()                                          DUQUESNE LIGHT COMPANY Beaver Valley Power Station NARRATIVE  
()                                          DUQUESNE LIGHT COMPANY Beaver Valley Power Station NARRATIVE  


==SUMMARY==
==SUMMARY==
OF MONTHLY OPERATING EXPERIENCE - MAY 198u
OF MONTHLY OPERATING EXPERIENCE - MAY 198u May 1                  Station in Operational Mode 5 with the
,
May 1                  Station in Operational Mode 5 with the
;                                                Through                reactor coolant system at atmospheric i                                                May 31                pressure and approximately 100F.
;                                                Through                reactor coolant system at atmospheric i                                                May 31                pressure and approximately 100F.
,                                                                    MAJCR SAFETY RELATED MAINTENANCE - MAY 1980
,                                                                    MAJCR SAFETY RELATED MAINTENANCE - MAY 1980 Beaver Valley Power Station Unit No. 1 is presently shut down for major modificat ions. Modifications are performed as construction activities.
                                                                                                                                      .
Beaver Valley Power Station Unit No. 1 is presently shut down for major modificat ions. Modifications are performed as construction activities.
The follcwing major modifications were performed or in progress during May 1980.
The follcwing major modifications were performed or in progress during May 1980.
: 1. Testing, seal replacement and re-installation of Berger-Patterson large-bore snubbers.
: 1. Testing, seal replacement and re-installation of Berger-Patterson large-bore snubbers.
: 2. Re-installation of the modified quench spray pumps.
: 2. Re-installation of the modified quench spray pumps.
: 3. Modification of the refueling water storage tank to . provide additional quench spray capacity and to add instrumentation required for the automatic
: 3. Modification of the refueling water storage tank to . provide additional quench spray capacity and to add instrumentation required for the automatic change-over from injection mode to recirculation mode of safety injection.
'
change-over from injection mode to recirculation mode of safety injection.
: 4. Inspection, modification and re-assembly of the low head safety injection
: 4. Inspection, modification and re-assembly of the low head safety injection
  !                                                    pumps.
  !                                                    pumps.
: 5. Inspection and modification on a continual basis, as required, of pipe hangers, supports and base plates.
: 5. Inspection and modification on a continual basis, as required, of pipe hangers, supports and base plates.
                  '
: 6. Inspection, internal cleaning and modification of the' reactor coolant pump motors thrust runners on oil pump to reduce cavitation and breakdown        -
: 6. Inspection, internal cleaning and modification of the' reactor coolant pump motors thrust runners on oil pump to reduce cavitation and breakdown        -
of motor lubrication oil.                                      ,
of motor lubrication oil.                                      ,
: 7. Modification to increase the auxiliary feedwater pumps' minimum rr irculation flow.
: 7. Modification to increase the auxiliary feedwater pumps' minimum rr irculation flow.
: 8. Inspection and installation of the Unit 2 low pressure turbine rotors into the Unit 1 main-turbine to replace Unit I rotors which had disc crack indi ations.
: 8. Inspection and installation of the Unit 2 low pressure turbine rotors into the Unit 1 main-turbine to replace Unit I rotors which had disc crack indi ations.
                                                                                                                                              !
l l
l l
_
goobib0                                          .
goobib0                                          .
                                                                                                                            .
                                                                                                                                    '
   .m _------ - _ _ _ . _- _ - . _ _ _ _ _ .                                _ _ . , .          _ _ .            _  _                    _
   .m _------ - _ _ _ . _- _ - . _ _ _ _ _ .                                _ _ . , .          _ _ .            _  _                    _


