Letter Sequence Other | |
---|---|
EPID:L-2020-LLA-0164, Presentation Cpc/Ceac Replacement License Amendment Request - September 22, 2020 (Approved, Closed) | |
Initiation Administration Results Other: ML20255A218, ML20255A239, ML20255A242, ML20255A253, ML20255A257, ML20258A071, ML20258A087, ML20258A088, ML20258A091, ML20258A092, ML21084A255, ML21091A147, ML21160A057, ML21160A085 | |
MONTHYEARML20255A2182018-07-25025 July 2018
[Table View]10 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant (EPID L-2020-LLA-0164) - Redacted Project stage: Other ML20255A2392018-07-25025 July 2018 10 to Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems (EPID L-2020-LLA-0164) - Redacted Project stage: Other ML20255A2422018-07-25025 July 2018 10 to Final Safety Analysis Report, Chapter 6, Engineered Safety Features (EPID L-2020-LLA-0164) - Redacted Project stage: Other ML20255A2572018-07-25025 July 2018 10 to Final Safety Analysis Report, Reference Drawings (EPID L-2020-LLA-0164) - Redacted Project stage: Other ML20255A2532018-07-25025 July 2018 10 to Final Safety Analysis Report, Chapter 12, Radiation Protection (EPID L-2020-LLA-0164) - Redacted Project stage: Other ML20258A0922019-09-11011 September 2019 11 to Final Safety Analysis Report, Reference Drawings (EPID L-2020-LLA-0164) - Redacted Project stage: Other ML20258A0912019-09-11011 September 2019 11 to Final Safety Analysis Report, Chapter 12 - Radiation Protection (EPID L-2020-LLA-0164) - Redacted Project stage: Other ML20258A0882019-09-11011 September 2019 11 to Final Safety Analysis Report, Chapter 06 - Engineered Safety Features (EPID L-2020-LLA-0164) - Redacted Project stage: Other ML20258A0872019-09-11011 September 2019 11 to Final Safety Analysis Report, Chapter 05 - Reactor Coolant System and Connected Systems (EPID L-2020-LLA-0164) - Redacted Project stage: Other ML20258A0712019-09-11011 September 2019 11 to Final Safety Analysis Report, Chapter 01 - Introduction and General Description of Plant - Redacted Project stage: Other W3F1-2020-0038, License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System2020-07-23023 July 2020 License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System Project stage: Request ML20239B0552020-08-26026 August 2020 NRR E-mail Capture - NRC LIC-109 Acceptance Review Results for Waterford U3 Digital Upgrade LAR Project stage: Acceptance Review ML20288A7292020-09-22022 September 2020 Presentation Cpc/Ceac Replacement License Amendment Request - September 22, 2020 Project stage: Request ML20289A2672020-09-22022 September 2020, 22 October 2020 Summary of September 22, 2020, Category 1 Public Meeting Di&C License Amendment Request Project stage: Request ML20265A2872020-10-0101 October 2020 Request for Withholding Information from Public Disclosure Submittals for a Digital Upgrade Project stage: Withholding Request Acceptance ML20268B3242020-10-0101 October 2020 Regulatory Audit in Support of Review of Digital Upgrade License Amendment Request Project stage: Approval PMNS20201184, Partially Closed Meeting with Entergy Operations, Inc. to Discuss a License Amendment Request for a Digital Upgrade at Waterford Steam Electric Station, Unit 32020-10-0707 October 2020 Partially Closed Meeting with Entergy Operations, Inc. to Discuss a License Amendment Request for a Digital Upgrade at Waterford Steam Electric Station, Unit 3 Project stage: Meeting ML20288A7422020-10-22022 October 2020 Summary of September 22, 2020, Meeting License Amendment Request to Install Digital Upgrade (EPID L-2020-LLA-0164) (Non-proprietary Version) Project stage: Meeting PMNS20201234, Partially Closed Meeting with Entergy Operations, Inc. to Discuss a License Amendment Request for a Digital Upgrade at Waterford Steam Electric Station, Unit 32020-10-28028 October 2020 Partially Closed Meeting with Entergy Operations, Inc. to Discuss a License Amendment Request for a Digital Upgrade at Waterford Steam Electric Station, Unit 3 Project stage: Meeting PMNS20201233, Partially Closed Meeting with Entergy Operations, Inc. to Discuss a License Amendment Request for a Digital Upgrade at Waterford Steam Electric Station, Unit 32020-10-28028 October 2020 Partially Closed Meeting with Entergy Operations, Inc. to Discuss a License Amendment Request for a Digital Upgrade at Waterford Steam Electric Station, Unit 3 Project