ML100050166

From kanterella
Jump to navigation Jump to search

Revised Review Schedule Regarding the Application from Florida Power Corporation for Renewal of the Operating License for Crystal River Unit 3 Nuclear Generating Plant
ML100050166
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/25/2010
From: David Wrona
License Renewal Projects Branch 2
To: Franke J
Florida Power Corp
KUNTZ R, NRR/DLR, 415-2989
References
TAC ME0274, TAC ME0278
Download: ML100050166 (4)


Text

January 25, 2010 Mr. Jon Franke, Vice President Crystal River Nuclear Plant (NA1B)

ATTN: Supervisor, Licensing & Regulatory Programs 15760 W. Power Line Street Crystal River, Florida 34428-6708

SUBJECT:

REVISED REVIEW SCHEDULE REGARDING THE APPLICATION FROM FLORIDA POWER CORPORATION FOR RENEWAL OF THE OPERATING LICENSE FOR CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT (TAC NOS. ME0274 AND ME0278)

Dear Mr. Franke:

By letter dated December 16, 2008, the U.S. Nuclear Regulatory Commission (NRC or the staff) received the Florida Power Corporation application for renewal of Operating License No. DPR-72 for Crystal River Unit 3 Nuclear Generating Plant (CR-3), in accordance with Title 10 of the Code of Federal Regulations Section 54.17. By letter dated May 22, 2009 (ADAMS Accession No. ML091200415), the staff issued a proposed schedule for the review of the CR-3 license renewal application.

During the most recent scheduled refueling outage at CR-3, a gap in the containment structure was noticed. The analysis of that gap is ongoing. Consequently, the NRC staff is revising the license renewal schedule so that a thorough analysis of the containment structure can be completed. The enclosed schedule may be modified if the resolution of the containment issue does not support the proposed schedule.

If you have any questions, please contact Project Managers Mr. Robert Kuntz by telephone at 301-415-3733 or by email at Robert.Kuntz@nrc.gov or Ms. Elaine Keegan by telephone at 301- 415-8517 or by email at Elaine.Keegan@nrc.gov, for the review of the CR-3 license renewal application.

Sincerely,

/RA/

David J. Wrona, Chief Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-302

Enclosure:

As stated cc w/encl: See next page

ML100050166 OFFICE PM:RPB2:DLR LA:RPOB:DLR PM:RPB2:DLR BC:RPB2:DLR NAME RKuntz YEdmonds EKeegan DWrona DATE 01/19/10 01/15/10 01/19/10 01/25/10 Letter to Jon Franke from David J. Wrona dated January 25, 2010

SUBJECT:

REVISED REVIEW SCHEDULE REGARDING THE APPLICATION FROM FLORIDA POWER CORPORATION FOR RENEWAL OF THE OPERATING LICENSE FOR CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT (TAC NOS. ME0274 AND ME0278)

DISTRIBUTION:

HARD COPY:

DLR RF E-MAIL:

PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsNrrDraApla Resource RidsOgcMailCenter E Keegan RKuntz DBrittner DLogan AJones, OGC LLake, RII MSykes, RII TMorrissey, RII

