ML16257A144

From kanterella
Jump to navigation Jump to search
09 to Final Safety Analysis Report, Chapter 15, Accident Analyses, Appendix 15A, Figures 15A.3-1 Through 5A.3-2
ML16257A144
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/25/2016
From:
Entergy Operations
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16256A115 List: ... further results
References
W3F1-2016-0053
Download: ML16257A144 (2)


Text

-0.4 I

I 0

20 40 60 80 100 TIME OF LOSS OF POWER, SECONDS LOUISIANA POWER LIGHT CO.

Waterford Steam Electric Station FULL POWER MAIN STEAMLINE BREAK MAXIMUM POST-TRIP REACTIVITY vs TIME OF LOSS OF POWER Figure

5 2

1 SIAS FOR LOP TIME 16 SECONDS 0

I I

I I

0 20 40 60 80 100 TIME OF LOSS OF POWER, SECONDS LOUISIANA POWER CO.

Waterford Steam Electric Stution FULL POWER MAIN STEAM LINE BREAK MINIMUM POST TRIP DNBR vs TIME OF LOSS OF POWER Figure