stage: Meeting PMNS20201232, Partially Closed Meeting with Entergy Operations, Inc. to Discuss a License Amendment Request for a Digital Upgrade at Waterford Steam Electric Station, Unit 32020-10-28028 October 2020 Partially Closed Meeting with Entergy Operations, Inc. to Discuss a License Amendment Request for a Digital Upgrade at Waterford Steam Electric Station, Unit 3 Project stage: Meeting PMNS20201195, Partially Closed Meeting with Entergy Operations, Inc. to Discuss a License Amendment Request for a Digital Upgrade at Waterford Steam Electric Station, Unit 32020-10-28028 October 2020 Partially Closed Meeting with Entergy Operations, Inc. to Discuss a License Amendment Request for a Digital Upgrade at Waterford Steam Electric Station, Unit 3 Project stage: Meeting ML20315A2672020-12-17017 December 2020 Summary of October 21,2020, Redacted Category 1 Public Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06,Rev.2, Licensing Processes(NON-PROPRIETARY) Project stage: Meeting ML20325A3212020-12-17017 December 2020 Summary of November 4, 2020, Nonproprietary - Category 1 Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Rev. 2, Licensing Processes (Redacted) Project stage: Meeting ML20325A2412020-12-17017 December 2020 Summary of November 18, 2020, REDACTED- Category 1 Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Rev. 2, Licensing Processes Project stage: Meeting W3F1-2021-0002, Open Item Response - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System2021-01-22022 January 2021 Open Item Response - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System Project stage: Request W3F1-2021-0015, Revised Vendor Oversight Plan Summary - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System2021-01-29029 January 2021 Revised Vendor Oversight Plan Summary - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System Project stage: Request PMNS20201419, Partially Closed Meeting with Entergy Operations, Inc. to Discuss a License Amendment Request for a Digital Upgrade at Waterford Steam Electric Station, Unit 32021-02-0505 February 2021 Partially Closed Meeting with Entergy Operations, Inc. to Discuss a License Amendment Request for a Digital Upgrade at Waterford Steam Electric Station, Unit 3 Project stage: Meeting ML21032A0132021-02-19019 February 2021 01/06 and 01/21/2021 Summary of - Category 1 Meetings with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C ISG No. 06, Rev. 2 for Waterford Steam Electric Station Project stage: Meeting ML21039A2682021-02-22022 February 2021 Summary of Category 1 Meetings with Entergy Operations, Inc. LAR to Install Digital Upgrade in Accordance with Digital I&C ISG No. 06, Rev. 2 for Waterford Steam Electric Station, Unit 3 Project stage: Meeting W3F1-2021-0025, Open Item Response - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System2021-03-0505 March 2021 Open Item Response - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System Project stage: Request W3F1-2021-0026, Open Item Response, License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System2021-03-19019 March 2021 Open Item Response, License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System Project stage: Request ML21084A2552021-03-22022 March 2021 NRR E-mail Capture - Supplement to Audit Plan Dated October 1, 2020 (Waterford 3, L-2020-LLA-0164) Project stage: Other ML21091A1472021-04-0101 April 2021 Annual Report for Entergy Quality Assurance Program Manual and Indian Point Energy Center Quality Assurance Program Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to Project stage: Other ML21071A2862021-04-0101 April 2021 Summary of Cat. 1 Public Meeting with Entergy Operations,Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital Instrumentation and Control Interim Staff Guidance No.06,Rev.2,Licensing Processes NON-PROPRIETARY Project stage: Meeting ML21075A0322021-04-0202 April 2021 Summary of Redacted - Category 1 Public Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C ISG No. 06, Revision 2, Licensing Processes Project stage: Meeting ML21095A1932021-04-0707 April 2021 Request for Withholding Information from Public Disclosure, Project stage: Withholding Request Acceptance ML21085A8652021-04-0808 April 2021 Summary of March 17, 2021, Category 1 Public Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Rev. 2, Licensing