Notification of NRC Supplemental Inspection (95001) and Request for Information
ML24040A180
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 02/12/2024
From: Jeffrey Hamman
NRC/RGN-II/DRP/RPB3
To: Carr E
Virginia Electric & Power Co (VEPCO)
References
Download: ML24040A180 (5)


Text

Eric S. Carr, President, Nuclear Operations and Chief Nuclear Officer Dominion Energy Innsbrook Technical Center 5000 Dominion Boulevard, Floor: IN-3SE Glen Allen, VA 23060

SUBJECT:

VIRGIL C. SUMMER - NOTIFICATION OF NRC SUPPLEMENTAL INSPECTION (95001) AND REQUEST FOR INFORMATION

Dear Eric Carr:

By letter dated December 21, 2023, (ADAMS ML23342A000), the U.S. Nuclear Regulatory Commission (NRC) communicated to you the final significance determination of a finding having low-to-moderate safety significance (White) at Virgil C. Summer. The finding was associated with an NRC-identified violation of Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Appendix B, Criterion XVI, Corrective Action for the failure to identify and correct a condition adverse to quality resulting in the inoperability of the A emergency diesel generator (EDG).

On January 24, 2024, I was notified by your staff of Dominion Energys readiness for the NRC to conduct a supplemental inspection to review the actions taken to address the White finding.

Accordingly, we plan to conduct a supplemental inspection, beginning on March 18, 2024, at Virgil C. Summer using Inspection Procedure 95001, Supplemental Inspection Response to Action Matrix Column 2 (Regulatory Response) Inputs. This on-site inspection is scheduled to be performed March 18 through March 22, 2024.

In order to minimize the impact to your on-site resources and to ensure a productive inspection for both organizations, we have enclosed a request for documents needed for this inspection.

The documents identified are those the inspectors will need prior to and upon their arrival on site. It is important that all of the documents are up-to-date and complete in order to minimize the number of additional documents requested during the on-site portion of the inspection. To the extent possible, please organize the information as specified in the request for information (RFI). Experience has shown that poorly organized files can lead to a less efficient inspection and places additional burden on licensee staff. Secure file server access such as Certrec or SharePoint is preferred. During the inspection, the inspectors may request additional documents. If there are questions regarding the documents or material requested, or if the documents cannot be provided by the due date, please do not hesitate to contact the lead inspector, Jason Parent, at (240) 460-9258. We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Hank Kirkland / Justin Bouknight of your organization.February 12, 2024 E. Carr 2 In accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records System (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, Jeffrey Hamman, Acting Chief Reactor Projects Branch 3 Division of Reactor Projects Docket No. 05000395 License No. NPF-12

Enclosure:

Supplemental Inspection Document Request Signed by Hamman, Jeffrey on 02/12/24

ML24040A180 X Non-Sensitive X Publicly Available X SUNSI Review Sensitive Non-Publicly Available

OFFICE RII/DRP RII/DCO RIII/DRP RII/DRS RII/DRP

NAME M. Read J. Parent N. Childs M. Schwieg J. Hamman DATE 2/09/2024 2/09/2024 2/09/2024 2/09/2024 2/12/2024 SUPPLEMENTAL INSPECTION DOCUMENT REQUEST

Inspection Report: 05000395/2024040

Inspection Dates: March 18 - 22, 2024

Inspection Procedure: IP 95001

Please assemble the following documents and upload to your secure file server (e.g., Certrec) or SharePoint before March 8, 2024. Please ensure the documents are text searchable. The information sent should be current as of the date of your mailing. Information provided onsite should be the latest approved documentation. The information should be transmitted in such a manner as to reach the addressee by the specified date. Proprietary information and security related information should be clearly marked. Draft documentation should not be provided as part of this information request.

1. Administrative procedures governing the sites corrective action program, including:
a. The identification and resolution of problems;
b. Root cause, apparent cause and other types of causal evaluations; and
c. Common cause assessments, effectiveness reviews, and self-assessments.
2. The root cause evaluation report(s) and associated documents for the white finding.

Include all documents referenced in the root cause evaluation.

3. All corrective actions implemented for the white finding:
a. Documentation supporting completion of any corrective actions; and
b. Current schedule and resource commitments for open corrective actions.
4. The evaluation of the extent of condition and extent of cause for the white finding.
5. Ongoing, planned, or completed effectiveness reviews associated with the implemented corrective actions. Include schedule for ongoing and planned effective reviews.
6. Results of any effectiveness reviews, audits, self-assessments, mock inspections, etc.

Include any internal and/or external assessments (e.g., departmental assessments, corporate assessments, etc.) of the root cause evaluation and any follow-up assessments that occurred because of the root cause evaluation to assess readiness for the inspection.

7. If applicable, any evaluations of the effectiveness of previous corrective actions to prevent recurrence.
8. Drawings (including mechanical one-line), Design Bases Document, and Plant Procedures associated with the Emergency Diesel Generator.
9. Condition reports that (1) resulted from the root cause evaluation and (2) resulted from any assessments of the root cause evaluation.

10.Updated Final Safety Analyses Report (UFSAR), Technical Specifications (TS), and TS Bases

Enclosure 11.EDG vendor manual

12.Surveillance Tests

a. Last two current monthly tests for each EDG
b. Last 18-month EDG test
c. Surveillance tests for each EDG that were missed opportunities to identify the issue (dating back to 2021), if applicable.

13.Preventative Maintenance Procedures for EDG (List of PMs if over 10 documents)

14.EDG Fuel Line Modification package and open & completed work orders.

15.EDG Maintenance rule scoping and performance criteria

16.Title 10 CFR 21 Reports applicable to the EDG from the past 5 years

17.List of site personnel involved in the root cause report, identifying their organizations and responsibility for the report.