| {{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 September 30, 2013 LICENSEE: | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 30, 2013 LICENSEE: Pacific Gas and Electric Company FACILITY: Diablo Canyon Power Plant, Unit Nos. 1 and 2 |
| Pacific Gas and Electric Company FACILITY: | |
| Diablo Canyon Power Plant, Unit Nos. 1 and 2 | |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| OF CLOSED CONFERENCE CALL MEETING HELD ON SEPTEMBER 18,2013, WITH PACIFIC GAS AND ELECTRIC COMPANY TO DISCUSS THE VIRTUAL CHANNEL CONCEPTS AND IMPLEMENTATION IN THE ADVANCED LOGIC SYSTEM FOR DIABLO CANYON POWER PLANT PROCESS PROTECTION SYSTEM (TAC NOS. ME7522 AND ME7523) On September 18, 2013, a closed conference call meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Pacific Gas and Electric Company (PG&E). The purpose of the meeting was to discuss the license amendment request that PG&E submitted on October 26, 2011, to the NRC for the Digital Replacement of the Process Protection System Portion of the Reactor Trip System and Engineered Safety Features Actuation System at Diablo Canyon Power Plant, Units 1 and 2 (publicly available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML113070457). | | OF CLOSED CONFERENCE CALL MEETING HELD ON SEPTEMBER 18,2013, WITH PACIFIC GAS AND ELECTRIC COMPANY TO DISCUSS THE VIRTUAL CHANNEL CONCEPTS AND IMPLEMENTATION IN THE ADVANCED LOGIC SYSTEM FOR DIABLO CANYON POWER PLANT PROCESS PROTECTION SYSTEM (TAC NOS. ME7522 AND ME7523) |
| The meeting was closed to the public because the NRC determined that the information to be discussed was proprietary, sensitive unclassified non-safeguards information. | | On September 18, 2013, a closed conference call meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Pacific Gas and Electric Company (PG&E). The purpose of the meeting was to discuss the license amendment request that PG&E submitted on October 26, 2011, to the NRC for the Digital Replacement of the Process Protection System Portion of the Reactor Trip System and Engineered Safety Features Actuation System at Diablo Canyon Power Plant, Units 1 and 2 (publicly available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML113070457). The meeting was closed to the public because the NRC determined that the information to be discussed was proprietary, sensitive unclassified non-safeguards information. |
| The discussion focused around the virtual channel concepts and implementation in the advanced logic system (ALS) for Diablo Canyon Process Protection System. The NRC staff explained that Chapter 7 of NUREG-800, "Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition" provides the expectation for the NRC staff to confirm that the communication functions do not adversely impact the safety functionality being performed by other portions of the core logic board (CLB) logic. To complete the safety evaluation, the NRC staff needs to better understand the description of the virtual channel and examine references to traceable system requirements of how the logic within the ALS-102 CLB performs data transfer from the virtual channels to the TxB and TAB communication interfaces. | | The discussion focused around the virtual channel concepts and implementation in the advanced logic system (ALS) for Diablo Canyon Process Protection System. The NRC staff explained that Chapter 7 of NUREG-800, "Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition" provides the expectation for the NRC staff to confirm that the communication functions do not adversely impact the safety functionality being performed by other portions of the core logic board (CLB) logic. To complete the safety evaluation, the NRC staff needs to better understand the description of the virtual channel and examine references to traceable system requirements of how the logic within the ALS-102 CLB performs data transfer from the virtual channels to the TxB and TAB communication interfaces. |
