DCL-13-061, Diablo Canyon, Units 1 and 2 - Submittal of CS Innovations Documents and Revised Software Configuration Management Plan for the License Amendment Request for Digital Process Protection System Replacement

From kanterella
(Redirected from ML13154A049)
Jump to navigation Jump to search
Diablo Canyon, Units 1 and 2 - Submittal of CS Innovations Documents and Revised Software Configuration Management Plan for the License Amendment Request for Digital Process Protection System Replacement
ML13154A049
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 05/30/2013
From: Allen B S
Pacific Gas & Electric Co
To:
Office of Nuclear Reactor Regulation, Document Control Desk
Shared Package
ML131540159 List:
References
DCL-13-061, OL-DPR-80, OL-DPR-82
Download: ML13154A049 (6)


Text

A tt achmen t s 3-7 t o t h e Enc l osure conta i n Propr i etary Information

-W it h ho l d Under 1 0 CFR 2.390 Pacific Gas and Electric Company M a y 3 0, 2 0 13 PG&E Letter DCL-13-061 Barry S. Allen Site Vice President Di a blo Canyon Power Plan t Mail Code 104/6 P. O. Box 56 Avila Beach, CA 93424 80 5.54 5.4888 Internal: 691.4888 Fax: 805.545.6 4 45 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 10 CFR 50.90 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Submittal of CS Innovations Documents and Revised Software Configuration Management Plan for the License Amendment Request for *Digital Process Protection System Replacement

References:

1. PG&E Letter DCL-11-1 04, "License Amendment Request 11-07, Process Protection System Replacement," dated October 26,2011 (ADAMS Accession No. ML 11307 A331 ). 2. Digital Instrumentation and Controls Digital I&C-ISG-06, "Task Working Group #6: Licensing Process, Interim Staff Guidance," Revision 1, January 19, 2011 (ADAMS Accession No. ML 110140103).
3. NRC Letter, "Diablo Canyon Power Plant, Unit Nos. 1 and 2 -Acceptance Review of License Amendment Request for Digital Process Protection System Replacement (TAC Nos. ME7522 and ME7523)," dated January 13, 2012. 4. NRC Letter, "Summary Of January 24, 2013, Teleconference Meeting With Pacific Gas And Electric Company On Digital Replacement Of The Process Protection System Portion Of The Reactor Trip System And Engineered Safety Features Actuation System At Diablo Canyon Power Plant, Unit Nos. 1 and 2 (TAC NOS. ME7522 AND ME7523)," dated March 4,2013 (ADAMS Accession No. ML 13035A167).
5. PG&E Letter DCL-12-121, "Submittal of Phase 2 Documents for the License Amendment Request for Digital Process Protection System Replacement," dated December 5, 2012 (ADAMS Accession No. ML 12342A 149). 6. PG&E Letter DCL-12-050, "Submittal of Phase 2 Documents for the License Amendment Request for Digital Process Protection System Replacement," dated June 6, 2012 (ADAMS Accession No. ML 12170A837).

Attachments 3-7 to the Enclosure contain Proprietary Information When separated from Attachments 3-7 to the Enclosure , this document is decontrolled. A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde
  • San Onofre
  • Wolf Creek Attachme n ts 3-7 to the Enclosure conta i n Proprietary I nformation

-W i thho l d Under 10 CFR 2.390 I I Document Contro l Desk I M a y 30,2013 PG&E Letter DCL-13-061 Pa ge 2

Dear C ommis s ioners and S ta ff:

In Reference 1, Pacific Gas and Electric (PG&E) submitted License Amendment Request (LAR) 11-07 to request NRC approval to replace the Diablo Canyon Power Plant Eagle 21 digital process protection system (PPS) with a new digital PPS that is based on the Invensys Operations Management Tricon Programmable Logic Controller, Version 10, and the CS Innovations, LLC (CSI) (a Westinghouse Electric Company), Advanced Logic System (ALS). The LAR format and contents in Reference 1 are consistent with the guidance provided in Enclosure E and Section C.3, respectively, of Digital Instrumentation and Controls (I&C) Revision 1 of Interim Staff Guidance Digitall&C-ISG-06, "Licensing Process," (ISG-06) (Reference 2). In Reference 3, the NRC Staff (Staff) documented its' acceptance of Reference 1 for review. In Open Item numbers 31,42, 72, 51.1 b, 51.3a, 51.3b, 51.4a, and 51.4b contained in Enclosure 2 of Reference 4, the Staff requested information related to PG&E document SCM 36-01, Revision 0, "Process Protection System Replacement Software Configuration Management Plan (SCMP)." The SCMP has been revised to address the open items in Reference

4. The SCM 36-01, Revision 1, is contained in Attachment 1 to the Enclosure and supersedes SCM 36-01, Revision 0, that was submitted in Reference
6. In Open Item number 71 contained in Enclosure 2 of Reference 4, the Staff requested that the CSI documents, "6002-10202, ALS-1 02 Design Specification," "6002-10206, ALS-102 FPGA Design Specification," and "6116-00100, Diablo Canyon Units 1 and 2 Process Protection System ALS-ASU Communication Protocol," documents be submitted.

