Inspection Report 05000397/2021010, Information Request Biennial Problem Identification and Resolution Inspection
ML21104A303
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/08/2021
From: Ramirez F
NRC Region 4
To:
References
IR 2021010
Download: ML21104A303 (5)


See also: IR 05000397/2021010

Text

Information Request

Biennial Problem Identification and Resolution Inspection

Columbia Generating Station

April 8, 2021

Inspection Report: 50-397/2021010

Inspection Dates: July 12-16 and July 26-30, 2021

Due to the COVID-19 pandemic conditions within the state of Washington, this

inspection may be conducted remotely.

This inspection will cover the period from March 21, 2019, through July 30, 2021. All requested

information is limited to this period or to the date of this request unless otherwise specified. To

the extent possible, the requested information should be provided electronically in word-

searchable Adobe PDF (preferred) or Microsoft Office format. If any information requested is

determined to be sensitive, the specific handling of this information should be discussed in

advance between the NRC inspectors and the Columbia Generating Station representatives

assigned to the Problem Identification and Resolution Inspection to ensure appropriate handling.

Lists of documents (summary lists) should be provided in Microsoft Excel or a similar sortable

format. Please be prepared to provide any significant updates to this information during the

teams first week of inspection and then as new information becomes available. As used in this

request, corrective action documents refers to condition reports, notifications, action requests,

cause evaluations, and/or other similar documents, as applicable to Columbia Generating

Station.

Please provide the following information no later than June 21, 2021:

i.

Document Lists

Note: For these summary lists, please include the document/reference number, the

document title, initiation date, current status, and long-text description of the issue.

a.

Summary list of all corrective action documents related to significant conditions

adverse to quality that were opened, closed, or evaluated during the period

b.

Summary list of all corrective action documents related to conditions adverse to

quality that were opened or closed during the period

c.

Summary list of all condition reports related to non-conditions adverse to

quality that were opened or closed during the period

d.

Summary list of all apparent cause evaluations (or equivalent) performed

during the period; if fewer than approximately 40, provide full documents and

attachments

e.

Summary list of all currently open corrective action documents associated with

conditions first identified prior to the beginning of the inspection period

f.

Summary list of all corrective action documents that were upgraded or

downgraded in priority/significance during the period (these may be limited to

those downgraded from, or upgraded to, apparent-cause level or higher)

ADAMS Accession No. ML21104A303

g.

Summary list of all corrective action documents initiated during the period that

identify an adverse or potentially adverse trend in safety-related or

risk-significant equipment performance or in any aspect of the stations safety

culture.

h.

Summary lists of operator workarounds, operator burdens, temporary

modifications, and control room deficiencies (1) currently open and (2) that were

evaluated and/or closed during the period; this should include the date that each

item was opened and/or closed.

i.

Summary list of all prompt operability determinations or other engineering

evaluations to provide reasonable assurance of operability; if fewer than

approximately 20, provide full documents and attachments

j.

Summary list of plant safety issues raised or addressed by the Employee

Concerns Program (or equivalent) (sensitive information should be made

available by appropriate means after discussion with the team lead)

2.

Full Documents with Attachments

a.

All root cause evaluations completed during the period; include a list of

any planned or in progress

b.

Quality Assurance audits performed during the period

c.

Audits/surveillances performed during the period on the Corrective Action

Program, of individual corrective actions, or of cause evaluations

d.

Functional area self-assessments and non-NRC third-party assessments (e.g.,

peer assessments performed as part of routine or focused station self- and

independent assessment activities; do not include INPO assessments) that were

performed or completed during the period; include a list of those that are

currently in progress

e.

Any assessments of the safety-conscious work environment at Columbia

Generating Station including any safety culture survey results; if none

performed during the inspection period, provide the most recent

f.

Corrective action documents generated during the period associated with the

following:

i.

NRC findings and/or violations issued to Columbia Generating Station

ii.

