MONTHYEARIR 05000254/20244022024-09-12012 September 2024 Material Control and Accounting Program Inspection Report 05000254/2024402 and 05000265/2024402 (Public) IR 05000254/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Quad Cities Nuclear Power Station (Report 05000254/2024005; 05000265/2024005) IR 05000254/20240022024-08-12012 August 2024 Integrated Inspection Report 05000254/2024002 and 05000265/2024002 IR 05000254/20243012024-08-0101 August 2024 NRC Initial License Examination Report 05000254/2024301; 05000265/2024301 IR 05000254/20240012024-05-14014 May 2024 Integrated Inspection Report Nos. 05000254/2024001 and 05000265/2024001 IR 05000254/20245012024-04-0505 April 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000254/2024501 and 05000265/2024501 IR 05000254/20230062024-02-28028 February 2024 Annual Assessment Letter for Quad Cities Nuclear Power Station, Units 1 and 2 (Report 05000254/2023006 and 05000265/2023006) IR 05000254/20230042024-02-0505 February 2024 Integrated Inspection Report 05000254/2023004 and 05000265/2023004 IR 05000254/20234032023-12-22022 December 2023 Public- Quad Cities Nuclear Power Station Security Baseline Inspection Report 05000254/2023403 and 05000265/2023403 IR 05000254/20230102023-12-20020 December 2023 Comprehensive Engineering Team Inspection Report 05000254/2023010 and 05000265/2023010 IR 05000254/20230032023-11-0909 November 2023 Integrated Inspection Report 05000254/2023003 and 05000265/2023003 IR 05000254/20230112023-09-20020 September 2023 Safety-Conscious Work Environment Issue of Concern Team Inspection Report 05000254/2023011 and 05000265/2023011 IR 05000254/20230022023-08-0808 August 2023 Integrated Inspection Report 05000254/2023002 and 05000265/2023002 IR 05000254/20234012023-06-26026 June 2023 Cyber Security Inspection Report 05000254/2023401 and 05000265/2023401 IR 05000265/20230402023-06-22022 June 2023 Reissue Quad Cities Nuclear Power Station 95001 Supplemental Inspection Supplemental Report 05000265/2023040 and Follow Up Assessment Letter ML23167B1722023-06-16016 June 2023 95001 Supplemental Inspection Report 05000265/2023040 and Follow-Up Assessment Letter IR 05000254/20234022023-05-15015 May 2023 Security Baseline and ISFSI Inspection Reports 05000254/2023402, 05000265/2023402, 07200053/2023401 IR 05000254/20230012023-05-0808 May 2023 Integrated Report 05000254/2023001 and 05000265/2023001 IR 05000254/20233012023-03-0707 March 2023 NRC Initial License Examination Report 05000254/2023301; 05000265/2023301 ML23065A2832023-03-0707 March 2023 Request for Information for the NRC Quadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000254/2023010 and 05000265/2023010 IR 05000254/20220062023-03-0101 March 2023 Annual Assessment Letter for Quad Cities Nuclear Power Station, Units 1 and 2 (Report 05000254/2022006 and 05000265/2022006) IR 05000254/20220042023-02-10010 February 2023 Integrated Inspection Report 05000254/2022004 and 05000265/2022004 IR 05000254/20220112023-01-0606 January 2023 Triennial Fire Protection Inspection Report 05000254/2022011 and 05000265/2022011 IR 05000254/20220102022-12-13013 December 2022 Phase 4 Post-Approval License Renewal Inspection Report 05000254/2022010 and 05000265/2022010 ML22313A1502022-11-29029 November 2022 EA-22-062 QC ERV Final Action IR 05000254/20224012022-11-22022 November 2022 Security Baseline Inspection Report 05000254/2022401 and 05000265/2022401 IR 05000254/20220132022-11-17017 November 2022 Biennial Problem Identification and Resolution Inspection Report 05000254/2022013 and 05000265/2022013 IR 05000254/20220032022-11-0303 November 2022 Integrated Inspection Report 05000254/2022003 and 05000265/2022003 IR 05000254/20220052022-08-22022 August 2022 Updated Inspection Plan for Quad Cities Nuclear Power Station (Report 05000254/2022005; 05000265/2022005) IR 05000254/20225012022-08-15015 August 2022 Emergency Preparedness Biennial Exercise Inspection Report 05000254/2022501 and 05000265/2022501 IR 05000254/20220022022-08-0909 August 2022 Integrated Inspection Report 05000254/2022002 and 05000265/2022002 IR 05000254/20220902022-08-0808 August 2022 NRC Inspection Report 05000254/2022090 and 05000265/2022090; Preliminary White Finding IR 05000254/20220122022-07-11011 July 2022 Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000254/2022012 and 05000265/2022012 IR 05000254/20220012022-05-11011 May 2022 Integrated Inspection Report 05000254/2022001 and 05000265/2022001 IR 05000254/20210062022-03-0202 