Processes (EPID L-2020-LLA-0164) Non Project stage: Meeting ML21090A0022021-04-12012 April 2021 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML21112A2542021-04-29029 April 2021 Request for Additional Information Digital Upgrade to the Core Protection and Control Element Assembly Calculator System (EPID L 2020 Lla 0164) - Redacted Version Project stage: RAI ML21112A2492021-05-0707 May 2021 Summary of April 14, 2021, Redacted - Partially Closed Observation Meeting with Entergy Operations Inc., LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Revision 2 (EPID L-2020-LLA-0164) (Non-Pro Project stage: Meeting W3F1-2021-0032, Revised License Amendment Request - Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System2021-05-21021 May 2021 Revised License Amendment Request - Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System Project stage: Request W3F1-2021-0041, Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request for Digital Upgrade to the Core Protection Calculator and Control Element Assembly Calculator System2021-06-0202 June 2021 Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request for Digital Upgrade to the Core Protection Calculator and Control Element Assembly Calculator System Project stage: Request ML21160A0852021-06-0404 June 2021 NRR E-mail Capture - (External_Sender) NRC Notification to the State of Louisiana Regarding a Waterford Steam Electric Station, Unit 3 Amendment - Digital Upgrade I&C Project stage: Other W3F1-2021-0047, Open Item Response - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System2021-06-21021 June 2021 Open Item Response - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System Project stage: Request W3F1-2021-0051, Revised Licensing Technical Report for the Common Q Core Protection Calculator System - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator System and Control Element Assembly Calculator2021-07-19019 July 2021 Revised Licensing Technical Report for the Common Q Core Protection Calculator System - License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator System and Control Element Assembly Calculator Project stage: Request W3F1-2021-0054, License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System, Dated July 23, 20202021-07-29029 July 2021 License Amendment Request to Implement a Digital Upgrade to the Core Protection Calculator (CPC) System and Control Element Assembly Calculator (Ceac) System, Dated July 23, 2020 Project stage: Request ML21203A3532021-08-0909 August 2021 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML21160A0572021-08-16016 August 2021 Summary of Regulatory Audit in Support of Digital Upgrade License Amendment Request (EPID L-2020-LLA-0164)Non-Proprietary Project stage: Other ML21131A2432021-08-24024 August 2021 Issuance of Amendment No. 260 Digital Upgrade to the Core Protection and Control Element Assembly Calculator System Project stage: Approval 2021-03-22 |
ML20258A092 | |
Person / Time | |
---|---|
Site: | Waterford |
Issue date: | 09/11/2019 |
From: | Audrey Klett Plant Licensing Branch IV |
To: | Entergy Operations |
Klett A | |
Shared Package | |
ML20254A356 | List: |
References | |
EPID L-2020-LLA-0164 | |
Download: ML20258A092 (125) | |
Similar Documents at Waterford | |
---|---|
Category:Drawing
MONTHYEARML20258A0922019-09-11011 September 2019
[Table view]11 to Final Safety Analysis Report, Reference Drawings (EPID L-2020-LLA-0164) - Redacted ML20255A2572018-07-25025 July 2018 10 to Final Safety Analysis Report, Reference Drawings (EPID L-2020-LLA-0164) - Redacted W3F1-2016-0053, Redacted - Waterford Steam Electric Station, Unit 3, Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Section 3.8, Figures 3.8-1 Through 3.8-472016-08-25025 August 2016 Redacted - Waterford Steam Electric Station, Unit 3, Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Section 3.8, Figures 3.8-1 Through 3.8-47 ML16344A2502016-08-25025 August 2016 Redacted - Waterford Steam Electric Station, Unit 3, Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Appendix 3.6A, Figures 3.6A-1 Through 3.6A-67 ML16257A1532016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 15, Accident Analyses, Appendix B, Figure 15B-1 ML16256A2102016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 4, Reactor, Section 4.3, Figures 4.3-1 Through 4.3-60 