| The licensee took an action to provide the NRC staff with a description of the virtual channel . and to describe how the data transfer occurs. This action will be tracked in Open Item 106. The NRC staff also stated that to complete this portion of the safety evaluation, the staff will need the to examine the design documentation, as well as perform an audit to confirm that these functions are, in fact, independent from the safety functions in the ALS-1 02. | | The licensee took an action to provide the NRC staff with a description of the virtual channel . |
| I -2 Please direct any inquiries to me at 301-415-1530 or at Jennivine.Rankin@nrc.gov. , )jJAV'IA£ Jennie K. Rankin, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-275 and List of cc w/encl: Distribution via LIST OF ATTENDEES U.S. NUCLEAR REGULATORY COMMISSION SEPTEMBER 18,2013, CLOSED MEETING WITH PACIFIC GAS AND ELECTRIC TO DISCUSS THE VIRTUAL CHANNEL CONCEPTS AND IMPLEMENTATION IN ADVANCED LOGIC SYSTEM FOR DIABLO CANYON POWER PROCESS PROTECTION DIABLO CANYON POWER PLANT, UNITS 1 AND DOCKET NO. Name Organization Rich Stattel NRR/DE/EICB Rossnyev Alvarado NRR/DE/EICB Samir Darbali '" NRR/DE/EICB Jennie Rankin NRR/DORL John Hefler "'* PG&E Kris Jentzsch ** PG&E Scott Patterson
| | and to describe how the data transfer occurs. This action will be tracked in Open Item 106. The NRC staff also stated that to complete this portion of the safety evaluation, the staff will need the to examine the design documentation, as well as perform an audit to confirm that these functions are, in fact, independent from the safety functions in the ALS-1 02. |
| ** PG&E Allen Wilson "'* PG&E | | |
| * Terry Tuite ** Westinghouse I Paul Sirianni ** Westinghouse Kyra Durinsky ** Westinghouse | | -2 I |
| *Participated via phone """Participated via phone and represented PG&E Enclosure I | | Please direct any inquiries to me at 301-415-1530 or at Jennivine.Rankin@nrc.gov. , |
| -2 Please direct any inquiries to me at 301-415-1530 or at Jennie K Rankin, Project Manager IRAJ Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-275 and List of cc w/encl: Distribution via LPLIV RidsAcrsAcnw MailCTR RidsNrrDeEicb RidsNrrDorl RidsNrrDorlLpl4 RidsNrrLAJBurkhardt RidsNrrPMDiabloCanyon RidsRgn4MailCenter | | )jJAV'IA£ f<cw1~ |
| : RStattel, RAlvarado,
| | Jennie K. Rankin, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323 |
| : SDarbali, WMaier, ADAM S Accession Nos. Meeting l\Jotice ML13246A262; M eeting s ummary ML13266A088 *via email OFFICE NRR/DORLlLPL4/PM NAME JRankin DATE 09/26/13 NRRlDORLlLPL4/LA JBurkhardt*
| | |
| 09/26/13 NRR/DORLlLPL4/BC MMarkley 09/30/13 NRRlDORLlLPL4/PM JRankin 09/30/13 OFFICIAL RECORD COpy}} | | ==Enclosure:== |
| | |
| | List of Attendees cc w/encl: Distribution via Listserv |
| | |
| | LIST OF ATTENDEES U.S. NUCLEAR REGULATORY COMMISSION SEPTEMBER 18,2013, CLOSED MEETING WITH PACIFIC GAS AND ELECTRIC COMPANY TO DISCUSS THE VIRTUAL CHANNEL CONCEPTS AND IMPLEMENTATION IN THE ADVANCED LOGIC SYSTEM FOR DIABLO CANYON POWER PLANT PROCESS PROTECTION SYSTEM DIABLO CANYON POWER PLANT, UNITS 1 AND 2 DOCKET NO. 50-285 Name Organization Rich Stattel NRR/DE/EICB Rossnyev Alvarado NRR/DE/EICB Samir Darbali '" NRR/DE/EICB Jennie Rankin NRR/DORL John Hefler "'* PG&E Kris Jentzsch ** PG&E Scott Patterson ** PG&E Allen Wilson "'* PG&E |
| | * Terry Tuite ** Westinghouse I Paul Sirianni ** Westinghouse Kyra Durinsky ** Westinghouse I |
| | *Participated via phone |
| | """Participated via phone and represented PG&E Enclosure |
| | |
| | -2 Please direct any inquiries to me at 301-415-1530 or at Jennivine.Rankin@nrc.gov. |
| | Jennie K Rankin, Project Manager IRAJ Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323 |
| | |
| | ==Enclosure:== |
| | |
| | List of Attendees cc w/encl: Distribution via Listserv DISTRIBUTION: |
