2021 River Bend Station - Biennial Problem Identification and Resolution Inspection Report 05000458/2021010 and Notice of Violation
ML21067A631
Person / Time
Site: River Bend Entergy icon.png
Issue date: 03/18/2021
From: Ami Agrawal
Division of Reactor Safety IV
To: Vercelli S
Entergy Operations
References
IR 2021010
Download: ML21067A631 (27)


Text

March 18, 2021

SUBJECT:

RIVER BEND STATION - BIENNIAL PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION REPORT 05000458/2021010 AND NOTICE OF VIOLATION

Dear Mr. Vercelli:

On February 12, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed a problem identification and resolution inspection at your River Bend Station and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspection team reviewed the stations corrective action program and the stations implementation of the program to evaluate its effectiveness in identifying, prioritizing, evaluating, and correcting problems, and to confirm that the station was complying with NRC regulations and licensee standards for corrective action programs. Based on the samples reviewed, the team determined that your staffs performance in each of these areas adequately supported nuclear safety. However, the team identified weaknesses associated with categorization of issues documented in condition reports and with taking appropriate actions to address non-cited violations. Specifically, the team identified a finding associated with identifying and classifying adverse conditions in the corrective action program, a finding associated with corrective action of a previous non-cited violation, a finding associated with failing to restore compliance associated with a non-cited violation, and other observations that highlighted these performance gaps.

The team also evaluated the stations processes for use of industry and NRC operating experience information and the effectiveness of the stations audits and self-assessments.

Based on the samples reviewed, the team determined that your staffs performance in each of these areas adequately supported nuclear safety.

Finally, the team reviewed the stations programs to establish and maintain a safety-conscious work environment and interviewed station personnel to evaluate the effectiveness of these programs. Based upon the interviews and document reviews, the team found that your organization appeared to have a safety conscious work environment where individuals felt free to raise concerns without fear of retaliation. Most expressed positive experiences after raising issues to their supervisors and documenting issues in condition reports, all individuals indicated that they would not hesitate to raise safety concerns. However, the team noted that some individuals did not always have positive experiences raising safety concerns by some methods and assessed that additional focus is warranted to build trust within the radiation protection and instrumentation and control groups to ensure individuals continue to feel free to raise concerns.

The enclosed report discusses a violation associated with a finding of very low safety significance (Green). The NRC evaluated this violation in accordance Section 2.3.2 of the NRC Enforcement Policy, which can be found at http://www.nrc.gov/about-nrc/regulatory/

enforcement/enforce-pol.html. The violation is cited in Enclosure 1, Notice of Violation (Notice),

and the circumstances surrounding it are described in detail in the subject inspection report (Enclosure 2). This violation is being cited in the Notice because it did not meet the criteria to be treated as a non-cited violation since your staff failed to restore compliance within a reasonable period of time after the violation was identified consistent with Section 2.3.2 of the Enforcement Policy. You are required to respond to this letter and should follow the instructions specified in the enclosed Notice when preparing your response. If you have additional information that you believe the NRC should consider, you may provide it in your response. The NRCs review of your response will also determine whether further enforcement action is necessary to ensure your compliance with regulatory requirements.

You are required to respond to this letter and should follow the instructions specified in the enclosed Notice when preparing your response. If you have additional information that you believe the NRC should consider, you may provide it in your response. The NRCs review of your response will also determine whether further enforcement action is necessary to ensure your compliance with regulatory requirements.

Additionally, two findings of very low safety significance (Green) are documented in this report.

One of these findings involved a violation of NRC requirements. We are treating this violation as a non-cited violation consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violations or the significance or severity of the violations documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; and the NRC Resident Inspector at River Bend Station.

If you disagree with a cross-cutting aspect assignment or a finding not associated with a regulatory requirement in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; and the NRC Resident Inspector at River Bend Station.

In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter, its enclosures, and your response will be made available electronically for public inspection in the NRC Public Document Room or in the NRCs Agencywide Documents Access and Management System (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, any response should not include any personal privacy or proprietary information so that it can be made available to the public without redaction. If you have any questions regarding this matter, you may contact Mr. Douglas Dodson at 817-200-1436.