ML16344A2962016-08-25025 August 2016 Redacted - Waterford Steam Electric Station, Unit 3, Revision 309 to Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems, Section 5.2, Figures 5.2-1 Through 5.2-30 ML16344A2712016-08-25025 August 2016 Redacted - Waterford Steam Electric Station, Unit 3, Revision 309 to Final Safety Analysis Report, Chapter 4, Reactor, Appendix 4.3A, Figures 4.3A-1 Through 4.3A-19b ML16256A1842016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Section 3.7, Figures 3.7-1 Through 3.7-36 ML16257A1522016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 15, Accident Analyses, Section 2, Figures 15.2-1 Through 15.2-65 ML16344A2932016-08-25025 August 2016 Redacted - Waterford Steam Electric Station, Unit 3, Revision 309 to Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems, Section 5.1, Figures 5.1-1 Through 5.1-4 ML16256A1852016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Section 3.7A, Figures 3.7A-1 Through 3.7A-4 ML16256A2132016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 4, Reactor, Section 4.4, Figures 4.4-1 Through 4.4-11 ML16256A1832016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Appendix 3.6C, Figures 3.6C-1 Through 3.6C-9 ML16256A1982016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Section 3.9, Figures 3.9-1 Through 3.9-20 ML16256A1962016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Appendix 3.6B, Figures 2.1.1 Through 4.19 ML16357A7602016-08-25025 August 2016 Redacted Waterford Steam Electric Station, Unit 3, Revision 309 to Final Safety Analysis Report, Chapter 4, Reactor, Section 4.2, Figures 4.2-1 Through 4.2-12 ML16257A2672015-07-0101 July 2015 Revision 309 to Final Safety Analysis Report, Drawing G162, Sh. 2, Rev. 37, Flow Diagram Sampling System. ML16257A2692014-11-13013 November 2014 Revision 309 to Final Safety Analysis Report, Drawing G162, Sh. 1, Rev. 24, Flow Diagram Sampling System. W3F1-2010-0050, Drawing G287, Revision 21, 125 Vdc and 120 Vac One Line Diagram. Sheet 12008-06-0202 June 2008 Drawing G287, Revision 21, 125 Vdc and 120 Vac One Line Diagram. Sheet 1 ML0612801112005-06-0606 June 2005 ER-W3-2004-0122-000, Pressurizer Heater Sleeve and Instrument Nozzle Repair ML0612800912005-02-25025 February 2005 ER-W3-2004-0122-000, Pressurizer Heater Sleeves and Instrument Nozzles Weld Repair ML0331401672003-11-0404 November 2003 Table, CEDM Nozzle Freespan Lengths ML0223202032002-07-30030 July 2002 Drawing SK-G-M-530, Rwsp Refuel Water Storage Purification System. ML0223201952002-07-30030 July 2002 Drawing SK-G-M-529, Rwsp Refuel Water Storage Purification System. ML0223201422002-07-30030 July 2002 Drawing SK-G-M-528, Rwsp Refuel Water Storage Purification System. 2019-09-11 Category:Updated Final Safety Analysis Report (UFSAR) MONTHYEARML20258A0872019-09-11011 September 2019
[Table view]11 to Final Safety Analysis Report, Chapter 05 - Reactor Coolant System and Connected Systems (EPID L-2020-LLA-0164) - Redacted ML20258A0882019-09-11011 September 2019 11 to Final Safety Analysis Report, Chapter 06 - Engineered Safety Features (EPID L-2020-LLA-0164) - Redacted ML20258A0712019-09-11011 September 2019 11 to Final Safety Analysis Report, Chapter 01 - Introduction and General Description of Plant - Redacted ML20258A0912019-09-11011 September 2019 11 to Final Safety Analysis Report, Chapter 12 - Radiation Protection (EPID L-2020-LLA-0164) - Redacted ML20258A0922019-09-11011 September 2019 11 to Final Safety Analysis Report, Reference Drawings (EPID L-2020-LLA-0164) - Redacted ML20255A2422018-07-25025 July 2018 10 to Final Safety Analysis Report, Chapter 6, Engineered Safety Features (EPID L-2020-LLA-0164) - Redacted ML20255A2532018-07-25025 July 2018 10 to Final Safety Analysis Report, Chapter 12, Radiation Protection (EPID L-2020-LLA-0164) - Redacted ML20255A2182018-07-25025 July 2018 10 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant (EPID L-2020-LLA-0164) - Redacted ML20255A2572018-07-25025 July 2018 10 to Final Safety Analysis Report, Reference Drawings (EPID L-2020-LLA-0164) - Redacted ML20255A2392018-07-25025 July 2018 10 to Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems (EPID L-2020-LLA-0164) - Redacted W3F1-2017-0078, Final Safety Analysis Report, Revision 3102017-12-0606 December 2017 Final Safety Analysis Report, Revision 310 ML16256A4332016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 