| | PUBLIC LPLIV Reading RidsAcrsAcnw MailCTR Resource RidsNrrDeEicb Resource RidsNrrDorl Resource RidsNrrDorlLpl4 Resource RidsNrrLAJBurkhardt Resource RidsNrrPMDiabloCanyon Resource RidsRgn4MailCenter Resource RStattel, NRRlDE/EICB RAlvarado, NRRlDE/EICB SDarbali, NRRlDE/EICB WMaier, RIV ADAM S Accession Nos. Meeting l\Jotice ML13246A262; Meeting s ummary ML13266A088 *via email OFFICE NRR/DORLlLPL4/PM NRRlDORLlLPL4/LA NRR/DORLlLPL4/BC NRRlDORLlLPL4/PM NAME JRankin JBurkhardt* MMarkley JRankin DATE 09/26/13 09/26/13 09/30/13 09/30/13 OFFICIAL RECORD COpy}} |
Letter Sequence Meeting |
---|
TAC:ME7522, Clarify Application of Setpoint Methodology for LSSS Functions (Open) TAC:ME7523, Clarify Application of Setpoint Methodology for LSSS Functions (Open) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, ... further results|Meeting]]
Results
Other: ML120250079, ML120590119, ML12276A050, ML13018A149, ML13024A105, ML13029A667, ML13101A278, ML13192A314, ML13232A258, ML13232A263, ML13339A428, ML15103A010, ML15121A310, ML15223A968
|
MONTHYEARML11279A1602011-09-27027 September 2011 Submittal of WNA-DS-02442-PGE, Rev. 2, Diablo Canyon Units 1 and 2 Process Protection System Replacement Project, Advanced Logic System (Als) - System Requirements Specification Project stage: Request ML1200602142012-01-0606 January 2012 Notice of Forthcoming Meeting in San Luis Obispo, CA, with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System of RPS and ESFAS Project stage: Meeting ML1202500792012-01-18018 January 2012 Project Plan for Diablo Canyon Digital Upgrade of Process Protection System LAR Review Project stage: Other ML1202500572012-01-18018 January 2012 Meeting Slides Process Protection System Replacement LAR Acceptance Review Meeting Presentation Project stage: Meeting ML1204006512012-02-21021 February 2012 Summary of Meeting in San Luis Obispo, CA, with Pacific Gas and Electric; Discuss Digital Replacement of Process Protection System of Reactor Protection System and Engineered Safety Feature Actuation System at Diablo Canyon, Units 1 and 2 Project stage: Meeting ML1205300742012-02-22022 February 2012 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML1205300782012-02-22022 February 2012 3/7/2012 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML1205901192012-02-29029 February 2012 Summary of Phone Call with Licensee on Digital Replacement of the Process Protection System Portion of the Reactor Trip System and Engineered Safety Features Actuation System at Diablo Canyon, Units 1 and 2 Project stage: Other ML1207200832012-03-13013 March 2012 4/4/2012 - Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML1207200922012-03-13013 March 2012 4/18/12 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML1207200622012-03-20020 March 2012 Summary of 3/7/12 Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting DCL-12-030, Response to Items Contained in NRC Acceptance Review of License Amendment Request for Digital Process Protection System Replacement2012-04-0202 April 2012 Response to Items Contained in NRC Acceptance Review of License Amendment Request for Digital Process Protection System Replacement Project stage: Request ML1209006882012-04-0404 April 2012 3/21/2012 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML1210101022012-04-11011 April 2012 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting DCL-12-039, Submittal of V10 Tricon Time Response Calculation for the License Amendment Request for Digital Process Protection System Replacement2012-04-30030 April 2012 Submittal of V10 Tricon Time Response Calculation for the License Amendment Request for Digital Process Protection System Replacement Project stage: Request ML1211505042012-05-0303 May 2012 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12142A2142012-05-24024 May 2012 Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12142A1112012-05-24024 May 2012 Request for Withholding Information from Public Disclosure, 4/10/2012 Affidavit Executed by R. Shaffer, Invensys Operations Management, Maximum Tsap Scan Time Project stage: Withholding Request Acceptance ML12170A8402012-06-0606 June 2012 Attachment 16 to DCL-12-050, PGE-12-52 Np, Westinghouse Input to Diablo Canyon Digital Process Protection System Replacement