Sincerely, Digitally signed by Ami Agrawal Ami Agrawal Date: 2021.03.19 08:50:12-05'00'

Ami N. Agrawal, Team Leader Inspection Program and Assessment Team Division of Reactor Safety Docket No. 05000458 License No. NPF-47

Enclosures:

1. Notice of Violation 2. Inspection Report 05000458/2021010

Inspection Report

Docket Number: 05000458 License Number: NPF-47 Report Number: 05000458/2021010 Enterprise Identifier: I-2021-010-0005 Licensee: Entergy Operations, Inc.

Facility: River Bend Station Location: St. Francisville, LA Inspection Dates: January 25, 2021 to February 12, 2021 Inspectors: D. Dodson, Senior Reactor Inspector R. Kumana, Senior Resident Inspector D. Reinert, Reactor Inspector A. Sanchez, Senior Project Engineer Approved By: Ami N. Agrawal, Team Leader Inspection Program and Assessment Team Division of Reactor Safety Enclosure 2

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a biennial problem identification and resolution inspection at River Bend Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

Failure to Follow Corrective Action Program Procedures Cornerstone Significance Cross-Cutting Report Aspect Section Barrier Integrity Green [P.1] - 71152B FIN 05000458/2021010-01 Identification Open/Closed The inspectors identified a Green finding associated with the licensees failure to follow procedure EN-LI-102, Corrective Action Program. Specifically, procedure EN-LI-102 requires the licensee to identify and classify adverse conditions in their corrective action program. On six occasions, the licensee failed to classify conditions adverse to quality associated with safety-related radiation monitors as adverse conditions in their corrective action program.

Failure to Adequately Correct Radiation Monitor Calibration Frequencies Cornerstone Significance Cross-Cutting Report Aspect Section Occupational Green [H.13] - 71152B Radiation Safety NCV 05000458/2021010-02 Consistent Open/Closed Process The inspectors identified a Green finding and associated non-cited violation (NCV) of Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Appendix B, Criterion XVI, Corrective Action, for the licensees failure to correct calibration frequencies for area and airborne particulate process radiation monitors that were not being performed at the frequencies specified in the Updated Final Safety Analysis Report (UFSAR).

Failure to Restore Compliance Associated with Technical Specification Required Procedures Cornerstone Significance Cross-Cutting Report Aspect Section Initiating Events Green [P.3] - 71152B NOV 05000458/2021010-03 Resolution Open The Inspectors identified a Green cited violation of Technical Specification 5.4.1.a for failure to maintain procedures required by Regulatory Guide 1.33, Revision 2, Appendix A. Specifically, the NRC issued a violation for failure to maintain adequate procedures for feedwater system operation on April 29, 2020, and the licensee failed to restore compliance within a reasonable amount of time.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19),inspectors were directed to begin telework. In addition, regional baseline inspections were evaluated to determine if all or portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on site. The inspections documented below met the objectives and requirements for completion of the IP.

OTHER ACTIVITIES - BASELINE

71152B - Problem Identification and Resolution Biennial Team Inspection (IP Section 02.04)

(1) The inspectors performed a biennial assessment of the licensees corrective action program, use of operating experience, self-assessments and audits, and safety conscious work environment.
  • Corrective Action Program Effectiveness: The inspectors assessed the corrective action programs effectiveness in identifying, prioritizing, evaluating, and correcting problems. The team also evaluated the stations compliance with NRC regulations and licensee standards for corrective action programs.

The inspectors sampled over 220 condition reports and their associated cause evaluations, if applicable. The inspectors also conducted five-year reviews of the recirculation system, the reactor core isolation cooling (RCIC) system, and the chilled water system, which included reviews of failures, maintenance issues, surveillances, corrective and preventive maintenance, reliability, and maintenance rule performance. Additionally, the inspectors reviewed all findings and violations issued during the biennial period.

  • Operating Experience, Self-Assessments and Audits: The inspectors assessed the effectiveness of the stations processes for use of operating experience, audits and self-assessments. The sample included industry operating experience communications like 10 CFR Part 21 notifications and other vendor correspondence, NRC generic communications, publications from various industry groups, and site evaluations. The sample also included reviews of licensee self-assessments and internal audits.
  • Safety Conscious Work Environment: The inspectors assessed the effectiveness of the stations programs to establish and maintain a safety-conscious work environment. The team interviewed 23 employees and contractors, observed interactions between licensee employees and management during routine meetings, reviewed employee concerns files, interviewed the Employee Concerns Program coordinator, and reviewed safety culture survey results.