March 2022 Annual Assessment Letter for Quad Cities Nuclear Power Station, Units 1 and 2 (Report 05000254/2021006 and 05000265/2021006) IR 05000254/20210042022-02-0202 February 2022 Integrated Inspection Report 05000254/2021004 and 05000265/2021004 ML22033A1672022-02-0202 February 2022 Notification of NRC Baseline Inspection and Request for Information Inspection Report 05000265/2022001 IR 05000254/20214022021-12-0101 December 2021 Security Baseline Inspection Report 05000254/2021402 and 05000265/2021402 IR 05000254/20210102021-11-24024 November 2021 Design Basis Assurance Inspection (Programs) Inspection Report 05000254/2021010 and 05000265/2021010 IR 05000254/20210032021-10-28028 October 2021 Integrated Inspection Report 05000254/2021003 and 05000265/2021003 IR 05000254/20214012021-09-0909 September 2021 Security Baseline Inspection Report 05000254/2021401 and 05000265/2021401 IR 05000254/20210052021-09-0101 September 2021 Updated Inspection Plan for Quad Cities Nuclear Power Station (Report 05000254/2021005 and 05000265/2021005) ML21238A3142021-08-26026 August 2021 Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information; Inspection Report 05000254/2021004; 05000265/2021004 IR 05000254/20213012021-08-23023 August 2021 NRC Initial License Examination Report 05000254/2021301; 05000265/2021301 IR 05000254/20210022021-08-0909 August 2021 Integrated Inspection Report 05000254/2021002 and 05000265/2021002 IR 05000254/20214032021-06-28028 June 2021 Quad Nuclear Power Station - Material Control and Accounting Program Inspection Report 05000254/2021403 and 05000265/2021403 IR 05000254/20210012021-04-26026 April 2021 Integrated Inspection Report 05000254/2021001 and 05000265/2021001 IR 05000254/20200062021-03-0404 March 2021 Annual Assessment Letter for Quad Cities Nuclear Power Station Units 1 and 2 (Report 05000254/2020006 and 05000265/2020006) IR 05000254/20200042021-02-0404 February 2021 Integrated Inspection Report 05000254/2020004 and 05000265/2020004 IR 05000254/20204022021-01-11011 January 2021 Security Baseline Inspection Report 05000254/2020402 and 05000265/2020402 2024-09-12
[Table view] Category:Letter
MONTHYEARRS-24-080, Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in .2024-10-16016 October 2024 Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in . RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests SVP-24-059, Correction to Registration of Use of Casks to Store Spent Fuel2024-10-0404 October 2024 Correction to Registration of Use of Casks to Store Spent Fuel ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24247A1642024-09-30030 September 2024 Alternative Request RP-01 IR 05000254/20244022024-09-12012 September 2024 Material Control and Accounting Program Inspection Report 05000254/2024402 and 05000265/2024402 (Public) SVP-24-054, Deviation from BWR Vessel and Internals Project (BWRVIP) Guidelines - Inspection of Top Guide Rim Welds2024-09-11011 September 2024 Deviation from BWR Vessel and Internals Project (BWRVIP) Guidelines - Inspection of Top Guide Rim Welds ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000254/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Quad Cities Nuclear Power Station (Report 05000254/2024005; 05000265/2024005) RS-24-078, Alternative Request RV-08, Revision 1, Associated with Safety Relief Valve Testing Interval2024-08-20020 August 2024 Alternative Request RV-08, Revision 1, Associated with Safety Relief Valve Testing Interval ML24183A1082024-08-0808 August 2024 – Issuance of Amendment Nos. 302 and 298 Adoption of Tstf-505, Provide Risk Informed Extended Completion Times – RITSTF Initiative 4b SVP-24-049, Owners Activity Report Submittal Sixth 10-Year Interval 2024 Refueling Outage Activities2024-08-0707 August 2024 Owners Activity Report Submittal Sixth 10-Year Interval 2024 Refueling Outage Activities IR 05000254/20243012024-08-0101 August 2024 NRC Initial License Examination Report 05000254/2024301; 05000265/2024301 SVP-24-048, Registration of Use of Casks to Store Spent Fuel2024-07-31031 July 2024 Registration of Use of Casks to Store Spent Fuel SVP-24-046, Turbine Trip and Automatic Scram Due to Digital EHC Power Supply Intermittent Failure2024-07-22022 July 2024 Turbine Trip and Automatic Scram Due to Digital EHC Power Supply Intermittent Failure RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions SVP-24-041, Regulatory Commitment Change Summary Report2024-07-0505 July 2024 Regulatory Commitment Change Summary Report