Uncertainty Calculations Summary Lar. Project stage: Request ML12170A8372012-06-0606 June 2012 Submittal of Phase 2 Documents for the License Amendment Request for Digital Process Protection System Replacement Project stage: Request ML12222A1012012-06-0707 June 2012 Invensys Operations Management Document 993754-1-813, Validation Test Plan, Revision 1, Attachment 6 Project stage: Request ML12222A1002012-06-0707 June 2012 Invensys Operations Management Document 993754-1-802, Software Verification and Validation Plan, Revision 2, Attachment 5 Project stage: Request ML12222A0982012-06-0707 June 2012 Process Protection System Replacement Interface Requirements Specification (Irs), Revision 6, Attachment 3 Project stage: Request ML12151A2582012-06-11011 June 2012 5/16/2012 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12170A0342012-06-18018 June 2012 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12170A8662012-06-27027 June 2012 6/13/2012 Summary of Meeting Via Teleconference with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting DCL-12-069, Invensys Operations Management Document 993754-1-906, Software Development Plan, Revision 1, Attachment 72012-07-11011 July 2012 Invensys Operations Management Document 993754-1-906, Software Development Plan, Revision 1, Attachment 7 Project stage: Request ML12177A2312012-07-24024 July 2012 Request for Withholding Information from Public Disclosure, 5/29/2012 Affidavit Executed by Scott Roberts, CS Innovations, LLC on 10 Proprietary Documents Project stage: Withholding Request Acceptance ML12178A1152012-07-24024 July 2012 Request for Withholding Information from Public Disclosure, 5/29/2012 Affidavit Executed by J. Gresham, Westinghouse on 1 Proprietary Document Project stage: Withholding Request Acceptance ML12195A1732012-07-24024 July 2012 Forthcoming Meeting on 8/22/12 with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12193A1412012-07-25025 July 2012 6/28/2012 Summary of Meeting with Pacific Gas and Electric to Discuss Digital Replacement of Process Protection System at Diablo Canyon, Units 1 and 2 and Presubmittal of TSTF-493 Option B License Amendment Request (TAC ME7522-ME7523, ME851 Project stage: Meeting ML12200A1272012-08-0202 August 2012 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12222A0942012-08-0202 August 2012 Submittal of Attachment 1, Quality Assurance Plan and Revised Phase 1 Documents for the License Amendment Request for Digital Process Protection System Replacement and Attachment 8 Affidavit 993754-AFF-38T Project stage: Request ML12208A3642012-08-0707 August 2012 Request for Additional Information, License Amendment Request to Replace Digital Process Protection System for Reactor Protection System and Engineered Safety Features Actuation System Functions Project stage: RAI ML12240A0752012-08-27027 August 2012 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting DCL-12-083, Response to Request for Additional Information on License Amendment Request for Digital Process Protection System Replacement2012-09-11011 September 2012 Response to Request for Additional Information on License Amendment Request for Digital Process Protection System Replacement Project stage: Response to RAI ML12242A2562012-09-25025 September 2012 8/22/12 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12275A2962012-10-0202 October 2012 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12276A0502012-10-10010 October 2012 Regulatory Audit Plan for 11/13-16/2012 Audit at the Invensys Operations Management Facility in Lake Forest, CA, to Support Digital Replacement of Process Protection System License Amendment Request Project stage: Other ML12228A4042012-10-10010 October 2012 Request for Withholding Information from Public Disclosure, 7/23/2012 Affidavit Executed by R. Shaffer, Invensys Operations Management, for 993754-1-802 R2, 993754-1-813 R1, and 993754-1-906 R1 Project stage: Withholding Request Acceptance ML12284A4452012-10-16016 October 2012 Summary of 9/19/12 Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML13004A4742012-10-24024 October 2012 Document 993754-1-915(NP), Rev. 1, Pacific Gas & Electric Company Nuclear Safety-Related Process Protection System Replacement, Diablo Canyon Power Plant, Safety Analysis. Project stage: Request ML12296A1822012-10-24024 October 2012 Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12297A2432012-10-31031 October 2012 Summary of 10/17/2012 Teleconference Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting DCL-12-120, Submittal of Revised Phases 1 & 2 Documents for License Amendment Request for Digital Process Protection System Replacement2012-11-27027 November 2012 Submittal of Revised Phases 1 & 2 Documents for License Amendment Request for Digital Process Protection System Replacement Project stage: Request ML12338A0932012-12-0404 December 2012 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting DCL-12-121, Submittal of Revised Phase 1 and 2 Documents for the License Amendment Request for Digital Process Protection System Replacement2012-12-0505 December 2012 Submittal of Revised Phase 1 and 2 Documents for the License Amendment Request for Digital Process Protection System Replacement Project stage: Request ML12341A1232012-12-19019 December 2012 Summary of Meeting Via Teleconference with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12355A1382012-12-20020 December 2012 1/24/2013 - Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12361A3602013-01-10010 January 2013 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting 2012-04-11
[Table View] |
|
---|
Category:Meeting Summary
MONTHYEARML24157A0252024-07-0101 July 2024 Memo to Michelle Rome Summary of 4/4/2024 Meeting with CA SHPO ML24143A1202024-06-0303 June 2024 Memo to Michelle Rome Summary of 4/5/2024 Meeting with Ytt ML24108A1472024-05-0707 May 2024 February 2024 Diablo Canyon Public Scoping Meetings - Summary ML24108A1482024-05-0707 May 2024 February 2024 Environmental Scoping Meetings Related to the Diablo Canyon LRA - Memo ML24081A3362024-03-22022 March 2024 Summary of March 7, 2024, Closed Presubmittal Meeting with Pacific Gas and Electric Company Alternative Security Measures for Early Warning System License Amendment and Exemption Requests for Diablo Canyon Units 1 and 2 ML23268A4072023-09-27027 September 2023 Summary of September 19, 2023, Closed Public Meeting with Pacific Gas and Electric Company Regarding Alternative Security Measures for Early Warning System License Amendment Request for Diablo Canyon Nuclear Power Plant, Units 1 and 2 ML23265A1902023-09-26026 September 2023 Meeting Summary: September 13, 2023 Diablo Canyon, Units 1 and 2 License Renewal Application Pre-Application Meeting ML23143A2262023-06-0101 June 2023 May 3, 2023, Summary of Public Meeting to Discuss the End of Cycle Assessment and Pre-Submittal License Renewal Process Overview for Diablo Canyon Power Plant, Units 1 and 2 ML22272A5072022-09-29029 September 2022 Summary of September 27, 2022, Closed Meeting with Pacific Gas and Electric Company Regarding Planned Security Plan Changes for Diablo Canyon Nuclear Power Plant, Units 1 and 2 ML22147A0932022-06-0606 June 2022 2021 Annual Assessment Public Meeting Summary ML22126A0162022-05-0909 May 2022 Summary of April 27, 2022, Closed Teleconference with Pacific Gas and Electric Company Regarding Alternative Security Measures for Early Warning System License Amendment Request for Diablo Canyon Nuclear Power Plant, Units 1 and 2 ML21246A0202021-09-0808 September 2021 Summary of August 30, 2021, Pre-Submittal Teleconference with Pacific Gas and Electric Company Regarding a Post-Shutdown Emergency Plan License Amendment Request for Diablo Canyon Nuclear Power Plant, Units 1 and 2 ML21140A3892021-05-24024 May 2021 Riv Column 1 EOC 2020 Public Meeting Summary ML20332A1802020-12-0101 December 2020 Summary of November 24, 2020, Pre-Submittal Teleconference with Pacific Gas and Electric Company a Permanently Defueled Technical Specification License Amendment Request ML20231A6522020-08-24024 