ML16257A147

From kanterella
Jump to navigation Jump to search
Revision 309 to Final Safety Analysis Report, Chapter 15, Accident Analyses, Appendix 15C
ML16257A147
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/25/2016
From:
Entergy Operations
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16256A115 List: ... further results
References
W3F1-2016-0053
Download: ML16257A147 (7)


Text

15C-i Revision 14 (12/05)

APPENDIX 15C SUPPLEMENTAL INFORMATION FOR CHAPTER 15 IN RESPONSE TO WATERFORD 3 SER (NUREG-0787) SUPPLEMENT NO. 1 CONFIRMATORY ITEMS 15.3.1 (DRN 02-1713, R12-B;05-543, R14)This appendix is deleted. The subject is encompassed by the information contained in sections 15.1.3.1 and 15.1.3.3 for Main Steam Line Break reanalyzed for the 3716 MWt Extended Power Uprate. (DRN 02-1713, R12-B;05-543, R14)

WSES-FSAR-UNIT-315C-iiRevision 12-B (04/03)APPENDIX 15C SUPPLEMENTAL INFORMATION FOR CHAPTER 15 TABLE OF CONTENTS SectionTitlePage(DRN 02-1713, R12-B) 15C.1RELOCATED TO FSAR SUB-SECTION 15.2.3.1.4 15C.1.1 RELOCATED TO FSAR SUB-SECTION 15.2.3.1.415C.1.2 RELOCATED TO FSAR SUB-SECTION 15.2.3.1.4 15C.1.3 RELOCATED TO FSAR SUB-SECTION 15.2.3.1.4 15C.1.4 RELOCATED TO FSAR SUB-SECTION 15.2.3.1.4 15C.1RELOCATED TO SECTION

15.2 REFERENCES

(DRN 02-1713, R12-B) 15C.2 EVALUATION OF THE EFFECT OF 15C-7 BREAK SIZE UPON THE CONSEQUENCES

OF STEAM LINE BREAKS WITH CONCURRENT

LOSS OF OFFSITE POWER 15C.

2.1 INTRODUCTION

15C-7 15C.2.2 PRETRIP FUEL FAILURE15C-715C.2.3POST-TRIP FUEL FAILURE15C-8 15C.

2.4CONCLUSION

15C-8 WSES-FSAR-UNIT-315C-iiiRevision 12-B (04/03)APPENDIX 15C SUPPLEMENTAL INFORMATION FOR CHAPTER 15 LIST OF TABLES TableTitlePage(DRN 02-1713, R12-B)15C.1-1RELOCATED TO TABLE 15.2-9a15C.1-2RELOCATED TO TABLE 15.2-9b(DRN 02-1713, R12-B)

WSES-FSAR-UNIT-315C-ivRevision 12-B (04/03)APPENDIX 15C SUPPLEMENTAL INFORMATION FOR CHAPTER 15 LIST OF FIGURESFigureTitle(DRN 02-1713, R12-B)15C.1-1Relocated to Figure 15.2-53a15C.1-2Relocated to Figure 15.2-53b15C.1-3Relocated to Figure 15.2-53c15C.1-4Relocated to Figure 15.2-53d15C.1-5 Deleted15C.1-6 Deleted15C.1-7 Deleted15C.1-8 Deleted15C.1-9 Deleted(DRN 02-1713, R12-B)

WSES-FSAR-UNIT-315C-1Revision 12-B (04/03)(DRN 02-1713, R12-B)

Section 15C.1 has been relocated to Sub-Section 15.2.3.1.4.(DRN02-1713, R12-B)

WSES-FSAR-UNIT-3 Revision 14 (12/05) (DRN 02-526, R12; 02-1713, R12-B;05-543, R14)

Table 15C.1-1 has been deleted.(DRN 02-526, R12; 02-1713, R12-B;05-543, R14)

WSES-FSAR-UNIT-3 Revision 14 (12/05) (DRN 00-592; 02-1713, R12-B;05-543, R14)

Table 15C.1-3 has been deleted. (DRN 00-592; 02-1713, R12-B;05-543, R14)