IR 05000395/2021401: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:April 16, 2021 | ||
==SUBJECT:== | |||
VIRGIL C. SUMMER NUCLEAR STATION - SECURITY BASELINE INSPECTION REPORT 05000395/2021401 | |||
==Dear Mr. Stoddard:== | |||
On March 5, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Virgil C. Summer Nuclear Station and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report. | |||
No findings or violations of more than minor significance were identified during this inspection. | |||
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding. | |||
Sincerely, | |||
/RA/ | |||
Otis Smith, Jr, Sr., Acting Chief Plant Support Branch Division of Reactor Safety Docket No. 05000395 License No. NPF-12 | |||
===Enclosure:=== | |||
As stated | |||
==Inspection Report== | |||
Docket Number: 05000395 License Number: NPF-12 Report Number: 05000395/2021401 Enterprise Identifier: I-2021-401-0026 Licensee: Dominion Energy South Carolina (DESC) | |||
Facility: Virgil C. Summer Nuclear Station Location: Jenkinsville, SC Inspection Dates: | |||
February 28 - March 4, 2021 (Onsite) | |||
Inspectors: J. Justice, Senior Physical Security Inspector J. Tornow, Physical Security Inspector Approved By: Otis Smith, JR, Sr. Physical Security Inspector Plant Support Branch Division of Reactor Safety Enclosure | |||
=SUMMARY= | |||
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Virgil C. Summer Nuclear Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. | |||
===List of Findings and Violations=== | |||
No findings or violations of more than minor significance were identified. | |||
===Additional Tracking Items=== | |||
None. | |||
=INSPECTION SCOPES= | |||
Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at: | |||
http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. | |||
==SAFEGUARDS== | |||
==71130.02 - Access Control == | |||
{{IP sample|IP=IP 71130.02|count=1}} | |||
The inspectors evaluated the access control program through completion of the following inspection elements: | |||
: (1) Tier I: All Requirements Tier II: No Requirements Tier III: 1 Requirement (02.10 (a)) | |||
==71130.05 - Protective Strategy Evaluation == | |||
{{IP sample|IP=IP 71130.05|count=2}} | |||
The inspectors evaluated the licensee's protective strategy through completion of the following procedure elements: | |||
: (1) Tier I: All Requirements Tier II: No Requirements Tier III: No Requirements | |||
==71130.09 - Security Plan Changes== | |||
The inspectors evaluated the security plan changes through completion of the following | |||
===procedure elements: Review Security Plan Changes (IP Section 02.01)=== | |||
{{IP sample|IP=IP 71130.09|count=1}} | |||
: (1) Since the last NRC inspection of this program area, Security Plan Revision 18 to 19 were implemented based on your determination, in accordance with 10 CFR 50.54(p)(2), that the changes resulted in no decrease in safeguards effectiveness of the security plan, and that the revised security plan continues to meet the requirements of 10 CFR 73.55(b). The inspectors conducted a review of the security plan changes to evaluate for a potential decrease in safeguards effectiveness of the security plan. However, this review does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety. | |||
==OTHER ACTIVITIES - BASELINE== | |||
71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below: | |||
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 03.17) (1 Sample) | |||
: (1) February 2020 through February | |||
==INSPECTION RESULTS== | |||
No findings were identified. | |||
==EXIT MEETINGS AND DEBRIEFS== | |||
The inspectors verified no proprietary information was retained or documented in this report. | |||
* On March 4, 2021, the inspectors presented the security baseline inspection results to Daniel Stoddard and other members of the licensee staff. | |||
=DOCUMENTS REVIEWED= | |||
Inspection Type Designation Description or Title Revision or | |||
Procedure Date | |||
71130.02 Procedures SCP-113 TWO PERSON RULE Revision 1 | |||
71130.02 Procedures SCP-114 SECURITY FORCE RESPONSIBILITIES DURING Revision 17 | |||
EMERGENCIES | |||
71130.02 Procedures SPP-201 PERSONNEL ACCESS Revision 9 | |||
71130.02 Procedures SPP-202 PROTECTED AREA Revision 13 | |||
VEHICLE ACCESS REQUIREMENTS | |||
71130.02 Procedures SPP-203 PERSONNEL, VEHICLE AND MATERIALS SEARCH Revision 12 | |||
REQUIREMENTS | |||
71130.02 Procedures SPP-210 SECURITY LOCK AND KEY CONTROL Revision 10 | |||
71130.02 Procedures SPP-213 SECURITY IDENTIFICATION BADGE FABRICATION Revision 23 | |||
AND CONTROL | |||
71130.02 Procedures SPP-214 SECURITY IDENTIFICATION BADGE ISSUANCE Revision 15 | |||
71130.02 Procedures SPP-236 OPERATION OF THE VEHICLE BARRIER SYSTEM Revision 2 | |||