                                                                -
                                                                                              ... . . - .        ..                                .,
        .                                                                                                                  -
  .
        ..                                                                                                          -
.,
                                                                                                                                            . . ..
                                                                                                                          .
OPERATISG DATA REPORT DOCKET NO. _50-334 DATE 6/2/c0 COMPLETED BY                D. R. Ticko TELEPHONE. 5'? 44'-5308 OPET'dTING STATUS Notes
OPERATISG DATA REPORT DOCKET NO. _50-334 DATE 6/2/c0 COMPLETED BY                D. R. Ticko TELEPHONE. 5'? 44'-5308 OPET'dTING STATUS Notes
: 1. Unit Name: Beaver Valley Power Station Unit #,1,
: 1. Unit Name: Beaver Valley Power Station Unit #,1,
Line 71: Line 48:
: 7. Maximum Dependable Capacity (Net SIWE):            810
: 7. Maximum Dependable Capacity (Net SIWE):            810
: 8. If Changes Occur in capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
: 8. If Changes Occur in capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
                                                .
: 9. Power Lese! To Which Restricted. If Any (Net MWe):          None
: 9. Power Lese! To Which Restricted. If Any (Net MWe):          None
: 10. Reasons For Restrictions,If Any:.                          N/A                                              '
: 10. Reasons For Restrictions,If Any:.                          N/A                                              '
                                                                                                                                          .
This Month            Yr to.Date                  ' Cumulative i1. Hours In Reporting P- iod                              744                  3,647                      C35,807                          ;
This Month            Yr to.Date                  ' Cumulative i1. Hours In Reporting P- iod                              744                  3,647                      C35,807                          ;
: 12. Number Of Hours Reactor Was Critical                      0                          0                      13,744.71
: 12. Number Of Hours Reactor Was Critical                      0                          0                      13,744.71
Line 94: Line 69:
: 26. Units in Test Status (Prior to Commercial Operation):                      Foret:ss:                    Achieved
: 26. Units in Test Status (Prior to Commercial Operation):                      Foret:ss:                    Achieved
                                                                                                                                                       ~
                                                                                                                                                       ~
INITIAL CRITICA LITY                                      N/A                            N/A INITIAL ELECTRICITY                                        N/A                            N/A COMMERCIA L OPERAT'ON                                      N/A                .          N/A
INITIAL CRITICA LITY                                      N/A                            N/A INITIAL ELECTRICITY                                        N/A                            N/A COMMERCIA L OPERAT'ON                                      N/A                .          N/A (9/77) :
._                                                                                                                    .
(9/77) :
% - -- _ _ _  .
                    -
                       . -- n -
                       . -- n -
m
m


                                                                        .                                      ..            --
     + ..
                                                                                                                  .
* AVERAGE DAIL UNIT POWER LEVEL DOCKET NO.      50-334 UNIT      BVPS Unit #1      ,
     + ..  *
DATE      6/2/80 COMPl.ETED BY D. R. m ko TELEPil0NE      412-643- 5308 May, 1980 MONTli DAY      AVERAGE DAILY POWER LEVEL                          DAY        AVERAGE DAILY POWER LEVEL (MWe Net)                                                  (MWe Net) 1 0                                37 0
                                                                                              ,.
* AVERAGE DAIL UNIT POWER LEVEL DOCKET NO.      50-334
                                                                                                    '
UNIT      BVPS Unit #1      ,
DATE      6/2/80 COMPl.ETED BY D. R. m ko
    .
TELEPil0NE      412-643- 5308
--
May, 1980 MONTli DAY      AVERAGE DAILY POWER LEVEL                          DAY        AVERAGE DAILY POWER LEVEL (MWe Net)                                                  (MWe Net) 1 0                                37 0
0 2                                                          18 3                                                          19 0
0 2                                                          18 3                                                          19 0
4                                                          20 0
4                                                          20 0
Line 122: Line 84:
i6                                                                                                                      l l
i6                                                                                                                      l l
l INSTRUCTIONS On this format.!ist the ascrage daily unit power leselin MWe Net for each day in the reportine month. Compute to        ,
l INSTRUCTIONS On this format.!ist the ascrage daily unit power leselin MWe Net for each day in the reportine month. Compute to        ,
                                                                                                                                    ,!
the nearest whole megawatt.
the nearest whole megawatt.
            .
(9/77) s O
                                                                                                  '
(9/77) s
                                                                  .
                                                                                                            .
O
                                                                                                                                  .


