ML16257A158

From kanterella
Jump to navigation Jump to search
09 to Final Safety Analysis Report, Chapter 17, Quality Assurance
ML16257A158
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/25/2016
From:
Entergy Operations
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16256A115 List: ... further results
References
W3F1-2016-0053
Download: ML16257A158 (3)


Text

WSES-FSAR-UNIT-3 17-i CHAPTER 17 QUALITY ASSURANCE TABLE OF CONTENTS Section Title Page 17.0 QUALITY ASSURANCE 17.1-1 17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION 17.1-1 17.2 QUALITY ASSURANCE DURING OPERATIONS 17.2-1

WSES-FSAR-UNIT-3 17.1-1 17.0 QUALITY ASSURANCE 17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION This section is not applicable to FSAR.

WSES-FSAR-UNIT-3 17.2-1 17.2 QUALITY ASSURANCE DURING OPERATIONS This section is covered in a separate Quality Assurance Program Manual which has been submitted to the NRC.