Letter Sequence Meeting |
|---|
TAC:ME7522, Clarify Application of Setpoint Methodology for LSSS Functions (Open) TAC:ME7523, Clarify Application of Setpoint Methodology for LSSS Functions (Open) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, ... further results|Meeting]]
Results
Other: ML120250079, ML120590119, ML12276A050, ML13018A149, ML13024A105, ML13029A667, ML13101A278, ML13192A314, ML13232A258, ML13339A428, ML14126A377, ML15103A010, ML15121A310, ML15223A968
|
MONTHYEARDCL-11-102, Expected Submittal Dates for Licensee Event Report Supplements2011-09-27027 September 2011 Expected Submittal Dates for Licensee Event Report Supplements Project stage: Request ML11279A1602011-09-27027 September 2011 Submittal of WNA-DS-02442-PGE, Rev. 2, Diablo Canyon Units 1 and 2 Process Protection System Replacement Project, Advanced Logic System (Als) - System Requirements Specification Project stage: Request DCL-11-104, Attachment 12: Revision 10 to CF2.ID2, Software Configuration Management for Plant Operations and Operations Support.2011-10-26026 October 2011 Attachment 12: Revision 10 to CF2.ID2, Software Configuration Management for Plant Operations and Operations Support. Project stage: Request ML11307A3312011-10-26026 October 2011 License Amendment Request 11-07 Process Protection System Replacement Project stage: Request 05000275/LER-2011-006, For Diablo Canyon, Unit 1, Regarding Loss of Control Room Envelope Due to the Work Control Shift Foreman Incorrectly Authorizing Removal of a Blank Flange2011-10-28028 October 2011 For Diablo Canyon, Unit 1, Regarding Loss of Control Room Envelope Due to the Work Control Shift Foreman Incorrectly Authorizing Removal of a Blank Flange Project stage: Request ML11307A2672011-10-28028 October 2011 Invensys Operations Management Submittal to Support License Amendment Request from PG&E for Replacement of the Eagle 21 Process Protection System at Diablo Canyon Power Plant Project stage: Request ML1133403042011-12-12012 December 2011 Request for Withholding Information from Public Disclosure, 10/28/11 Affidavit Executed by R. Shaffer, Invensys Operations Management, 4 Software Requirements Specification Documents Project stage: Withholding Request Acceptance ML1133402882011-12-12012 December 2011 Request for Withholding Information from Public Disclosure, 10/26/11 Affidavit Executed by R. Shaffler, Invensys Operations Management, 11 V10 Tricon Documents Project stage: Withholding Request Acceptance ML1134000942011-12-14014 December 2011 Request for Withholding Information from Public Disclosure, 9/27/11 Affidavit Executed by J. Gresham, Westinghouse, WNA-DS-02442-PGE, Revision 2, System Requirements Specification Project stage: Withholding Request Acceptance ML1134000972011-12-14014 December 2011 Request for Withholding Information from Public Disclosure, 9/28/11 Affidavit Executed by S. Roberts, CS Innovations, LLC, Four Proprietary Documents Project stage: Withholding Request Acceptance ML1200602142012-01-0606 January 2012 Notice of Forthcoming Meeting in San Luis Obispo, CA, with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System of RPS and ESFAS Project stage: Meeting ML1201301352012-01-0606 January 2012 1/18/2012 Revised Notice of Meeting with Pacific Gas and Electric Co., to Discuss Digital Replacement of Process Protection System of RPS and ESFAS Project stage: Meeting ML1201200052012-01-13013 January 2012 Acceptance Review Letter, License Amendment Request to Replace Digital Process Protection System for Reactor Protection System and Engineered Safety Features Actuation System Functions Project stage: Acceptance Review ML1202500792012-01-18018 January 2012 Project Plan for Diablo Canyon Digital Upgrade of Process Protection System LAR Review Project stage: Other ML1202500572012-01-18018 January 2012 Meeting Slides Process Protection System Replacement LAR Acceptance Review Meeting Presentation Project stage: Meeting ML1204006512012-02-21021 February 2012 Summary of Meeting in San Luis Obispo, CA, with Pacific Gas and Electric; Discuss Digital Replacement of Process Protection System of Reactor Protection System and Engineered Safety Feature Actuation System at