:
                                                                                                                                                          .
                                                                                                                                                              .
                                                                                                                                                            .
                                                                                                                                                              .
                                                                                          .
DOCKET NO.        50-334 UNIT SilUIDOWNS AND POWER REDUCTIONS                                        IWPS Unic r1 UNIT NAME DATE      6/2/H0 COMPLETE!                .R    'I L REPORT MON ril May, 1980                                                  _
DOCKET NO.        50-334 UNIT SilUIDOWNS AND POWER REDUCTIONS                                        IWPS Unic r1 UNIT NAME DATE      6/2/H0 COMPLETE!                .R    'I L REPORT MON ril May, 1980                                                  _
  ,
                                                                *.
          -
                                                           -      E                                c
                                                           -      E                                c
                                 -,      ,$g      3      3 Y "d        Licennee      j-t,        h                  Cause & Consestise No.        DJ'e      i      Eg          4    355            Event        g?
                                 -,      ,$g      3      3 Y "d        Licennee      j-t,        h                  Cause & Consestise No.        DJ'e      i      Eg          4    355            Event        g?
                                                                                                '
5-3                      Assion to fE        d    3;ji,=
5-3                      Assion to
                                '-
fE        d    3;ji,=
: s.      !
: s.      !
Repost a    mO u
Repost a    mO u
E'                Prevent Recuirence 6
E'                Prevent Recuirence 6
* 1        010180    S      3647    11        1            N/A        ZZ        ZZZZZZ  Unit shutdown for major modifications as required by the Nuclear, Regulatory Commission, including NRC Bulletins lEB 79-02 and 79-14.
* 1        010180    S      3647    11        1            N/A        ZZ        ZZZZZZ  Unit shutdown for major modifications as required by the Nuclear, Regulatory Commission, including NRC Bulletins lEB 79-02 and 79-14.
                                                                                              .
                                                                                                                                                        .
                        .
                                                                                                                                                            ,
r                                                                              .
r                                                                              .
                                                                                    .
I .                  2                                                    3                              4 F: Forced          Reason:                                              Method:                          Exhibit G Instinctions S: Schedu'ed        A. Equipment Failure (Explain)                        1 -Manual                        for Pieparation al Data 113taintenance ei Test                                2-M mual Serain.                  Entr> Sheets fin 1.icensee C. Refueling                                        3 Automatic Scram.                Event Repost al.1 RII de INUREG D. Regulator) Restriction                            -l Other (Explain)                01611 l' Opesaim Training & l_icense Examination I: Administrative                                                                  5 G Operational 1:sso Ilimplaint                                                          thhibit I - Sam /Somce I'7/77)                IlOlisceiISplain)
                                                                      *                            '
I .                  2                                                    3                              4
    -
F: Forced          Reason:                                              Method:                          Exhibit G Instinctions S: Schedu'ed        A. Equipment Failure (Explain)                        1 -Manual                        for Pieparation al Data 113taintenance ei Test                                2-M mual Serain.                  Entr> Sheets fin 1.icensee C. Refueling                                        3 Automatic Scram.                Event Repost al.1 RII de INUREG
* D. Regulator) Restriction                            -l Other (Explain)                01611
      -
l' Opesaim Training & l_icense Examination
* I: Administrative                                                                  5 G Operational 1:sso Ilimplaint                                                          thhibit I - Sam /Somce I'7/77)                IlOlisceiISplain)
                                                                                                                                      '
                           -}}
                           -}}

Latest revision as of 02:30, 1 February 2020

Monthly Operating Rept for May 1980
ML19323H651
Person / Time
Site: Beaver Valley
Issue date: 06/02/1980
From: Timko D
DUQUESNE LIGHT CO.
To:
Shared Package
ML19323H649 List:
References
NUDOCS 8006160016
Download: ML19323H651 (4)


Text

_

() DUQUESNE LIGHT COMPANY Beaver Valley Power Station NARRATIVE

SUMMARY

OF MONTHLY OPERATING EXPERIENCE - MAY 198u May 1 Station in Operational Mode 5 with the

Through reactor coolant system at atmospheric i May 31 pressure and approximately 100F.

, MAJCR SAFETY RELATED MAINTENANCE - MAY 1980 Beaver Valley Power Station Unit No. 1 is presently shut down for major modificat ions. Modifications are performed as construction activities.

The follcwing major modifications were performed or in progress during May 1980.

1. Testing, seal replacement and re-installation of Berger-Patterson large-bore snubbers.
2. Re-installation of the modified quench spray pumps.
3. Modification of the refueling water storage tank to . provide additional quench spray capacity and to add instrumentation required for the automatic change-over from injection mode to recirculation mode of safety injection.
4. Inspection, modification and re-assembly of the low head safety injection

! pumps.

5. Inspection and modification on a continual basis, as required, of pipe hangers, supports and base plates.
6. Inspection, internal cleaning and modification of the' reactor coolant pump motors thrust runners on oil pump to reduce cavitation and breakdown -

of motor lubrication oil. ,

7. Modification to increase the auxiliary feedwater pumps' minimum rr irculation flow.
8. Inspection and installation of the Unit 2 low pressure turbine rotors into the Unit 1 main-turbine to replace Unit I rotors which had disc crack indi ations.

l l

goobib0 .