CSI documents, "6002-10202, Revision 3, ALS-1 02 Design Specification," "6002-10206, Revision 1, ALS-102 FPGA Design Specification," and "6116-00100, Revision A, Diablo Canyon Units 1 and 2 Process Protection System ALS-ASU Communication Protocol," are contained in Attachments 3, 4, and 5 of the Enclosure of this letter, respectively.

In Open Item number 83 contained in Enclosure 2 of Reference 4, the Staff requested information on the scope of the software hazard analysis contained in CSI document, "6116-00000, Diablo Canyon PPS Management Plan." The CSI document 6116-00000 has been revised to address the open item in Reference

4. The CSI document, "6116-00000, Revision 4, Diablo Canyon PPS Management Plan," is contained in Attachment 6 of the Enclosure of this letter and supersedes 6116-00000, Revision 3, that was submitted in Attachment 5 to the Endosure of Reference
5. In Open Item number 82 contained in Enclosure 2 of Reference 4, the Staff requested additional information on the notes contained in Table 2 in Appendix A of CSI Attachments 3-7 to the Enclosure contain Proprietary Informa t ion When separated from Attachments 3-7 to the Enclosure, this document is decontrolled. A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
  • Comanche Peak
  • Diablo Canyon
  • Palo Verde
  • San Onofre
  • Wolf Creek Attachments 3-7 to the Enclosure contain Proprietary Information

-Withhold Under 10 CFR 2.390 __ Document Control Desk May 30, 2013 Page 3 PG&E Letter DCL-13-061 document, "6116-00003, Revision 1, Diablo Canyon PPS VV Plan." The CSI document 6116-00003 has been revised to address the open item in Reference

4. The CSI document, "6116-00003, Revision 2, Diablo Canyon PPS VV Plan," is contained in Attachment 7 of the Enclosure of this letter and supersedes 6116-00003, Revision 1, that was submitted in Attachment 6 to the Enclosure of Reference
5. This letter contains CSI documents in Attachments 3 through 7 to the Enclosure with information proprietary to CSI. Accordingly, Attachment 2 to the Enclosure includes a CSI authorization letter, Affidavit AFF6116-00053-5, an accompanying affidavit, a Proprietary Information Notice, and a Copyright Notice. The affidavit is signed by CSI, the owner of the information.

The affidavit sets forth the basis on which the CSI proprietary information contained in Attachments 3 through 7 to the Enclosure may be withheld from public disclosure by the NRC, and it addresses with specificity the considerations listed in paragraph (b )(4) of 10 CFR 2.390 of the NRC's regulations.

PG&E requests that the CSI proprietary information be withheld from public disclosure in accordance with 10 CFR 2.390. Correspondence with respect to the CSI affidavit, copyright, or proprietary aspects of the application for withholding related to the CSI proprietary information provided in Attachments 3 through 7 of the Enclosure should reference CSI Affidavit AFF6116-00053-5 and be addressed to Scott Roberts, President, CS Innovations, LLC, 7400 E Tierra Buena Lane, Suite 101, Scottsdale, AZ 85260-1795.

If you have any questions, or require additional information, please contact Tom Baldwin at (805) 545-4720.

This information does not affect the results of the technical evaluation or the significant hazards consideration determination previously transmitted in Reference

1. This communication does not contain regulatory commitments (as defined by NEI99-04).

I state under penalty of perjury that the foregoing is true and correct. Executed on May 30,2013. Sincerely, Jf75.Aa--Barry S. Allen Site Vice President Attachments 3-7 to the Enclosure contain Proprietary Information When separated from Attachments 3-7 to the Enclosure, this document is decontrolled.

A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde
  • San Onofre
  • Wolf Creek Attachments 3-7 to the Enclosure contain Proprietary Information

-Withhold Under 10 CFR 2.390 __ Document Control Desk May 30, 2013 Page 4 kjse/4328 SAPN 50271918 Enclosure cc: Diablo Distribution PG&E Letter DCL-13-061 cc/enc: Thomas R. Hipschman, NRC Senior Resident Inspector Arthur T. Howell, III, NRC Region IV Gonzalo L. Perez, Branch Chief, California Department of Public Health James T. Polickoski, NRR Project Manager Attachments 3-7 to the Enclosure contain Proprietary Information When separated from Attachments 3-7 to the Enclosure , this document is decontrolled. A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde
  • San Onofre
  • Wolf Creek A t tach m ents 3-7 to the Enc l osure conta i n Prop ri etary I nformation

-W i th h o l d U nder 10 CFR 2.390 Enclosure PG&E Letter DCL-13-061 Submittal of CS Innovations Documents and Revised Software Configuration Management Plan for the License Amendment Request for Digital Process Protection System Replacement In Pacific Gas and Electric (PG&E) Letter DCL-11-104, "License Amendment Request 11-07, Process Protection System Replacement," dated October 26,2011, PG&E submitted License Amendment Request (LAR) 11-07 to request NRC approval to replace the Diablo Canyon Power Plant Eagle 21 digital process protection system (PPS) with a new digital PPS that is based on the Invensys Operations Management Tricon Programmable Logic Controller, Version 10, and the CS Innovations, LLC (CSI) (a Westinghouse Electric Company), Field Programmable Gate Array based Advanced Logic System (ALS). The LAR 11-07 format and contents are consistent with the guidance provided in Enclosure E and Section C.3, respectively, of Digital Instrumentation and Controls (I&C), Revision 1 of Interim Staff Guidance Digital I&C-ISG-06, "Licensing Process," (ISG-06).

