ML16250A371: Difference between revisions
From kanterella
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 13: | Line 13: | ||
| document type = Final Safety Analysis Report (FSAR), Letter | | document type = Final Safety Analysis Report (FSAR), Letter | ||
| page count = 14 | | page count = 14 | ||
}} | }} |
Revision as of 19:10, 26 February 2018
ML16250A371 | |
Person / Time | |
---|---|
Site: | Waterford |
Issue date: | 08/25/2016 |
From: | Chisum M R Entergy Operations |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
W3F1-2016-0053 | |
Download: ML16250A371 (14) | |
Similar Documents at Waterford | |
---|---|
Category:Final Safety Analysis Report (FSAR)
MONTHYEARML20258A0872019-09-11011 September 2019
[Table view]11 to Final Safety Analysis Report, Chapter 05 - Reactor Coolant System and Connected Systems (EPID L-2020-LLA-0164) - Redacted ML20258A0882019-09-11011 September 2019 11 to Final Safety Analysis Report, Chapter 06 - Engineered Safety Features (EPID L-2020-LLA-0164) - Redacted ML20258A0712019-09-11011 September 2019 11 to Final Safety Analysis Report, Chapter 01 - Introduction and General Description of Plant - Redacted ML20258A0912019-09-11011 September 2019 11 to Final Safety Analysis Report, Chapter 12 - Radiation Protection (EPID L-2020-LLA-0164) - Redacted ML20258A0922019-09-11011 September 2019 11 to Final Safety Analysis Report, Reference Drawings (EPID L-2020-LLA-0164) - Redacted ML20255A2422018-07-25025 July 2018 10 to Final Safety Analysis Report, Chapter 6, Engineered Safety Features (EPID L-2020-LLA-0164) - Redacted ML20255A2532018-07-25025 July 2018 10 to Final Safety Analysis Report, Chapter 12, Radiation Protection (EPID L-2020-LLA-0164) - Redacted ML20255A2182018-07-25025 July 2018 10 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant (EPID L-2020-LLA-0164) - Redacted ML20255A2572018-07-25025 July 2018 10 to Final Safety Analysis Report, Reference Drawings (EPID L-2020-LLA-0164) - Redacted ML20255A2392018-07-25025 July 2018 10 to Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems (EPID L-2020-LLA-0164) - Redacted W3F1-2017-0078, Final Safety Analysis Report, Revision 3102017-12-0606 December 2017 Final Safety Analysis Report, Revision 310 ML16256A4332016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 8, Table of Contents ML16256A2832016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 6, Engineered Safety Features, Appendix 6.2B ML16256A1932016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Section 3.4 - Water Level (Flood) Design ML16257A1182016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 14, Initial Test Program, Table of Contents ML16256A1382016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant, Section 1.9, Figures 1.93 Through 1.94 ML16257A1502016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 15, Accident Analyses, Appendix 15D, Figures 15D.1-1 Through 15D.1-7 ML16257A0912016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 13, Organizational Structure, Table of Contents ML16256A1822016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Appendix 3.6C - Bend Force Calculation in a Piping System Using CALPLOTF2421 ML16257A1442016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 15, Accident Analyses, Appendix 15A, Figures 15A.3-1 Through 5A.3-2 ML16256A2762016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 6, Engineered Safety Features, Appendix 6.2C ML16257A0952016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 13, Organizational Structure, Section 13.3 ML16257A0962016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 13, Organizational Structure, Section 13.4 ML16257A0882016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 12, Radiation Protection, Section 12.4 ML16257A1412016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 15, Accident Analyses, Appendix 15A ML16257A0992016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 13, Organizational Structure, Section 13.7 ML16257A0982016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 13, Organizational Structure, Section 13.6 ML16256A1742016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Section 3.3 ML16256A4812016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System, Table of Contents ML16257A0972016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 13, Organizational Structure, Section 13.5 ML16256A1282016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant, Section 1.6 ML16257A0942016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 13, Organizational Structure, Section 13.2 ML16256A1892016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Appendix 3.9A - Seismic Considerations for Equipment Specifications ML16257A1002016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 13, Organizational Structure, Appendix 13A ML16257A1382016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 15, Accident Analyses, Section 15.8 ML16257A1582016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 17, Quality Assurance ML16256A1272016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant, Section 1.4 ML16256A4902016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System, Section 10.4.9A, Figure 10.4.9A-1 ML16256A2412016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems, Appendix 5.2B, Figures 5.2B-1 Through 5.2B-3 ML16256A2392016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems, Appendix 5.2A, Figures 5.2A-1 Through 5.2A-4 ML16256A3262016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 7, Instrumentation and Controls, Appendix 7.7A