Letter Sequence Request |
---|
TAC:ME7522, Clarify Application of Setpoint Methodology for LSSS Functions (Open) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, ... further results|Meeting]]
Results
Other: ML120250079, ML120590119, ML12276A050, ML13018A149, ML13024A105, ML13029A667, ML13101A278, ML13192A314, ML13232A258, ML13232A263, ML13339A428, ML15103A010, ML15121A310, ML15223A968
|
MONTHYEARML11279A1602011-09-27027 September 2011 Submittal of WNA-DS-02442-PGE, Rev. 2, Diablo Canyon Units 1 and 2 Process Protection System Replacement Project, Advanced Logic System (Als) - System Requirements Specification Project stage: Request ML1200602142012-01-0606 January 2012 Notice of Forthcoming Meeting in San Luis Obispo, CA, with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System of RPS and ESFAS Project stage: Meeting ML1202500792012-01-18018 January 2012 Project Plan for Diablo Canyon Digital Upgrade of Process Protection System LAR Review Project stage: Other ML1202500572012-01-18018 January 2012 Meeting Slides Process Protection System Replacement LAR Acceptance Review Meeting Presentation Project stage: Meeting ML1204006512012-02-21021 February 2012 Summary of Meeting in San Luis Obispo, CA, with Pacific Gas and Electric; Discuss Digital Replacement of Process Protection System of Reactor Protection System and Engineered Safety Feature Actuation System at Diablo Canyon, Units 1 and 2 Project stage: Meeting ML1205300742012-02-22022 February 2012 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML1205300782012-02-22022 February 2012 3/7/2012 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML1205901192012-02-29029 February 2012 Summary of Phone Call with Licensee on Digital Replacement of the Process Protection System Portion of the Reactor Trip System and Engineered Safety Features Actuation System at Diablo Canyon, Units 1 and 2 Project stage: Other ML1207200832012-03-13013 March 2012 4/4/2012 - Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML1207200922012-03-13013 March 2012 4/18/12 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML1207200622012-03-20020 March 2012 Summary of 3/7/12 Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting DCL-12-030, Response to Items Contained in NRC Acceptance Review of License Amendment Request for Digital Process Protection System Replacement2012-04-0202 April 2012 Response to Items Contained in NRC Acceptance Review of License Amendment Request for Digital Process Protection System Replacement Project stage: Request ML1209006882012-04-0404 April 2012 3/21/2012 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML1210101022012-04-11011 April 2012 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting DCL-12-039, Submittal of V10 Tricon Time Response Calculation for the License Amendment Request for Digital Process Protection System Replacement2012-04-30030 April 2012 Submittal of V10 Tricon Time Response Calculation for the License Amendment Request for Digital Process Protection System Replacement Project stage: Request ML1211505042012-05-0303 May 2012 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12142A2142012-05-24024 May 2012 Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12142A1112012-05-24024 May 2012 Request for Withholding Information from Public Disclosure, 4/10/2012 Affidavit Executed by R. Shaffer, Invensys Operations Management, Maximum Tsap Scan Time Project stage: Withholding Request Acceptance ML12170A8402012-06-0606 June 2012 Attachment 16 to DCL-12-050, PGE-12-52 Np, Westinghouse Input to Diablo Canyon Digital Process Protection System Replacement Uncertainty Calculations Summary Lar. Project stage: Request ML12170A8372012-06-0606 June 2012 Submittal of Phase 2 Documents for the License Amendment Request for Digital Process Protection System Replacement Project stage: Request ML12222A1012012-06-0707 June 2012 Invensys Operations Management Document 993754-1-813, Validation Test Plan, Revision 1, Attachment 6 Project stage: Request ML12222A1002012-06-0707 June 2012 Invensys Operations Management Document 993754-1-802, Software Verification and Validation Plan, Revision 2, Attachment 5 Project stage: Request ML12222A0982012-06-0707 June 2012 Process Protection System Replacement Interface Requirements