The NRC Staff (Staff) documented its acceptance of LAR 11-07 for review in the NRC Letter, "Diablo Canyon Power Plant, Unit Nos. 1 and 2 -Acceptance Review of License Amendment Request for Digital Process Protection System Replacement (TAC Nos. ME7522 and ME7523)," dated January 13, 2012. The NRC Letter, "Summary Of January 24, 2013, Teleconference Meeting With Pacific Gas And Electric Company On Digital Replacement Of The Process Protection System Portion Of The Reactor Trip System And Engineered Safety Features Actuation System At Diablo Canyon Power Plant, Unit Nos. 1 and 2 (TAC NOS. ME7522 AND ME7523)," dated March 4,2013, contains Open Item numbers 31,42, 72, 51.1 b, 51.3a, 51.3b, 51.4a, and 51.4b in Enclosure 2 that are related to the PG&E document, "SCM 36-01, Revision 0, Process Protection System Replacement Software Configuration Management Plan (SCMP)." The SCMP has been revised to address the open items in the March 4, 2013, NRC letter. The SCM 36-01, Revision 1, is contained in Attachment 1 to the Enclosure.

The SCM 36-01, Revision 1, identifies the changes to address the open items in the revision history at the beginning of the document.

In Open Item number 71 contained in Enclosure 2 of the March 4, 2013, NRC letter, the Staff requested that the CSI documents, "6002-10202, ALS-102 Design Specification," "6002-10206, ALS-102 FPGA Design Specification," and "6116-00100, Diablo Canyon Units 1 and 2 Process Protection System ALS-ASU Communication Protocol," documents be submitted. CSI documents, "6002-10202, Revision 3, ALS-1 02 Design Specification," "6002-10206, Revision 1, ALS-102 FPGA Design Specification," and "6116-00100, Revision A, Diablo Canyon Units 1 1 Att ac hm e nt s 3-7 to th e Enclosur e cont a in Propriet a ry Information When separated from Attachments 3-7 to the Enclosure, this document is decontro ll ed.

Attachments 3-7 to the E n c l osure contain Propr i etary I nf ormation -Withhold Under 10 CFR 2.390 E ncl osure PG&E L ette r DC L-1 3-061 a nd 2 Process Protect i o n Syste m ALS-A SU Commu ni ca ti o n P r o t oco l," are conta i ned in A tt achmen ts 3 , 4 , and 5 of th e En cl os u re , res p ec ti ve l y. In Open Item number 83 contained in Enclosure 2 of the March 4, 2013, NRC letter, the Staff requested information on the scope of the software hazard analysis contained in CSI document, "6116-00000, Diablo Canyon PPS Management Plan". The CSI document 6116-00000 has been revised to address the scope of the software hazard analysis.

The CSI document, "6116-00000, Revision 4, Diablo Canyon PPS Management Plan," is contained in Attachment 6 of the Enclosure.

In Open Item number 82 contained in Enclosure 2 of the March 4,2013, NRC letter, the Staff requested additional information on the notes contained in Table 2 in Appendix A of CSI document, "6116-00003, Revision 1, Diablo Canyon PPS W Plan." The CSI document 6116-00003 has been revised to include additional information on the notes contained in Table 2 in Appendix A of the CSI document 6116-00003. The CSI document, "6116-00003, Revision 2, Diablo Canyon PPS W Plan," is contained in Attachment 7 of the Enclosure.

ATTACHMENTS

1. PG&E Document, "SCM 36-01, Revision1, Process Protection System Replacement Software Configuration Management Plan (SCMP)" 2. CS Innovations Authorization Letter, Affidavit AFF6116-00053-5
3. CS Innovations document, "6002-10202, Revision 3, ALS-1 02 Design Specification" (Proprietary)
4. CS Innovations document, "6002-10206, Revision 1, ALS-102 FPGA Design Specification" (Proprietary)
5. CS Innovations document, "6116-00100, Revision A, Diablo Canyon Units 1 and 2 Process Protection System Communication Protocol" (Proprietary)
6. CS Innovations document, "6116-00000, Revision 4, Diablo Canyon PPS Management Plan" (Proprietary)
7. CS Innovations document, "6116-00003, Revision 2,Diablo Canyon PPS W Plan" (Proprietary) 2 Att ac hments 3-7 to the Enclosur e co nta in P r opr i etary I nformation When separated from Attachments 3-7 to the Enc l osure , this document i s decontro l led.