ML16257A1512016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 15, Accident Analyses, Appendix D, Figures 15D.2-1 Through 15D.2-7 ML16256A1232016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant, Section 1.0 ML16256A2702016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 6, Engineered Safety Features, Section 6.0 ML16256A1922016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Section 3.10 - Seismic Qualifications of Seismic Category 1 Instrumentation & Electrical Equipment ML16256A4822016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System, Sections 10.0 and 10.1 ML16257A0792016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 11, Radioactive Waste Management, Section 11.2, Figures 11.2-1 Through 11.2-2 ML16256A3322016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 7, Instrumentation and Controls, Section 7.8 ML16256A1362016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant, Section 1.5 ML16257A1472016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 15, Accident Analyses, Appendix 15C 2019-09-11 Category:Letter MONTHYEARIR 05000382/20230042024-09-25025 September 2024
[Table view]Integrated Inspection Report 05000382/2023004, Disputed Non-Cited Violation Revised ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000382/20240052024-08-21021 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Waterford Steam Electric Station, Unit 3 Report 05000382/2024005 IR 05000382/20240132024-08-20020 August 2024 Notice of Violation; NRC Inspection Report 05000382/2024013 ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment 05000382/LER-2024-004, Automatic Reactor Trip Due to Lightning Strike2024-08-15015 August 2024 Automatic Reactor Trip Due to Lightning Strike IR 05000382/20240022024-08-0808 August 2024 Integrated Inspection Report 05000382/2024002 ML24164A2512024-08-0707 August 2024 Issuance of Amendment No. 271 Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program ML24213A1632024-08-0101 August 2024 2024 Waterford Notification of Biennial Problem Identification and Resolution Inspection and Request for Information ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24150A3852024-06-0404 June 2024 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000382/2024011) and Request for Information ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 ML24141A1012024-05-20020 May 2024 Amended Integrated Inspection Report 05000382/2023004 ML24137A3352024-05-16016 May 2024 Automatic Reactor Trip Due to Transformer Failure ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions IR 05000382/20240012024-05-0606 May 2024 Integrated Inspection Report 05000382/2024001 ML24067A1032024-04-25025 April 2024 Closeout of Generic Letter 2004 02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams IR 05000382/20244012024-03-18018 March 2024 Material Control and Accounting Program Inspection Report 05000382/2024401 ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24074A3742024-03-15015 March 2024 Acknowledgement of Response to NRC Inspection Report 05000382/2023004 and Disputed Non-Cited Violation ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24032A0032024-03-0606 March 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0053 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000382/20230062024-02-28028 February 2024 Annual Assessment Letter for Waterford Steam Electric Station, Unit 3 Report 05000382/2023006 ML24039A1992024-02-12012 February 2024 – Integrated Inspection Report 05000382/2023004 IR 05000382/20230102024-01-31031 January 2024 Comprehensive Engineering Team Inspection Report 05000382/2023010 IR 05000382/20230032024-01-23023 January 2024 Acknowledgment of Reply to a Notice of Violation NRC Inspection Report 05000382/2023003 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 – Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML23340A2292023-12-28028 December 2023 Withdrawal of an Amendment Request to Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability (EPID L-2022-LLA-0169)-LTR ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1442023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23312A1832023-11-14014 November 2023 Integrated Inspection Report 05000382/2023003 and Notice of Violation ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000382/20234012023-10-0404 October 2023 Cyber Security Inspection Report 05000382/2023401 (Cover Letter Only) IR 05000382/20230052023-08-21021 August 2023 Updated Inspection Plan for Waterford Steam Electric Station, Unit 3 - (Report 05000382/2023005) IR 05000382/20233012023-08-15015 August 2023 NRC Initial Operator Licensing Examination Approval 05000382/2023301 IR 05000382/20230022023-08-0808 August 2023 Integrated Inspection Report 05000382/2023002 IR 05000382/20234022023-08-0707 August 2023 NRC Security Inspection Report 05000382/2023402 (Full Report) IR 05000382/20230402023-07-12012 July 2023 Revised 95001 Supplemental Inspection Report 05000382/2023040, Exercise of Enforcement Discretion, and Follow-Up Assessment Letter ML23191A4562023-07-10010 July 2023 Notification of Comprehensive Engineering Team Inspection (050003822023010) and Request for Information ML23158A1042023-06-0808 June 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000382/2023401 ML23145A2272023-06-0202 June 2023 95001 Supplemental Inspection Report 05000382/2023040, and Exercise of Enforcement Discretion ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment 2024-09-06 |
Retrieved from "https://kanterella.com/w/index.php?title=ML16250A371&oldid=372842"