{{#Wiki_filter:October 12, 2021
Mr. Robert Schuetz , Chief Executive Officer
Energy Northwest
MD 1023
P.O. Box 968
Richland, WA 99352
SUBJECT:        COLUMBIA GENERATING STATION - NOTIFICATION OF INSPECTION (NRC
                INSPECTION REPORT 05000397/2021004) AND REQUEST FOR
                INFORMATION
Dear Mr. Schuetz,
During the week of November 8, 2021, three inspectors from the Nuclear Regulatory
Commissions (NRC) Region IV office will perform the baseline biennial requalification
inspection at Columbia Generating Station, using NRC Inspection Procedure 71111.11B,
Licensed Operator Requalification Program.
Experience has shown that this inspection is a resource intensive inspection both for the NRC
inspectors and your staff. In order to minimize the impact to your onsite resources and to
ensure a productive inspection, we have enclosed a request for documents needed for this
inspection. These documents have been divided into three groups:
    *  The first group (Section A of the enclosure) identifies information to be provided prior to
        the inspection to ensure that the inspectors are adequately prepared.
    *  The second group (Section B of the enclosure) identifies the information the inspectors
        will need upon arrival at the site.
    *  The third group (Section C of this enclosure) identifies the items which are necessary to
        close out the inspection and are usually sent a few weeks after the team has left the site.
It is important that all of these documents are up to date and complete in order to minimize the
number of additional documents requested during the preparation and/or the onsite portions of
the inspection.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Mr. Kelly Robertson of your training
organization. Our inspection dates are subject to change based on your updated schedule of
examination activities. If there are any questions about this inspection or the material
requested, please contact the lead inspector Nicholas Hernandez, at (817) 200-1118
(nicholas.hernandez@nrc.gov).
 
R. Schuetz                                    2
PAPERWORK REDUCTION ACT STATEMENT
This letter contains mandatory information collections that are subject to the Paperwork
Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB)
approved these information collections (approval number 3150-0011). Send comments
regarding this information collection to the Information Services Branch, Office of the Chief
Information Officer, Mail Stop: T6 A10M, U.S. Nuclear Regulatory Commission, Washington,
DC 20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office
of Information and Regulatory Affairs, NEOB-10202, (3150-0011) Office of Management and
Budget, Washington, DC 20503.
PUBLIC PROTECTION NOTIFICATION
The NRC may not conduct nor sponsor, and a person is not required to respond to, a request
for information or an information collection requirement unless the requesting document
displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter
and its enclosure will be available electronically for public inspection in the NRC Public
Document Room or from the Publicly Available Records (PARS) component of NRCs
document system (ADAMS). ADAMS is accessible from the NRC web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
                                                  Sincerely,
                                                    Nicholas                Digitally signed by Nicholas
                                                                            Hernandez
                                                    Hernandez              Date: 2021.10.12 15:46:15
                                                                            -05'00'
                                                  Nicholas A. Hernandez, Operations Engineer
                                                  Operations Branch
                                                  Division of Reactor Safety
Docket No. 50-397
License No. NPF-21
Enclosure:
Biennial Requalification Inspection
  Request for Information
cc w/ encl: Distribution via LISTSERV
 
                                    Initial Request for Information
                                  Biennial Requalification Inspection
                                    Columbia Generating Station
Inspection Report:                        05000397/2019004
Inspection Dates:                        November 8, 2021 - November 12, 2021
Inspection Procedure:                    IP 71111.11B, Licensed Operator Requalification
                                          Program
Lead Inspector:                          Nicholas Hernandez, Operations Engineer
A. The following information is requested in order to support inspection preparation
    activities. These items are listed by section as they appear in the inspection module
    (i.e. 03.04a, 03.04b, etc.). Requested materials should be sent in an electronic format
    on CD/DVD in order to arrive at the Region IV office no later than October 25, 2021 OR
    uploaded to the NRCs secure Box application.
        *  CD/DVD to: US Nuclear Regulatory Commission, Region IV
                            ATTN: Nicholas Hernandez
                            1600 E. Lamar Blvd
                            Arlington, TX 76011
                            Or
        *  For Box application access coordinate with Mr. Nicholas Hernandez
    General Requests:
        *  List of licensed operators (SRO & RO) by crew (operating & staff)
        *  Training and Operations Department organization charts (with qualified LOR
            evaluators identified)
        *  Procedures that identify process for revising and maintaining LO continuing training
            program up to date
        *  List of outstanding LOR program changes
        *  List of plant events and industry operating experience incorporated into LOR
            program since last BRQ
        *  Audits and/or self-assessment reports addressing the licensed operator
            requalification training program
        *  Last 2 years of simulator review committee (or equivalent) meeting minutes
        *  Last 2 years of Curriculum Review Committee (or equivalent) meeting minutes
                                                                                    Enclosure
 
