Category:Letter type:RS
MONTHYEARRS-24-101, License Amendment Request for One-Time Extension of Standby Gas Treatment System Technical Specifications Completion Time to Support Piping Repair2024-11-0404 November 2024 License Amendment Request for One-Time Extension of Standby Gas Treatment System Technical Specifications Completion Time to Support Piping Repair RS-24-126, Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in Accordance with 10 CFR 2.390(b)(4)2024-10-31031 October 2024 Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in Accordance with 10 CFR 2.390(b)(4) RS-24-080, Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in .2024-10-16016 October 2024 Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in . RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests RS-24-078, Alternative Request RV-08, Revision 1, Associated with Safety Relief Valve Testing Interval2024-08-20020 August 2024 Alternative Request RV-08, Revision 1, Associated with Safety Relief Valve Testing Interval RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations RS-24-053, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed2024-06-0606 June 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report RS-24-042, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion2024-05-10010 May 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion RS-24-046, 10 CFR 50.46 Annual Report2024-05-0606 May 2024 10 CFR 50.46 Annual Report RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests RS-24-032, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion2024-04-0505 April 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report RS-24-019, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Completion Times TSTF2024-03-19019 March 2024 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Completion Times TSTF RS-24-020, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for Quad Cities Nuclear Power Station - Holtec MPC-68MCBS2024-03-15015 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for Quad Cities Nuclear Power Station - Holtec MPC-68MCBS RS-24-015, Submittal of RP-01 Relief Request Associated with the Sixth Inservice Testing Interval2024-02-29029 February 2024 Submittal of RP-01 Relief Request Associated with the Sixth Inservice Testing Interval RS-24-001, Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2024-01-0303 January 2024 Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval RS-23-128, Response to Request for Additional Information for the Emergency License Amendment Request – Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days2023-12-15015 December 2023 Response to Request for Additional Information for the Emergency License Amendment Request – Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days RS-23-123, Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days2023-12-13013 December 2023 Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days RS-23-104, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-089, Sixth Ten-Year Interval Inservice Testing Program2023-09-0505 September 2023 Sixth Ten-Year Interval Inservice Testing Program RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs RS-23-086, Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2023-08-28028 August 2023 Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-060, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors2023-06-0808 June 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors RS-23-059, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0808 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling RS-23-068, Response to Request for Additional Information for Quad Cities Relief Request I6R-11, Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell2023-04-28028 April 2023 Response to Request for Additional Information for Quad Cities Relief Request I6R-11, Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell RS-23-058, Submittal of Sixth Inservice Inspection Interval Relief Request I6R-11 Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell Flanges2023-04-24024 April 2023 Submittal of Sixth Inservice Inspection Interval Relief Request I6R-11 Proposed Alternatives for a Temper Bead Weld Repair of the Mating Surfaces of the Reactor Pressure Vessel Head and Shell Flanges RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations RS-23-007, Application to Adopt TSTF-564, Safety Limit MCPR2023-03-0303 March 2023 Application to Adopt TSTF-564, Safety Limit MCPR RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 RS-23-032, Application to Move SR 3.5.1.2 Note to LCO 3.5.1 in Accordance with TSTF-416, LPCI Valve Alignment Verification Note Location2023-02-0303 February 2023 Application to Move SR 3.5.1.2 Note to LCO 3.5.1 in Accordance with TSTF-416, LPCI Valve Alignment Verification Note Location RS-23-034, Notification of Extension to the Fifth Ten-Year Interval of the Inservice Testing Program2023-02-0202 February 2023 