INSPECTION RESULTS

Assessment 71152B Corrective Action Program Effectiveness Based on the samples reviewed, the team determined that the licensees corrective action program complied with regulatory requirements and self-imposed standards. The licensees performance in each of the areas of Problem Identification, Problem Prioritization and Evaluation, and Corrective Actions adequately supported nuclear safety. The team noted weaknesses associated with the licensees categorization of issues documented in condition reports and with taking appropriate actions to address non-cited violations.

Problem Identification The team found that the licensee was identifying and documenting problems at an appropriately low threshold that supported nuclear safety. During the 2-year assessment period, the licensee initiated over 12,000 conditions reports, including approximately 3,400 condition reports associated with conditions adverse to quality. However, the team noted in interviews that writing a condition report was not the default method for many when they raised safety concerns, and some individuals indicated that they had not or did not frequently write condition reports. All individuals indicated that they would be willing to write condition reports, but this could be impacting the size of the total population of condition reports and adverse conditions that are ultimately identified.

Problem Prioritization and Evaluation In general, the team found that the licensee was adequately prioritizing and evaluating problems; however, the team identified a weakness associated with evaluating adverse conditions associated with safety-related equipment issues and quality related procedure compliance. Specifically, the team noted 12 examples (six associated with finding and other six associated with minor violation) of condition reports that were inappropriately categorized as non-adverse conditions. In each of these examples, the team determined that these conditions represented adverse conditions. Considering the sample size of approximately 75 condition reports categorized as non-conditions adverse to quality, the team determined that this represented a weakness. This report documents Green FIN 05000458/2021010-01, Failure to Follow Corrective Action Program Procedures, and a minor performance deficiency associated with this weakness.

In addition to noting a weakness associated with evaluating adverse conditions associated with safety-related equipment issues and quality related procedure compliance, the team noted at least nine examples of issues where the licensee did not demonstrate a robust questioning attitude in its evaluations and chose not to evaluate, identify, and correct underlying programmatic or human performance related causes of issues. Examples identified by the team included the following:

  • On April 30, 2020, the NRC completed a special inspection (inspection report 05000458/202050) related to several issues with FLEX equipment, like diesel generators and other electrical components. The licensee took corrective actions to resolve these issues associated with failing to set up equipment according to approved design criteria. However, since the special inspection there have been four additional issues with the diesel generators that have prevented successful surveillance tests and rendered the equipment non-functional. In each case condition reports were written (CR-RBS-2020-0445, CR-RBS-2021-0344, CR-RBS-2021-0751, and CR-RBS-2021-0773), and the CRs were categorized as having category C significance, requiring broke-fix resolution in accordance with approved corrective action procedures. To date, the NRC has not identified any performance deficiencies with these equipment issues but continues to inspect these issues, as appropriate. The team also noted that none of these issues were evaluated with a root cause or adverse condition analysis to determine underlying causes. The inspectors noted that the issues are maintenance related (loose and worn cooling fan belts, wires not properly landed in wiring harnesses, a leaking cooling system nipple, and a damaged heater) and are adversely impacting the availability and reliability of the FLEX diesel generators. In each case, the component deficiencies were resolved, but the licensee has not classified these issues as a degrading trend or determined any underlying human performance or programmatic causes for the continued deficiencies.
  • CR-RBS-2020-03056 and its evaluation documents that a non-safety-related relief valve was installed in a safety-related reactor core isolation cooling (RCIC) system application. The condition was evaluated; however, affirmation that current work management processes would not cause a similar incorrect installation in the future did not occur.
  • CR-RBS-2017-07237 and its evaluation documents a failure to have adequate instructions from a vendor for RCIC testing. The licensee corrected this condition, but no effort was made to understand why the licensee had inadequate instructions from a vendor.
  • CR-RBS-2019-03018 and its evaluation documents a loss of a safety related DC bus. Through interviews, the inspectors determined that the issue appeared to be caused by work planning issues during an outage. Although the bus condition was corrected, the condition report was categorized as a broke-fix, and correcting potential underlying causes was not prioritized.
  • CR-RBS-2018-6018 and its evaluation document the stations identification that a corrective action to prevent recurrence associated with a bent turbine governor valve caused a 2018 trip. However, the condition report did not seek to understand why the 2012 corrective action to prevent recurrence was not completed.
  • CR-RBS-2019-06990 documents an inadequately evaluated maintenance rule functional failure associated with a safety-related containment cooler failure. The cause evaluation associated with the inadequately evaluated maintenance rule functional failure determined that the issue was too old to determine a cause of the inadequate evaluation.
  • CR-RBS-2019-07454 documents a feedwater pump oil pipe fatigue failure associated with a missing pipe clamp. The licensee corrected the condition and installed a new pipe clamp. However, no effort was made to understand why the pipe clamp was not installed.
  • CR-RBS-2019-01976 documents a loss of normal service water and initiation of standby service water. The licensees evaluation noted that there was some leak by from the normal service water system to the standby service water system. Though, no context (quantification or acceptability) was discussed in the evaluation, and the evaluation did not consider whether the leakage could have contributed to the event.
  • CR-RBS-2020-02095 documents that the preventive maintenance frequency for a residual heat removal (RHR) train C room floor drain check valve was inappropriately moved to 40 years. Although the licensee corrected the preventive maintenance frequency, the underlying causes for the inadequate preventive maintenance frequency change were not considered in the licensees evaluation.

