Letter Sequence Meeting |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting
|
MONTHYEARML0807303392008-01-31031 January 2008 License Amendment Request for Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade, Technical Specification Change Number 2007-09 Project stage: Request ML0806503202008-03-0505 March 2008 3/18/2008 - Forthcoming Meeting with Duke Power Company LLC, Oconee, Units 1, 2, and 3 to Discuss the January 31, 2008 License Amendment Request for Digital Upgrade to the Reactor Protective System and Engineered Safeguards Protective Syste Project stage: Meeting ML0808400402008-03-18018 March 2008 Duke Handout from 03/18/08 Meeting Project stage: Request ML0808400382008-03-18018 March 2008 Draft NRC Handout from 03/18/2008 Meeting Project stage: Request ML0808400442008-03-20020 March 2008 Corrected NRC Handout from 03/18/2008 Meeting, Draft Project stage: Request ML0808801512008-04-0202 April 2008 Summary of March 18, 2008 Meeting to Discuss the January 31, 2008, License Amendment Request (LAR) for a Digital Upgrade to Oconee Reactor Protective System (RPS) and Engineered Safeguards Protective System (Esps) Project stage: Meeting ML0809900862008-04-0303 April 2008 Schedule for Providing Information Requested During March 18, 2008, Duke/Nrc Meeting Associated with the License Amendment Request for Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade.. Project stage: Meeting ML0809900512008-04-0303 April 2008 License Amendment Request for Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade, Technical Specification Change (TSC) Number 2007-09, Supplement 1 Project stage: Supplement ML0808605472008-04-10010 April 2008 /2/3, Call Summary to Discuss the Availability of Documents Related to the January 31, 2008 License Amendment Request Project stage: Other ML0810705212008-04-24024 April 2008 Acceptance Review of January 31, 2008, License Amendment Request for a Upgrade to the Reactor Protective System and Engineered Safeguards Protective System Project stage: Acceptance Review ML0812702222008-04-29029 April 2008 Rps/Esps Digital LAR, Oconee Nuclear Station, Non-Proprietary Material Project stage: Request ML0812601672008-04-29029 April 2008 License Amendment Request for Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade, Technical Specification Change (TSC) Number 2007-09, Supplement 2 Project stage: Supplement ML0814300032008-05-15015 May 2008 License Amendment Request for Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade, Technical Specification Change (TSC) Number 2007-09, Supplement 3 Project stage: Supplement ML0810601562008-05-27027 May 2008 Areva Np Incorp. Request for Withholding Information from Public Disclosure for Oconee, Units 1,2, & 3 Project stage: Withholding Request Acceptance ML0815501452008-05-28028 May 2008 License Amendment Request for Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade, Technical Specification Change (TSC) Number 2007-09, Supplement 4 Project stage: Supplement ML0815603312008-06-16016 June 2008 Summary of Closed Meeting to Discuss Two Issues Related to the Oconee, Units 1, 2, and 3, January 31, 2008, License Amendment Request (LAR) Project stage: Meeting ML0819001972008-07-23023 July 2008 /2/3, Trip Report for NRC Staff Visit to Discuss Issues Identified in the Acceptance Review Letter Regarding the Digital Upgrade of the Reactor Protective System and Esps (TAC MD7999-MD8001) Project stage: Acceptance Review ML0823306182008-08-28028 August 2008 Nonproprietary Version- Oconee Nuclear Station, Units 1, 2, Request for Additional Information Digital Upgrade of Reactor Protective System and Engineered Safeguards Protective System Project stage: RAI ML0826310132008-10-10010 October 2008 Summary of Meeting to Discuss August 20, 2008, Request for Additional Information Pertaining the Digital Upgrade to the Oconee Reactor Protective System and Engineered Safeguards Protective System (TAC Nos. MD7999, MD80000, and MD8001) Project stage: RAI ML0830804532008-11-12012 November 2008 Trip Report for U.S. Nuclear Commission (NRC) Staff'S Oconee Nuclear Station, Units 1, 2, and 3 (Oconee) - Thread Audit at Areva for Digital Upgrade of the Reactor Protective System (RPS) and Engineered Safeguards Protective System (Esps) Project stage: Other ML0832603052008-11-24024 November 2008 Individual Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for Hearing Project stage: Other ML0832602582008-11-24024 November 2008 FRN: Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for a Hearing Project stage: Other ML0906202452009-03-11011 March 2009 Request for Additional Information (RAI) Regarding License Amendment Request (LAR) to Change Technical Specifications as Well as Cyber Security Features Related to Replacement of Current Analog Reactor. Project stage: RAI ML0913804332009-04-30030 April 2009 Response to Supplemental Request for Additional Information for License Amendment Request for Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade Project stage: Supplement ML0917704362009-06-19019 June 2009 Suppl. Request for Additional Information for License Amendment Request for Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade, Technical Specification Change (TSC) Number 2007-09, Suppl. 17 Project stage: Request ML0918300102009-07-13013 July 2009 Request for Withholding Information from Public Disclosure Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade Project stage: Withholding Request Acceptance ML0923205502009-08-10010 August 2009 Supplemental Request for Additional Information for License Amendment Request for Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade, Technical Specification Change Number Project stage: Supplement ML0921807362009-09-0202 September 2009 Request for Withholding Information from Public Disclosure for Oconee Nuclear Station, Units 1, 2, and 3 Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade (TAC Nos. MD7999, MD8000, and MD8001) - Sup Project stage: Withholding Request Acceptance ML0921806152009-09-0202 September 2009 Request for Withholding Information from Public Disclosure for Oconee Nuclear Station, Units 1, 2, and 3 Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade (TAC Nos. MD7999, MD8000, and 8001) - Suppl Project stage: Withholding Request Acceptance ML0921706842009-09-0202 September 2009 Request for Withholding Information from Public Disclosure for Oconee Nuclear Station, Units 1, 2, and 3 Regarding Reactor Protective Systems/ Engineered Safeguards Protective System Digital Upgrade (Tac Nos. MD7999, MD8000, and MD8001) - S Project stage: Withholding Request Acceptance ML0920801012009-09-0202 September 2009 Request for Withholding Information from Public Disclosure for Oconee Nuclear Station, Units 1, 2, and 3 Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade - Supplement 6 Project stage: Withholding Request Acceptance ML0920800742009-09-0202 September 2009 Request for Withholding Information from Public Disclosure for Oconee Nuclear Station, Units 1, 2, and 3 Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade Project stage: Withholding Request Acceptance ML0926700632009-10-0909 October 2009 Request for Withholding Information from Public Disclosure Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade (TAC Nos. MD7999, MD8000 and MD8001 Project stage: Withholding Request Acceptance ML0926701022009-10-0909 October 2009 Request for Withholding Information from Public Disclosure Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade Project stage: Withholding Request Acceptance ML0926701302009-10-0909 October 2009 Request for Withholding Information from Public Disclosure Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade Project stage: Withholding Request Acceptance ML0929600422009-10-23023 October 2009 Decontrolled Version of Transmittal Letter