ML16257A144
Jump to navigation
Jump to search
| ML16257A144 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 08/25/2016 |
| From: | Entergy Operations |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML16256A115 | List:
|
| References | |
| W3F1-2016-0053 | |
| Download: ML16257A144 (2) | |
Text
-0.4 I
I 0
20 40 60 80 100 TIME OF LOSS OF POWER, SECONDS LOUISIANA POWER LIGHT CO.
Waterford Steam Electric Station FULL POWER MAIN STEAMLINE BREAK MAXIMUM POST-TRIP REACTIVITY vs TIME OF LOSS OF POWER Figure
5 2
1 SIAS FOR LOP TIME 16 SECONDS 0
I I
I I
0 20 40 60 80 100 TIME OF LOSS OF POWER, SECONDS LOUISIANA POWER CO.
Waterford Steam Electric Stution FULL POWER MAIN STEAM LINE BREAK MINIMUM POST TRIP DNBR vs TIME OF LOSS OF POWER Figure