  *  A summary report of all condition reports related to operator actions/errors in the
      control room
  *  Any revised requalification training that was based on licensed operator performance
      issues
03.04a: Biennial Requalification Written Examinations
  *  The current and approved biennial written examination schedule
  *  The current requalification cycle written examination results for both SRO & RO that
      have already been administered up to the week prior to the inspection team arrival
      onsite.
  *  All written examinations that have been approved for administration up to and
      including the week before the inspection team is onsite. This will need to have
      adequate password protection or double envelope protection if mailed via regular
      mail per NUREG-1021.
  *  The current requalification cycle examination methodology (sample plan)
03.04b: Annual Requalification Operating Tests
  *  The schedule for the operating tests (JPMs & scenarios) to be given the week of
      November 8, 2021
  *  The operating tests (JPMs & scenarios) (password protected and provide separately
      via telephone at later date) to be given the week of November 8, 2021
  *  Current requalification cycle operating tests (SRO & RO) and results up to the week
      prior to the inspection team arrival onsite
  *  All 2020 NRC required annual operating tests
  *  Current requalification cycle operating test methodology (sample plan)
03.04c: Administration of an Annual Requalification Operating Test
  *  All procedures used to administer the annual operating test
  *  All procedures used to assess operator performance
  *  All procedures that describe conduct of simulator training
  *  All procedures used to test, operate, and maintain the simulator
03.04d: Requalification Examination Security
                                              2
 
  *  Submit any tracking tools that you use as a means to prevent excessive overlap on
      the written examinations and also meet the intent of sampling all required topics on a
      periodic basis.
  *  Submit any tracking tools that you use as a means to prevent excessive overlap on
      the operating tests and also meet the intent of sampling all required malfunctions
      (including major events, instrument/component malfunctions, TS calls, etc.) on a
      periodic basis.
  *  All procedures that describe examination security, including procedures used to
      develop the examinations that include guidelines on overlap between examinations
      in current exam cycle tests and prior year examinations
  *  List of all condition reports since the last biennial requalification inspection related to
      examination security and overlap
03.04e: Remedial Training and Re-Examinations
  *  List of remedial training conducted or planned since last requalification exam
      (includes training provided to operators to enable passing requalification exam and
      training provided to correct generic or individual weaknesses observed during
      previous requalification exam cycle)
  *  Remediation plans (lesson plans, reference materials, and attendance
      documentation)
03.04f: Operator License Conditions
  *  All procedures and program documentation for maintaining active operator licenses,
      tracking training attendance, and ensuring medical fitness of licensed operators
  *  All procedures and associated documentation that supports reactivation of any
      SRO/RO license (operating or staff crew) since the last biennial inspection
03.04g: Control Room Simulator
  *  All simulator management and configuration procedures if not already provided
  *  Simulator discrepancy report summary list for all open discrepancy reports and
      summary list for those items closed since November 8, 2019
  *  Primary parameters tested in order to verify core physics parameters (such as
      moderator temperature coefficient, integral rod worth)). The applicable reference
      graphs from the plant physics data book (electronic or other means as available)
                                              3
 
          should also be included as well as the test procedures used and the acceptance
          criteria with results.
      *  All simulator modification packages that are on hold, delayed, or not completed in the
          last 2 years
      *  A list of simulator modification packages completed in the last two-year window
B. The following information is requested in order to support the onsite inspection
  activities. Requested materials should be available to the inspection team, either
  electronically or hardcopy, upon site arrival on November 8, 2021.
  03.03: Requalification Exam Results / 03.04a and 03.04b: Biennial Requalification Written
          Exam and Annual Requalification Operating Tests Quality
      *  All operating tests (JPMs & scenarios) to be given in all subsequent weeks after
          onsite week, if available
      *  All results up to the day the team leaves the site
  03.04f: Conformance with Operator License Conditions
      *  Access to licensed operators records (operating and staff crews)
      *  Access to licensed operators training attendance records
      *  Access to licensed operators medical records
  03.04g: Control Room Simulator Performance
      *  Simulator discrepancies from November 8, 2019 - October 25, 2021. This should
          include all open and closed simulator discrepancy reports, including the
          documentation/justification for closure.
      *  Acceptance test documentation, including hardware and software model revisions at
          the time of acceptance (as available)
      *  Documentation that validates current models, including the thermal-hydraulics and
          neutronics models, to the actual plant
      *  All current model deficiencies, including FSAR vs Design differences in the simulator
          (any documentation on this)
      *  Summary list of modifications since November 8, 2019
      *  Plant modifications (both hardware and software) completed on the simulator by due
          date from since December 9, 2019
      *  Simulator differences Lesson plan used in training (current to October 25, 2021)
                                                4
 