August 2020 Summary of Teleconference with Pacific Gas & Electric Company Regarding an Exigent Amendment Request to Modify Diablo Canyon Power Plant, Units 1 & 2, Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System EPID L-2020-LLA-017 ML20189A2832020-07-0707 July 2020 Summary of Region IV Annual Assessment Public Meeting ML19318F5272019-11-15015 November 2019 Summary of the August 27, 2019, Public Meeting Near the Diablo Canyon Nuclear Power Plant Regarding the Establishment and Operation of Community Advisory Boards ML19196A0742019-07-22022 July 2019 Summary of Meeting with Pacific Gas and Electric Company Regarding Forthcoming Activities Associated with Diablo Canyon Nuclear Power Plant, Units 1 and 2 Planned Decommissioning ML19064B2652019-03-14014 March 2019 Summary of February 28, 2019, Public Meeting with Pacific Gas and Electric Company to Discuss the Proposed Relief Request Concerning Reactor Vessel Internal Visual Examination for the Diablo Canyon Nuclear Power Plant, Units 1 & 2 ML18348A4202018-12-31031 December 2018 Summary of Meeting with Pacific Gas & Electric Co. to Discuss Exemption Request to Withdraw Funds from the Nuclear Decommissioning Trusts to Fund Decommissioning Planning Activities at Diablo Canyon Nuclear Power Plant ML18207A7332018-08-10010 August 2018 Summary of Pre-Licensing Meeting with PG&E Co. to Discuss the Proposed LAR to Implement WCAP-16996-A, Revision 1, Realistic LOCA Evaluation Methodology Applied to the Full Spectrum of Break Sizes at Diablo Canyon ML17198A6032017-07-17017 July 2017 Summary of Annual Assessment Meeting Regarding Diablo Canyon Power Plant 2016 Performance ML16190A1782016-07-0808 July 2016 Summary of Annual Assessment Town Hall Meeting and Public Outreach Regarding Diablo Canyon Power Plant 2015 Performance ML16011A2042016-01-14014 January 2016 Summary of Conference Call on January 7, 2016, Between the U.S. NRC and Pacific Gas and Electric Co. Concerning the Responses to RAI for the Review of the Diablo Canyon Power Plant, Units 1 and 2, License Renewal Application (CAC Nos. MF401 ML15343A1272015-12-24024 December 2015 Summary of Meeting with Pacific Gas and Electric to Discuss Diablo Canyon, Units 1 and 2 Amendment Request to Revise UFSAR for Beacon Power Distribution Monitoring System Methodology and TS 5.6.5 (COLR) Paragon and Nexus Methodologies ML15348A1702015-12-17017 December 2015 Summary of Telephone Conference Call Held Between NRC and Pacific Gas and Electric Co., Concerning the RAI Responses Pertaining to the Diablo Canyon Power Plant LRA Environmental Review ML15280A2842015-10-20020 October 2015 Summary of Meeting with Pacific Gas & Electric to Discuss Diablo Canyon, Units 1 and 2 Request to Adopt National Fire Protection Association NFPA 805, Performance-Based Standard for Fire Protection for LWR Generating Plants (2001 Edition), ML15279A4222015-10-0909 October 2015 Summary of 8/25/15 Meeting with Pacific Gas and Electric to Discuss Diablo Canyon Units 1 and 2 Amendment Request to Adopt Risk-Informed Completion Times, TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times-RITSTF Initiati ML15275A1302015-10-0707 October 2015 Summary of the Site Audit Related to the Diablo Canyon Power Plant, Units 1 and 2 License Renewal Environmental Review ML15275A0942015-10-0707 October 2015 Summary of the Severe Accident Mitigation Alternatives Site Audit Related to the Diablo Canyon Power Plant, Units 1 and 2 License Renewal Review ML15233A0062015-09-10010 September 2015 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML15233A0052015-09-0909 September 2015 Summary of Meeting with Pacific Gas and Electric to Discuss Diablo Canyon, Units 1 & 2 License Amendment Request to Adopt Risk-Informed Completion Times, TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times-RITSTF. Initiati ML15233A4912015-09-0101 September 2015 August 5, 2015, Public Scoping Meetings for the Environmental Review of the Diablo Canyon Power Plant, Units 1 and 2 License Renewal Application