The licensees procedures provide a great deal of flexibility with respect to categorizing conditions and performing (or not performing) evaluations. The team determined that the flexibility was most frequently used by the licensee to justify lesser evaluations that did not identify underlying causes. In each of these cases, the inspectors did not identify any more-than-minor performance deficiencies, but the team assessed that a very strong corrective action program would have been more interested in the underlying causes of these safety-related and important issues and taken more action to evaluate and learn more from them.

Corrective Actions The team concluded that River Bend Station generally developed effective corrective actions for the problems evaluated in the corrective action program. River Bend Station generally implemented these corrective actions in a timely manner, commensurate with their safety significance. However, the team identified a weakness associated with taking appropriate actions to address non-cited violations. Specifically, the team identified one non-cited violation for which the licensee failed to restore compliance, and for another non-cited violation the inspectors determined that the licensee did not take appropriate corrective actions to address the issue. As a result, this report documents Green NOV 05000458/2021010-03, Failure to Restore Compliance Associated with Technical Specification Required Procedures, and Green NCV 05000458/2021010-02, Failure to Adequately Correct Radiation Monitor Calibration Frequencies. These issues suggest to the inspection team that the station is not rigorously considering issues documented in findings and violations and adequately correcting the conditions.

Similarly, the team determined the licensees response to the only identified significant condition adverse to quality and root cause evaluation was not timely. Specifically, the station performed a root cause evaluation in 2019 associated with a recirculation pump oil consumption issue that required a power reduction to add oil. This root cause evaluation was the only root cause evaluation performed over the last two years. Considering the station determined the issue was a significant condition adverse to quality, the inspectors expected the licensee would have promptly identified the root cause and corrected the condition. However, as of the inspection, the licensee had not identified a root cause, a planned temporary modification to mitigate the condition was not installed during two recent forced outages, and the final actions to correct the condition are not expected to be completed until June 2023. Although the inspectors did not identify any failures to follow procedures or other performance deficiencies associated with this issue, the inspectors assessed that in this example the licensee did not demonstrate timely corrective action and decision making.

Assessment 71152B Use of Operating Experience The team reviewed a variety of sources of operating experience including part 21 notifications and other vendor correspondence, NRC generic communications, publications from various industry groups. The team determined that River Bend Station is adequately screening and addressing issues identified through operational experience that apply to the station and that this information is evaluated in a timely manner once it is received.

Assessment 71152B Use of Self-Assessment & Audits The team reviewed a sample of River Bends departmental self-assessments and audits to assess whether performance trends were regularly identified and effectively addressed. The team also reviewed audit reports to assess the effectiveness of assessments in specific areas. Overall, the team concluded that the licensee had an adequate departmental self-assessment and audit process.

The team noted two observations in this area. Specifically, the team noted that CR-HQN-2018-00153 evaluated gaseous and area radiation monitors to ensure the monitors complied with the licensing and design basis. However, this evaluation did not identify the issues documented by NCV 2019004-02, which was associated with the radiation monitor calibration discrepancies and alignment with the Updated Safety Analysis Report. The team determined this was a missed opportunity. Additionally, the team noted that the station may not be taking full advantage of Nuclear Independent Oversight (NIOS) and self-assessment insights. For example, the pre-problem identification and resolution self-assessment of the 2019 root cause evaluation associated with the recirculation pump oil consumption issue was similar to the NRC teams independent assessment. However, in response to the self-assessment, the licensees evaluation determined that procedures were being followed and the self-assessment concerns were dismissed without additional actions being taken. Although the team did not identify any more-than-minor performance deficiencies in either case, the team views this as another missed opportunity for the station to holistically consider if the root cause evaluation was being treated with appropriate urgency.