.m _------ - _ _ _ . _- _ - . _ _ _ _ _ . _ _ . , . _ _ . _ _ _

OPERATISG DATA REPORT DOCKET NO. _50-334 DATE 6/2/c0 COMPLETED BY D. R. Ticko TELEPHONE. 5'? 44'-5308 OPET'dTING STATUS Notes

1. Unit Name: Beaver Valley Power Station Unit #,1,
2. Reporting Period: Stav , 1980
3. Licensed Thermal Power (51Wt): 2'M
4. Nameplate Rating (Gross SIWE): 923
5. Design Electrical Rating (Net SIWE): 852
6. Maximum Dependable Capacity (Gross SIWE): 845
7. Maximum Dependable Capacity (Net SIWE): 810
8. If Changes Occur in capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Lese! To Which Restricted. If Any (Net MWe): None
10. Reasons For Restrictions,If Any:. N/A '

This Month Yr to.Date ' Cumulative i1. Hours In Reporting P- iod 744 3,647 C35,807  ;

12. Number Of Hours Reactor Was Critical 0 0 13,744.71
13. Reactor Reserve Shutdown Hours .

0 0 f4,482.8

14. Hours Generator On.Line 0 0 13,105.07
15. Unit Resene Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (51WH) 0 0 26,974,253.33
17. Gross Electrical Energy Generated (MWH) 0 , _ ,

0 8,277,940

18. Net Electrical Energy Generated (MWH) 0 0 7,570,743 l
19. Unit Service Factor 0 0 38.5 l
20. Unit Availability Factor 0 0 38.5
21. Unit Capacity Factor (Using MDC Net) 0 0 30.1
22. Unit Capacity Factor (Using DER Net) 0 0 28.6
23. Unit Forced Ontage Rate 0 0 46,4
24. Shutdowns Scheduled Over Next 6 Months (Type.Date,and Duration of Each): l Maior Modifications Outane (December, 1979, through July, 1980) l
25. If Shut Down At End Of Report Period Estimated Date of Startup: Julv 22, 1980
26. Units in Test Status (Prior to Commercial Operation): Foret:ss: Achieved

~

INITIAL CRITICA LITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIA L OPERAT'ON N/A . N/A (9/77) :

. -- n -

m

+ ..

  • AVERAGE DAIL UNIT POWER LEVEL DOCKET NO. 50-334 UNIT BVPS Unit #1 ,

DATE 6/2/80 COMPl.ETED BY D. R. m ko TELEPil0NE 412-643- 5308 May, 1980 MONTli DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net) 1 0 37 0

0 2 18 3 19 0

4 20 0

5 21 6 22 l 0

7 23 0 0 8 24 0 0 9 25 .

10 26 0 0 l II 27 l 12 28 13 29 0 0 14 30 0 -

0 15 31 ,

i6 l l

l INSTRUCTIONS On this format.!ist the ascrage daily unit power leselin MWe Net for each day in the reportine month. Compute to ,

the nearest whole megawatt.

(9/77) s O

DOCKET NO. 50-334 UNIT SilUIDOWNS AND POWER REDUCTIONS IWPS Unic r1 UNIT NAME DATE 6/2/H0 COMPLETE! .R 'I L REPORT MON ril May, 1980 _

- E c

-, ,$g 3 3 Y "d Licennee j-t, h Cause & Consestise No. DJ'e i Eg 4 355 Event g?

5-3 Assion to fE d 3;ji,=

s.  !

Repost a mO u

E' Prevent Recuirence 6

  • 1 010180 S 3647 11 1 N/A ZZ ZZZZZZ Unit shutdown for major modifications as required by the Nuclear, Regulatory Commission, including NRC Bulletins lEB 79-02 and 79-14.

r .

I . 2 3 4 F: Forced Reason: Method: Exhibit G Instinctions S: Schedu'ed A. Equipment Failure (Explain) 1 -Manual for Pieparation al Data 113taintenance ei Test 2-M mual Serain. Entr> Sheets fin 1.icensee C. Refueling 3 Automatic Scram. Event Repost al.1 RII de INUREG D. Regulator) Restriction -l Other (Explain) 01611 l' Opesaim Training & l_icense Examination I: Administrative 5 G Operational 1:sso Ilimplaint thhibit I - Sam /Somce I'7/77) IlOlisceiISplain)

-