Information Request
Biennial Problem Identification and Resolution Inspection
Columbia Generating Station
April 8, 2021
Inspection Report: 50-397/2021010
Inspection Dates: July 12-16 and July 26-30, 2021
Due to the COVID-19 pandemic conditions within the state of Washington, this
inspection may be conducted remotely.
This inspection will cover the period from March 21, 2019, through July 30, 2021. All requested
information is limited to this period or to the date of this request unless otherwise specified. To
the extent possible, the requested information should be provided electronically in word-
searchable Adobe PDF (preferred) or Microsoft Office format. If any information requested is
determined to be sensitive, the specific handling of this information should be discussed in
advance between the NRC inspectors and the Columbia Generating Station representatives
assigned to the Problem Identification and Resolution Inspection to ensure appropriate handling.
Lists of documents (summary lists) should be provided in Microsoft Excel or a similar sortable
format. Please be prepared to provide any significant updates to this information during the
teams first week of inspection and then as new information becomes available. As used in this
request, corrective action documents refers to condition reports, notifications, action requests,
cause evaluations, and/or other similar documents, as applicable to Columbia Generating
Station.
Please provide the following information no later than June 21, 2021:
i.
Document Lists
Note: For these summary lists, please include the document/reference number, the
document title, initiation date, current status, and long-text description of the issue.
a.
Summary list of all corrective action documents related to significant conditions
adverse to quality that were opened, closed, or evaluated during the period
b.
Summary list of all corrective action documents related to conditions adverse to
quality that were opened or closed during the period
c.
Summary list of all condition reports related to non-conditions adverse to
quality that were opened or closed during the period
d.
Summary list of all apparent cause evaluations (or equivalent) performed
during the period; if fewer than approximately 40, provide full documents and
attachments
e.
Summary list of all currently open corrective action documents associated with
conditions first identified prior to the beginning of the inspection period
f.
Summary list of all corrective action documents that were upgraded or
downgraded in priority/significance during the period (these may be limited to
those downgraded from, or upgraded to, apparent-cause level or higher)
ADAMS Accession No. ML21104A303
g.
Summary list of all corrective action documents initiated during the period that
identify an adverse or potentially adverse trend in safety-related or
risk-significant equipment performance or in any aspect of the stations safety
culture.
h.
Summary lists of operator workarounds, operator burdens, temporary
modifications, and control room deficiencies (1) currently open and (2) that were
evaluated and/or closed during the period; this should include the date that each
item was opened and/or closed.
i.
Summary list of all prompt operability determinations or other engineering
evaluations to provide reasonable assurance of operability; if fewer than
approximately 20, provide full documents and attachments
j.
Summary list of plant safety issues raised or addressed by the Employee
Concerns Program (or equivalent) (sensitive information should be made
available by appropriate means after discussion with the team lead)
2.
Full Documents with Attachments
a.
All root cause evaluations completed during the period; include a list of
any planned or in progress
b.
Quality Assurance audits performed during the period
c.
Audits/surveillances performed during the period on the Corrective Action
Program, of individual corrective actions, or of cause evaluations
d.
Functional area self-assessments and non-NRC third-party assessments (e.g.,
peer assessments performed as part of routine or focused station self- and
independent assessment activities; do not include INPO assessments) that were
performed or completed during the period; include a list of those that are
currently in progress
e.
Any assessments of the safety-conscious work environment at Columbia
Generating Station including any safety culture survey results; if none
performed during the inspection period, provide the most recent
f.
Corrective action documents generated during the period associated with the
following:
i.
NRC findings and/or violations issued to Columbia Generating Station
ii.
Licensee Event Reports issued by Columbia Generating Station
g.
Corrective action documents generated for the following, if they were determined
to be applicable to Columbia Generating Station (for those that were evaluated
but determined not to be applicable, provide a summary list):
i.
NRC Information Notices, Bulletins, and Generic Letters issued
or evaluated during the period
ii.
Part 21 reports issued or evaluated during the period
iii.
Vendor safety information letters (or equivalent) issued or
evaluated during the period
iv.
Other external events and/or operating experience evaluated
for applicability during the period
h.
Corrective action documents generated for the following:
i.
Maintenance preventable functional failures that occurred or were
evaluated during the period
ii.
Adverse trends in equipment, processes, procedures, or programs
that were evaluated during the period
iii.
Action items generated or addressed by offsite review committees
during the period
3.
Logs and Reports
a.
Corrective action performance trending/tracking information generated during the
period and broken down by functional organization (if this information is fully
included in item 3.b, it need not be provided separately)
b.
Current system health reports, Management Review Meeting package, or similar
information; provide past reports as necessary to include greater-than-or-equal
to 12 months of metric/trending data
c.
Radiation protection event logs during the period
d.
Security event logs and security incidents during the period (sensitive information
should be made available during the teams first weekdo not provide
electronically) - Handling of this item will need additional discussion
e.
Employee Concerns Program (or equivalent) logs (sensitive information should
be made available during the teams first week of inspectiondo not provide
electronically)
f.
List of training deficiencies, requests for training improvements, and simulator
deficiencies for the period
Note: For item 3.c-3.d, if there is no log or report maintained separate from the
corrective action program, please provide a summary list of corrective action program
items for the category described.
4.
Procedures
Note: For these procedures, please include all revisions that were in effect at any time
during the period.
a.
Corrective action program procedures, to include initiation and evaluation
procedures, operability determination procedures, cause evaluation
procedures, and any other procedures that implement the corrective action
program at Columbia Generating Station, including applicable corporate
procedures
b.
Quality Assurance program procedures (specific audit procedures are not
necessary)
c.
Employee Concerns Program (or equivalent) procedures
d.
Procedures that implement/maintain a Safety Conscious Work Environment
e.
Conduct of Operations procedure (or equivalent) and any other procedures or
policies governing control room conduct, operator burdens and workarounds, etc.
f.
Maintenance rule procedures and any procedures implementing any portion of
the maintenance rule at Columbia Generating Station
g.
Operating experience program procedures and any other procedures or guidance
documents that describe the sites use of operating experience information
5.
Other
a.
List of risk-significant components and systems, ranked by risk worth; if the list
uses system designators, provide a list of the associated equipment/system
names
b.
List of structures, systems and components and/or functions that were in
maintenance rule (a)(1) status or evaluated for (a)(1) status at any time during the
inspection period; include dates and results of expert panel reviews and dates of
status changes
c.
Organization charts for plant staff and long-term/permanent contractors
d.
Electronic copies of the Updated Final Safety Analysis Report (or equivalent),
technical specifications, and technical specification bases, if available
e.
Table showing the number of corrective action documents (or equivalent)
initiated during each month of the inspection period, by screened significance
f.
For each day the team is inspecting,
i.
Planned work/maintenance schedule for the station
ii.
Schedule of management or corrective action review meetings (e.g.
operations focus meetings, condition report screening meetings,
Corrective Action Review Boards, Management Review Meetings,
challenge meetings for cause evaluations, etc.)
iii.
Agendas and materials for these meetings
Note: Please provide the items listed in 5.f on a daily basis
All requested documents should be provided electronically (e.g., Certrecs IMS) where possible.
Frances Ramirez
U.S. NRC Senior Reactor Inspector
Inspection Program and Assessment Team
Division of Reactor Safety, Region IV
1600 E. Lamar Blvd, Arlington, TX 76011
Frances.Ramirez@nrc.gov