      *  The complete book of all simulator annual performance test packages (usually in a
          single book but may be electronic or in single test packages), complete with all
          transient tests, steady state tests, and malfunction tests. This should also include
          the test procedures for each test, the acceptance criteria, and results. For each
          transient test, the reference chart should be included or an equivalent subject matter
          expert review versus the simulator results with a write-up for any differences beyond
          the ANSI standard requirements.
      *  All test packages used to verify core physics parameters (such as moderator
          temperature coefficient and integral rod worth). The applicable reference graphs
          from the plant physics data book (electronic or other means as available) should also
          be included as well as the test procedures used and the acceptance criteria with
          results.
      *  All simulator tests, configuration management, and related documents available in
          the room for inspectors to review. This includes training needs analysis packages,
          simulator review committee meeting minutes, etc.
      *  Current copy of ANSI 3.5 standard you are committed to for simulator testing
C. Columbia Generating Station is required to send the final results summary (see Table
  1 below) and any remaining exams and operating tests that have not been reviewed to
  the regional office lead inspector for this inspection for final review and comparison
  against the Significance Determination Tools in order to communicate the exit results
  for the inspection.
      TABLE 1: EXAMINATION RESULTS
        1. Total number of licensed operators.
        2. Number of licensed operators administered a requalification
            examination required by 10 CFR 55.59(a).
        3. Number of individual licensed operators who failed any portion of a
            requalification examination (written, JPM, or individual simulator
            scenario failures).
        4. Divide line 3 by line 2 to obtain the individual requalification
            examination failure rate. Line 3/Line 2.                                          %
        5. Number of crews administered simulator scenarios as part of a
            requalification examination required by 10 CFR 55.59(a).
        6. Number of crews who performed unsatisfactorily on the
            simulator scenarios.
        7. Divide line 6 by line 5 to obtain the crew simulator scenario
            failure rate. Line 6/Line 5.                                                      %
                                                  5
 
 
ML21277A357
SUNSI Review        ADAMS:      Non-Publicly Available  Non-Sensitive Keyword:
  By: NAH            Yes  No  Publicly Available      Sensitive      NRC-002
OFFICE        OE:DRS/OB
NAME          GGeorge
SIGNATURE        /RA/
DATE            10/5/2021
}}
}}

Latest revision as of 02:52, 31 January 2022

CGS Brq RFI Letter, Columbia Generating Station - Notification of Inspection (NRC Inspection Report 05000397/2021004) and Request for Information
ML21277A357
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/12/2021
From: Nicholas Hernandez
Division of Reactor Safety IV
To: Schuetz R
Energy Northwest
References
IR 2021004
Download: ML21277A357 (8)


See also: IR 05000397/2021004

Text

October 12, 2021

Mr. Robert Schuetz , Chief Executive Officer

Energy Northwest

MD 1023

P.O. Box 968

Richland, WA 99352

SUBJECT: COLUMBIA GENERATING STATION - NOTIFICATION OF INSPECTION (NRC

INSPECTION REPORT 05000397/2021004) AND REQUEST FOR

INFORMATION

Dear Mr. Schuetz,

During the week of November 8, 2021, three inspectors from the Nuclear Regulatory

Commissions (NRC) Region IV office will perform the baseline biennial requalification

inspection at Columbia Generating Station, using NRC Inspection Procedure 71111.11B,

Licensed Operator Requalification Program.

Experience has shown that this inspection is a resource intensive inspection both for the NRC

inspectors and your staff. In order to minimize the impact to your onsite resources and to

ensure a productive inspection, we have enclosed a request for documents needed for this

inspection. These documents have been divided into three groups:

  • The first group (Section A of the enclosure) identifies information to be provided prior to

the inspection to ensure that the inspectors are adequately prepared.

  • The second group (Section B of the enclosure) identifies the information the inspectors

will need upon arrival at the site.

  • The third group (Section C of this enclosure) identifies the items which are necessary to

close out the inspection and are usually sent a few weeks after the team has left the site.

It is important that all of these documents are up to date and complete in order to minimize the

number of additional documents requested during the preparation and/or the onsite portions of

the inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Mr. Kelly Robertson of your training

organization. Our inspection dates are subject to change based on your updated schedule of

examination activities. If there are any questions about this inspection or the material

requested, please contact the lead inspector Nicholas Hernandez, at (817) 200-1118

(nicholas.hernandez@nrc.gov).

