Line 12: |
Line 12: |
| | document report number = LER-82-007-01T, LER-82-7-1T, NUDOCS 8206210385 | | | document report number = LER-82-007-01T, LER-82-7-1T, NUDOCS 8206210385 |
| | package number = ML20054G289 | | | package number = ML20054G289 |
| | document type = LICENSEE EVENT REPORT (SEE ALSO AO,RO), TEXT-SAFETY REPORT | | | document type = LICENSEE EVENT REPORT (SEE ALSO AO RO), TEXT-SAFETY REPORT |
| | page count = 2 | | | page count = 2 |
| }} | | }} |
|
---|
Category:LICENSEE EVENT REPORT (SEE ALSO AO RO)
MONTHYEARML20064F7011978-11-24024 November 1978 /03L-0 on 781025:during Pwr Oper,Intake Cooling Water Pumps Were Running When 3B Pump Motor Failed.The 3B Pump Motor Failed Because of Short Circuit in the Motor Windings ML20090E6071976-06-25025 June 1976 /01T:on 760611,boron Concentration of Injection Tank Below 20,000 Ppm Limit.Caused by Recirculation W/Low Concentration of Boric Acid Storage Tank B.Shutdown Initiated 1978-11-24
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L9371999-10-20020 October 1999 Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3891999-07-20020 July 1999 LER 99-001-00:on 990623,manual Rt from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With 990720 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17355A3611999-06-30030 June 1999 Refueling Outage ISI Rept. ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML20217B9871999-04-0808 April 1999 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408 ML17355A2881999-04-0505 April 1999 COLR for Turkey Point Unit 4 Cycle 18. ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17355A2201999-01-20020 January 1999 Refueling Outage ISI Rept. ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17354B1921998-11-18018 November 1998 LER 98-007-00:on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With 981118 Ltr ML17354B1891998-11-0909 November 1998 Simulatory Certification Update 2. ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17354B1591998-10-23023 October 1998 COLR for Turkey Point Unit 3 Cycle 17. ML17354B1361998-10-16016 October 1998 LER 98-004-00:on 980921,automatic Reactor Trip Occurred. Caused by Inadequate re-correlation of Intermediate Range Neutron Flux Instrumentation Reactor Trip Bistable. Enhanced Applicable Plant Procedures.With 981016 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17354B0971998-09-0909 September 1998 Part 21 Rept Re Possible Machining Defect in Certain One Inch Stainless Steel Swagelok Front Ferrules,Part Number SS-1613-1.Caused by Tubing Slipping Out of Fitting at Three Times Working Pressure of Tubing.Notified Affected Utils ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17354B0341998-07-15015 July 1998 LER 98-003-00:on 980619,discovered That Auxiliary Feedwater Sys Was Inoperable Due to Inadequate Inservice Testing of Valves.Caused by Misunderstanding of Testing Criteria.Util Revised Procedures & Verified Operability of Valves ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17354B0171998-06-29029 June 1998 Rev 1 to PTN-FPER-97-013, Evaluation of Turbine Lube Oil Fire. ML17354A9841998-06-18018 June 1998 LER 97-007-01:on 970730,automatic Reactor Trip Occurred Due to Closure of B Msiv.Caused by Failed BFD22S Relay.Six Relays on 3A,3B & 3C MSIVs Were Replaced & Implemented Plant Change to Disable Electronic Trip Function on 3 AFW Pumps ML17354A9741998-06-0909 June 1998 LER 98-002-00:on 980513,discovered Potential LOCA-initiated Electrical Fault Which Places ECCS Outside Design Basis. Caused by Inadequate Review of Effect on non-safety Circuit failures.Re-powered PC-*-600A Relays ML20248F7441998-05-31031 May 1998 Reactor Vessel Working Group,Response to RAI Regarding Reactor Pressure Vessel Integrity ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17354A8511998-03-24024 March 1998 LER 97-009-01:on 971114,discovered That CR Console Switch for 3B Sgfp Was Not in Start Position.Caused by Inadequate Procedural Guidance.Revised Procedures 3/4-OP-074,informed Personnel of Event & Performed Walkdown of CR ML17354B0001998-03-18018 March 1998 Florida Power & Light Topical Quality Asurance Rept, Dtd June 1998 ML17354A8441998-03-18018 March 1998 LER 98-001-00:on 980216,manual Reactor Trip Occurred Due to Loss of Turbine Control Oil Pressure W/Steam Leak in Auxiliary Feedwater Steam Supply Piping.Auxiliary Governor Maint Instructions Will Be revised.W/980318 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17354A7361997-12-12012 December 1997 LER 97-009-01:on 971114,identified That CR Console Switch for 3B SG Feedwater Pump Was Not in Start Position.Caused by Inadequate Procedural Guidance.Procedures 3/4-OP-074,SGFP Were revised.W/971212 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17354A7491997-10-13013 October 1997 SG Insp Rept. ML17354A8851997-10-13013 October 1997 FPL Units 3 & 4 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 960408-971013. ML17354A6801997-10-0808 October 1997 LER 97-008-00:on 970909,containment Sump Debris Screens Outside Design Basis Due to Stress Damage Was Discovered. Caused by Inadequate Procedural Guidance & Personnel Error. Discrepancies Found on Screens corrected.W/971008 Ltr ML17354A6791997-10-0606 October 1997 COLR Unit 4 Cycle 17, for Turkey Point ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr 1999-09-30
[Table view] |
LER-2082-007, |
Event date: |
|
---|
Report date: |
|
---|
2512082007R00 - NRC Website |
|
text
. .