Notification of Extension to the Fifth Ten-Year Interval of the Inservice Testing Program RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 RS-23-033, Request for Exemption from 10 CFR 2.109(b)2023-01-27027 January 2023 Request for Exemption from 10 CFR 2.109(b) RS-23-005, Response to Request for Additional Information for Quad Cities Relief Request RV-04, Inservice Testing of High Pressure Coolant Injection Drain Pot Solenoid Valves2023-01-17017 January 2023 Response to Request for Additional Information for Quad Cities Relief Request RV-04, Inservice Testing of High Pressure Coolant Injection Drain Pot Solenoid Valves RS-22-127, Submittal of Sixth Inservice Inspection Interval Relief Request I6R-10 Reactor Pressure Vessel Penetration N-11B Repair2022-12-14014 December 2022 Submittal of Sixth Inservice Inspection Interval Relief Request I6R-10 Reactor Pressure Vessel Penetration N-11B Repair RS-22-126, Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2022-11-30030 November 2022 Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI RS-22-119, Withdrawal of Relief Request RV-11 Associated with the Sixth Inservice Testing Interval2022-10-31031 October 2022 Withdrawal of Relief Request RV-11 Associated with the Sixth Inservice Testing Interval RS-22-109, Response to Request for Additional Information License Amendments Related to Fuel Storage2022-10-12012 October 2022 Response to Request for Additional Information License Amendments Related to Fuel Storage RS-22-112, Submittal of RV-04 Relief Request Associated with the Sixth Inservice Testing Interval2022-10-0707 October 2022 Submittal of RV-04 Relief Request Associated with the Sixth Inservice Testing Interval RS-22-108, Response to Request for Additional Information LaSalle County Station, Units 1 and 2 and Quad Cities Nuclear Power Station, Units 1 and 2 License Amendments Related to Fuel Storage2022-10-0505 October 2022 Response to Request for Additional Information LaSalle County Station, Units 1 and 2 and Quad Cities Nuclear Power Station, Units 1 and 2 License Amendments Related to Fuel Storage RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration RS-22-102, Supplement to Request to Revise Technical Specification 3.1.4, Control Rod Scam Times2022-08-18018 August 2022 Supplement to Request to Revise Technical Specification 3.1.4, Control Rod Scam Times RS-22-093, Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans2022-08-18018 August 2022 Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans RS-22-095, Response to Request for Additional Information Regarding Request to Expand Applicability of GNF Thermal Mechanical Analysis Methods to Framatome Fuel2022-08-10010 August 2022 Response to Request for Additional Information Regarding Request to Expand Applicability of GNF Thermal Mechanical Analysis Methods to Framatome Fuel RS-22-096, Response to Request for Additional Information Related to Relief Request I6R-01 Associated with the Sixth Inservice Inspection Interval2022-08-10010 August 2022 Response to Request for Additional Information Related to Relief Request I6R-01 Associated with the Sixth Inservice Inspection Interval 2024-08-20
[Table view] Category:Report
MONTHYEARRS-24-126, Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in Accordance with 10 CFR 2.390(b)(4)2024-10-31031 October 2024 Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in Accordance with 10 CFR 2.390(b)(4) RS-24-080, Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in .2024-10-16016 October 2024 Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in . RS-24-046, 10 CFR 50.46 Annual Report2024-05-0606 May 2024 10 CFR 50.46 Annual Report RS-22-090, Response to Request for Additional Information Regarding Quad Cities New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies2022-07-13013 July 2022 Response to Request for Additional Information Regarding Quad Cities New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies NMP1L3469, Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits2022-06-30030 June 2022 Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits RS-22-006, Request to Expand Applicability of Prime Methods to Evaluate Fuel Centerline Melt and Cladding Strain Compliance for Framatome Fuel2022-01-20020 January 2022 Request to Expand Applicability of Prime Methods to Evaluate Fuel Centerline Melt and Cladding Strain Compliance for Framatome Fuel SVP-21-041, Regulatory Commitment Change Summary Report2021-07-15015 July 2021 Regulatory Commitment Change Summary Report RS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping2021-01-0404 January 2021 Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping ML20303A1752020-10-23023 October 2020 Proposed Relief Request from Section XI Repair/Replacement Documentation for Bolting Replacement of Pressure Retaining Bolting SVP-20-074, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report2020-10-0808 October 2020 Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report RS-20-086, Renewed Facility Operating License Nos. DPR-29 and DPR-302020-09-24024 September 2020 Renewed Facility Operating License Nos. DPR-29 and DPR-30 ML19168A1962019-08-29029 August 2019 Staff Assessment of Flood Hazard Integrated Assessment RS-19-049, Submittal of 10 CFR 50.46 Annual Report2019-05-0202 May 2019 Submittal of 10 CFR 50.46 Annual Report ML19064B3712019-03-0505 March 2019 Enclosure B - QDC-0000-N-1481, Revision 3, Quad Cities Units 1 & 2 Post-LOCA Eab, LPZ, and CR Dose - AST Analysis. ML19064B3702019-03-0505 March 2019 Enclosure a - QDC-7500-M-2341, Revision 0, Quad Cities Units 1 & 2 Secondary Containment Drawdown Analysis. SVP-19-002, Submittal of 10 CFR 50.59, 10 CFR 72.48 Summary Report2019-01-0404 January 2019 Submittal of 10 CFR 50.59, 10 CFR 72.48 Summary Report RS-18-087, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2018-08-14014 August 2018 Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) RS-18-089, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (EA-13-109)2018-08-14014 August 2018 Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (EA-13-109) RS-18-048, Submittal of 10 CFR 50.46 Annual Report Acceptance Criteria for Emergency Core Cooling Systems for Light-Water Nuclear Power Reactors.2018-05-0202 May 2018 Submittal of 10 CFR 50.46 Annual Report Acceptance Criteria for Emergency Core Cooling Systems for Light-Water Nuclear Power Reactors. SVP-17-046, Regulatory Commitment Change Summary Report2017-07-0606 July 2017 Regulatory Commitment Change Summary Report ML16271A3242016-10-31031 October 2016 Technical Review Documentation for Flooding Hazard Reevaluation of Quad Cities Nuclear Power Station, Units 1 and 2 RS-16-044, High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima..2016-02-19019 February 2016 High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima.. ML15309A4932016-02-10010 February 2016 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force ML15251A3842015-08-31031 August 2015 Attachment 9 - NP-3305NP, Revision 1, Mechanical Design Report for Quad Cities and Dresden Atrium 10XN Fuel Assemblies - Licensing Report. (Non-Proprietary) SVP-15-052, Submittal of Regulatory Commitment Change Summary Report2015-07-0808 July 2015 Submittal of Regulatory Commitment Change Summary Report RS-15-085, Provides Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentaiton (Order Number EA-12-051)2015-05-0707 May 2015 Provides Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentaiton (Order Number EA-12-051) RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 12014-09-24024 September 2014 Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 SVP-14-057, Owner'S Activity Report Submittal Fifth 10 Year Interval 2014 Refueling Outage Activities2014-08-0101 August 2014 Owner'S Activity Report Submittal Fifth 10 Year Interval 2014 Refueling Outage Activities ML14176A9612014-06-24024 June 2014 Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 ML14101A2282014-04-0707 April 2014 Holtec International Report No. HI-2125245, Revision 5, Licensing Report for Quad Cities Criticality Analysis for Inserts. RS-14-072, Seismic Hazard and Screening Report (Central and Eastern United States (CEUS) Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re Recommendation 2.1 of the Near-Term Task Force Review of Insights..2014-03-31031 March 2014 Seismic Hazard and Screening Report (Central and Eastern United States (CEUS) Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re Recommendation 2.1 of the Near-Term Task Force Review of Insights.. RS-13-288, Request for License Amendment to Technical Specifications Section 5.6.5. Core Operating Limits Report.2013-12-19019 December 2013 Request for License Amendment to Technical Specifications Section 5.6.5. Core Operating Limits Report. ML13317A9572013-11-20020 November 2013 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Quad Cities Nuclear Power Station, TAC Nos.: MF1048 and MF1049 ML13199A0382013-07-16016 July 2013 Attachment 5 - Holtec International Report No. HI-2125245, Revision 2, Licensing Report for Quad Cities Criticality Analysis for Inserts - Non Proprietary Version IR 05000456/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000289/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee ML13008A2192013-01-31031 January 2013 U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000454/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000461/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000237/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000373/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000352/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000219/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000277/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000254/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000272/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee SVP-13-001, Summary Report of Completed Changes, Tests and Experiments for January 2011 - December 20122013-01-0404 January 2013 Summary Report of Completed Changes, Tests and Experiments for January 2011 - December 2012 ML12361A0952012-10-31031 October 2012 Report 12Q0108.40-R-002, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 2. Part 12 of 15 ML12361A0942012-10-31031 October 2012 Report 12Q0108.40-R-002, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 2. Part 11 of 15 ML12361A0932012-10-31031 October 2012 Report 12Q0108.40-R-002, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 2. Part 10 of 15 2024-05-06
