ML16257A147
| ML16257A147 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 08/25/2016 |
| From: | Entergy Operations |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML16256A115 | List:
|
| References | |
| W3F1-2016-0053 | |
| Download: ML16257A147 (7) | |
Text
15C-i Revision 14 (12/05)
APPENDIX 15C SUPPLEMENTAL INFORMATION FOR CHAPTER 15 IN RESPONSE TO WATERFORD 3 SER (NUREG-0787) SUPPLEMENT NO. 1 CONFIRMATORY ITEMS 15.3.1
(DRN 02-1713, R12-B;05-543, R14)
This appendix is deleted. The subject is encompassed by the information contained in sections 15.1.3.1 and 15.1.3.3 for Main Steam Line Break reanalyzed for the 3716 MWt Extended Power Uprate.
(DRN 02-1713, R12-B;05-543, R14)
WSES-FSAR-UNIT-3 15C-ii Revision 12-B (04/03)
APPENDIX 15C SUPPLEMENTAL INFORMATION FOR CHAPTER 15 TABLE OF CONTENTS Section Title Page
¨(DRN 02-1713, R12-B) 15C.1 RELOCATED TO FSAR SUB-SECTION 15.2.3.1.4 15C.1.1 RELOCATED TO FSAR SUB-SECTION 15.2.3.1.4 15C.1.2 RELOCATED TO FSAR SUB-SECTION 15.2.3.1.4 15C.1.3 RELOCATED TO FSAR SUB-SECTION 15.2.3.1.4 15C.1.4 RELOCATED TO FSAR SUB-SECTION 15.2.3.1.4 15C.1 RELOCATED TO SECTION
15.2 REFERENCES
(DRN 02-1713, R12-B) 15C.2 EVALUATION OF THE EFFECT OF 15C-7 BREAK SIZE UPON THE CONSEQUENCES OF STEAM LINE BREAKS WITH CONCURRENT LOSS OF OFFSITE POWER 15C.
2.1 INTRODUCTION
15C-7 15C.2.2 PRETRIP FUEL FAILURE 15C-7 15C.2.3 POST-TRIP FUEL FAILURE 15C-8 15C.
2.4 CONCLUSION
WSES-FSAR-UNIT-3 15C-iii Revision 12-B (04/03)
APPENDIX 15C SUPPLEMENTAL INFORMATION FOR CHAPTER 15 LIST OF TABLES Table Title Page
¨(DRN 02-1713, R12-B) 15C.1-1 RELOCATED TO TABLE 15.2-9a 15C.1-2 RELOCATED TO TABLE 15.2-9b (DRN 02-1713, R12-B)
WSES-FSAR-UNIT-3 15C-iv Revision 12-B (04/03)
APPENDIX 15C SUPPLEMENTAL INFORMATION FOR CHAPTER 15 LIST OF FIGURES Figure Title
¨(DRN 02-1713, R12-B) 15C.1-1 Relocated to Figure 15.2-53a 15C.1-2 Relocated to Figure 15.2-53b 15C.1-3 Relocated to Figure 15.2-53c 15C.1-4 Relocated to Figure 15.2-53d 15C.1-5 Deleted 15C.1-6 Deleted 15C.1-7 Deleted 15C.1-8 Deleted 15C.1-9 Deleted (DRN 02-1713, R12-B)
WSES-FSAR-UNIT-3 15C-1 Revision 12-B (04/03)
¨(DRN 02-1713, R12-B)
Section 15C.1 has been relocated to Sub-Section 15.2.3.1.4.
(DRN 02-1713, R12-B)
WSES-FSAR-UNIT-3 Revision 14 (12/05)
(DRN 02-526, R12; 02-1713, R12-B;05-543, R14)
Table 15C.1-1 has been deleted.
(DRN 02-526, R12; 02-1713, R12-B;05-543, R14)
WSES-FSAR-UNIT-3 Revision 14 (12/05)
(DRN 00-592; 02-1713, R12-B;05-543, R14)
Table 15C.1-3 has been deleted.
(DRN 00-592; 02-1713, R12-B;05-543, R14)