Specification (Irs), Revision 6, Attachment 3 Project stage: Request ML12151A2582012-06-11011 June 2012 5/16/2012 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12170A0342012-06-18018 June 2012 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12170A8662012-06-27027 June 2012 6/13/2012 Summary of Meeting Via Teleconference with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting DCL-12-069, Invensys Operations Management Document 993754-1-906, Software Development Plan, Revision 1, Attachment 72012-07-11011 July 2012 Invensys Operations Management Document 993754-1-906, Software Development Plan, Revision 1, Attachment 7 Project stage: Request ML12177A2312012-07-24024 July 2012 Request for Withholding Information from Public Disclosure, 5/29/2012 Affidavit Executed by Scott Roberts, CS Innovations, LLC on 10 Proprietary Documents Project stage: Withholding Request Acceptance ML12178A1152012-07-24024 July 2012 Request for Withholding Information from Public Disclosure, 5/29/2012 Affidavit Executed by J. Gresham, Westinghouse on 1 Proprietary Document Project stage: Withholding Request Acceptance ML12195A1732012-07-24024 July 2012 Forthcoming Meeting on 8/22/12 with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12193A1412012-07-25025 July 2012 6/28/2012 Summary of Meeting with Pacific Gas and Electric to Discuss Digital Replacement of Process Protection System at Diablo Canyon, Units 1 and 2 and Presubmittal of TSTF-493 Option B License Amendment Request (TAC ME7522-ME7523, ME851 Project stage: Meeting ML12200A1272012-08-0202 August 2012 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12222A0942012-08-0202 August 2012 Submittal of Attachment 1, Quality Assurance Plan and Revised Phase 1 Documents for the License Amendment Request for Digital Process Protection System Replacement and Attachment 8 Affidavit 993754-AFF-38T Project stage: Request ML12208A3642012-08-0707 August 2012 Request for Additional Information, License Amendment Request to Replace Digital Process Protection System for Reactor Protection System and Engineered Safety Features Actuation System Functions Project stage: RAI ML12240A0752012-08-27027 August 2012 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting DCL-12-083, Response to Request for Additional Information on License Amendment Request for Digital Process Protection System Replacement2012-09-11011 September 2012 Response to Request for Additional Information on License Amendment Request for Digital Process Protection System Replacement Project stage: Response to RAI ML12242A2562012-09-25025 September 2012 8/22/12 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12275A2962012-10-0202 October 2012 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12276A0502012-10-10010 October 2012 Regulatory Audit Plan for 11/13-16/2012 Audit at the Invensys Operations Management Facility in Lake Forest, CA, to Support Digital Replacement of Process Protection System License Amendment Request Project stage: Other ML12228A4042012-10-10010 October 2012 Request for Withholding Information from Public Disclosure, 7/23/2012 Affidavit Executed by R. Shaffer, Invensys Operations Management, for 993754-1-802 R2, 993754-1-813 R1, and 993754-1-906 R1 Project stage: Withholding Request Acceptance ML12284A4452012-10-16016 October 2012 Summary of 9/19/12 Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML13004A4742012-10-24024 October 2012 Document 993754-1-915(NP), Rev. 1, Pacific Gas & Electric Company Nuclear Safety-Related Process Protection System Replacement, Diablo Canyon Power Plant, Safety Analysis. Project stage: Request ML12296A1822012-10-24024 October 2012 Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12297A2432012-10-31031 October 2012 Summary of 10/17/2012 Teleconference Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting DCL-12-120, Submittal of Revised Phases 1 & 2 Documents for License Amendment Request for Digital Process Protection System Replacement2012-11-27027 November 2012 Submittal of Revised Phases 1 & 2 Documents for License Amendment Request for Digital Process Protection System Replacement Project stage: Request ML12338A0932012-12-0404 December 2012 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting DCL-12-121, Submittal of Revised Phase 1 and 2 Documents for the License Amendment Request for Digital Process Protection System Replacement2012-12-0505 December 2012 Submittal of Revised Phase 1 and 2 Documents for the License Amendment Request for Digital Process Protection System Replacement Project stage: Request ML12341A1232012-12-19019 December 2012 Summary of Meeting Via Teleconference with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12355A1382012-12-20020 December 2012 1/24/2013 - Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12361A3602013-01-10010 January 2013 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting 2012-04-11