for Draft Safety Evaluation for Acceptance of the Reactor Protective System and Engineered Safeguard Protective System (Rps/Esps) Digital Upgrades Project stage: Draft Approval ML0924504412009-11-12012 November 2009 Request for Withholding Information from Public Disclosure, Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade Project stage: Withholding Request Acceptance ML0924502332009-11-12012 November 2009 Request for Withholding Information from Public Disclosure, Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade Project stage: Withholding Request Acceptance ML0924503862009-11-12012 November 2009 Request for Withholding Information from Public Disclosure, Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade (Supplement 15-2), Project stage: Withholding Request Acceptance ML0924504122009-11-12012 November 2009 Request for Withholding Information from Public Disclosure, Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade (Supplement 16-1), Project stage: Withholding Request Acceptance ML0924504572009-11-12012 November 2009 Request for Withholding Information from Public Disclosure, Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade (Supplement 16-3), Project stage: Withholding Request Acceptance ML0924504912009-11-12012 November 2009 Request for Withholding Information from Public Disclosure, Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade (Supplement 17), Project stage: Withholding Request Acceptance ML0924505432009-11-12012 November 2009 Request for Withholding Information from Public Disclosure, Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade (Supplement 12), TAC Nos. MD7999, MD8000, and MD8001 Project stage: Withholding Request Acceptance ML0930704632009-11-12012 November 2009 Request for Withholding Information from Public Disclosure, Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade Project stage: Withholding Request Acceptance ML0930707182009-11-12012 November 2009 Request for Withholding Information from Public Disclosure, Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade Project stage: Withholding Request Acceptance ML0930707342009-11-12012 November 2009 Request for Withholding Information from Public Disclosure, Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade Project stage: Withholding Request Acceptance ML0933101832009-11-19019 November 2009 Comments on Draft NRC Safety Evaluation for Acceptance of the Reactor Protective System and Engineered Safeguards Protective System Digital Upgrade Project stage: Request ML0931000772009-12-0101 December 2009 Environmental Assessment and Finding of No Significant Impact Project stage: Other ML0931001732009-12-0101 December 2009 Environmental Assessment and Finding of No Significant Impact Project stage: Other NRC-2009-0537, Environmental Assessment and Finding of No Significant Impact2009-12-0101 December 2009 Environmental Assessment and Finding of No Significant Impact Project stage: Other 2008-05-28
[Table View] |
Summary of Closed Meeting to Discuss Two Issues Related to the Oconee, Units 1, 2, and 3, January 31, 2008, License Amendment Request (LAR)ML081560331 |
Person / Time |
---|
Site: |
Oconee |
---|
Issue date: |
06/16/2008 |
---|
From: |
Olshan L NRC/NRR/ADRO/DORL/LPLII-1 |
---|
To: |
Duke Energy Carolinas |
---|
Olshan L N, NRR/DLPM, 415-1419 |
References |
---|
TAC MD7999, TAC MD8000, TAC MD8001 |
Download: ML081560331 (3) |
|
|
---|
Category:Meeting Summary