Assessment 71152B Safety Conscious Work Environment (SCWE)

The team conducted safety conscious work environment interviews with 23 employees and contractors from eight different disciplines (chemistry, engineering, electrical maintenance, instrumentation and controls, health physics, mechanical maintenance, operations, and security). The team also observed interactions between employees during routine condition report screening and management oversight meetings, and the team interviewed the Employee Concerns Program coordinator and reviewed the results of the latest safety culture surveys and any case files that may relate to safety conscious work environment.

Based upon the interviews and document reviews, the team found that the licensee had a safety conscious work environment where individuals felt free to raise concerns without fear of retaliation. Most expressed positive experiences after raising issues to their supervisors and after documenting issues in condition reports, and all individuals indicated that they would not hesitate to raise safety concerns.

However, the inspectors noted that some individuals did not have positive experiences raising safety concerns to the outage control center at the end of outages; some individuals indicated that they were not sure that their concerns mattered; one individual indicated he/she would not use the Employee Concerns Program again; and some individuals indicated some issues could have been addressed more promptly. Though, all individuals were still willing to raise safety concerns through their chain of command or in a condition report.

Additionally, the inspectors noted that the stations pre-PI&R self-assessment noted that the radiation protection group is an outlier in the area of morale and leader/work relationships. Considering this self-assessment input and many other inputs, including interviews, Employee Concerns Program input, safety culture surveys, and other insights, the inspectors independently assessed that additional focus is warranted to build trust within the radiation protection and instrumentation and control groups to ensure that individuals continue to feel free to raise concerns.

Failure to Follow Corrective Action Program Procedures Cornerstone Significance Cross-Cutting Report Aspect Section Barrier Integrity Green [P.1] - 71152B FIN 05000458/2021010-01 Identification Open/Closed The inspectors identified a Green finding associated with the licensees failure to follow procedure EN-LI-102, Corrective Action Program. Specifically, procedure EN-LI-102, Revision 42, requires the licensee to identify and classify adverse conditions in the corrective action program. On six occasions, the licensee failed to classify conditions adverse to quality associated with safety-related radiation monitors as adverse conditions in the corrective action program.

Description:

During a review of selected condition reports, the inspectors identified six condition reports that were classified as non adverse by the licensee. The inspectors reviewed the associated conditions and found that six condition reports issued between November 12, 2019, and November 29, 2020, documented failures, malfunctions, and non-conformances of safety-related components that affected their safety-related function. Procedure EN-LI-102 defines an adverse condition to include a condition adverse to quality. The procedure further defines a condition adverse to quality as, a failure, malfunction, deficiency, deviation, defect, or nonconformance associated with the performance of an activity affecting the safety-related function of a structure, system or component [(SSC)].

The six condition reports (CR-RBS-2019-07312; CR-RBS-2020-01861; CR-RBS-2020-02301; CR-RBS-2020-05053; CR-RBS-2020-04607; and CR-RBS-2019-07281) were associated with the containment atmosphere gaseous and particulate radiation monitor (RE-111), one of two reactor building annulus monitors (RE-11B), and one of two residual heat removal heat exchanger radiation monitors (RE-15A). Each of these monitors is safety-related. The inspectors noted that the impact on the safety function was not described in the associated condition reports. Of the six condition reports, the inspectors determined that the most significant impact was the failure of the reactor building annulus monitor RE-11B data transfer signal documented in CR-RBS-2020-04607. This failure resulted in one of two instruments being incapable of performing its design and safety functions of alerting operators in the control room of high radiation in the reactor building annulus and automatic actuation of one train of the standby gas treatment system on a high reactor building annulus radiation signal.

Section 5.4 of procedure EN-LI-102 provides instructions on screening of condition reports. In particular, Step 8 describes the required actions of the Performance Improvement Review Group (PRG). Specifically, Step 8.c states that the PRG, Classifies the [condition report]

based on risk significance as identified in Attachment 1. EN-LI-102 Attachment 1, Condition Report Classification Guidance, specifies that adverse conditions are to be given a classification of A, B, C or D, depending on the significance. The six condition reports identified by the inspectors were classified as N, or non-adverse. The inspectors noted that a classification of non-adverse would result in allowing the condition to be given a lower priority, to not be tracked to completion, or to not be corrected. In addition, none of these conditions were evaluated for functionality to ensure that the affected safety-related functions described in the Updated Final Safety Analysis Report were still met.