[Table View] |
|
---|
Category:Letter
MONTHYEARML24302A2622024-11-0101 November 2024 Letter to CA SHPO Regarding DCPP Dseis ML24302A1922024-11-0101 November 2024 Ltr to G. Frausto Coastal Band of Chumash Indians Re DCPP Dseis ML24302A1952024-11-0101 November 2024 Ltr to M. Olivas Tucker Ytt Re DCPP Dseis ML24302A1912024-11-0101 November 2024 Ltr to C. Mcdarment Tule River Tribe Re DCPP Dseis ML24302A1942024-11-0101 November 2024 Ltr to K. Kahn Santa Ynez Band of Chumash Indians Re DCPP Dseis ML24302A1962024-11-0101 November 2024 Ltr to SLO County Chumash Indians Re DCPP Dseis ML24302A1932024-11-0101 November 2024 Letter to G. Pierce Salinan Tribe of Monterey, SLO Re DCPP Dseis ML24302A1972024-11-0101 November 2024 Letter to V. Sage Walker Northern Chumash Tribal Council Re DCPP Dseis ML24302A2612024-11-0101 November 2024 Letter to Achp Re DCPP Dseis ML24275A0622024-10-30030 October 2024 NRC to NMFS Request Initiate Formal Endangered Species Act Consultation and Abbreviated Essential Fish Habitat for Proposed License Renewal of DCP Plant Units 1, 2 IR 05000275/20240032024-10-30030 October 2024 Integrated Inspection Report 05000275/2024003 and 05000323/2024003 and Independent Spent Fuel Storage Installation Report 07200026/2024001 ML24269A0122024-10-29029 October 2024 OEDO-24-00083 2.206 Petition Diablo Canyon Seismic CDF - Response to Petitioner Letter ML24284A3122024-10-28028 October 2024 Ltr to P Ting, Diablo Canyon Nuclear Power Plant Units 1 and 2 Notice of Avail of Draft Supplement 62 to the GEIS for Lic Renew of Nuclear Plants ML24284A3112024-10-28028 October 2024 Ltr to a Peck, Diablo Canyon Nuclear Power Plant Units 1 and 2 Notice of Avail of Draft Supplement 62 to the GEIS for Lic Renew of Nuclear Plants IR 05000275/20240132024-10-28028 October 2024 – License Renewal Report 05000275/2024013 and 05000323/2024013 DCL-24-103, Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 22024-10-24024 October 2024 Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 2 ML24261B9492024-10-24024 October 2024 Issuance of Amendment Nos. 246 and 248 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) IR 05000275/20244042024-10-23023 October 2024 Security Baseline Inspection Report 05000275/2024404 and 05000323/2024404 ML24277A0292024-10-18018 October 2024 NRC to Fws Req. for Concurrence W. Endangered Species Act Determinations for Diablo Canyon Power Plant Units 1,2, ISFSI Proposed License Renewals in San Luis Obispo Co., CA DCL-24-092, Supplement and Annual Update License Renewal Application, Amendment 12024-10-14014 October 2024 Supplement and Annual Update License Renewal Application, Amendment 1 DCL-24-098, Material Status Report for the Period Ending August 31, 20242024-10-0909 October 2024 Material Status Report for the Period Ending August 31, 2024 DCL-24-091, Response to Request for Additional Information by the Office of Nuclear Reactor Regulation2024-10-0303 October 2024 Response to Request for Additional Information by the Office of Nuclear Reactor Regulation IR 05000275/20253012024-10-0303 October 2024 Notification of NRC Initial Operator Licensing Examination 05000275/2025301; 05000323/2025301 ML24240A0222024-09-20020 September 2024 Letter to A. Peck Environmental Impact Statement Scoping Summary Report for Diablo Canyon Nuclear Power Plant Units 1 and 2 ML24260A1222024-09-14014 September 2024 14 Sept 2024 Ltr - California Coastal Commission to Pg&E, Incomplete Consistency Certification for Requested Nuclear Regulatory Commission License Renewal for Diablo Canyon Power Plant DCL-24-087, License Renewal - Historic and Cultural Resources Reference Documents (Redacted)2024-09-12012 September 2024 