R. Schuetz 2

PAPERWORK REDUCTION ACT STATEMENT

This letter contains mandatory information collections that are subject to the Paperwork

Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB)

approved these information collections (approval number 3150-0011). Send comments

regarding this information collection to the Information Services Branch, Office of the Chief

Information Officer, Mail Stop: T6 A10M, U.S. Nuclear Regulatory Commission, Washington,

DC 20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office

of Information and Regulatory Affairs, NEOB-10202, (3150-0011) Office of Management and

Budget, Washington, DC 20503.

PUBLIC PROTECTION NOTIFICATION

The NRC may not conduct nor sponsor, and a person is not required to respond to, a request

for information or an information collection requirement unless the requesting document

displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter

and its enclosure will be available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRCs

document system (ADAMS). ADAMS is accessible from the NRC web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

Nicholas Digitally signed by Nicholas

Hernandez

Hernandez Date: 2021.10.12 15:46:15

-05'00'

Nicholas A. Hernandez, Operations Engineer

Operations Branch

Division of Reactor Safety

Docket No. 50-397

License No. NPF-21

Enclosure:

Biennial Requalification Inspection

Request for Information

cc w/ encl: Distribution via LISTSERV

Initial Request for Information

Biennial Requalification Inspection

Columbia Generating Station

Inspection Report: 05000397/2019004

Inspection Dates: November 8, 2021 - November 12, 2021

Inspection Procedure: IP 71111.11B, Licensed Operator Requalification

Program

Lead Inspector: Nicholas Hernandez, Operations Engineer

A. The following information is requested in order to support inspection preparation

activities. These items are listed by section as they appear in the inspection module

(i.e. 03.04a, 03.04b, etc.). Requested materials should be sent in an electronic format

on CD/DVD in order to arrive at the Region IV office no later than October 25, 2021 OR

uploaded to the NRCs secure Box application.

  • CD/DVD to: US Nuclear Regulatory Commission, Region IV

ATTN: Nicholas Hernandez

1600 E. Lamar Blvd

Arlington, TX 76011

Or

General Requests:

  • List of licensed operators (SRO & RO) by crew (operating & staff)
  • Training and Operations Department organization charts (with qualified LOR

evaluators identified)

  • Procedures that identify process for revising and maintaining LO continuing training

program up to date

  • List of outstanding LOR program changes
  • List of plant events and industry operating experience incorporated into LOR

program since last BRQ

  • Audits and/or self-assessment reports addressing the licensed operator

requalification training program

  • Last 2 years of simulator review committee (or equivalent) meeting minutes
  • Last 2 years of Curriculum Review Committee (or equivalent) meeting minutes

Enclosure

  • A summary report of all condition reports related to operator actions/errors in the

control room

  • Any revised requalification training that was based on licensed operator performance

issues

03.04a: Biennial Requalification Written Examinations

  • The current and approved biennial written examination schedule
  • The current requalification cycle written examination results for both SRO & RO that

have already been administered up to the week prior to the inspection team arrival

onsite.

  • All written examinations that have been approved for administration up to and

including the week before the inspection team is onsite. This will need to have

adequate password protection or double envelope protection if mailed via regular

mail per NUREG-1021.

  • The current requalification cycle examination methodology (sample plan)

03.04b: Annual Requalification Operating Tests

  • The schedule for the operating tests (JPMs & scenarios) to be given the week of

November 8, 2021

  • The operating tests (JPMs & scenarios) (password protected and provide separately

via telephone at later date) to be given the week of November 8, 2021

  • Current requalification cycle operating tests (SRO & RO) and results up to the week

prior to the inspection team arrival onsite

  • All 2020 NRC required annual operating tests
  • Current requalification cycle operating test methodology (sample plan)

03.04c: Administration of an Annual Requalification Operating Test

  • All procedures used to administer the annual operating test
  • All procedures used to assess operator performance
  • All procedures that describe conduct of simulator training
  • All procedures used to test, operate, and maintain the simulator

03.04d: Requalification Examination Security

2

  • Submit any tracking tools that you use as a means to prevent excessive overlap on

the written examinations and also meet the intent of sampling all required topics on a

periodic basis.

  • Submit any tracking tools that you use as a means to prevent excessive overlap on

the operating tests and also meet the intent of sampling all required malfunctions

(including major events, instrument/component malfunctions, TS calls, etc.) on a

periodic basis.