Corrective Actions: The licensee entered this issue into its corrective action program and verified that the associated conditions in the condition reports had ultimately been corrected.

Corrective Action References: CR-RBS-2021-00794

Performance Assessment:

Performance Deficiency: The licensee failed to follow corrective action program procedures and appropriately classify six condition reports associated with safety-related radiation monitors. Specifically, the licensee inappropriately classified the condition reports as non-adverse and failed to determine whether the affected safety-related radiation monitors could perform their safety and design basis functions.

Screening: The inspectors determined the performance deficiency was more than minor because if left uncorrected, it would have the potential to lead to a more significant safety concern and impacted the SSC and barrier performance attribute of the Barrier Integrity Cornerstone objective. Specifically, continuing to fail to treat conditions associated with these SSCs as adverse conditions has resulted in and will continue to result in these SSCs not being evaluated for functionality when equipment degradation occurs, and could result in these radiation monitors not being able to perform their safety-related functions during design basis events. In the case of the failure of the reactor building annulus monitor RE-11B (CR-RBS-2020-04607), this failure resulted in one of two instruments being incapable of performing its design and safety functions of alerting operators in the control room of high radiation in the reactor building annulus and automatic actuation of one train of the standby gas treatment system on a high reactor building annulus radiation signal, and the issue was not given the appropriate priority within the corrective action program.

Significance: The inspectors assessed the significance of the finding using Appendix A, The Significance Determination Process (SDP) for Findings At-Power. The inspectors determined that the performance deficiency was Green because it affected the SSC and barrier performance attribute of the Barrier Integrity Cornerstone objective and only represents a degradation of the radiological barrier function for the auxiliary building and standby gas treatment system.

Cross-Cutting Aspect: P.1 - Identification: The organization implements a corrective action program with a low threshold for identifying issues. Individuals identify issues completely, accurately, and in a timely manner in accordance with the program. Specifically, individuals did not describe the issues entered in the corrective action program in sufficient detail to ensure they can be appropriately prioritized, trended, and assigned for resolution, which resulted in the licensee failing to follow corrective action program procedures.

Enforcement:

Inspectors did not identify a violation of regulatory requirements associated with this finding.

Failure to Adequately Correct Radiation Monitor Calibration Frequencies Cornerstone Significance Cross-Cutting Report Aspect Section Occupational Green [H.13] - 71152B Radiation Safety NCV 05000458/2021010-02 Consistent Open/Closed Process The inspectors identified a Green finding and associated non-cited violation (NCV) of Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Appendix B, Criterion XVI, Corrective Action, for the licensees failure to correct calibration frequencies for area and airborne particulate process radiation monitors that were not being performed at the frequencies specified in the Updated Final Safety Analysis Report (UFSAR).

Description:

The inspectors reviewed the licensees response to NCV 2019004-02. The NCV stated the licensee had not maintained process, effluent, and area radiation monitors calibrated periodically, annually, or per the 2-year refueling frequency as stated in the UFSAR. In response to the NCV, the licensee initiated condition report CR-RBS-2019-07493 in November 2019 to evaluate and adjust the calibration frequencies. The licensee evaluated the calibration frequencies for all 55 UFSAR radiation monitors listed in UFSAR Tables 11.5 and 12.3 (this group did not include Technical Specification radiation monitors) and adjusted the calibration frequency for all 55 monitors to four years. Of these 55 monitors, 39 have still not been calibrated since 2019. Three of the eight airborne particulate continuous radiation monitors, which are a subset of the radiation monitors listed in Table 12.3-2, Airborne Process and Effluent Radiation Monitors, have not been calibrated since 2005 or 2006; these radiation monitors fall under UFSAR Section 12.3.4.2.5, which states that these radiation monitors are calibrated annually.

The inspectors reviewed the adjusted frequencies and noted that UFSAR Section 12.3.4.1.5 states the following regarding area radiation monitors, In-plant calibration, using a standard radioactive point source traceable to NIST, is done at each refueling or whenever maintenance work is performed on the detectors or in accordance with the Technical Specifications/Requirements. Similarly, the inspectors identified that UFSAR Section 12.3.4.5.2 states that for airborne particulate process radiation monitors, Each continuous monitor is calibrated annually using the secondary radionuclide standards.