License Renewal - Historic and Cultural Resources Reference Documents (Redacted) ML24262A2462024-09-11011 September 2024 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic - Petitioner Response to Acknowledgement Letter - DCL-24-083, CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated2024-09-0909 September 2024 CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated DCL-24-078, Pre-Notice of Disbursement from Decommissioning Trust2024-09-0303 September 2024 Pre-Notice of Disbursement from Decommissioning Trust DCL-24-082, Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment2024-08-28028 August 2024 Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment ML24205A0662024-08-27027 August 2024 OEDO-24-00083 - 10 CFR 2.206 - Ack Letter - Diablo Canyon Units 1 and 2 Seismic Core Damage Frequency - IR 05000275/20240052024-08-22022 August 2024 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2024005 and 05000323/2024005) DCL-24-077, Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident2024-08-15015 August 2024 Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident DCL-24-075, Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React2024-08-0808 August 2024 Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React IR 05000275/20240022024-08-0606 August 2024 Integrated Inspection Report 05000275/2024002 and 05000323/2024002 DCL-24-079, DC-2024-07 Post Exam Comments Analysis2024-08-0202 August 2024 DC-2024-07 Post Exam Comments Analysis DCL-24-070, License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2024-07-31031 July 2024 License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies DCL-24-071, Core Operating Limits Report for Unit 2 Cycle 252024-07-22022 July 2024 Core Operating Limits Report for Unit 2 Cycle 25 DCL-2024-523, Submittal of Report on Discharge Self-Monitoring2024-07-18018 July 2024 Submittal of Report on Discharge Self-Monitoring ML24187A1352024-07-16016 July 2024 Letter to Paula Gerfen - Diablo Canyon Units 1 and 2 - Summary of June 2024 Audit Related to the License Renewal Application Severe Accident Mitigation Alternatives Review IR 05000275/20240142024-07-11011 July 2024 Age-Related Degradation Inspection Report 05000275/2024014 and 05000323/2024014 IR 05000275/20244012024-07-0808 July 2024 Security Baseline Inspection Report 05000275/2024401 and 05000323/2024401 (Full Report) IR 05000323/20240112024-07-0303 July 2024 License Renewal Phase Report 05000323/2024011 DCL-2024-527, Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant2024-07-0101 July 2024 Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant DCL-24-066, Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL2024-06-27027 June 2024 Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL ML24155A2182024-06-18018 June 2024 OEDO-23-00350-NRR - (LTR-23-0228-1) - Closure Letter - 10 CFR 2.206 Petition from Mothers for Peace and Friends of the Earth Regarding Diablo Canyon ML24129A1762024-06-14014 June 2024 National Historic Preservation Act Section 106 Consultation – Results of Identification and Evaluation (Docket Number: 72-026) ML24200A2052024-06-0707 June 2024 Fws to NRC, List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project for Diablo Canyon License Renewal ML24099A2192024-05-29029 May 2024 Issuance of Amendment Nos. 245 and 247 Revision to TSs to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24117A0132024-05-20020 May 2024 Letter to Paula Gerfen-Diablo Canyon Units 1 and 2-Regulatory Audit Regarding Severe Accident Mitigation Alternatives for the License Renewal Application 2024-09-09
[Table view] |
Text
eWestinghouse Nuclear Services Westinghouse Electric 1000 Westinghouse Company Drive Cranberry Township, Pennsylvania 16066 USA U.S. Nuclear Regulatory Commission Direct tel: (412) 374-4643 Document Control Desk Direct fax: (724) 720-0754 11555 Rockville Pike e-mail: greshaja@westinghouse.com Rockville, MD 20852 LTR-NRC- 11-50 September 27, 2011
Subject:
Submittal of WNA-DS-02442-PGE, Rev. 2, "Diablo Canyon Units 1 and 2 Process Protection System Replacement Project, Advanced Logic System (ALS) - System Requirements Specification" (Proprietary)
Reference:
- 1. PG&E Letter DCL-09-05 1, from James R. Becker (PG&E) to the Chief Financial Officer of the NRC, dated July 17, 2009.