Licensee Event Reports issued by Columbia Generating Station

g.

Corrective action documents generated for the following, if they were determined

to be applicable to Columbia Generating Station (for those that were evaluated

but determined not to be applicable, provide a summary list):

i.

NRC Information Notices, Bulletins, and Generic Letters issued

or evaluated during the period

ii.

Part 21 reports issued or evaluated during the period

iii.

Vendor safety information letters (or equivalent) issued or

evaluated during the period

iv.

Other external events and/or operating experience evaluated

for applicability during the period

h.

Corrective action documents generated for the following:

i.

Maintenance preventable functional failures that occurred or were

evaluated during the period

ii.

Adverse trends in equipment, processes, procedures, or programs

that were evaluated during the period

iii.

Action items generated or addressed by offsite review committees

during the period

3.

Logs and Reports

a.

Corrective action performance trending/tracking information generated during the

period and broken down by functional organization (if this information is fully

included in item 3.b, it need not be provided separately)

b.

Current system health reports, Management Review Meeting package, or similar

information; provide past reports as necessary to include greater-than-or-equal

to 12 months of metric/trending data

c.

Radiation protection event logs during the period

d.

Security event logs and security incidents during the period (sensitive information

should be made available during the teams first weekdo not provide

electronically) - Handling of this item will need additional discussion

e.

Employee Concerns Program (or equivalent) logs (sensitive information should

be made available during the teams first week of inspectiondo not provide

electronically)

f.

List of training deficiencies, requests for training improvements, and simulator

deficiencies for the period

Note: For item 3.c-3.d, if there is no log or report maintained separate from the

corrective action program, please provide a summary list of corrective action program

items for the category described.

4.

Procedures

Note: For these procedures, please include all revisions that were in effect at any time

during the period.

a.

Corrective action program procedures, to include initiation and evaluation

procedures, operability determination procedures, cause evaluation

procedures, and any other procedures that implement the corrective action

program at Columbia Generating Station, including applicable corporate

procedures

b.

Quality Assurance program procedures (specific audit procedures are not

necessary)

c.

Employee Concerns Program (or equivalent) procedures

d.

Procedures that implement/maintain a Safety Conscious Work Environment

e.

Conduct of Operations procedure (or equivalent) and any other procedures or

policies governing control room conduct, operator burdens and workarounds, etc.

f.

Maintenance rule procedures and any procedures implementing any portion of

the maintenance rule at Columbia Generating Station

g.

Operating experience program procedures and any other procedures or guidance

documents that describe the sites use of operating experience information

5.

Other

a.

List of risk-significant components and systems, ranked by risk worth; if the list

uses system designators, provide a list of the associated equipment/system

names

b.

List of structures, systems and components and/or functions that were in

maintenance rule (a)(1) status or evaluated for (a)(1) status at any time during the

inspection period; include dates and results of expert panel reviews and dates of

status changes

c.

Organization charts for plant staff and long-term/permanent contractors

d.

Electronic copies of the Updated Final Safety Analysis Report (or equivalent),

technical specifications, and technical specification bases, if available

e.

Table showing the number of corrective action documents (or equivalent)

initiated during each month of the inspection period, by screened significance

f.

For each day the team is inspecting,

i.

Planned work/maintenance schedule for the station

ii.

Schedule of management or corrective action review meetings (e.g.

operations focus meetings, condition report screening meetings,

Corrective Action Review Boards, Management Review Meetings,

challenge meetings for cause evaluations, etc.)

iii.

Agendas and materials for these meetings

Note: Please provide the items listed in 5.f on a daily basis

All requested documents should be provided electronically (e.g., Certrecs IMS) where possible.

Frances Ramirez

U.S. NRC Senior Reactor Inspector

Inspection Program and Assessment Team

Division of Reactor Safety, Region IV

1600 E. Lamar Blvd, Arlington, TX 76011

Frances.Ramirez@nrc.gov