SVP-24-043, Registration of Use of Casks to Store Spent Fuel2024-07-0505 July 2024 Registration of Use of Casks to Store Spent Fuel ML24162A0982024-07-0303 July 2024 – Issuance of Amendment Nos. 301 and 297 Adoption of 10 CFR 50.69 Risk Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors SVP-24-040, Registration of Use of Casks to Store Spent Fuel2024-06-25025 June 2024 Registration of Use of Casks to Store Spent Fuel RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations SVP-24-039, Ile Post Exam Package Letter2024-06-12012 June 2024 Ile Post Exam Package Letter RS-24-053, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed2024-06-0606 June 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed ML24110A0492024-05-28028 May 2024 Audit Report Related to the TSTF-505 and 10 CFR 50.59 Amendments ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes ML24141A2102024-05-20020 May 2024 Operator Licensing Examination Approval - Quad Cities Nuclear Power Station, May 2024 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report IR 05000254/20240012024-05-14014 May 2024 Integrated Inspection Report Nos. 05000254/2024001 and 05000265/2024001 SVP-24-034, Annual Radiological Environmental Operating Report2024-05-10010 May 2024 Annual Radiological Environmental Operating Report RS-24-042, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion2024-05-10010 May 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion SVP-24-031, Automatic Actuation of Reactor Protection System During Scram Discharge Volume Leak Rate Testing2024-05-10010 May 2024 Automatic Actuation of Reactor Protection System During Scram Discharge Volume Leak Rate Testing RS-24-046, 10 CFR 50.46 Annual Report2024-05-0606 May 2024 10 CFR 50.46 Annual Report ML24109A0662024-05-0202 May 2024 – Relief Request I5R-26, Revision 0 RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests SVP-24-029, Radioactive Effluent Release Report for 20232024-04-26026 April 2024 Radioactive Effluent Release Report for 2023 SVP-24-028, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2024-04-26026 April 2024 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report ML24114A1712024-04-23023 April 2024 State of Illinois (IEMA-OHS) Comment Quad Cities HI-STORM Exemption Environmental Assessment IR 05000254/20245012024-04-0505 April 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000254/2024501 and 05000265/2024501 RS-24-032, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion2024-04-0505 April 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion SVP-24-024, Corrected Radioactive Effluent Release Report for 20222024-04-0505 April 2024 Corrected Radioactive Effluent Release Report for 2022 RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report SVP-24-023, Ile Outline Submittal Letter2024-03-29029 March 2024 Ile Outline Submittal Letter RS-24-019, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Completion Times TSTF2024-03-19019 March 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Completion Times TSTF ML23340A1552024-03-15015 March 2024 – Issuance of Amendment Nos. 299 and 295 Adoption of TSTF-564, Safety Limit MCPR RS-24-020, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for Quad Cities Nuclear Power Station - Holtec MPC-68MCBS2024-03-15015 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for Quad Cities Nuclear Power Station - Holtec MPC-68MCBS SVP-24-018, Ile Proposed Exam Submittal Letter2024-03-13013 March 2024 Ile Proposed Exam Submittal Letter RS-24-015, Submittal of RP-01 Relief Request Associated with the Sixth Inservice Testing Interval2024-02-29029 February 2024 Submittal of RP-01 Relief Request Associated with the Sixth Inservice Testing Interval IR 05000254/20230062024-02-28028 February 2024 Annual Assessment Letter for Quad Cities Nuclear Power Station, Units 1 and 2 (Report 05000254/2023006 and 05000265/2023006) ML24053A1192024-02-22022 February 2024 Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000265/2024010 and 05000254/2024010 2024-09-04
[Table view] |
Text
UNITED STATES ary 13, 2019
SUBJECT:
QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS INSPECTION REPORT 05000254/2019010 AND 05000265/2019010
Dear Mr. Hanson:
On January 18, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Quad Cities Nuclear Power Station, Units 1 and 2, and discussed the results of this inspection with Mr. Hal Dodd and other members of your staff. The results of this inspection are documented in the enclosed report.