MONTHYEARML24124A0342024-05-0101 May 2024 Summary of Public Meeting Concerning Annual Assessment of Catawba Nuclear Station Units 1 and 2, McGuire Nuclear Station Units 1 and 2, Oconee Nuclear Station Units 1, 2, and 3, Brunswick Steam Electric Plant Units 1 and 2, Shearon Harris ML24071A1692024-03-15015 March 2024 February 2024 Subsequent License Renewal Public Draft Environmental Impact Statement Meetings-Memo ML24071A1702024-03-15015 March 2024 February 2024 Oconee Draft EIS Public Meetings - Summary ML23118A2852023-05-0202 May 2023 Public Meeting Summary - 2022 Annual Assessment Meeting Regarding Catawba Nuclear Station, McGuire Nuclear and Oconee Nuclear Station ML22200A0772022-08-0808 August 2022 SLRA - Summary of July 14, 2022 and July 28, 2022 Public Meetings ML22193A0182022-07-18018 July 2022 SLRA - Summary of June 30, 2022 Public Meeting ML22129A0062022-05-10010 May 2022 Summary of April 20, 2022, Meeting with Duke Energy Progress, LLC, to Discuss Proposed License Amendment Request to Revise Reactor Coolant System Pressure Isolation Valve Operational Leakage Surveillance Requirement Frequency (L-2022-LRM 00 ML22124A2052022-05-0404 May 2022 Summary of May 4, 2022, Clarification Call with Duke Energy Carolinas, LLC, Application to Revise TS 3.7.7, Low Pressure Service Water (LPSW) System ML22130A0122022-05-0404 May 2022 SLRA - Summary of April 28, 2022 Public Meeting ML22075A2042022-04-0505 April 2022 SLRA - Summary of March 7, 2022 Public Meeting ML22084A6142022-04-0404 April 2022 SLRA - Summary of March 16, 2022 (Closed Public Meeting) ML22094A1112022-04-0404 April 2022 Public Meeting Summary 2021 Annual Assessment Meeting Catawba Dockets Nos. 50-413 and 50-414; McGuire No. 50-369 and 50-370; Oconee. 50-269, 50-270, and 50-287 ML22063A1162022-03-0808 March 2022 SLRA - Summary of Public Meeting Dated February 17, 2022 ML21341A5542021-12-29029 December 2021 Summary of November 29, 2021, Meeting with Duke Energy Progress, LLC and Duke Energy Carolinas, LLC to Discuss a Planned License Amendment Request to Relocate ML21348A5452021-12-14014 December 2021 December 13, 2021, Clarification Call Summary Use of an Alternative to the ASME Code Case N-853 Acceptance Criteria ML21279A1542021-11-0808 November 2021 August 25, 2021, Oconee Nuclear Station, Units 1, 2, and 3 Subsequent License Renewal Application Public Environmental Scoping Meeting Summary Memo ML21279A1192021-08-25025 August 2021 August 25, 2021, Oconee Nuclear Station, Units 1, 2, and 3 Subsequent License Renewal Application Public Environmental Scoping Meeting Summary ML21195A2692021-07-14014 July 2021 Meeting Summary: Pre-Submittal Meeting for the Oconee Subsequent License Renewal Application (EPID Number: L-2020-RNW-0028) (Docket Numbers: 50 269, 50-270, and 50-287) - Memo ML21195A2712021-07-14014 July 2021 Meeting Summary: Pre-Submittal Meeting for the Oconee Subsequent License Renewal Application (EPID Number: L-2020-RNW-0028) (Docket Numbers: 50 269, 50-270, and 50-287) - Summary ML21102A0612021-04-27027 April 2021 April 14, 2021, Meeting Summary Regarding Pre-Application Meeting to Discuss Proposed Relief Request Related to Code Case N-853 ML21099A0932021-04-0909 April 2021 Public Meeting Summary - 2020 Annual Assessment Meeting Regarding Catawba, McGuire, and Oconee Nuclear Stations ML20266G2192020-11-0303 November 2020 Regulatory Audit Report Regarding License Amendment Request to Revise the Licensing Basis for High Energy Line Breaks Outside of the Containment Building ML20141L4172020-05-20020 May 2020 EOC Public Meeting Summary ML19331A5202019-12-12012 December 2019 Summary of Meeting with Duke Energy Carolinas, LLC to Discuss Submitted License Amendment Request for Oconee Nuclear Station, Units 1, 2, and 3 Regarding High Energy Line Break Licensing Basis ML19220A6702019-08-26026 August 2019 Summary of August 7, 2019, Meeting with Duke Energy Progress, LLC and Duke Energy Carolinas, LLC to Discuss a Proposed License Amendment Request for a Common Emergency Plan ML19207A0172019-07-30030 July 2019 Summary of Meeting with Duke Energy Carolinas, LLC to Discuss Proposed License Amendment Request for Oconee Nuclear Station, Units 1, 2, and 3 Regarding High Energy Line Break Licensing Basis ML19102A3352019-04-12012 April 2019 Public Meeting Summary - Oconee Nuclear Station Docket Nos. 50-269, 50-270, and 50-287 ML19087A0622019-04-11011 