The inspectors questioned why the licensees new strategy of calibrating detectors every four years did not match the refueling outage and annual frequencies described in UFSAR Sections 12.3.4.1.5 and 12.3.4.2.5, respectively. The licensee informed the inspectors that they had considered the UFSAR frequency descriptions but had interpreted the descriptions to mean the calibration frequency could be set at the licensees discretion in accordance with the licensees preventative maintenance strategy. The inspectors noted that the UFSAR Sections 12.3.4.1.5 and 12.3.4.2.5 had not been changed or specifically evaluated for change.

The inspectors also noted the licensee used its preventative maintenance change process checklist, Attachment 9.1 to Procedure EN-DC-324, Preventative Maintenance Program, Revision 22, to justify the change to the four-year frequency. Along with other factors, the checklist has the change evaluator consider any licensing or regulatory commitments and any design bases documents that could affect the proposed change. The checklist forms that were completed for the calibration frequency change noted a non-cited violation for failure to maintain an adequate calibration frequency of the [UFSAR] radiation monitors, but the checklist neither identified the specific frequencies described in Sections 12.3.4.1.5 and 12.3.4.2.5 of the UFSAR (and as discussed in the NCV), nor evaluated these discrepancies. The inspectors learned through interviews that these discrepancies should have been specifically identified and evaluated before proceeding with the change. The inspectors determined that the licensees preventative maintenance change process did not appropriately consider all design bases documents prior to adjusting the calibration frequencies for all 55 UFSAR radiation monitors to four years.

Corrective Actions: The licensee entered this issue in the corrective action program to re-evaluate and align the UFSAR and preventative maintenance calibration frequencies. For those detectors that had not been recently calibrated in accordance with the UFSAR specified frequencies the licensee reviewed historic data and observed no adverse performance trends.

Corrective Action References: CR-RBS-2021-00482 and CR-RBS-2021-00744

Performance Assessment:

Performance Deficiency: The failure to properly calibrate radiation monitors in accordance with UFSAR specified frequencies and adequately correct the conditions identified in NCV 2019004-02 is a performance deficiency.

Screening: The inspectors determined the performance deficiency was more than minor because it was associated with the Plant Facilities/Equipment and Instrumentation attribute of the Occupational Radiation Safety cornerstone and adversely affected the cornerstone objective to ensure the adequate protection of the worker health and safety from exposure to radiation from radioactive material during routine civilian nuclear reactor operation.

Specifically, the failure to properly calibrate radiation monitors impacts the ability to mitigate radiation dose to workers and the public from radioactive material during routine civilian nuclear reactor operation. Consequently, the failure to calibrate or verify the calibration of these plant radiation monitors impacts the licensees ability to ensure accurate radiation measurements; three of the 55 UFSAR monitors, which the UFSAR states are calibrated annually, have not been calibrated since 2005 or 2006.

Significance: The inspectors assessed the significance of the finding using Appendix C, Occupational Radiation Safety SDP. The inspectors determined the finding to be of very low safety significance (Green) because it was not an as low as reasonably achievable (ALARA)issue, there was no overexposure or substantial potential for overexposure, and the licensees ability to assess dose was not compromised.

Cross-Cutting Aspect: H.13 - Consistent Process: Individuals use a consistent, systematic approach to make decisions. Risk insights are incorporated as appropriate. Specifically, individuals did not demonstrate an understanding of the decision-making process and use it consistently in 2019 when making changes to the preventive maintenance frequencies utilizing Procedure EN-DC-324, Preventive Maintenance Program.

Enforcement:

Violation: Title 10 CFR Part 50, Appendix B, Criterion XVI, Corrective Action, requires, in part, that measures shall be established to assure that conditions adverse to quality, such as failures, malfunctions, deficiencies, deviations, defective material and equipment, and nonconformances are promptly identified and corrected.

Contrary to the above, from October 22, 2019, until February 12, 2021, the licensee failed to establish measures to assure that a condition adverse to quality was promptly identified and corrected. Specifically, the licensee failed to adequately correct the conditions outlined in NCV 2019004-02 and ensure calibration frequencies for area radiation monitors that were not being calibrated at the specific frequencies described in UFSAR section 12.3.4.1.5, and airborne particulate process continuous radiation monitors that were not being calibrated on an annual frequency as described in in UFSAR section 12.3.4.2.5 matched design basis information.

Enforcement Action: This violation is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.

