ML16256A127
| ML16256A127 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 08/25/2016 |
| From: | Entergy Operations |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML16256A115 | List:
|
| References | |
| W3F1-2016-0053 | |
| Download: ML16256A127 (1) | |
Text
WSES-FSAR-UNIT-3 1.4-1 Revision 11-A (02/02) 1.4 IDENTIFICATION OF AGENTS AND CONTRACTORS Louisiana Power & Light Company, as owner, has arranged for the purchase of equipment and consulting, engineering, and construction services for the installation of Waterford Steam Electric Station Unit No. 3.
As owner, Louisiana Power & Light Company is responsible for the design, construction, and operation of the unit.
Ebasco Services Incorporated has been retained for engineering, procurement and management of construction services. Ebasco is also providing assistance in obtaining licenses and permits, in preoperational testing, in quality control, and in initial startup of the plant.
¨ (DRN 01-758)
Combustion Engineering, Inc. has been contracted to design, manufacture, and deliver to the site a complete Nuclear Steam Supply System including first core fuel. In addition, Combustion Engineering, Inc.
is supplying competent technical and professional consultation for erection, initial fuel loading, testing and initial startup of the complete Nuclear Steam Supply System. Combustion Engineering, Inc. is participating in plant personnel training.
The Westinghouse Electric Corporation is supplying the turbine generator and its auxiliaries.