8, Table of Contents ML16256A2832016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 6, Engineered Safety Features, Appendix 6.2B ML16256A1932016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Section 3.4 - Water Level (Flood) Design ML16257A1182016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 14, Initial Test Program, Table of Contents ML16256A1382016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant, Section 1.9, Figures 1.93 Through 1.94 ML16257A1502016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 15, Accident Analyses, Appendix 15D, Figures 15D.1-1 Through 15D.1-7 ML16257A0912016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 13, Organizational Structure, Table of Contents ML16256A1822016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Appendix 3.6C - Bend Force Calculation in a Piping System Using CALPLOTF2421 ML16257A1442016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 15, Accident Analyses, Appendix 15A, Figures 15A.3-1 Through 5A.3-2 ML16256A2762016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 6, Engineered Safety Features, Appendix 6.2C ML16257A0952016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 13, Organizational Structure, Section 13.3 ML16257A0962016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 13, Organizational Structure, Section 13.4 ML16257A0882016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 12, Radiation Protection, Section 12.4 ML16257A1412016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 15, Accident Analyses, Appendix 15A ML16257A0992016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 13, Organizational Structure, Section 13.7 ML16257A0982016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 13, Organizational Structure, Section 13.6 ML16256A1742016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Section 3.3 ML16256A4812016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System, Table of Contents ML16257A0972016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 13, Organizational Structure, Section 13.5 ML16256A1282016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant, Section 1.6 ML16257A0942016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 13, Organizational Structure, Section 13.2 ML16256A1892016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Appendix 3.9A - Seismic Considerations for Equipment Specifications ML16257A1002016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 13, Organizational Structure, Appendix 13A ML16257A1382016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 15, Accident Analyses, Section 15.8 ML16257A1582016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 17, Quality Assurance ML16256A1272016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant, Section 1.4 ML16256A4902016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System, Section 10.4.9A, Figure 10.4.9A-1 ML16256A2412016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems, Appendix 5.2B, Figures 5.2B-1 Through 5.2B-3 ML16256A2392016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems, Appendix 5.2A, Figures 5.2A-1 Through 5.2A-4 ML16256A3262016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 7, Instrumentation and Controls, Appendix 7.7A ML16257A1512016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 15, Accident Analyses, Appendix D, Figures 15D.2-1 Through 15D.2-7 ML16256A1232016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant, Section 1.0 ML16256A2702016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 6, Engineered Safety Features, Section 6.0 ML16256A1922016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Section 3.10 - Seismic Qualifications of Seismic Category 1 Instrumentation & Electrical Equipment ML16256A4822016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System, Sections 10.0 and 10.1 ML16257A0792016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 11, Radioactive Waste Management, Section 11.2, Figures 11.2-1 Through 11.2-2 ML16256A3322016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 7, Instrumentation and Controls, Section 7.8 ML16256A1362016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant, Section 1.5 ML16257A1472016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 15, Accident Analyses, Appendix 15C 2019-09-11 |