ML16257A138

From kanterella
Jump to navigation Jump to search
Revision 309 to Final Safety Analysis Report, Chapter 15, Accident Analyses, Section 15.8
ML16257A138
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/25/2016
From:
Entergy Operations
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16256A115 List: ... further results
References
W3F1-2016-0053
Download: ML16257A138 (1)


Text

WSES-FSAR-UNIT-3 15.8-115.8ANTICIPATED TRANSIENTS WITHOUT SCRAM (ATWS)

By letter W3P89-1401 dated 7/17/89, LP&L submitted to the NRC a report describing the design and function of the Waterford 3 ATWS mitigating systems

required by 10CFR50.62 (the ATWS Rule). The ATWS mitigating systems consists

of the Diverse Reactor Trip System, the Diverse Turbine Trip, and the Diverse

Emergency Feedwater Actuation System. These systems were installed during the

third refueling outage at Waterford 3. Further discussions describing the

systems are provided in FSAR Section 7.8.

There is no impact on FSAR Chapters 6 and 15 events, analyses and evaluations due to the implementation of the ATWS mitigating systems. These systems are

designed as diverse secondary alternates to existing systems based on common

mode failure in the systems not being assumed by the ATWS Rule, and a single

failure will not cause the Diverse Emergency Feedwater Actuation System to

adversely impact FSAR Chapters 6 and 15 events.