[Table view] Category:Technical
MONTHYEARRS-24-126, Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in Accordance with 10 CFR 2.390(b)(4)2024-10-31031 October 2024 Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in Accordance with 10 CFR 2.390(b)(4) RS-24-080, Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in .2024-10-16016 October 2024 Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in . RS-24-046, 10 CFR 50.46 Annual Report2024-05-0606 May 2024 10 CFR 50.46 Annual Report RS-22-090, Response to Request for Additional Information Regarding Quad Cities New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies2022-07-13013 July 2022 Response to Request for Additional Information Regarding Quad Cities New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies NMP1L3469, Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits2022-06-30030 June 2022 Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits RS-22-006, Request to Expand Applicability of Prime Methods to Evaluate Fuel Centerline Melt and Cladding Strain Compliance for Framatome Fuel2022-01-20020 January 2022 Request to Expand Applicability of Prime Methods to Evaluate Fuel Centerline Melt and Cladding Strain Compliance for Framatome Fuel RS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping2021-01-0404 January 2021 Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping SVP-20-074, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report2020-10-0808 October 2020 Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report RS-20-086, Renewed Facility Operating License Nos. DPR-29 and DPR-302020-09-24024 September 2020 Renewed Facility Operating License Nos. DPR-29 and DPR-30 RS-19-049, Submittal of 10 CFR 50.46 Annual Report2019-05-0202 May 2019 Submittal of 10 CFR 50.46 Annual Report ML19064B3702019-03-0505 March 2019 Enclosure a - QDC-7500-M-2341, Revision 0, Quad Cities Units 1 & 2 Secondary Containment Drawdown Analysis. ML19064B3712019-03-0505 March 2019 Enclosure B - QDC-0000-N-1481, Revision 3, Quad Cities Units 1 & 2 Post-LOCA Eab, LPZ, and CR Dose - AST Analysis. RS-18-089, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (EA-13-109)2018-08-14014 August 2018 Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (EA-13-109) RS-18-087, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2018-08-14014 August 2018 Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) ML16271A3242016-10-31031 October 2016 Technical Review Documentation for Flooding Hazard Reevaluation of Quad Cities Nuclear Power Station, Units 1 and 2 ML15251A3842015-08-31031 August 2015 Attachment 9 - NP-3305NP, Revision 1, Mechanical Design Report for Quad Cities and Dresden Atrium 10XN Fuel Assemblies - Licensing Report. (Non-Proprietary) RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 12014-09-24024 September 2014 Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 ML14176A9612014-06-24024 June 2014 Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 ML14101A2282014-04-0707 April 2014 Holtec International Report No. HI-2125245, Revision 5, Licensing Report for Quad Cities Criticality Analysis for Inserts. RS-13-288, Request for License Amendment to Technical Specifications Section 5.6.5. Core Operating Limits Report.2013-12-19019 December 2013 Request for License Amendment to Technical Specifications Section 5.6.5. Core Operating Limits Report. ML13317A9572013-11-20020 November 2013 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Quad Cities Nuclear Power Station, TAC Nos.: MF1048 and MF1049 ML13199A0382013-07-16016 July 2013 Attachment 5 - Holtec International Report No. HI-2125245, Revision 2, Licensing Report for Quad Cities Criticality Analysis for Inserts - Non Proprietary Version ML12361A0872012-10-31031 October 2012 Report 12Q0108.40-R-002, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 2. Part 5 of 15 ML12361A0862012-10-31031 October 2012 Report 12Q0108.40-R-002, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 2. Part 4 of 15 RS-12-169, Report 12Q0108.40-R-002, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 2. Part 3 of 152012-10-31031 October 2012 Report 12Q0108.40-R-002, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 2. Part 3 of 15 ML12361A0892012-10-31031 October 2012 Report 