Diablo Canyon, Units 1 and 2 Project stage: Meeting ML1205300742012-02-22022 February 2012 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML1205300782012-02-22022 February 2012 3/7/2012 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML1205901192012-02-29029 February 2012 Summary of Phone Call with Licensee on Digital Replacement of the Process Protection System Portion of the Reactor Trip System and Engineered Safety Features Actuation System at Diablo Canyon, Units 1 and 2 Project stage: Other ML1207200922012-03-13013 March 2012 4/18/12 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML1207200832012-03-13013 March 2012 4/4/2012 - Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML1207200622012-03-20020 March 2012 Summary of 3/7/12 Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting DCL-12-030, Response to Items Contained in NRC Acceptance Review of License Amendment Request for Digital Process Protection System Replacement2012-04-0202 April 2012 Response to Items Contained in NRC Acceptance Review of License Amendment Request for Digital Process Protection System Replacement Project stage: Request ML1209006882012-04-0404 April 2012 3/21/2012 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML1210101022012-04-11011 April 2012 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML1210200652012-04-16016 April 2012 Summary of Teleconference Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting DCL-12-039, Submittal of V10 Tricon Time Response Calculation for the License Amendment Request for Digital Process Protection System Replacement2012-04-30030 April 2012 Submittal of V10 Tricon Time Response Calculation for the License Amendment Request for Digital Process Protection System Replacement Project stage: Request ML1211505042012-05-0303 May 2012 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML1211703372012-05-0404 May 2012 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML1213500372012-05-15015 May 2012 Forthcoming Meeting on with Pacific Gas and Electric to Discuss Digital Replacement of Process Protection System at Diablo Canyon, Units 1 and 2 & Pre-submittal of TSTF-493 Option B License Amendment Request (TAC ME7522-ME7523; ME8517-ME851 Project stage: Meeting ML12142A1112012-05-24024 May 2012 Request for Withholding Information from Public Disclosure, 4/10/2012 Affidavit Executed by R. Shaffer, Invensys Operations Management, Maximum Tsap Scan Time Project stage: Withholding Request Acceptance ML12142A2142012-05-24024 May 2012 Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting DCL-12-050, Attachment 2 to DCL-12-050, Final Safety Analysis Report Changes for Process Protection System Replacement2012-06-0606 June 2012 Attachment 2 to DCL-12-050, Final Safety Analysis Report Changes for Process Protection System Replacement Project stage: Request ML12170A8372012-06-0606 June 2012 Submittal of Phase 2 Documents for the License Amendment Request for Digital Process Protection System Replacement Project stage: Request ML12170A8402012-06-0606 June 2012 Attachment 16 to DCL-12-050, PGE-12-52 Np, Westinghouse Input to Diablo Canyon Digital Process Protection System Replacement Uncertainty Calculations Summary Lar Project stage: Request ML12222A1012012-06-0707 June 2012 Invensys Operations Management Document 993754-1-813, Validation Test Plan, Revision 1, Attachment 6 Project stage: Request ML12222A1002012-06-0707 June 2012 Invensys Operations Management Document 993754-1-802, Software Verification and Validation Plan, Revision 2, Attachment 5 Project stage: Request ML12222A0982012-06-0707 June 2012 Process Protection System Replacement Interface Requirements Specification (Irs), Revision 6, Attachment 3 Project stage: Request ML12151A2582012-06-11011 June 2012 5/16/2012 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12170A0342012-06-18018 June 2012 Notice of Forthcoming Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12170A8662012-06-27027 June 2012 6/13/2012 Summary of Meeting Via Teleconference with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting DCL-12-069, Invensys Operations Management Document 993754-1-906, Software Development Plan, Revision 