Crystal River Unit 3 Nuclear Generating Plant LICENSE RENEWAL APPLICATION REVIEW SCHEDULE Milestones Schedule Actual Receive License Renewal (LR) Application 12/18/08 12/18/08 FRN Published - Receipt & Availability 1/7/09 1/7/09 FRN Published - Acceptability and Opportunity for Hearing 3/9/09 3/9/09 FRN Published - Notice of Intent to Conduct Environmental 4/6/09 4/6/09 Scoping Public Meeting - LR Overview & Environmental Scoping 4/16/09 4/16/09 Deadline for Filing Hearing Requests and Petitions for 5/8/09 5/8/09 Intervention Environmental Scoping Period Ends 6/8/09 6/8/09 Audit - Scoping & Screening Methodology 6/22-6/26/09 6/22-6/26/09 Aging Management Programs 7/13-7/17/09 7/13-7/17/09 Audit - Environmental Audit 7/20-7/24/09 7/20-7/24/09 7/27-7/31/09 7/27-7/31/09 Inspection - Regional 4/12-4/16/10 Inspection - Final TBD Public Exit Meeting - Regional Inspections 8/14/09 8/14/09 Draft Supplemental Environmental Impact Statement (SEIS) 4/28/10 Issued EPA FRN Published - Availability / Comment on draft SEIS 6/11/10 Public Meeting - draft SEIS 7/21/10 Safety Evaluation Report (SER) with Open Items - Issued 7/30/10 End of draft SEIS Comment Period 8/13/10 ACRS Subcommittee Meeting on SER with Open Items 9/9/10 Final SEIS - Issued 10/29/10 EPA FRN Published - Availability of Final SEIS 11/8/10 SER - Issued 12/23/10 ACRS Full Committee Meeting on SER 2/4/11 Decision Director NRR - Approval (if no hearing) 4/22/11 Commission decision (if hearing is granted)* 9/19/11 ENCLOSURE

Crystal River Unit 3 Nuclear Generating Plant cc:

Mr. R. Alexander Glenn Mr. Daniel R. Westcott Associate General Counsel (MAC-BT15A) Supervisor, Licensing & Regulatory Florida Power Corporation Programs P.O. Box 14042 Crystal River Nuclear Plant St. Petersburg, FL 33733-4042 15760 W. Power Line Street Crystal River, FL 34428-6708 Mr. James W. Holt Plant General Manager Senior Resident Inspector Crystal River Nuclear Plant (NA2C) Crystal River Unit 3 15760 W. Power Line Street U.S. Nuclear Regulatory Commission Crystal River, FL 34428-6708 6745 N. Tallahassee Road Crystal River, FL 34428 Mr. William A. Passetti, Chief Department of Health Mr. Jack E. Huegel Bureau of Radiation Control Manager, Nuclear Oversight 2020 Capital Circle, SE, Bin #C21 Crystal River Nuclear Plant (NA2C)

Tallahassee, FL 32399-1741 15760 W. Power Line Street Crystal River, FL 34428-6708 Attorney General Department of Legal Affairs Mr. David T. Conley The Capitol Associate General Counsel II - Legal Dept.

Tallahassee, FL 32304 Progress Energy Service Company, LLC P.O. Box 1551 Mr. Ruben D. Almaguer, Director Raleigh, NC 27602-1551 Division of Emergency Preparedness Department of Community Affairs Mr. Michael P. Heath 2740 Centerview Drive Supervisor, License Renewal Tallahassee, FL 32399-2100 Progress Energy 8470 River Road, SE Chairman Southport, NC 28461 Board of County Commissioners Citrus County Mr. Mark Rigsby 110 North Apopka Avenue Manager, Support Services - Nuclear Inverness, FL 34450-4245 Crystal River Nuclear Plant (SA2C) 15760 W. Power Line Street Mr. Stephen J. Cahill Crystal River, FL 34428-6708 Engineering Manager Crystal River Nuclear Plant (NA2C) Mr. Robert J. Duncan II 15760 W. Power Line Street Vice President, Nuclear Operations Crystal River, FL 34428-6708 Progress Energy P.O. Box 1551 Raleigh, NC 27602-1551

Crystal River Unit 3 Nuclear Generating Plant cc:

Mr. Brian C. McCabe Manager, Nuclear Regulatory Affairs Progress Energy P.O. Box 1551 Raleigh, NC 27602-1551 Mr. Brian Moore 5559 Cactus Circle Spring Hill, FL 34606 Ms. Gail Grimm 1007 W. Main Street Inverness, FL 34450 Mr. John H. Ring 220 N. Big Oaks Point Lecanto, FL 34461 Mr. Andrija (Andy) Vukmir 1498 N. Endicott Point Crystal River, FL 34423 Mr. Dixie Hollins Citrus County Chamber of Commerce P.O. Box 277 Crystal River, FL 34423 Mr. Gary W. Maidhof Department Director Citrus County Government 3600 W. Sovereign Path Suite 109 Lecanto, FL 34461