ML15209A9442015-07-28028 July 2015 June 24, 2015, Summary of Annual Assessment Meeting with Pacific Gas and Electric and Public Open House Regarding Diablo Canyon Power Plant 2014 Performance ML15125A1862015-05-27027 May 2015 April 28, 2015, Summary of Category 1 Public Meeting with Pacific Gas and Electric Company to Discuss Diablo Canyon'S Seismic Hazard Reevaluation Associated with Implementation of Japan Lessons-Learned Near-Term Task Force Recommendation 2. ML15134A2572015-05-18018 May 2015 5/7/15 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML15092A0792015-04-16016 April 2015 July 14-17, 2014 - Summary of Diablo Canyon, Units 1 and 2, Audit to Adopt National Fire Protection Association NFPA 805, Performance-Based Standard for Fire Protection for LWR Generating Plants (2001 Edition) ML15069A0952015-03-24024 March 2015 Summary of Telephone Conference Call Held on March 4, 2015 Between the U.S. Nuclear Regulatory Commission and Pacific Gas and Electric Company Concerning the Diablo Canyon Power Plant, Units 1 and 2, License Renewal Application ML15043A1992015-02-19019 February 2015 2/3/2015 Summary of Meeting with Pacific Gas and Electric Regarding Presubmittal Discussion on Alternate Source Term License Amendment Request for Diablo Canyon Power Plant, Units 1 and 2 ML15037A2482015-02-0505 February 2015 Summary of Regulatory Conference to Discuss Safety Significance of Diablo Canyon Power Plant Protective Action Recommendations for Areas of the Ocean Finding ML14350A2712014-12-22022 December 2014 Summary of 12/11/14 Preapplication Meeting with Pacific Gas and Electric Company to Discuss License Amendment Request to Support Installation of 500 Kilovolt Output Generator Breakers at Diablo Canyon, Units 1 and 2 ML14029A4502014-12-10010 December 2014 Summary of 12/18/13 Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML14295A7332014-11-17017 November 2014 9/24/14 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML14197A3522014-07-22022 July 2014 7/9/14 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML14157A0912014-06-17017 June 2014 Summary of 5/21/14 Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML14155A3742014-06-0404 June 2014 May 22, 2014, Summary of Annual Assessment Meeting with Pacific Gas and Electric Regarding Diablo Canyon Power Plant 2013 Performance ML14113A4932014-05-0606 May 2014 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML14113A4222014-04-23023 April 2014 Public Meeting with Pacific Gas & Electric (Pg&E)To Discuss the Operating Performance for Diablo Canyon Power Plant for the Period January 1 - December 31, 2013 ML13329A4172013-12-30030 December 2013 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML13354C0912013-12-23023 December 2013 Summary of Annual Assessment Meeting with Pacific Gas & Electric Re Diablo Canyon Nuclear Power Plant 2012 Performance 2024-07-01
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 30, 2013 LICENSEE: Pacific Gas and Electric Company FACILITY: Diablo Canyon Power Plant, Unit Nos. 1 and 2
SUBJECT:
SUMMARY
OF CLOSED CONFERENCE CALL MEETING HELD ON SEPTEMBER 18,2013, WITH PACIFIC GAS AND ELECTRIC COMPANY TO DISCUSS THE VIRTUAL CHANNEL CONCEPTS AND IMPLEMENTATION IN THE ADVANCED LOGIC SYSTEM FOR DIABLO CANYON POWER PLANT PROCESS PROTECTION SYSTEM (TAC NOS. ME7522 AND ME7523)
On September 18, 2013, a closed conference call meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Pacific Gas and Electric Company (PG&E). The purpose of the meeting was to discuss the license amendment request that PG&E submitted on October 26, 2011, to the NRC for the Digital Replacement of the Process Protection System Portion of the Reactor Trip System and Engineered Safety Features Actuation System at Diablo Canyon Power Plant, Units 1 and 2 (publicly available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML113070457). The meeting was closed to the public because the NRC determined that the information to be discussed was proprietary, sensitive unclassified non-safeguards information.