12Q0108.40-R-002, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 2. Part 6 of 15 ML12361A0902012-10-31031 October 2012 Report 12Q0108.40-R-002, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 2. Part 7 of 15 ML12361A0912012-10-31031 October 2012 Report 12Q0108.40-R-002, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 2. Part 8 of 15 ML12361A0932012-10-31031 October 2012 Report 12Q0108.40-R-002, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 2. Part 10 of 15 ML12361A1122012-10-31031 October 2012 Report 12Q0108.40-R-002, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 2. Part 2 of 15 ML12361A1112012-10-31031 October 2012 Report 12Q0108.40-R-002, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 2. Part 1 of 15 ML12361A1102012-10-31031 October 2012 Report 12Q0108.40-R-001, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 1. Part 10 of 10 ML12361A1092012-10-31031 October 2012 Report 12Q0108.40-R-001, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 1. Part 9 of 10 ML12361A1082012-10-31031 October 2012 Report 12Q0108.40-R-001, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 1. Part 8 of 10 ML12361A1072012-10-31031 October 2012 Report 12Q0108.40-R-001, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 1. Part 7 of 10 ML12361A1062012-10-31031 October 2012 Report 12Q0108.40-R-001, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 1. Part 6 of 10 ML12361A1052012-10-31031 October 2012 Report 12Q0108.40-R-001, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 1. Part 5 of 10 ML12361A1042012-10-31031 October 2012 Report 12Q0108.40-R-001, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 1. Part 4 of 10 ML12361A1032012-10-31031 October 2012 Report 12Q0108.40-R-001, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 1. Part 3 of 10 ML12361A1012012-10-31031 October 2012 Report 12Q0108.40-R-001, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 1. Part 2 of 10 ML12361A1002012-10-31031 October 2012 Report 12Q0108.40-R-001, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 1. Part 1 of 10 ML12361A0992012-10-31031 October 2012 Report 12Q0108.40-R-002, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 2. Part 15 of 15 ML12361A0982012-10-31031 October 2012 Report 12Q0108.40-R-002, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 2. Part 14 of 15 ML12361A0962012-10-31031 October 2012 Report 12Q0108.40-R-002, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 2. Part 13 of 15 ML12361A0952012-10-31031 October 2012 Report 12Q0108.40-R-002, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 2. Part 12 of 15 ML12361A0942012-10-31031 October 2012 Report 12Q0108.40-R-002, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 2. Part 11 of 15 ML12361A0922012-10-31031 October 2012 Report 12Q0108.40-R-002, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Force Recommendation 2.3: Seismic for Quad Cities Generating Station Unit 2. Part 9 of 15 ML13199A0392009-07-30030 July 2009 Attachment 8 - Netco Report NET-259-03, Revision 5, Material Qualification of Alcan Composite for Spent Fuel Storage ML0821900132008-08-0707 August 2008 Monthly Operating Reports Second Quarter 2008 RS-07-157, Request for Technical Specification Change for Minimum Power Ratio Safety Limit2007-11-20020 November 2007 Request for Technical Specification Change for Minimum Power Ratio Safety Limit 2024-05-06
[Table view] |
Text
4300 Winfield Road Warrenville, IL 60555 630 657 2000 Office RS-24-046 10 CFR 50.46 May 6, 2024 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265
Subject:
10 CFR 50.46 Annual Report
Reference:
Letter from P. R. Simpson (Constellation Energy Generation, LLC) to U.S. NRC, "10 CFR 50.46 Annual Report," dated May 4, 2023 This letter provides the annual report required by 10 CFR 50.46, "Acceptance criteria for emergency core cooling systems for light-water nuclear power reactors," for Quad Cities Nuclear Power Station, Units 1 and 2. The attachments describe the changes in accumulated peak cladding temperature since the previous annual report submitted in the referenced letter.
There are no regulatory commitments contained in this letter. Should you have any questions concerning this letter, please contact Mr. Kenneth M. Nicely at (779) 231-6119.
Respectfully, Mark D. Humphrey Sr. Manager Licensing Constellation Energy Generation, LLC Attachments:
- 1. Quad Cities Nuclear Power Station Unit 1, 10 CFR 50.46 Report (Framatome Fuel)
- 2. Quad Cities Nuclear Power Station Unit 2, 10 CFR 50.46 Report (Framatome Fuel)
- 3. Quad Cities Nuclear Power Station Unit 1, 10 CFR 50.46 Report (GE Hitachi Fuel)
- 4. Quad Cities Nuclear Power Station Unit 2, 10 CFR 50.46 Report (GE Hitachi Fuel)
- 5. Quad Cities Nuclear Power Station Units 1 and 2, 10 CFR 50.46 Report Assessment Notes cc:
NRC Regional Administrator, Region III NRC Senior Resident Inspector - Quad Cities Nuclear Power Station
- Humphrey, Mark D.
Digitally signed by Humphrey, Mark D.