  • All procedures that describe examination security, including procedures used to

develop the examinations that include guidelines on overlap between examinations

in current exam cycle tests and prior year examinations

  • List of all condition reports since the last biennial requalification inspection related to

examination security and overlap

03.04e: Remedial Training and Re-Examinations

  • List of remedial training conducted or planned since last requalification exam

(includes training provided to operators to enable passing requalification exam and

training provided to correct generic or individual weaknesses observed during

previous requalification exam cycle)

  • Remediation plans (lesson plans, reference materials, and attendance

documentation)

03.04f: Operator License Conditions

  • All procedures and program documentation for maintaining active operator licenses,

tracking training attendance, and ensuring medical fitness of licensed operators

  • All procedures and associated documentation that supports reactivation of any

SRO/RO license (operating or staff crew) since the last biennial inspection

03.04g: Control Room Simulator

  • All simulator management and configuration procedures if not already provided
  • Simulator discrepancy report summary list for all open discrepancy reports and

summary list for those items closed since November 8, 2019

  • Primary parameters tested in order to verify core physics parameters (such as

moderator temperature coefficient, integral rod worth)). The applicable reference

graphs from the plant physics data book (electronic or other means as available)

3

should also be included as well as the test procedures used and the acceptance

criteria with results.

  • All simulator modification packages that are on hold, delayed, or not completed in the

last 2 years

  • A list of simulator modification packages completed in the last two-year window

B. The following information is requested in order to support the onsite inspection

activities. Requested materials should be available to the inspection team, either

electronically or hardcopy, upon site arrival on November 8, 2021.

03.03: Requalification Exam Results / 03.04a and 03.04b: Biennial Requalification Written

Exam and Annual Requalification Operating Tests Quality

  • All operating tests (JPMs & scenarios) to be given in all subsequent weeks after

onsite week, if available

  • All results up to the day the team leaves the site

03.04f: Conformance with Operator License Conditions

  • Access to licensed operators records (operating and staff crews)
  • Access to licensed operators training attendance records
  • Access to licensed operators medical records

03.04g: Control Room Simulator Performance

  • Simulator discrepancies from November 8, 2019 - October 25, 2021. This should

include all open and closed simulator discrepancy reports, including the

documentation/justification for closure.

  • Acceptance test documentation, including hardware and software model revisions at

the time of acceptance (as available)

  • Documentation that validates current models, including the thermal-hydraulics and

neutronics models, to the actual plant

  • All current model deficiencies, including FSAR vs Design differences in the simulator

(any documentation on this)

  • Summary list of modifications since November 8, 2019
  • Plant modifications (both hardware and software) completed on the simulator by due

date from since December 9, 2019

  • Simulator differences Lesson plan used in training (current to October 25, 2021)

4

  • The complete book of all simulator annual performance test packages (usually in a

single book but may be electronic or in single test packages), complete with all

transient tests, steady state tests, and malfunction tests. This should also include

the test procedures for each test, the acceptance criteria, and results. For each

transient test, the reference chart should be included or an equivalent subject matter

expert review versus the simulator results with a write-up for any differences beyond

the ANSI standard requirements.

  • All test packages used to verify core physics parameters (such as moderator

temperature coefficient and integral rod worth). The applicable reference graphs

from the plant physics data book (electronic or other means as available) should also

be included as well as the test procedures used and the acceptance criteria with

results.

  • All simulator tests, configuration management, and related documents available in

the room for inspectors to review. This includes training needs analysis packages,

simulator review committee meeting minutes, etc.

  • Current copy of ANSI 3.5 standard you are committed to for simulator testing

C. Columbia Generating Station is required to send the final results summary (see Table

1 below) and any remaining exams and operating tests that have not been reviewed to

the regional office lead inspector for this inspection for final review and comparison

against the Significance Determination Tools in order to communicate the exit results

for the inspection.

TABLE 1: EXAMINATION RESULTS

1. Total number of licensed operators.

2. Number of licensed operators administered a requalification

examination required by 10 CFR 55.59(a).

3. Number of individual licensed operators who failed any portion of a

requalification examination (written, JPM, or individual simulator

scenario failures).

4. Divide line 3 by line 2 to obtain the individual requalification

examination failure rate. Line 3/Line 2.  %

5. Number of crews administered simulator scenarios as part of a

requalification examination required by 10 CFR 55.59(a).

6. Number of crews who performed unsatisfactorily on the

simulator scenarios.

7. Divide line 6 by line 5 to obtain the crew simulator scenario

failure rate. Line 6/Line 5.  %

5

ML21277A357

SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: NAH Yes No Publicly Available Sensitive NRC-002

OFFICE OE:DRS/OB

NAME GGeorge

SIGNATURE /RA/

DATE 10/5/2021