NRC FOAM 364 U. S. NUCLEAA REGULATORY COMMISSION (7 773 LICENSEE EVENT REPORT I I t utaAse ra:NT on Tves ALL neculato iNroAMATIONI c0NTact. stoc<: l l 1 I i e@
[TT 1 P 3 3Iv i TIT UCENSEE ! PCODEI S! 4!@Ml0!0 l- I O .sciNi4 10 lNwwSSA 0 0 IO l- I O10 1
JS l@l4 6.CEN54
- 6 Il l 1l Yveg II1 J3l@l 61 CAT ! l@ id CON'T lolil r
"f ,% @_ @ l 015 101 0101 215 M 11 69 Gio I S I 2121812@lol6fot718!2l@
14 ?s agpQAT3aTI 40 S 40 61 OCC4 4T NwMe t R 4 VENT 3ATI tveNT osscairrios ANo eacsA8LE CoNSEcuGNCE3 I o i r1 i Unit 4's Boron Injection Bank (BIT h ) was being recirculated Iwith C lo 121 1 Acid Storace Tank (BAST) . A sample taken from the BIT revealed that the f 17141 l boron concentration was below the minimum allowable limir of 20.000 nnm. I I .> I s i i This is reportable in accordance with T.S. 3.4.1.a.2. The C BAST was then I i a is 1 I recirculated and a samole was drawn. This horon concentration was also 1
[o j r; l found to be below the limit. A and B BASTS were sampled and found to have 1 10631I acceptable boron concentrations. I 7
50 3 3 SYSTE'J CAJsE CAL $E C3Me vau g 2001 COQE $U8CCOE COMPONENT CODE tceCc33 sugCOOE le 191 lSl Fl @ [x_j @ lZ l @ l ZIZl Zi ZiZl Zi@ W @ [Z_j @ 23 F & 9 10 11 12 83 18 ed Jf 971AL OCOLgeESCE esece ?
_EvtNTvtam li3'on aEP r No. COC4 n Pt N C.
@ lcla g:;T80
_a, la I ?!
u l-l n
10 101 71 2 :.
M 2r 1011 I
- s n ITl u l. ,--J Lo_j n
CC
^*iN 'frYl4
. C'Ut' fir 5*4WE' u -ouas 22 ^U.'*WT s .8"S7 "s'f$t // vis*u","$0.',.
LXJ@l.x jg i z ig g@
u l 010 10 l [ [Y u_
j@ [Njg W@
<a _
J Z ]9 l9 l 9 lg u >< 2s 2 '. ao n u .1 cAuse oescaierion ANo coanscave AcriaNs @
i , , o j l Inspection of the system lineup found MOV-4-867B open one turn. It was ;
,,;,,, manually closed. A high head safety injection pump was being used to fill ;
gi the accumulators on Unit 3 with water from the refueling water storage tanka ii ! 21 1 It is suspected that some of this flow went through MOV-4-867B. diluting i Iilai I ehn BIT. Adoannen BIT concentration was confirmed in 2.25 hours2.893519e-4 days <br />0.00694 hours <br />4.133598e-5 weeks <br />9.5125e-6 months <br />. !
r B 9 30 57 5 it Isl (E j @ l 1l 010 l @ l NA
%*OWER CTwt457ATUS l
D'S V V W @lRoutine Sanpling and Analysis OiSC3v!Rv oEscaiPT'04 h !
' " '* so
' .C'riviry C: '4rtst
'**"cuen=ttrasa@
j@lavou~r ca .Criviry @ l l i .ite.se NA li!6I[Z_j@aenasuaase[ZNA !
