| number = ML20070U751
| number = ML20070U751
| issue date = 04/04/1991
| issue date = 04/04/1991
| title = Forwards Rev 0 to, Core Operating Limits Rept for Peach Bottom Atomic Power Station Unit 2 Reload 8,Cycle 9.
| title = Forwards Rev 0 to, Core Operating Limits Rept for Peach Bottom Atomic Power Station Unit 2 Reload 8,Cycle 9
| author name = Beck G
| author name = Beck G
| author affiliation = PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
| author affiliation = PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC

Latest revision as of 21:22, 23 May 2020

Forwards Rev 0 to, Core Operating Limits Rept for Peach Bottom Atomic Power Station Unit 2 Reload 8,Cycle 9
ML20070U751
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 04/04/1991
From: Beck G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20070U754 List:
References
NUDOCS 9104090301
Download: ML20070U751 (1)


Text

- _ _ _ _ _ _ - _ _ _ _

T8 '*9'l'

, PillLADELPillA Et,ECTRIC COMPANY NUCLEAR GROUP llEADQUAirfERS 955 65 C}lESTERilROOK IiLVD.

WAYNE, PA 19087 5691 (21$) 640-6(KK)

NUCLEAR ENGINEERINO & $1 RVICE3 DEfARTMENT April 4, 1991 Docket No. 50-277 Licenso No. DPR 44 U.S. Nuclear Regulatory Commission Attn Document Control Donk Wauhington, DC 20SSS SUllJECT: Poach 110ttom Atomic Power Station, Unit 2 Issuance of the core Operating Limits Hoport fc; Roload 8, Cyclo 9 Operation

Dear Sir:

Enclosed is a copy of the the core Operating Limits Report (COIJt) for Peach 11ottom Atomic Power Station (PBAPS), Unit 2, Roload 8, Cyclo 9 operation.

This report providos the cyclo-specific paramotor limits fort Averago Planar Linear float Conoration Rato ( APLilGR) ; Minimum Critical Power Ratio (MCPR); Flow Adjustment Factor (K ); Linear llaat Concration Rato (IJIGR); and Rod Block Ponitor fich biased upscale sotpoints. Thosn values have boon cotormined using NRC-approved methodology and are established such that all upplicable limits of the plant safety analysis are not.

This report is being submitted in accordance with the P11APS Unit 2 Technical Specifications (TS) Section 6.9.1.0 If you have any questions concerning this submittal, '

pleano do not hesitato to contact us.

Sincoroly, (bcAdde G. J. Ilock ht Managor, Licensing Nuclear Engineering and Services Enclosure cc: T. T. Martin, Administrator, Region I, USNRC J.J. Lyash, USNRC Senior Resident Inspector, PBAPS )OD l 9104090301 910404 (