1, Attachment 72012-07-11011 July 2012 Invensys Operations Management Document 993754-1-906, Software Development Plan, Revision 1, Attachment 7 Project stage: Request ML12178A1152012-07-24024 July 2012 Request for Withholding Information from Public Disclosure, 5/29/2012 Affidavit Executed by J. Gresham, Westinghouse on 1 Proprietary Document Project stage: Withholding Request Acceptance ML12195A1732012-07-24024 July 2012 Forthcoming Meeting on 8/22/12 with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML12177A2312012-07-24024 July 2012 Request for Withholding Information from Public Disclosure, 5/29/2012 Affidavit Executed by Scott Roberts, CS Innovations, LLC on 10 Proprietary Documents Project stage: Withholding Request Acceptance ML12193A1412012-07-25025 July 2012 6/28/2012 Summary of Meeting with Pacific Gas and Electric to Discuss Digital Replacement of Process Protection System at Diablo Canyon, Units 1 and 2 and Presubmittal of TSTF-493 Option B License Amendment Request (TAC ME7522-ME7523, ME851 Project stage: Meeting ML12222A0942012-08-0202 August 2012 Submittal of Attachment 1, Quality Assurance Plan and Revised Phase 1 Documents for the License Amendment Request for Digital Process Protection System Replacement and Attachment 8 Affidavit 993754-AFF-38T Project stage: Request ML12200A1272012-08-0202 August 2012 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting DCL-12-069, Diablo Canyon, Units 1 and 2 - Submittal of Attachment 1, Quality Assurance Plan and Revised Phase 1 Documents for the License Amendment Request for Digital Process Protection System Replacement and Attachment 8 Affidavit 993754-AFF-38T2012-08-0202 August 2012 Diablo Canyon, Units 1 and 2 - Submittal of Attachment 1, Quality Assurance Plan and Revised Phase 1 Documents for the License Amendment Request for Digital Process Protection System Replacement and Attachment 8 Affidavit 993754-AFF-38T Project stage: Request ML12208A3642012-08-0707 August 2012 Request for Additional Information, License Amendment Request to Replace Digital Process Protection System for Reactor Protection System and Engineered Safety Features Actuation System Functions Project stage: RAI 2012-04-02
[Table View] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 21, 2012 LICENSEE:
Pacific Gas and Electric Company FACILITY:
Diablo Canyon Power Plant, Unit Nos. 1 and 2
SUBJECT:
SUMMARY
OF JANUARY 18, 2012, MEETING WITH PACIFIC GAS AND ELECTRIC COMPANY ON DIGITAL REPLACEMENT OF THE PROCESS PROTECTION SYSTEM PORTION OF THE REACTOR TRIP SYSTEM AND ENGINEERED SAFETY FEATURES ACTUATION SYSTEM AT DIABLO CANYON POWER PLANT (TAC NOS. ME7522 AND ME7523)
On January 18, 2012, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Pacific Gas and Electric Company (PG&E, the licensee) at the Embassy Suites Hotel, 333 Madonna Road, San Luis Obispo, California 93405. The purpose of the meeting was to discuss the license amendment request (LAR) submitted by PG&E on October 26, 2011, for the Digital Replacement of the Process Protection System (PPS) Portion of the Reactor Trip System and Engineered Safety Features Actuation System at Diablo Canyon Power Plant, Unit Nos. 1 and 2 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML113070457). A list of attendees is provided in Enclosure 1.
The NRC staff discussed the results of its acceptance review of PG&E's LAR contained in a letter dated January 13, 2012 (ADAMS Accession No. ML120120005). This discussion consisted of an explanation of the acceptance review process and the regulatory requirements of Title 10 of the Code of Federal Regulations for LARs. Additionally, the staff addressed several items that may present challenges to the performance of a detailed technical evaluation of the proposed PPS replacement system. These open items are discussed in detail in the acceptance review letter mentioned above. The licensee was given an opportunity to address each of the open items following the NRC presentation. The NRC staff requested that PG&E submit written responses to these open review items within 60 days of the date of the acceptance review letter to facilitate a timely review of the amendment request.