Reference I discussed Pacific Gas & Electric Company's (PG&E) intention to submit a license amendment request (LAR) for a digital upgrade of the Diablo Canyon Power Plant (DCPP) Eagle 21 Process Protection System (PPS) and requested NRC consideration of DCPP as a pilot plant for the use of DI&C-ISG-06, "Digital Instrumentation and Controls Task Working Group #6: Licensing Process Interim Staff Guidance." DI&C-ISG-06 contains the licensing process that will be used by the NRC for the review of digital I&C systems and provides guidance to licensees on the content of the associated LAR.
Enclosed are copies of the proprietary version of WNA-DS-02442-PGE, Rev. 2, "Diablo Canyon Units I and 2 Process Protection System Replacement Project, Advanced Logic System (ALS) - System Requirements Specification." This document will be incorporated by reference by PG&E in their LAR requesting NRC approval to replace the DCPP Eagle 21 PPS with a new PPS that is based, in part, on the Advanced Logic System of Westinghouse Electric Company LLC (Westinghouse) and CS Innovations, a wholly-owned subsidiary of Westinghouse.
Any Requests for Additional Information (RAI) associated with the NRC's review of the enclosed document should be sent to Mr. Tom Baldwin of PG&E. PG&E is responsible for the payment of any NRC review fees associated with the review of this document. If you have questions or requests regarding the enclosed document, please contact Tom Baldwin of PG&E at 805-545-4720.
Also enclosed are:
- i. One (1) copy of the Application for Withholding Proprietary Information from Public Disclosure, AW-1 1-3249 (Non-Proprietary), with Proprietary Information Notice and Copyright Notice.
- 2. One (1) copy of Affidavit (Non-Proprietary).
This submittal contains proprietary information prepared by Westinghouse. In conformance with the requirements of 10 CFR Section 2.390, as amended, of the Co.mission's regulations, we are enclosing with this submittal an Application for Withholding Proprietary Information from Public Disclosure and an 4C 6 - QL4~i CCjP 12t LkJre_:
Page 2 of 2 LTR-NRC- 11-50 September 27, 2011 affidavit. The affidavit sets forth the basis on which the information identified as proprietary may be withheld from public disclosure by the Commission.
The subject document was prepared and classified as Westinghouse Proprietary Class 2, and Westinghouse requests that it be considered proprietary in its entirety. Westinghouse does not plan to submit a non-proprietary version of this document due to its extensive proprietary content. A non-proprietary version would be of no value to the public.
Correspondence with respect to the proprietary aspects of the application for withholding or the Westinghouse affidavit should reference AW-1 1-3249 and should be addressed to J. A. Gresham, Manager, Regulatory Compliance, Westinghouse Electric Company LLC, Suite 428, 1000 Westinghouse Drive, Cranberry Township, Pennsylvania 16066.
Very truly yours,
- .A. Gresham, Manager Regulatory Compliance Enclosures
M WSWWestinghouse I Westinghouse Electric Company etnhueEeriCopYNuclear t g1000 Services Westinghouse Drive Cranberry Township, Pennsylvania 16066 USA U.S. Nuclear Regulatory Commission Direct tel: (412) 374-4643 Document Control Desk Direct fax: (724) 720-0754 11555 Rockville Pike e-mail: greshaja@westinghouse.com Rockville, MD 20852 AW- 11-3249 September 27, 2011 APPLICATION FOR WITHHOLDING PROPRIETARY INFORMATION FROM PUBLIC DISCLOSURE
Subject:
WNA-DS-02442-PGE, Rev. 2, "Diablo Canyon Units I and 2 Process Protection System Replacement Project, Advanced Logic System (ALS) - System Requirements Specification" (Proprietary)
Reference:
Letter from J. A. Gresham to Document Control Desk, LTR-NRC- 11-50, dated September 27, 2011 The Application for Withholding Proprietary Information from Public Disclosure is submitted by Westinghouse Electric Company LLC (Westinghouse), pursuant to the provisions of paragraph (b)(1) of Section 2.390 of the Commission's regulations. It contains commercial strategic information proprietary to Westinghouse and customarily held in confidence.