CHECKPOINT | |||
71130.02 Procedures SPP-236 OWNER CONTROLLED AREA Revision 2 | |||
PERSONNEL ACCESS | |||
71130.05 Procedures SPP-301 SECURITY TRAINING AND QUALIFICATION PROGRAM: Revision 9 | |||
QUALIFICATION | |||
71130.05 Procedures SPP-302 SECURITY DRILL AND EXERCISE PROGRAM Revision 2 | |||
71130.05 Procedures SY-AA-TR-203 Composite Adversary Team Revision 3 | |||
71130.09 Procedures SY-AA-TR-126 Regulatory Assessment Performance Indicator Data Revision 1 | |||
Reporting | |||
5 | |||
}} | }} |
Revision as of 11:37, 9 September 2021
ML21106A143 | |
Person / Time | |
---|---|
Site: | Summer |
Issue date: | 04/16/2021 |
From: | Otis Smith Division of Reactor Safety II |
To: | Stoddard D Dominion Energy Co |
References | |
IR 2021401 | |
Download: ML21106A143 (7) | |
Text
April 16, 2021
SUBJECT:
VIRGIL C. SUMMER NUCLEAR STATION - SECURITY BASELINE INSPECTION REPORT 05000395/2021401
Dear Mr. Stoddard:
On March 5, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Virgil C. Summer Nuclear Station and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Otis Smith, Jr, Sr., Acting Chief Plant Support Branch Division of Reactor Safety Docket No. 05000395 License No. NPF-12
Enclosure:
As stated
Inspection Report
Docket Number: 05000395 License Number: NPF-12 Report Number: 05000395/2021401 Enterprise Identifier: I-2021-401-0026 Licensee: Dominion Energy South Carolina (DESC)
Facility: Virgil C. Summer Nuclear Station Location: Jenkinsville, SC Inspection Dates:
February 28 - March 4, 2021 (Onsite)
Inspectors: J. Justice, Senior Physical Security Inspector J. Tornow, Physical Security Inspector Approved By: Otis Smith, JR, Sr. Physical Security Inspector Plant Support Branch Division of Reactor Safety Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Virgil C. Summer Nuclear Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:
http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
SAFEGUARDS
71130.02 - Access Control
The inspectors evaluated the access control program through completion of the following inspection elements:
- (1) Tier I: All Requirements Tier II: No Requirements Tier III: 1 Requirement (02.10 (a))
71130.05 - Protective Strategy Evaluation
The inspectors evaluated the licensee's protective strategy through completion of the following procedure elements:
- (1) Tier I: All Requirements Tier II: No Requirements Tier III: No Requirements
71130.09 - Security Plan Changes
The inspectors evaluated the security plan changes through completion of the following
procedure elements: Review Security Plan Changes (IP Section 02.01)
- (1) Since the last NRC inspection of this program area, Security Plan Revision 18 to 19 were implemented based on your determination, in accordance with 10 CFR 50.54(p)(2), that the changes resulted in no decrease in safeguards effectiveness of the security plan, and that the revised security plan continues to meet the requirements of 10 CFR 73.55(b). The inspectors conducted a review of the security plan changes to evaluate for a potential decrease in safeguards effectiveness of the security plan. However, this review does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety.
OTHER ACTIVITIES - BASELINE
71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 03.17) (1 Sample)
- (1) February 2020 through February
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On March 4, 2021, the inspectors presented the security baseline inspection results to Daniel Stoddard and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection Type Designation Description or Title Revision or
Procedure Date
71130.02 Procedures SCP-113 TWO PERSON RULE Revision 1
71130.02 Procedures SCP-114 SECURITY FORCE RESPONSIBILITIES DURING Revision 17
EMERGENCIES
71130.02 Procedures SPP-201 PERSONNEL ACCESS Revision 9
71130.02 Procedures SPP-202 PROTECTED AREA Revision 13
VEHICLE ACCESS REQUIREMENTS
71130.02 Procedures SPP-203 PERSONNEL, VEHICLE AND MATERIALS SEARCH Revision 12
REQUIREMENTS
71130.02 Procedures SPP-210 SECURITY LOCK AND KEY CONTROL Revision 10
71130.02 Procedures SPP-213 SECURITY IDENTIFICATION BADGE FABRICATION Revision 23
AND CONTROL
71130.02 Procedures SPP-214 SECURITY IDENTIFICATION BADGE ISSUANCE Revision 15
71130.02 Procedures SPP-236 OPERATION OF THE VEHICLE BARRIER SYSTEM Revision 2
CHECKPOINT
71130.02 Procedures SPP-236 OWNER CONTROLLED AREA Revision 2
PERSONNEL ACCESS
71130.05 Procedures SPP-301 SECURITY TRAINING AND QUALIFICATION PROGRAM: Revision 9
QUALIFICATION
71130.05 Procedures SPP-302 SECURITY DRILL AND EXERCISE PROGRAM Revision 2
71130.05 Procedures SY-AA-TR-203 Composite Adversary Team Revision 3
71130.09 Procedures SY-AA-TR-126 Regulatory Assessment Performance Indicator Data Revision 1
Reporting
5