The NRC staff further discussed its review plan for the amendment request and associated milestones to illustrate anticipated interactions between the NRC staff and the licensee and its contractors. The NRC review plan is provided in Enclosure 2. The technical review of the LAR is expected to take approximately 18 months and be completed in late 2013. The NRC staff plans to conduct two audits with a third audit likely during the review process. The staff also anticipates presenting the safety bases for approving the LAR to the AdviSOry Committee on Reactor Safeguards and may request licensee support.
Finally, the NRC staff addressed the status and review plan for the issuance of safety evaluations for the Invensys Operations Management Tricon Programmable Logic Controller (PLC), Version 10 (Tricon V10), and the CS Innovations, LLC Advanced Logic System (ALS).
ph M. Sebrosky, Senior Plant Licensing Branch IV
- 2 The licensee presented information (ADAMS Accession No. ML120250057) on the status of the ALS and Tricon V10 platform development and factory acceptance testing as well as observations and comments on the effectiveness of Digital Instrumentation and Controls Interim Staff Guidance DI&C-ISG-061*
Members of the public were in attendance. A Public Meeting Feedback form was received and expressed appreciation for the time taken by the NRC to explain the discussion topics in such a way as to allow understanding of the material by the general public. This comment has been forwarded to the NRR Senior Communications Analyst who will forward them to the Office of the Executive Director for Operations.
Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323
Enclosures:
- 1. List of Attendees
- 2. Review Plan cc w/encls: Distribution via Listserv U.S. Nuclear Regulatory Commission, Digital Instrumentation and Controls, Dt&C-ISG-06, "Task Working Group #6: Licensing Process, Interim Staff Guidance, Revision 1," dated January 19, 2011 (ADAMS Accession No. ML110140103).
LIST OF ATTENDEES JANUARY 18,2012, MEETING WITH PACIFIC GAS AND ELECTRIC COMPANY REGARDING DIABLO CANYON POWER PLANT DIGITAL UPGRADE NAME Sherry Lewis Jane Swanson Liz Apfelberg Ken Schrader Jeff Bonner Dave Van Mouwerik Bob Lint John Hefler Bill Petrick Edward Quinn Steve Seaman Warren Odess-Gillett Roman Shaffer Ken Thompson Gene Nelson, Ph,D Steve Lynch Bill Kemper Rich Stattel ORGANIZATION Mothers for Peace Mothers for Peace Mothers for Peace Pacific Gas and Electric Pacific Gas and Electric Pacific Gas and Electric Altran Altran Altran Altran Westinghouse Westinghouse Invensys Avila Valley Advisory Council Biometrics U,S, Nuclear Regulatory Commission U,S, Nuclear Regulatory Commission U,S, Nuclear Regulatory Commission
Project Plan for Diablo Canyon Replacement of Digital RPS and ESFAS (PPS) - LAR Review (DRAFT)
Planned Actual Step Date Task Date 1
Oct. 26, PG&E LAR Submittal for NRC approval. Submittal includes all Oct. 26, 2011 Phase 1 documents needed to be docketed prior to 2011 acceptance for review per ISG-06, "Digital Licensing."
2 Jan. 12, Acceptance Review complete. LAR accepted for detailed Jan. 12, 2012 technical review. Several issues identified that could present 2012 challenges for the staff to complete its review. Scheduled public meeting with PG&E to discuss the results of the acceptance review.
3 TBD Acceptance letter sent to licensee.
4 Jan. 18, Conduct Public Meeting to discuss staffs findings during the Jan. 18, 2012 LAR acceptance review. Staff proceeds with LAR technical 2012 review.
S March 18, PG&E provides information requested in acceptance letter.
2012 Initiate bi-weekly telecoms with PG&E and its contractors to discuss potential RAI issues. Open Items spreadsheet will be maintained by NRC to document staff issues and planned licensee responses.
6 May 30, PG&E provides partial set of Phase 2 documentation per 2012 commitments made in LAR 7
July 2012 First RAI sent to PG&E on Phase 1 documentation ( e.g.,
specifications, plans, and equipment qualification). Continue review of the application.