The proprietary information for which withholding is being requested is contained in the proprietary version of the subject document. In conformance with 10 CFR Section 2.390, Affidavit AW- 1!-3249 accompanies this Application for Withholding Proprietary Information from Public Disclosure, setting forth the basis on which the identified proprietary information may be withheld from public disclosure.
The subject document was prepared and classified as Westinghouse Proprietary Class 2, and Westinghouse requests that it be considered proprietary in its entirety. Westinghouse does not plan to submit a non-proprietary version of this document due to its extensive proprietary content. A non-proprietary version would be of no value to the public.
Accordingly, it is respectfully requested that the subject information which is proprietary to Westinghouse be withheld from public disclosure in accordance with 10 CFR Section 2.390 of the Commission's regulations.
Page 2 of 2 AW-1 1-3249 September 27, 2011 Correspondence with respect to the proprietary aspects of the application for withholding or the accompanying affidavit should reference AW-1 1-3249 and should be addressed to J. A. Gresham, Manager, Regulatory Compliance, Westinghouse Electric Company LLC, Suite 428, 1000 Westinghouse Drive, Cranberry Township, Pennsylvania 16066.
Very truly yours, J. A. Gresham, Manager Regulatory Compliance Enclosures
AW- 11-3249 AFFIDAVIT COMMONWEALTH OF PENNSYLVANIA:
ss COUNTY OF BUTLER:
Before me, the undersigned authority, personally appeared J. A. Gresham, who, being by me duly sworn according to law, deposes and says that he is authorized to execute this Affidavit on behalf of Westinghouse Electric Company LLC (Westinghouse), and that the averments of fact set forth in this Affidavit are true and correct to the best of his knowledge, information, and belief:
A. Gresham, Manager Regulatory Compliance Sworn to and subscribed before me this 27th day of September 2011 Notary Public COMMONWEALTH OF PENNSYLVANIA Notarial Seal Cynthia Olesky, Notary Public Manor Boro, Westmoreland County My Commission Expires July 16, 2014 Member. Pennsylvania Association of Notaries
2 AW-1 1-3249 (1) I am Manager, Regulatory Compliance, in Nuclear Services, Westinghouse Electric Company LLC (Westinghouse), and as such, I have been specifically delegated the function of reviewing the proprietary information sought to be withheld from public disclosure in connection with nuclear power plant licensing and rule making proceedings, and am authorized to apply for its withholding on behalf of Westinghouse.
(2) I am making this Affidavit in conformance with the provisions of 10 CFR Section 2.390 of the Commission's regulations and in conjunction with the Westinghouse Application for Withholding Proprietary Information from Public Disclosure accompanying this Affidavit.
(3) I have personal knowledge of the criteria and procedures utilized by Westinghouse in designating information as a trade secret, privileged or as confidential commercial or financial information.
(4) Pursuant to the provisions of paragraph (b)(4) of Section 2.390 of the Commission's regulations, the following is furnished for consideration by the Commission in determining whether the information sought to be withheld from public disclosure should be withheld.
(i) The information sought to be withheld from public disclosure is owned and has been held in confidence by Westinghouse.
(ii) The information is of a type customarily held in confidence by Westinghouse and not customarily disclosed to the public. Westinghouse has a rational basis for determining the types of information customarily held in confidence by it and, in that connection, utilizes a system to determine when and whether to hold certain types of information in confidence. The application of that system and the substance of that system constitutes Westinghouse policy and provides the rational basis required.
Under that system, information is held in confidence if it falls in one or more of several types, the release of which might result in the loss of an existing or potential competitive advantage, as follows:
(a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of
3 AW- 11-3249 Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.
(b) It consists of supporting data, including test data, relative to a process (or component, structure, tool, method, etc.), the application of which data secures a competitive economic advantage, e.g., by optimization or improved marketability.
(c) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product.
(d) It reveals cost or price information, production capacities, budget levels, or commercial strategies of Westinghouse, its customers or suppliers.
(e) It reveals aspects of past, present, or future Westinghouse or customer funded development plans and programs of potential commercial value to Westinghouse.
(f) It contains patentable ideas, for which patent protection may be desirable.