Date: 2024.05.06 08:40:17
-05'00'
ATTACHMENT 1 Quad Cities Nuclear Power Station Unit 1, 10 CFR 50.46 Report (Framatome Fuel) - ATRIUM 10XM PLANT NAME:
Quad Cities Unit 1 ECCS EVALUATION MODEL:
EXEM BWR-2000 50.46 REPORT REVISION DATE:
05/06/2024 CURRENT OPERATING CYCLE:
28 ANALYSIS OF RECORD Evaluation Model:
"EXEM BWR-2000 ECCS Evaluation Model," EMF-2361(P)(A)
Revision 0, May 2001 Calculations:
- 1. "Quad Cities Units 1 and 2 ATRIUM 10XM Break Spectrum with Increased ADS Flow," ANP-3794P, Revision 0A, March 2021
- 2. "Quad Cities Units 1 and 2 ATRIUM 10XM LOCA-ECCS Analysis MAPLHGR Limits With Increased ADS Flow," ANP-3795P, Revision 0, October 2019
- 3. "Quad Cities Unit 1 Cycle 27 Reload Safety Analysis," ANP-3896P, Revision 0, January 2021 Fuel Analyzed in Calculation:
ATRIUM 10XM Limiting Fuel Type:
ATRIUM 10XM Limiting Single Failure:
High Pressure Coolant Injection Limiting Break Size and Location:
0.12 ft2 split break in the recirculation discharge line Reference Peak Cladding Temperature (PCT):
PCT = 2139°F MARGIN ALLOCATION A. PRIOR LOCA MODEL ASSESSMENTS 10 CFR 50.46 Report dated May 4, 2021 (See Note 2)
PCT = 0°F 10 CFR 50.46 Report dated May 4, 2022 (See Note 3)
PCT = 0°F 10 CFR 50.46 Report dated May 4, 2023 (See Note 4)
PCT = 0°F Net PCT 2139°F B. CURRENT LOCA MODEL ASSESSMENTS RODEX4 Fuel Pellet Rim Porosity Model (See Note 5)
PCT = 0°F Total PCT change from current assessments PCT = 0°F Cumulative PCT change from current assessments PCT = 0°F Net PCT 2139°F
ATTACHMENT 2 Quad Cities Nuclear Power Station Unit 2, 10 CFR 50.46 Report (Framatome Fuel) - ATRIUM 10XM PLANT NAME:
Quad Cities Unit 2 ECCS EVALUATION MODEL:
EXEM BWR-2000 50.46 REPORT REVISION DATE:
05/06/2024 CURRENT OPERATING CYCLE:
28 ANALYSIS OF RECORD Evaluation Model:
"EXEM BWR-2000 ECCS Evaluation Model," EMF-2361(P)(A)
Revision 0, May 2001 Calculations:
- 1. "Quad Cities Units 1 and 2 ATRIUM 10XM Break Spectrum with Increased ADS Flow," ANP-3794P, Revision 0A, March 2021
- 2. "Quad Cities Units 1 and 2 ATRIUM 10XM LOCA-ECCS Analysis MAPLHGR Limits With Increased ADS Flow," ANP-3795P, Revision 0, October 2019
- 3. "Quad Cities Unit 2 Cycle 27 Reload Safety Analysis," ANP-3976P, Revision 0, January 2022 Fuel Analyzed in Calculation:
ATRIUM 10XM Limiting Fuel Type:
ATRIUM 10XM Limiting Single Failure:
High Pressure Coolant Injection Limiting Break Size and Location:
0.12 ft2 split break in the recirculation discharge line Reference Peak Cladding Temperature (PCT):
PCT = 2139°F MARGIN ALLOCATION A. PRIOR LOCA MODEL ASSESSMENTS 10 CFR 50.46 Report dated May 4, 2020 (See Note 1)
PCT = 0°F 10 CFR 50.46 Report dated May 4, 2021 (See Note 2)
PCT = 0°F 10 CFR 50.46 Report dated May 4, 2022 (See Note 3)
PCT = 0°F 10 CFR 50.46 Report dated May 4, 2023 (See Note 4)
PCT = 0°F Net PCT 2139°F B. CURRENT LOCA MODEL ASSESSMENTS RODEX4 Fuel Pellet Rim Porosity Model (See Note 5)
PCT = 0°F Total PCT change from current assessments PCT = 0°F Cumulative PCT change from current assessments PCT = 0°F Net PCT 2139°F
ATTACHMENT 3 Quad Cities Nuclear Power Station Unit 1, 10 CFR 50.46 Report (GE Hitachi Fuel) - GNF3 PLANT NAME:
Quad Cities Unit 1 ECCS EVALUATION MODEL:
SAFER/PRIME 50.46 REPORT REVISION DATE:
05/06/2024 CURRENT OPERATING CYCLE:
28 ANALYSIS OF RECORD Calculation:
"Quad Cities Nuclear Power Station (QCNPS) Units 1 and 2 GNF3 ECCS-LOCA Evaluation," GEH Report 006N1118, Revision 0, July 2022 Fuel Analyzed in Calculation:
GNF3 Limiting Fuel Type:
GNF3 Limiting Single Failure:
Diesel Generator Failure Limiting Break Size and Location:
Double-ended guillotine break of recirculation pump suction piping Reference Peak Cladding Temperature (PCT):
PCT = 2170°F MARGIN ALLOCATION A. PRIOR LOCA MODEL ASSESSMENTS 10 CFR 50.46 Report dated May 4, 2023 (See Note 4)
PCT = 0°F Net PCT 2170°F B. CURRENT LOCA MODEL ASSESSMENTS None (see Note 5)
PCT = 0°F Total PCT change from current assessments PCT = 0°F Cumulative PCT change from current assessments PCT = 0°F Net PCT 2170°F
ATTACHMENT 4 Quad Cities Nuclear Power Station Unit 2, 10 CFR 50.46 Report (GE Hitachi Fuel) - GNF3 PLANT NAME:
Quad Cities Unit 2 ECCS EVALUATION MODEL:
SAFER/PRIME 50.46 REPORT REVISION DATE:
05/06/2024 CURRENT OPERATING CYCLE:
28 ANALYSIS OF RECORD Calculation:
"Quad Cities Nuclear Power Station (QCNPS) Units 1 and 2 GNF3 ECCS-LOCA Evaluation," GEH Report 006N1118, Revision 0, July 2022 Fuel Analyzed in Calculation:
GNF3 Limiting Fuel Type:
GNF3 Limiting Single Failure:
Diesel Generator Failure Limiting Break Size and Location:
Double-ended guillotine break of recirculation pump suction piping Reference Peak Cladding Temperature (PCT):
PCT = 2170°F MARGIN ALLOCATION A. PRIOR LOCA MODEL ASSESSMENTS No prior LOCA model assessments are applicable since this is the first time the reference Analysis of Record is being reported (See Note 5)
PCT = N/A Net PCT 2170°F B. CURRENT LOCA MODEL ASSESSMENTS None (See Note 5)
PCT = N/A Total PCT change from current assessments PCT = N/A Cumulative PCT change from current assessments PCT = N/A Net PCT 2170°F
ATTACHMENT 5 Quad Cities Nuclear Power Station Units 1 and 2, 10 CFR 50.46 Report Assessment Notes Page 1
- 1.
Prior Loss-of-Coolant Accident (LOCA) Assessment A new calculation of the Framatome EXEM BWR-2000 Evaluation Model was implemented for QCNPS Unit 2.
Two assessments of the Framatome EXEM BWR-2000 Evaluation Model applied to both the QCNPS Unit 1 and 2 analyses. The first assessment was a coding issue in the RODEX4 thermal-mechanical code interpolation process of the RODEX4 Pellet-Cladding Mechanical Interaction routine with an estimated impact on PCT of +1°F. The second assessment was that some of the RODEX2-2a inputs associated with the fuel rod geometry were not being appropriately prepared with an estimated impact on PCT of -1°F.
[
Reference:
Letter from P. R. Simpson (Exelon Generation Company, LLC) to U.S.
NRC, "10 CFR 50.46 Annual Report," dated May 4, 2020]
- 2.
Prior LOCA Assessment A new calculation of the Framatome EXEM BWR-2000 Evaluation Model has been performed for QCNPS Unit 1 with a limiting Peak Clad Temperature of 2139°F. This referenced Peak Clad Temperature is an increase of 40°F from the previously reported referenced Peak Clad Temperature. This calculation incorporates all previous errors and impacts to the LOCA model except for the RODEX2-2a input error discussed in Note 1. The previously discussed impact of 0°F to the limiting Peak Clad Temperature remains valid.