The NRC inspectors did not identify any finding or violation of more-than-minor significance.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Robert C. Daley, Chief Engineering Branch 3 Docket Nos.: 05000254 and 05000265 License Nos.: DPR-29 and DPR-30
Enclosure:
IR 05000254/2019010; 05000265/2019010
Inspection Report
Docket Number(s): 05000254 and 05000265 License Number(s): DPR-29 and DPR-30 Report Number(s): 05000254/2019010 and 05000265/2019010 Enterprise Identifier: I-2019-010-0035 Licensee: Exelon Generation Company, LLC Facility: Quad Cities Nuclear Power Station, Units 1 and 2 Location: Cordova, IL Inspection Dates: January 14, 2019 to January 18, 2019 Inspectors: M. Domke, Reactor Inspector I. Hafeez, Reactor Inspector A. Shaikh, Senior Reactor Inspector Approved By: Robert C. Daley, Chief Engineering Branch 3 Division of Reactor Safety Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Evaluations of Changes, Tests, and Experiments inspection at Quad Cities Nuclear Power Station, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
No findings or violations were identified.
TABLE OF CONTENTS
INSPECTION SCOPES
REACTOR SAFETY
...............................................................................................................
INSPECTION RESULTS
...........................................................................................................
EXIT MEETINGS AND DEBRIEFS
............................................................................................ 5
DOCUMENTS REVIEWED
........................................................................................................ 5
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in
effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with
their attached revision histories are located on the public website at http://www.nrc.gov/reading-
rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared
complete when the IP requirements most appropriate to the inspection activity were met
consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection
Program - Operations Phase. The inspectors reviewed selected procedures and records,
observed activities, and interviewed personnel to assess licensee performance and compliance
with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.17T - Evaluations of Changes, Tests, and Experiments
2.01 Sample Selection (29 Samples)
The inspectors evaluated the following:
(1) QC-S-2016-0028; TSI -Bypass Unit 1 Turbine Rotor Expansion
(2) QC-E-2017-001; Updated QDC Dose Calculations to Increase the Core Average
Exposure (CAVEX) Limit
(3) QC-S-2016-0043; Install Jumper Around Unit 1 Non-Essential 250VDC Battery Cell 45
(4) QC-S-2016-0031; Return 2-4601 Service Air Compressor to Original Design and
Incorporate Vendor (NEAC) Recommended Upgrades
(5) QC-S-2016-0036; Unit 1 Containment Coatings Condition and Deferral of Inspection
(6) QC-S-2017-0025; RHR Pump/Loop Operability Test
(7) QC-S-2017-0026; Removing the Actuator from the 1-5772-32A Damper and Gagging
the Damper in the Open or Closed Position
(8) QC-S-2017-0029; Update Procedures and Calculation QDC-1000-M-0131 for Unit 0
DGCW Upper Flow Limit
(9) QC-S-2017-0053; Return 1-3999-56 to Normal Open Position by Installing a Disc Lifting