There are sound policy reasons behind the Westinghouse system which include the following:
(a) The use of such information by Westinghouse gives Westinghouse a competitive advantage over its competitors. It is, therefore, withheld from disclosure to protect the Westinghouse competitive position.
(b) It is information that is marketable in many ways. The extent to which such information is available to competitors diminishes the Westinghouse ability to sell products and services involving the use of the information.
(c) Use by our competitor would put Westinghouse at a competitive disadvantage by reducing his expenditure of resources at our expense.
4 AW- 11-3249 (d) Each component of proprietary information pertinent to a particular competitive advantage is potentially as valuable as the total competitive advantage. If competitors acquire components of proprietary information, any one component may be the key to the entire puzzle, thereby depriving Westinghouse of a competitive advantage.
(e) Unrestricted disclosure would jeopardize the position of prominence of Westinghouse in the world market, and thereby give a market advantage to the competition of those countries.
(f) The Westinghouse capacity to invest corporate assets in research and development depends upon the success in obtaining and maintaining a competitive advantage.
(iii) The information is being transmitted to the Commission in confidence and, under the provisions of 10 CFR Section 2.390, it is to be received in confidence by the Commission.
(iv) The information sought to be protected is not available in public sources or available information has not been previously employed in the same original manner or method to the best of our knowledge and belief.
(v) The proprietary information sought to be withheld in this submittal is that which is contained in WNA-DS-02442-PGE, Rev. 2, "Diablo Canyon Units 1 and 2 Process Protection System Replacement Project, Advanced Logic System (ALS) - System Requirements Specification" (Proprietary), for submittal to the Commission, being transmitted by Westinghouse letter, LTR-NRC-1 1-50, and Application for Withholding Proprietary Information from Public Disclosure, to the Document Control Desk. The proprietary information as submitted by Westinghouse is submitted in support of Pacific Gas & Electric Company's intention to submit a license amendment request for a digital upgrade of the Diablo Canyon Power Plant Reactor Trip System and Engineered Safety Features Actuation System, and may be used only for that purpose.
5 AW-1 1-3249 This information is part of that which will enable Westinghouse to:
(a) Obtain NRC approval of its Advanced Logic System for use in Reactor Trip and Engineered Safety Features Actuation Systems.
Further this information has substantial commercial value as follows:
(a) Westinghouse plans to sell the use of this information to its customers for purposes of obtaining NRC approval of its Advanced Logic System for use in Reactor Trip and Engineered Safety Features Actuation Systems.
(b) Westinghouse can sell support and defense of the use of its Advanced Logic System in safety-related applications.
(c) The information requested to be withheld reveals the distinguishing aspects of a methodology which was developed by Westinghouse.
Public disclosure of this proprietary information is likely to cause substantial harm to the competitive position of Westinghouse because it would enhance the ability of competitors to provide similar engineering services and licensing defense services for commercial power reactors without commensurate expenses. Also, public disclosure of the information would enable others to use the information to meet NRC requirements for licensing documentation without purchasing the right to use the information.
The development of the technology described in part by the information is the result of applying the results of many years of experience in an intensive Westinghouse effort and the expenditure of a considerable sum of money.
In order for competitors of Westinghouse to duplicate this information, similar technical programs would have to be performed and a significant manpower effort, having the requisite talent and experience, would have to be expended.
Further the deponent sayeth not.
PROPRIETARY INFORMATION NOTICE Transmitted herewith is the proprietary version of a document furnished to the NRC in connection with requests for generic and/or plant-specific review and approval. The document is to be considered proprietary in its entirety.
COPYRIGHT NOTICE The document transmitted herewith bears a Westinghouse copyright notice. The NRC is permitted to make the number of copies of the information contained in this document which is necessary for its internal use in connection with generic and plant-specific reviews and approvals as well as the issuance, denial, amendment, transfer, renewal, modification, suspension, revocation, or violation of a license, permit, order, or regulation subject to the requirements of 10 CFR 2.390 regarding restrictions on public disclosure to the extent such information has been identified as proprietary by Westinghouse, copyright protection notwithstanding. Copies made by the NRC must include the copyright notice in all instances and the proprietary notice if the original was identified as proprietary.