April 2019 Summary of March 25, 2019, Public Teleconference with Duke Energy to Discuss the Request for Additional Information Response Regarding the Proposed Alternative to the Depth Sizing Qualification Requirement (Duke Energy Fleet Relief Request ML18227B2122018-09-0505 September 2018 Summary of August 1, 2018, Meeting with Duke Energy Carolinas, LLC to Discuss Proposed License Amendment Request for Oconee Nuclear Station, Units 1, 2, and 3 Regarding Tornado Mitigation Licensing Basis ML18134A2292018-05-14014 May 2018 Summary of April 26, 2018, Public Teleconference with Duke Energy Carolinas, LLC to Discuss Proposed License Amendment and 3 Regarding Technical Specification 3.8.1 ML18082A1082018-03-29029 March 2018 Summary of February 28, 2018, Meeting with Duke Energy Carolinas, LLC to Discuss Proposed LAR Regarding Tornado Mitigation Licensing Basis ML18082A0582018-03-23023 March 2018 Summary of Meeting with Oconee Nuclear Station to Discuss Annual Assessment of Oconee for the Period of January 01, 2017 - December 31, 2017 ML17179A3472017-07-18018 July 2017 Summary of Meeting with Duke Energy Carolinas, LLC to Discuss Proposed License Amendment Request for Oconee Nuclear Station, Units 1, 2, and 3 Regarding Thermal Margin for the Standby Shutdown Facility ML17103A0292017-04-13013 April 2017 Summary of Meeting to Provide Opportunities to Discuss Annual Assessment of Oconee Nuclear Station Units 1, 2 and 3 ML16166A4022016-06-27027 June 2016 Summary of November 18, 2015, and December 15, 2015, Meetings with Duke Energy Carolinas, LLC to Discuss a Proposed Relief Request in Accordance with 10 CFR 50.55a(z) for the Oconee Nuclear Station, Units 1, 2, and 3 ML16132A4352016-05-20020 May 2016 Summary of October 13, 2015, Meeting with Duke Energy Carolinas, LLC to Discuss Proposed LAR to Support Keowee Dam Stator Replacement ML15161A4312015-06-19019 June 2015 Summary of Meeting with Duke Energy Carolinas, LLC, to Discuss Ongoing Major Projects at Oconee Nuclear Station, Units 1, 2 and 3 ML15089A1642015-04-27027 April 2015 Summary of February 25, 2015, Partially Closed Meeting with Industry Stakeholders Regarding the Babcock and Wilcox Loss of Coolant Accident Evaluation Model Analysis ML15113A6262015-04-23023 April 2015 April 14, 2015 Summary of Public Meeting on Oconee Nuclear Station, Units 1, 2 and 3 to Discuss the Annual Assessment ML14356A0052014-12-31031 December 2014 Summary of December 3, 2014, Category 1 Public Meeting with Duke Energy Carolinas, LLC to Discuss NTTF Recommendation 2.1, Flooding Response for Oconee Nuclear Station, Units 1, 2, and 3 ML14147A3652014-05-27027 May 2014 Annual Assessment Public Meeting Summary Memo ML14069A3492014-03-13013 March 2014 Summary of Meeting with Duke Energy Carolinas, LLC, to Discuss Ongoing Major Projects at Oconee Nuclear Station, Units 1, 2, and 3 ML13336A5982013-12-0404 December 2013 Summary of Meeting with Duke Energy Carolinas, LLC, to Discuss the Proposed One-time TS Completion Time Change to Perform Khu Generator Field Pole Rewind Maintenance - Oconee Nuclear Station Units 1, 2, and 3 (TAC Nos. ME9021, ME9022, and M ML13312A9882013-11-0808 November 2013 Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications ML13281A6972013-10-21021 October 2013 10/3/13 Summary of Meeting with Duke Energy Carolinas, LLC to Discuss the Protected Service Water System Operation - Oconee Nuclear Station Units 1, 2, and 3 (TAC Nos. ME7737, ME7738, ME7739, ME7746, ME7747, and ME7748) ML13281A5412013-10-21021 October 2013 9/24/2013 - Oconee Nuclear Station, Units 1, 2, and 3, Summary of Meeting with Duke Energy Carolinas, LLC, to Discuss the Jocassee Dam Seismic Analysis ML13241A4482013-08-29029 August 2013 August 28, 2013 Summary of Public Meeting - Major Projects Status Meeting with Oconee ML13225A2932013-08-12012 August 2013 7/23-24/2013, Summary of Meeting 2013 U.S. Nuclear Regulatory Commission (NRC) Initial Exam Writers' Workshop ML13134A5232013-05-14014 May 2013 5/9/2013 Summary of Public Meeting with Duke Energy Corp., Oconee Nuclear Station to Provide Opportunities to Discuss the Annual Assessment for the Year 2012 ML13122A4362013-05-0606 May 2013 Summary of April 9, 2013, Meeting with Duke Energy Carolinas, LLC, to Discuss the Re-evaluation of External Flooding for Oconee Nuclear Station, Units 1, 2, and 3 2024-05-01