Gag to Mitigate Stem-Disc Separation Problem
(10) QC-S-2017-0079; Replace SBLC Tank Heater Controller TIC 1(2)-1154
(11) QC-S-2018-0038; Diesel Generator Cooling Water Pump Flow Rate Test
(12) QC-S-2017-0002; 345KV Switchyard Line L0401 System 1 Relay Protection Upgrade
(13) QC-S-2017-0007; Temp Power For HRSS Valves 1-8941-727/728/729/701 During
Q1R24
(14) QC-S-2017-0008; Provide Temp Power Feed To U1 TB Lighting During Q1R24 When
Bus 15 is OOS
(15) QC-S-2017-0010; Reactor Recirc Pump Motor Lube Oil Level Indication-Unit 1
(16) QC-S-2017-0011; Provide Temp Power For EDG Equipment Associated with Bus 15
OOS
(17) QC-S-2017-0014; 345KV Bus Tie (BT) 3-4 Gas Circuit Breaker (GCB) Replacement
(18) QC-S-2017-0022; Perform Field Mod of HU-1 for 2nd Harmonic Restraint From 15% to
7.5%
(19) QC-S-2017-0022; Operation of Transformer Severon Monitors for Maintenance
(20) QC-S-2017-0033; Temporarily Isolate Turbine Bearing #* Deluge Detector to Remove
Ground Fault Alarm
(21) QC-S-2017-0059; Reactor Recirc Pump Motor Lube Oil Level Indication-Unit 2
(22) QC-S-2018-0015; 345KV Switchyard Line L0404 MOD and Stability Scheme Upgrade
(23) QC-E-2017-002; Perform 50.59 Evaluation of UFSAR Change in Accordance with
Recommendation of IR 01418982
(24) QC-S-2016-0029; H2 Area Leak Detectors Set Point Change
(25) QC-S-2016-0030; Structural Analysis of the Quad Cities Low Profile Transporter
(26) QC-S-2017-0089; Lifting Devices for the 2B Core Spray Motor Replacement
(27) QC-S--2017-0078; Perform Field MODs of HU-1 Relays for 2nd Harmonic Restraint
From 15% to 7.5%
(28) QC-S-2016-0042; Revise Outdated UFSAR Description of Reactor Building Penetration
Seal Material
(29) QC-S-2018-0046;Technical Support Center (TSC) HVAC Upgrade
INSPECTION RESULTS
No findings of significance were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors confirmed that proprietary information was controlled to protect from public
disclosure.
- On January 18, 2019, the inspector presented the Evaluations of Changes, Tests, and
Experiments inspection results to Mr. Hal Dodd and other members of the licensee staff.
DOCUMENTS REVIEWED
- QC-S-2016-0028; TSI -Bypass Unit 1 Turbine Rotor Expansion; Revision 0
- QC-S-2016-0031; Return 2-4601 Service Air Compressor to Original Design and
Incorporate Vendor (NEAC) Recommended Upgrades; Revision 0
- QC-S-2016-0036; Unit 1 Containment Coatings Condition and Deferral of Inspection;
Revision 0
- QC-S-2017-0025; RHR Pump/Loop Operability Test; Revision 0
- QC-S-2017-0026; Removing the Actuator from the 1-5772-32A Damper and Gagging
the Damper in the Open or Closed Position; Revision 0
- QC-S-2017-0029; Update Procedures and Calculation QDC-1000-M-0131 for Unit 0
DGCW Upper Flow Limit; Revision 0
- QC-S-2017-0053; Return 1-3999-56 to Normal Open Position by Installing a Disc Lifting
Gag to Mitigate Stem-Disc Separation Problem; Revision 0
- QC-S-2017-0079; Replace SBLC Tank Heater Controller TIC 1(2)-1154; Revision 0
- QC-S-2018-0038; Diesel Generator Cooling Water Pump Flow Rate Test; Revision 0
- ECR 428527; Provide Input to Procedure Change on QCOS 1000-06; 04/11/2017
- ECR 48466; Develop Suction Head Pressure/Cavitation Limit for QCOS 1000-06;
2/25/1998
- ECR 436259; Document the Basis for Moving the QCOS 6600-06 DGWP NPSH Limit;
