embrittlement, of the license renewal application will be documented in the staffs safety evaluation report.