8 TBD SERs for Tricon V10 and Westinghouse ALS Platforms issued final. Both platforms become Tier 1 reviews of the LAR 9
September Audit trip to Invensys facility for thread audit; audit the life 2012 cycle planning documents and outputs, with particular emphases on verification and validation, configuration management, quality assurance, software safety, the Invensys application software development procedures, and application software program design.
10 September Receive answers to first RAI.
2012 11 ~ctober Audit report provided to PG&E and its contractor.
2012
- 2 Step Planned Date Task Actual Date 12 November 2012 Second RAI to PG&E on Phase 2 documentation (e.g., FEMA, safety analysis, RTM, EQ Tests results, setpoint calcs, SW Tool analysis reports, and any incomplete or un-satisfactory response to first RAI. Continue review - hardware and program design and V&V activities 13 December 2012 PG&E provides remaining set of Phase 2 documentation per commitments made in LAR.
14 January 2013 Receive answers to second RAI.
Continue review - V&V program, security requirements (RG 1.152, Rev. 2).
15 January 2013 Audit trip to Invensys facility for additional thread audit items; audit hardware and software installation plans, configuration management reports, detailed system and hardware design, completed test procedures, V&V activities, summary test results (including FAT) and incident reports, and application code listings.
February 2013 Audit report provided to PG&E and its contractor.
17 June 2013 Presentation to ACRS Subcommittee/Full ACRS Committee on DCPP PPS LAR Safety Evaluation.
18 June 2013 Complete draft technical SER for management review and approval.
19 July 2, 2013 Issue completed draft technical SER to DORL.
20 July 2013 Draft SER sent it to PG&E, Invensys, and W/CSI to perform technical review and ensure no proprietary information was included.
21 August 2013 Receive comments from PG&E and its contractors on draft SER proprietary review.
22
-Oct. 2013 Approved License Amendment issued to PG&E.
23
-Dec.
2013 Inspection trip to DCPP for PPS SAT and installation test, training and other preparation for new system. To be coordinated with regional visit. Date based on February 2014 Unit 1 Refueling Outage (1R18) of February 2014.
ML120250057) on the status of the ALS and Tricon V1 0 platform development and factory acceptance testing as well as observations and comments on the effectiveness of Digital Instrumentation and Controls Interim Staff Guidance DI&C-ISG-061.
Members of the public were in attendance. A Public Meeting Feedback form was received and expressed appreciation for the time taken by the NRC to explain the discussion topics in such a way as to allow understanding of the material by the general public. This comment has been forwarded to the NRR Senior Communications Analyst who will forward them to the Office of the Executive Director for Operations.
Please direct any inquiries to me at 301-415-1132 or at Joseph.Sebrosky@nrc.gov.
IRA!
Joseph M. Sebrosky, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323
Enclosures:
- 1. List of Attendees
- 2. Review Plan cc w/encls: Distribution via Listserv U.S. Nuclear Regulatory Commission, Digital Instrumentation and Controls, DI&C-ISG-06, "Task Working Group #6: Licensing Process, Interim Staff Guidance, Revision 1," dated January 19, 2011 (ADAMS Accession No. ML110140103).
DISTRIBUTION:
PUBLIC RidsOgcRp Resource LPLIV Reading RidsRgn4MailCenter Resource RidsAcrsAcnw _MailCTR Resource WMaier, RIV RidsNrrDeEicb Resource CSteger, NRR RidsNrrDorl Resource WKemper, NRR/DElEICB RidsNrrDorlLpl4 Resource RStattel, NRR/DElEICB RidsNrrLAJBurkhardt Resource SLynch, NRR RidsNrrPM DiabloCanyon Resource LChang, EDO RIV ADAMS Accession Nos.
Meeting Notice ML120130135; Meeting Summary ML120400651; Licensee Handout ML120250057
- via email OFFICE DORULPL4/PMIT DORULPL4IPM DORULPL4/LA DE/EICBlBC DORULPL4IBC DORULPL4/PM NAME SLynch JSebrosky JBurkhardt WKemper*
MMarkley JSebrosky DATE 2/12/12 2121112 2/16/12 2/21/12 2/21/12 2/21/12