07/31/2018
- EC 404993; Updated QDC Dose Calculations to Increase the Core Average Exposure
(CAVEX) Limit
- EC 619709; Return 1-3999-56 Valve to Normal Open Position by Installing a Disc Lifting
Gag to Mitigate Stem Disc Separation Problem; 08/02/2017
10/06/2016
Revision 12
- QDC-1000-M-0131; NPSH Availability vs. Requirements for DGCW and RHRSW
Pumps; Revision 4
- CWE097.0200.40; Base Suppression Pool Level Required for Proper Operation of the
RHR/LPCI and Core Spray Pumps During Plant Cold Shutdown and Refueling
Conditions; Revision 0
- CWE097.0200.41; Minimum Suppression Pool Water Level Required During Cold
Shutdown and Refueling Conditions; Revision 0
- IR 4036334; NOS ID: 50.59 Screening Weaknesses Noted; 07/27/2017
- IR 4158916; EO ID: 1-4601-B, Service Air Compressor Leak; 07/26/2018
- QC-S-2016-0043; Install Jumper Around Unit 1 Non-Essential 250VDC Battery Cell 45;
Revision 0
- QC-S-2017-0002; 345KV Switchyard Line L0401 System 1 Relay Protection Upgrade;
Revision 0
- QC-S-2017-0007; Temp Power For HRSS Valves 1-8941-727/728/729/701 During
Q1R24; Revision 1
- QC-S-2017-0008; Provide Temp Power Feed To U1 TB Lighting During Q1R24 When
Bus 15 is OOS; Revision 0
- QC-S-2017-0010; Reactor Recirc Pump Motor Lube Oil Level Indication-Unit 1;
Revision 0
- QC-S-2017-0011; Provide Temp Power For EDG Equipment Associated with Bus 15
OOS; Revision 0
- QC-S-2017-0014; 345KV Bus Tie (BT) 3-4 Gas Circuit Breaker (GCB) Replacement;
Revision 0
- QC-S-2017-0022; Perform Field Mod of HU-1 for 2nd Harmonic Restraint From 15% to
7.5%; Revision 0
- QC-S-2017-0022; Operation of Transformer Severon Monitors for Maintenance;
Revision 0
- QC-S-2017-0033; Temporarily Isolate Turbine Bearing #* Deluge Detector to Remove
Ground Fault Alarm; Revision 0
- QC-S-2017-0059; Reactor Recirc Pump Motor Lube Oil Level Indication-Unit 2;
Revision 0
Revision 1
- IR 02682387; 50.59 Screening Records Retention - Scaffolds > 90 Days; 06/16/2016
11/22/2017
- QC-E-2017-002; Perform 50.59 Evaluation of UFSAR Change in Accordance with
Recommendation of IR 01418982
- QC-S-2016-0029; H2 Area Leak Detectors Set Point Change
- QC-S-2016-0030; Structural Analysis of the Quad Cities Low Profile Transporter
- QC-S-2017-0089; Lifting Devices for the 2B Core Spray Motor Replacement
- QC-S--2017-0078; Perform Field MODs of HU-1 Relays for 2nd Harmonic Restraint
From 15% to 7.5%
- QC-S-2016-0042; Revise Outdated UFSAR Description of Reactor Building Penetration
Seal Material
- IR02676983; MODA/50.59 CISA DEF - 50.59 Screening Records Retention
- GE-NE-A22-00103-5601-Q; Appendix R Fire Protection Extended Power Uprate;
Revision 0C
- QDC-0030-S-2306; Evaluation of New 5 Ton Trolley Beam and IP Turbine Building Steel
at Elevation 611-6 in Support of the 2B Core Spray Motor Replacement; Revision 9
- EC 395566; Evaluation of GODWIN DPC300 Pump Capacity to Provide Sufficient
Makeup Flow to the Ultimate Heat Sink; Revision 1
- QDC-0000-N-1481; Quad Cities Units 1 and 2 Post LOCA EAB, LPZ, and CR
Dose - AST Analysis; Revision 2
- HI-2114950; Structural Analysis of the Quad Cities Low Profile Transporter;
Revision 001A
- QCAP 1500-02; Administrative Technical Requirements for Non-Functional Safe
Shutdown Equipment; Revision 35
7