IR 05000397/2018006
| ML19057A608 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 03/04/2019 |
| From: | Mark Haire NRC/RGN-IV/DRP |
| To: | Sawatzke B Energy Northwest |
| References | |
| IR 2018006 | |
| Download: ML19057A608 (6) | |
Text
March 4, 2019
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR COLUMBIA GENERATING STATION (REPORT 05000397/2018006)
Dear Mr. Sawatzke:
The U.S. Nuclear Regulatory Commission (NRC) has completed its end-of-cycle performance assessment of Columbia Generating Station, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2018, through December 31, 2018. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.
The NRC determined the performance at Columbia Generating Station during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green).
Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through December 31, 2020.
This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondence. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. You should be aware that the agency has proposed changes regarding engineering inspections (SECY-18-0113, Recommendations for Modifying the Reactor Oversight Process Engineering Inspections) and is drafting proposed changes to the ROP for Commission consideration. Should the Commission approve changes to the ROP, the engineering and other region-based inspections are subject to change in scope, as well as schedule, beginning in January 2020. The inspections listed during the last 12 months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
Additionally, as reflected in the enclosure, during this period the NRC staff will complete Temporary Instruction 2515/194, Inspection of the Licensees Implementation of Industry Initiative Associated with the Open Phase Condition Design Vulnerability in Electrical Power Systems (NRC Bulletin 2012-01). Further it is anticipated that the NRC staff will also complete Temporary Instruction 2515/193, Inspection of the Implementation of EA-13-109: Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions, during this period. This inspection will be scheduled and completed at Columbia Generating Station to confirm the stations full implementation of Commission Order EA-13-109, once your staff submits the applicable compliance letter and final integrated plan, which is anticipated later this year.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of
NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at (817) 200-1148 with any questions you have regarding this letter.
Sincerely,
/RA/
Mark S. Haire, Chief Project Branch A Division of Reactor Projects
Docket No. 50-397 Licenses No. NPF-21
Enclosure:
Inspection Plan
Columbia Generating Station 01/01/2019 - 12/31/2020 Unit Start End Activity CAC Title Staff Count CGS 2019 INITIAL EXAM
2 01/27/2019 02/02/2019 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
02/24/2019 03/02/2019 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)
EP PROGRAM INSPECTION
2 01/28/2019 02/01/2019 IP 71114.02 000717 Alert and Notification System Testing
01/28/2019 02/01/2019 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System
01/28/2019 02/01/2019 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
01/28/2019 02/01/2019 IP 71114.05 000720 Maintenance of Emergency Preparedness
01/28/2019 02/01/2019 IP 71151 001397 Performance Indicator Verification CGS 2019 PI&R INSPECTION
2 03/04/2019 03/08/2019 IP 71152B 000747 Problem Identification and Resolution
03/18/2019 03/22/2019 IP 71152B 000747 Problem Identification and Resolution INSERVICE INSPECTION RF24
2 05/12/2019 05/25/2019 IP 71111.08G 000701 Inservice Inspection Activities (BWR)
2 05/20/2019 05/24/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
05/20/2019 05/24/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls Security Access Control.02
2 07/15/2019 07/19/2019 IP 71130.02 000734 Access Control
07/15/2019 07/19/2019 IP 71151 001338 Performance Indicator Verification COLUMBIA DBA TEAMS INSPECTION
2 08/05/2019 08/23/2019 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)
Security Protective Strategy.05
2 08/12/2019 08/16/2019 IP 71130.05 000737 Protective Strategy Evaluation RP TEAM INSPECTION
2 11/04/2019 11/08/2019 IP 71124.05 000729 Radiation Monitoring Instrumentation
11/04/2019 11/08/2019 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment
11/04/2019 11/08/2019 IP 71124.07 000731 Radiological Environmental Monitoring Program 2/22/2019 8:24:35 AM Page 1 of 3 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
IP 22 Inspection Activity Plan Report
Columbia Generating Station 01/01/2019 - 12/31/2020 Unit Start End Activity CAC Title Staff Count RP TEAM INSPECTION
2 11/04/2019 11/08/2019 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation MAT'L CONTROL & ACCOUNTING
2 11/04/2019 11/08/2019 IP 71130.11 000742 Material Control and Accounting (MC&A)
2 11/18/2019 11/22/2019 TI 2515/194 000512 Inspection of the Licensees Implementation of Industry Initiative Associated With the Open Phase Condition Design Vulnerabilities In Electric Power Systems (NRC Bulletin 2012-01)
CGS 2019 BRQ
2 12/01/2019 12/07/2019 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance (Biennial)
2 03/23/2020 03/27/2020 IP 71114.01 000716 Exercise Evaluation
03/23/2020 03/27/2020 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
03/23/2020 03/27/2020 IP 71151 001397 Performance Indicator Verification Columbia Generating Station - Evaluations of Changes, Tests, and Experiments
2 04/13/2020 04/17/2020 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments RS13PI Radiation Safety
2 04/13/2020 04/17/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
04/13/2020 04/17/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation Cyber Security Inspection
2 06/22/2020 06/26/2020 IP 71130.10P 000741 Cyber Security
07/06/2020 07/10/2020 IP 71130.10P 000741 Cyber Security RS24 Radiation Safety
2 07/27/2020 07/31/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls
07/27/2020 07/31/2020 IP 71124.04 000728 Occupational Dose Assessment 2/22/2019 8:24:35 AM Page 2 of 3 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
IP 22 Inspection Activity Plan Report
Columbia Generating Station 01/01/2019 - 12/31/2020 Unit Start End Activity CAC Title Staff Count Columbia Generating Station - Heat Sink Performance (Triennial)
2 08/17/2020 08/21/2020 IP 71111.07T 000700 Heat Sink Performance -Triennial 2/22/2019 8:24:35 AM Page 3 of 3 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
IP 22 Inspection Activity Plan Report
ML19057A608 SUNSI Review ADAMS:
Non-Publicly Available Non-Sensitive Keyword:
By: RDA/rdr Yes No Publicly Available Sensitive NRC-002 OFFICE DRP/SPE:A DRP/C:A
NAME RAlexander MHaire
SIGNATURE
/RA/
/RA/
DATE 2/19/19 3/4/19