[Table view] |
Text
June 16, 2008 LICENSEE: DUKE ENERGY CAROLINAS, LLC (DUKE)
FACILITY: OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3 (OCONEE 1/2/3)
SUBJECT:
SUMMARY
OF APRIL 29, 2008, CLOSED MEETING TO DISCUSS TWO ISSUES RELATED TO THE JANUARY 31, 2008, LICENSE AMENDMENT REQUEST (LAR) FOR A DIGITAL UPGRADE TO OCONEE REACTOR PROTECTIVE SYSTEM (RPS) AND ENGINEERED SAFEGUARDS PROTECTIVE SYSTEM (ESPS) (TAC NOS. MD7999, MD8000, AND MD8001)
On April 29, 2008, the U.S. Nuclear Regulatory Commission (NRC) met with Duke (the licensee) and its contractor, AREVA, to discuss two issues related to the January 31, 2008, LAR for a digital upgrade to the Oconee 1/2/3 RPS/ESPS. The meeting was closed to the public because proprietary material was discussed throughout the entire meeting. A non-proprietary version of the material presented by the licensee during the meeting is available in the Agencywide Documents Access and Management System (ADAMS) under accession number ML081270222. Enclosed is a list of the attendees.
During the March 18, 2008, meeting (meeting summary available under ADAMS accession number ML080880151) and in the NRC letter dated April 24, 2008 (available under ADAMS accession number ML081070521), the NRC staff identified six issues that will present a significant challenge to completing a comprehensive review of the LAR. Two of these issues were discussed during the meeting: (1) the exceptions taken to the Institute of Electrical and Electronics Engineers (IEEE) IEEE-1012-1998, IEEE Standard for Software Verification and Validation, for the verification and validation effort; and (2) the use of the simulation and validation tool.
/RA/
Leonard N. Olshan, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287
Enclosure:
List of Attendees cc w/encl: See next page
MEETING ATTENDEES FROM APRIL 29, 2008, CLOSED MEETING WITH DUKE ENERGY CAROLINAS, LLC (DUKE)
TO DISCUSS TWO ISSUES RELATED TO THE JANUARY 31, 2008 LICENSE AMENDMENT REQUEST FOR A DIGITAL UPGRADE TO THE OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3 REACTOR PROTECTIVE SYSTEM (RPS) AND ENGINEERED SAFEGUARDS PROTECTIVE SYSTEM (ESPS)
NRC DUKE P. Loeser M. Bailey W. Kemper B. Shingleton I. Ahmed D. Richardson N. Carte G. Davenport J. Smith J. Bryan S. Bailey R. Freudenberger T. Jackson R. Gill P. Hiland S. Arndt AREVA M. Gareri M. Burzynski T. McGinty W. Baltes L. Olshan A. Kunzel M. Canova S. Yang S. Richter F. Abbasbanaey R. Gardner V. Fregonese Enclosure
June 16, 2008 LICENSEE: DUKE ENERGY CAROLINAS, LLC (DUKE)
FACILITY: OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3 (OCONEE 1/2/3)
SUBJECT:
SUMMARY
OF APRIL 29, 2008, CLOSED MEETING TO DISCUSS TWO ISSUES RELATED TO THE JANUARY 31, 2008, LICENSE AMENDMENT REQUEST (LAR) FOR A DIGITAL UPGRADE TO OCONEE REACTOR PROTECTIVE SYSTEM (RPS) AND ENGINEERED SAFEGUARDS PROTECTIVE SYSTEM (ESPS) (TAC NOS. MD7999, MD8000, AND MD8001)
On April 29, 2008, the U.S. Nuclear Regulatory Commission (NRC) met with Duke (the licensee) and its contractor, AREVA, to discuss two issues related to the January 31, 2008, LAR for a digital upgrade to the Oconee 1/2/3 RPS/ESPS. The meeting was closed to the public because proprietary material was discussed throughout the entire meeting. A non-proprietary version of the material presented by the licensee during the meeting is available in the Agencywide Documents Access and Management System (ADAMS) under accession number ML081270222. Enclosed is a list of the attendees.