Overall, the implementation of this new calculation along with the one impact represents an increase of the Peak Clad Temperature of +40°F from the previously reported limiting Peak Clad Temperature which is below the l50°Fl threshold for 30 day 10 CFR 50.46 reporting requirements.
There were no new changes, error corrections or enhancements to the Framatome EXEM BWR-2000 Evaluation Model for QCNPS Unit 2.
Lastly, no ECCS-related changes or modifications occurred at QCNPS Units 1 and 2 that affected the assumptions to any of the LOCA Analyses of Record (AORs).
[
Reference:
Letter from P. R. Simpson (Exelon Generation Company, LLC) to U.S.
NRC, "10 CFR 50.46 Annual Report," dated May 4, 2021]
- 3.
Prior LOCA Assessment There were two new changes to the Framatome EXEM BWR-2000 Evaluation Model for QCNPS Units 1 and 2. The utilization of the RDS2_2_RDX4 code created two changes impacting the effects of exposure-dependent thermal conductivity degradation (TCD) of the EXEM BWR-2000 LOCA methodology.
- 1.
The RDX2_2_RDX4 code corrected the input conversion process for the cladding and pellet roughness values. The assessment showed that the estimated impact on PCT of this RDX2_2_RDX4 coding adjustment is +1°F.
- 2.
The calculation of the TCD multiplication factor is based on the ratio of pellet temperatures. As part of the implementation of RDX2_2_RDX4, the process was
ATTACHMENT 5 Quad Cities Nuclear Power Station Units 1 and 2, 10 CFR 50.46 Report Assessment Notes Page 2 modified to use pellet temperatures in degrees Rankine instead of degrees Fahrenheit. The assessment showed the estimated impact on PCT of using degrees Rankine to calculate the TCD factor is -1°F.
The overall impact of these changes was 0°F with an absolute value of both changes being 2°F. Lastly, no ECCS-related changes or modifications occurred at QCNPS Units 1 and 2 that affected the assumptions to any of the LOCA AORs.
[
Reference:
Letter from P. R. Simpson (Constellation Energy Generation, LLC) to U.S.
NRC, "10 CFR 50.46 Annual Report," dated May 4, 2022]
- 4.
Prior LOCA Assessment The new GE Hitachi SAFER/PRIME Evaluation Model and calculation have been implemented for QCNPS Unit 1 for the fresh fuel of GNF3 loaded into the Cycle 28 core.
This model reports a limiting PCT of 2170°F and has no additional PCT impacts or estimates.
It was discovered that a change in 2011 was made to the decay heat (DH) input used in nominal calculations for the SAFER evaluation model. The updated DH model is a best estimate decay heat curve based on the 1979 ANS 5.1 standard and considers Service Information Letter (SIL) 636. This change was discovered during review of GNF3 new fuel introduction activities. Additional vendor assessments estimated an impact of 0°F upon GNF2 PCT. This change was already incorporated into the initial GNF3 LOCA evaluation and therefore has no impact on the GNF3 LOCA AOR.
Lastly, no ECCS-related changes or modifications occurred at QCNPS Units 1 and 2 that affected the assumptions to any of the LOCA AORs.
[
Reference:
Letter from P. R. Simpson (Constellation Energy Generation, LLC) to U.S.
NRC, "10 CFR 50.46 Annual Report," dated May 4, 2023]
- 5.
Current LOCA Assessment One notification letter was issued for the Framatome ATRIUM 10XM fuel type. The effects of exposure-dependent TCD are accounted for in the heat-up analyses by applying a multiplication factor to the average pellet temperature, which includes the use of the RODEX4 code. The model in the standalone RODEX4 code used to determine the fuel pellet porosity near the edge or rim of the pellet was not implemented correctly for very high exposures. A corrected version of the code showed this issue has only small impacts. The estimated impact of this issue on PCT is 0°F. This PCT impacts both QCNPS Units 1 and 2.
The new GE Hitachi SAFER/PRIME Evaluation Model and calculation have been implemented for QCNPS Unit 2 for the fresh fuel of GNF3 loaded into the Cycle 28 core.
This model reports a limiting PCT of 2170°F and has no additional PCT impacts or estimates.
Lastly, no ECCS-related changes or modifications occurred at QCNPS Units 1 and 2 that affected the assumptions to any of the LOCA AORs.