August 31, 2016

Mr. Mark E. Reddemann

Chief Executive Officer

Energy Northwest

76 North Power Plant Loop

P.O. Box 968 - Mail Drop 1023

Richland, WA 99352-0968

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR COLUMBIA GENERATING STATION

(REPORT 05000397/2016005)

Dear Mr. Reddemann:

On August 10, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle

performance review of Columbia Generating Station. The NRC reviewed the most recent

quarterly performance indicators (PIs) in addition to inspection results and enforcement actions

from July 1, 2015 through June 30, 2016. This letter informs you of the NRCs assessment of

your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Columbia Generating Station operated in a manner that

preserved public health and safety and met all cornerstone objectives. The NRC determined

the performance at Columbia Generating Station during the most recent quarter was within the

Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix

because all inspection findings had very low (i.e., Green) safety significance, and all PIs

indicated that your performance was within the nominal, expected range (i.e., Green).

Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine

inspections performed by resident inspectors are not included in the inspection plan. The

inspections listed during the second half of the inspection plan are tentative and may be revised

at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the

resolution of any scheduling conflicts and personnel availability issues. The NRC will contact

you as soon as possible to discuss changes to the inspection plan should circumstances

warrant any changes. This inspection plan does not include security related inspections, which

will be sent via separate, non-publicly available correspondence.

In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order

Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-

Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard to

Reliable Spent Fuel Pool Instrumentation. The NRC conducted audits of licensee efforts

towards compliance with these Orders, and the information gathered will aid staff in

development of the ultimate Safety Evaluation for the site. After the NRC staff receives the

Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff

will confirm through inspections the full implementation of the orders mentioned above by

M. Reddemann

- 2 -

performing Temporary Instruction 191, Inspection of the Implementation of Mitigation Strategies

and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness

Communication/Staffing/Multi-Unit Dose Assessment Plans.

In Staff Requirements Memorandum - SECY 16-0009, Recommendations Resulting from the

Integrated Prioritization and Re-Baselining of Agency Activities, the Commission approved the

NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning

in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue

to conduct quarterly assessment meetings and communicate changes in the assessment of

licensee performance in accordance with the guidance in Inspection Manual Chapter 0305,

Operating Reactor Assessment Program.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs

Rules of Practice, a copy of this letter will be available electronically for public inspection in the

NRC Public Document Room or from the Publicly Available Records (PARS) component of

NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public

Electronic Reading Room).

Please contact me at 817-200-1148 with any questions you have regarding this letter.

Sincerely,

/RA/

Jeremy R. Groom, Chief

Projects Branch A

Division of Reactor Projects

Docket No. 50-397

License No. NPF-21

Enclosure: Columbia Plant Inspection/Activity Plan

Page 1 of 2

08/30/2016

09:33:11

Report 22

Unit

Number

Planned Dates

Start End

Inspection Activity

Title

No. of Staff

on Site

Columbia Generating Stati

Inspection / Activity Plan

07/01/2016 - 06/30/2018

EXAM

- INITIAL EXAM

4

2

INITIAL EXAM CGS (02/2017)

X02586

01/23/2017

01/27/2017

2

INITIAL EXAM CGS (02/2017)

X02586

02/27/2017

03/09/2017

ISFSI

- ROUTINE ISFSI (ONE WEEK IN MONTH)