During the March 18, 2008, meeting (meeting summary available under ADAMS accession number ML080880151) and in the NRC letter dated April 24, 2008 (available under ADAMS accession number ML081070521), the NRC staff identified six issues that will present a significant challenge to completing a comprehensive review of the LAR. Two of these issues were discussed during the meeting: (1) the exceptions taken to the Institute of Electrical and Electronics Engineers (IEEE) IEEE-1012-1998, IEEE Standard for Software Verification and Validation, for the verification and validation effort; and (2) the use of the simulation and validation tool.
/RA/
Leonard N. Olshan, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287
Enclosure:
List of Attendees cc w/encl: See next page DISTRIBUTION:
PUBLIC LPL2-1 R/F RidsOgcRp RidsNrrDorlLpl2-1(MWong) RidsAcrsAcnw&mMailCenter RidsNrrPMLOlshan C. Tucci, NRR RidsNrrLAMOBrien RidsRgn2MailCenter M. Cox, EDO Reg II Accession Number: ML081560331 OFFICE NRR/LPL-2-1/PM NRR/LPL-2-1/LA NRR/LPL2-1/BC NAME LOlshan MOBrien MWong DATE 6/16/08 6/16/08 6/16/08 OFFICIAL RECORD COPY
Oconee Nuclear Station, Units 1, 2, and 3 cc:
Mr. Dave Baxter Mr. R. L. Gill, Jr.
Vice President, Oconee Site Manager - Nuclear Regulatory Duke Power Company LLC Issues and Industry Affairs 7800 Rochester Highway Duke Power Company LLC Seneca, SC 29672 526 S. Church St.
Mail Stop EC05P Ms. Lisa F. Vaughn Charlotte, NC 28202 Associate General Counsel and Managing Attorney Division of Radiation Protection Duke Energy Carolinas, LLC NC Dept of Environment, Health, & Natural 526 South Church Street - EC07H Resources Charlotte, North Carolina 28202 3825 Barrett Dr.
Raleigh, NC 27609-7721 Manager, LIS NUS Corporation Mr. Peter R. Harden, IV 2650 McCormick Dr., 3rd Floor VP-Customer Relations and Sales Clearwater, FL 34619-1035 Westinghouse Electric Company 6000 Fairview Road Senior Resident Inspector 12th Floor U.S. Nuclear Regulatory Commission Charlotte, NC 28210 7812B Rochester Highway Seneca, SC 29672 Mr. Henry Barron Group Vice President, Nuclear Generation Mr. Henry Porter, Director and Chief Nuclear Officer Division of Radioactive Waste Management P.O. Box 1006-EC07H Bureau of Land and Waste Management Charlotte, NC 28201-1006 Dept. of Health and Env. Control 2600 Bull St. Mr. Charles Brinkman Columbia, SC 29201-1708 Director, Washington Operations Westinghouse Electric Company Mr. Michael A. Schoppman 12300 Twinbrook Parkway, Suite 330 Framatome ANP Rockville, MD 20852 1911 North Ft. Myer Dr.
Suite 705 Ms. Kathryn B. Nolan Rosslyn, VA 22209 Senior Counsel Duke Energy Carolinas, LLC Mr. B. G. Davenport 526 South Church Street - EC07H Regulatory Compliance Manager Charlotte, NC 28202 Oconee Nuclear Site Duke Energy Corporation ON03RC Ronnie L. Gardner, PMP 7800 Rochester Highway Manager, Site Operations and Corporate Seneca, SC 29672 Regulatory Affairs AREVA NP Inc.
Mr. Leonard G. Green An AREVA AND Siemens Company Assistant Attorney General 3315 Old Forest Road OF -16 NC Department of Justice Lynchburg, VA 24501 P.O. Box 629 Raleigh, NC 27602