<w=ves.sodio ves sSes @
essCaierio=
I
- l ' I i [0 l 0 l O l@[Z_J@lNA
' ' ' ' , sasen.~e'e b ' Ass
i*
su..e . :ssCa..rics@
liial1010IOl@l r ua n NA 2 u
'rves 1C 77 og I8 Ii![Z_j@l NA I
, , . > 30 NPC LSE O\I*Y gg (sCa.af.ON W ed@l v >
NAa i i it! flIiit It !
sa su n
" Pam yaven,..,-.--- L. p css (305) 55?-%54 I
8206210385 1 l PDR ADOCK 0 png
\ R I __- _ _ _ _
> e d LER 251-82-007 ADDITIONAL EVENT DESCRIPTION AND PROBABLE CONSEQUENCES Unit 4's Boron Injection Tank-(BIT) was being recirculated with C Boric Acid Storage Tank (BAST) by using the mini recirculation pumps. The BIT was sampled at 5:00am and the results showed a concentration of 19,000 ppm. Another sample was taken to check the results of the first analysis. The original results were confirmed. The system lineup was checked and flow was adequate. Then C BAST was recirculated alone and a sample was analyzed. A low boron concentration was also found in the BAST.
ADDITIONAL CAUSE DESCRIPTION AND CORRECTIVE ACTIONS The system lineup was inspected and MOV-4-867B was found open one hand turn.
The nuclear operator closed it manually. No other abnormalities were found in the system. While the BIT-BAST recirculation was taking place, a high head safety injection pump was being used to fill the accumulators on Unit 3 with water from the refueling water storage tank. It is suspected that some of the flow went through MOV-4-867B, diluting the BIT. However, no substantial level increase in the BAST was noted that would tend to support this explanation.
After MOV-4-867B was closed, the BIT was recirculated with one of the other two BASTS which contained adequate boric acid. At 7:15am, a sample from the BIT was analyzed and found to have sufficient boron concentration. Boric acid was added to C BAST and an acceptable concentration was confirmed at 12:19am on May 23, 1982.
Apparently, the Limitorque Operator on MOV-4-867B had failed to close the valve completely. A test will be devised to verify that the Limitorque operator properly closes the valve and assure that any seat leakage is min-imum.
It should be noted that with the upcoming installation of model 44F steam generators currently scheduled for November, 1982, the concentration require-ments in the BIT will be dropped.
|
---|
|
|
| | Reporting criterion |
---|
05000251/LER-1982-002, Forwards LER 82-002/01T-0 | Forwards LER 82-002/01T-0 | | 05000250/LER-1982-003, Forwards LER 82-003/03L-0 | Forwards LER 82-003/03L-0 | | 05000250/LER-1982-004, Forwards LER 82-004/03L-0 | Forwards LER 82-004/03L-0 | | 05000250/LER-1982-005, Forwards LER 82-005/03L-0 | Forwards LER 82-005/03L-0 | | 05000250/LER-1982-006, Forwards LER 82-006/03L-0 | Forwards LER 82-006/03L-0 | | 05000251/LER-1982-006, Forwards LER 82-006/01T-0 | Forwards LER 82-006/01T-0 | | 05000250/LER-1982-007, Forwards LER 82-007/03L-0 | Forwards LER 82-007/03L-0 | | 05000251/LER-1982-007, Forwards LER 82-007/01T-0 | Forwards LER 82-007/01T-0 | | 05000251/LER-1982-008, Forwards LER 82-008/03L-0 | Forwards LER 82-008/03L-0 | | 05000250/LER-1982-008, Forwards LER 82-008/03L-0 | Forwards LER 82-008/03L-0 | | 05000250/LER-1982-009, Forwards LER 82-009/03L-0 | Forwards LER 82-009/03L-0 | | 05000251/LER-1982-009, Forwards LER 82-009/03L-0 | Forwards LER 82-009/03L-0 | | 05000251/LER-1982-010, Forwards LER 82-010/03L-0 | Forwards LER 82-010/03L-0 | | 05000250/LER-1982-010, Forwards LER 82-010/03L-0 | Forwards LER 82-010/03L-0 | | 05000250/LER-1982-011, Forwards LER 82-011/03L-0 | Forwards LER 82-011/03L-0 | | 05000251/LER-1982-011, Forwards LER 82-011/03L-0 | Forwards LER 82-011/03L-0 | | 05000250/LER-1982-013, Forwards LER 82-013/03L-0 | Forwards LER 82-013/03L-0 | | 05000251/LER-1982-013, Forwards LER 82-013/03L-0 | Forwards LER 82-013/03L-0 | | 05000250/LER-1982-014, Forwards LER 82-014/01T-0 | Forwards LER 82-014/01T-0 | | 05000251/LER-1982-014, Forwards LER 82-014/03L-0 | Forwards LER 82-014/03L-0 | | 05000250/LER-1982-015, Forwards LER 82-015/03L-0 | Forwards LER 82-015/03L-0 | | 05000250/LER-1982-016, Forwards LER 82-016/03L-0 | Forwards LER 82-016/03L-0 | | 05000250/LER-1982-017, Forwards LER 82-017/03L-0 | Forwards LER 82-017/03L-0 | | 05000250/LER-1982-018, Forwards LER 82-018/01T-0 | Forwards LER 82-018/01T-0 | | 05000250/LER-1982-019, Forwards LER 82-019/03L-0 | Forwards LER 82-019/03L-0 | |
|