1

2

IP

Operation of an Independent Spent Fuel Storage Installation at Operating Plants

60855.1

07/01/2016

07/30/2016

RS 24

- RADIATION SAFETY

2

2

IP

Occupational ALARA Planning and Controls

71124.02

08/29/2016

09/02/2016

2

IP

Occupational Dose Assessment

71124.04

08/29/2016

09/02/2016

EB1-07T

- CGS HEAT SINK PERFORMANCE

1

2

IP

Heat Sink Performance

7111107T

09/12/2016

09/16/2016

INSP

- BIENNIAL REQUAL INSPECTION

3

2

IP

Licensed Operator Requalification Program

7111111B

12/05/2016

12/09/2016

EP-1

- BIENNIAL EP PROGRAM INSPECTION

1

2

IP

Alert and Notification System Testing

7111402

01/30/2017

02/03/2017

2

IP

Emergency Preparedness Organization Staffing and Augmentation System

7111403

01/30/2017

02/03/2017

2

IP

Emergency Action Level and Emergency Plan Changes

7111404

01/30/2017

02/03/2017

2

IP

Correction of Emergency Preparedness Weaknesses and Deficiencies

7111405

01/30/2017

02/03/2017

EP-2

- EP PERFORMANCE INDICATOR VERIFICATION

1

2

IP

Drill/Exercise Performance

71151-EP01

01/30/2017

02/03/2017

2

IP

ERO Readiness

71151-EP02

01/30/2017

02/03/2017

2

IP

Alert & Notification System Reliability

71151-EP03

01/30/2017

02/03/2017

TSB 52B

- BIENNIAL PI&R

5

2

IP

Problem Identification and Resolution

71152B

02/13/2017

02/17/2017

2

IP

Problem Identification and Resolution

71152B

02/27/2017

03/03/2017

71111.08

- INSERVICE INSPECTION

1

2

IP

Inservice Inspection Activities - BWR

7111108G

05/22/2017

05/26/2017

RS 12 PI

- RADIATION SAFETY

3

2

IP

Radiological Hazard Assessment and Exposure Controls

71124.01

05/22/2017

05/26/2017

2

IP

Occupational ALARA Planning and Controls

71124.02

05/22/2017

05/26/2017

2

IP

Occupational Exposure Control Effectiveness

71151-OR01

05/22/2017

05/26/2017

2

IP

RETS/ODCM Radiological Effluent Occurrences

71151-PR01

05/22/2017

05/26/2017

RS 5678

- RS TEAM

5

2

IP

Radiation Monitoring Instrumentation

71124.05

09/11/2017

09/15/2017

2

IP

Radioactive Gaseous and Liquid Effluent Treatment

71124.06

09/11/2017

09/15/2017

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Attachment 2 - Proposed Inspection Plan

Official Use Only - Sensitive Internal Information/Security-Related Information

CGS

Official Use Only - Sensitive Internal Information/Security-Related Information

Enclosure

Page 2 of 2

08/30/2016

09:33:11

Report 22

Unit

Number

Planned Dates

Start End

Inspection Activity

Title

No. of Staff

on Site

Columbia Generating Stati

Inspection / Activity Plan

07/01/2016 - 06/30/2018

RS 5678

- RS TEAM

5

2

IP

Radiological Environmental Monitoring Program

71124.07

09/11/2017

09/15/2017

2

IP

Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation

71124.08

09/11/2017

09/15/2017

EB1-17T

- CGS 50.59 EVALUATIONS OF CHANGES, TEST,

3

2

IP

Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications

7111117T

10/02/2017

10/06/2017

2

IP

Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications

7111117T

10/16/2017

10/20/2017

EB2-05T

- TRIENNIAL FIRE PROTECTION INSPECTION

4

2

IP

Fire Protection [Triennial]

7111105T

04/09/2018

04/13/2018

2

IP

Fire Protection [Triennial]

7111105T

04/23/2018

04/27/2018

EP-1

- EP EXERCISE INSPECTION

4

2

IP

Exercise Evaluation

7111401

03/26/2018

03/30/2018

2

IP

Emergency Action Level and Emergency Plan Changes

7111404

03/26/2018

03/30/2018

EP-3

- EP PERFORMANCE INDICATORS

1

2

IP

Drill/Exercise Performance

71151-EP01

03/26/2018

03/30/2018

2

IP

ERO Readiness

71151-EP02

03/26/2018

03/30/2018

2

IP

Alert & Notification System Reliability

71151-EP03

03/26/2018

03/30/2018

EB1-07T

- CGS HEAT SINK PERFORMANCE

1

2

IP

Heat Sink Performance

7111107T

05/14/2018

05/18/2018

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Attachment 2 - Proposed Inspection Plan

Official Use Only - Sensitive Internal Information/Security-Related Information

CGS

Official Use Only - Sensitive Internal Information/Security-Related Information

Enclosure

ML16239A241

SUNSI Review

By: JRG

ADAMS

Yes No

Publicly Available

Non-Publicly Available

Non-Sensitive

Sensitive

Keyword:

NRC-002

OFFICE: RIV

SPE: DRP/A

D: DRS

D: DRP

C: DRP/A

NAME

RAlexander

AVegel

TWPruett

JGroom

SIGNATURE

/RA/

/RA-JClark for

/RA/

/RA/

DATE

8/22/16

8/19/16

8/22/16

8/26/16

Letter to Mark Reddemann from Jeremy Groom dated August 31, 2016

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR COLUMBIA GENERATING

STATION (REPORT 05000483/2016005)

DISTRIBUTION:

Regional Administrator (Kriss.Kennedy@nrc.gov)

Deputy Regional Administrator (Scott.Morris@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Gregory.Kolcum@nrc.gov)

Resident Inspector (Dan.Bradley@nrc.gov)

Administrative Assistant (Vacant)

Branch Chief, DRP/A (Jeremy.Groom@nrc.gov)

Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov)

Project Engineer (Thomas.Sullivan@nrc.gov)

Project Engineer (Matthew.Kirk@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (John.Klos@nrc.gov)

Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)

RIV RSLO (Bill.Maier@nrc.gov)

Director, DIRS, NRR (Chris.Miller@nrc.gov)

Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov)

Director, DORL, NRR (Anne.Boland@nrc.gov)

Deputy Director, DORL, NRR (George.Wilson@nrc.gov)

Director, NSIR (Brian.Holian@nrc.gov)

Director, DPR, NSIR (Marissa.Bailey@nrc.gov)

DRP Branch Chiefs (R4DRPBC@nrc.gov)

DRS Branch Chiefs (R4DRSBC@nrc.gov)

ROPreports.Resource@nrc.gov

ROPassessment.Resource@nrc.gov