ML16257A099

From kanterella
Jump to navigation Jump to search
09 to Final Safety Analysis Report, Chapter 13, Organizational Structure, Section 13.7
ML16257A099
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/25/2016
From:
Entergy Operations
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16256A115 List: ... further results
References
W3F1-2016-0053
Download: ML16257A099 (1)


Text

WSES-FSAR-UNIT 3 13.7-1 Revision 308 (11/17)

(LBDCR 13-015, R308) 13.7 EMERGENCY PREPAREDNESS 13.7.1 Emergency Plan In accordance with 10 CFR 50.54 (q), a document titled Waterford 3 SES Emergency Plan is maintained and submitted by Entergy to the NRC.

13.7.2 Emergency Response Facilities The Emergency Operations Facility (EOF) provides for the management of overall emergency response, coordination of radiological and environmental assessments, and determination of recommended public protective actions. An alternate Emergency Operations Facility is located outside of the 10-mile emergency planning zone.

(LBDCR 13-015, R308)