The discussion focused around the virtual channel concepts and implementation in the advanced logic system (ALS) for Diablo Canyon Process Protection System. The NRC staff explained that Chapter 7 of NUREG-800, "Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition" provides the expectation for the NRC staff to confirm that the communication functions do not adversely impact the safety functionality being performed by other portions of the core logic board (CLB) logic. To complete the safety evaluation, the NRC staff needs to better understand the description of the virtual channel and examine references to traceable system requirements of how the logic within the ALS-102 CLB performs data transfer from the virtual channels to the TxB and TAB communication interfaces.
The licensee took an action to provide the NRC staff with a description of the virtual channel .
and to describe how the data transfer occurs. This action will be tracked in Open Item 106. The NRC staff also stated that to complete this portion of the safety evaluation, the staff will need the to examine the design documentation, as well as perform an audit to confirm that these functions are, in fact, independent from the safety functions in the ALS-1 02.
-2 I
Please direct any inquiries to me at 301-415-1530 or at Jennivine.Rankin@nrc.gov. ,
)jJAV'IA£ f<cw1~
Jennie K. Rankin, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323
Enclosure:
List of Attendees cc w/encl: Distribution via Listserv
LIST OF ATTENDEES U.S. NUCLEAR REGULATORY COMMISSION SEPTEMBER 18,2013, CLOSED MEETING WITH PACIFIC GAS AND ELECTRIC COMPANY TO DISCUSS THE VIRTUAL CHANNEL CONCEPTS AND IMPLEMENTATION IN THE ADVANCED LOGIC SYSTEM FOR DIABLO CANYON POWER PLANT PROCESS PROTECTION SYSTEM DIABLO CANYON POWER PLANT, UNITS 1 AND 2 DOCKET NO. 50-285 Name Organization Rich Stattel NRR/DE/EICB Rossnyev Alvarado NRR/DE/EICB Samir Darbali '" NRR/DE/EICB Jennie Rankin NRR/DORL John Hefler "'* PG&E Kris Jentzsch ** PG&E Scott Patterson ** PG&E Allen Wilson "'* PG&E
- Terry Tuite ** Westinghouse I Paul Sirianni ** Westinghouse Kyra Durinsky ** Westinghouse I
"""Participated via phone and represented PG&E Enclosure
-2 Please direct any inquiries to me at 301-415-1530 or at Jennivine.Rankin@nrc.gov.
Jennie K Rankin, Project Manager IRAJ Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323
Enclosure:
List of Attendees cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC LPLIV Reading RidsAcrsAcnw MailCTR Resource RidsNrrDeEicb Resource RidsNrrDorl Resource RidsNrrDorlLpl4 Resource RidsNrrLAJBurkhardt Resource RidsNrrPMDiabloCanyon Resource RidsRgn4MailCenter Resource RStattel, NRRlDE/EICB RAlvarado, NRRlDE/EICB SDarbali, NRRlDE/EICB WMaier, RIV ADAM S Accession Nos. Meeting l\Jotice ML13246A262; Meeting s ummary ML13266A088 *via email OFFICE NRR/DORLlLPL4/PM NRRlDORLlLPL4/LA NRR/DORLlLPL4/BC NRRlDORLlLPL4/PM NAME JRankin JBurkhardt* MMarkley JRankin DATE 09/26/13 09/26/13 09/30/13 09/30/13 OFFICIAL RECORD COpy