Failure to Restore Compliance Associated with Technical Specification Required Procedures Cornerstone Significance/Severity Cross-Cutting Report Aspect Section Initiating Green [P.3] - 71152B Events NOV 05000458/2021010-03 Resolution Open The Inspectors identified a Green cited violation of Technical Specification 5.4.1.a for failure to maintain procedures required by Regulatory Guide 1.33, Revision 2, Appendix A. Specifically, the NRC issued a violation for failure to maintain adequate procedures for feedwater system operation on April 29, 2020, and the licensee failed to restore compliance within a reasonable amount of time.

Description:

Following a review of a reactor scram that occurred on May 31, 2019, the inspectors identified that the procedures governing operation of the feedwater system during normal and abnormal conditions, SOP-0009, Reactor Feedwater System (SYS #107), and OSP-0053, Emergency and Transient Response Support Procedure, did not contain precautions to ensure that a heater string was in service prior to feedwater pump operation. Consequently, following the scram on May 31, 2019, the licensee started a feedwater pump with no heater string in service, resulting in a second loss of feedwater, loss of reactor water level, and a second scram actuation on low water level following the initial reactor scram. Technical Specification 5.4.1.a requires, in part, that written procedures shall be established, implemented, and maintained covering the applicable procedures recommended in Regulatory Guide 1.33, Revision 2, Appendix A, dated February 1978. Regulatory Guide 1.33, Revision 2, Appendix A, Section 4.o identifies procedures governing the operation of the feedwater system as recommended procedures. The inspectors determined that the failure to include necessary precautions in the two procedures was a failure to maintain them in accordance with TS 5.4.1.a. In inspection report 05000458/2020001 the NRC issued a Green NCV of Technical Specification 5.4.1.a for failure to maintain required procedures.

The licensee documented this violation in condition report CR-RBS-2020-00965. This condition report was closed to two actions taken under condition report CR-RBS-2019-03891. Corrective action CA-2 developed interim guidance for operation, and corrective action CA-13 reviewed all procedures for accurate technical data. These actions had already been closed at the time CR-RBS-2020-00965 was issued to document the violation. Neither of the actions addressed the inadequate procedural guidance on preventing operation of a feedwater pump with no feedwater heater string in service.

The inspectors noted that EN-LI-102, Corrective Action Program, Step 5.6.2.l requires, Corrective action descriptions must be worded to ensure the Adverse Condition or cause/factor is addressed and the corrective action is tracked to completion. However, the inspectors determined that none of the corrective actions developed were worded to ensure the adverse condition was addressed, and all condition reports addressing the issue were closed. As a result, the inadequate procedures were not corrected.

Corrective Actions: The licensee initiated the required changes to the affected procedures through their procedure change process.

Corrective Action References: CR-RBS-2021-00644

Performance Assessment:

Performance Deficiency: The failure to restore compliance by correcting procedure inadequacies identified in NCV 2020001-03 was a performance deficiency. Specifically, the licensee failed to correct inadequate procedures SOP-0009 and OSP-0053 for operation of the feedwater system, as described in NCV 2020001-03.

Screening: The inspectors determined the performance deficiency was more than minor because it was associated with the Procedure Quality attribute of the Initiating Events cornerstone and adversely affected the cornerstone objective to limit the likelihood of events that upset plant stability and challenge critical safety functions during shutdown as well as power operations. Specifically, station procedures for reactor feedwater system operation, SOP-0009 and OSP-0053, do not contain sufficient precautions or guidance to ensure that a heater string is in service prior to feedwater pump operation, which has been shown to be necessary to prevent an unplanned loss of feedwater, loss of reactor water level control, and scram actuation.

Significance: The inspectors assessed the significance of the finding using Appendix A, The Significance Determination Process (SDP) for Findings At-Power. The inspectors determined that the finding was of very low safety significance (Green) because the finding did not cause a reactor trip and the loss of mitigation equipment relied upon to transition the plant from the onset of the trip to a stable shutdown condition.

Cross-Cutting Aspect: P.3 - Resolution: The organization takes effective corrective actions to address issues in a timely manner commensurate with their safety significance. Specifically, corrective actions did not resolve and correct the identified issues described in NCV 2020001-03, which resulted in the licensee failing to restore compliance.

Enforcement:

Violation: Technical Specification 5.4.1.a, requires, in part, that procedures shall be established, implemented, and maintained covering the applicable procedures recommended in Appendix A of Regulatory Guide 1.33, Revision 2. Section 4.o of Appendix A to Regulatory Guide 1.33, Revision 2, requires instructions for the operation of the feedwater system.

Contrary to the above, between June 1, 2019, until February 10, 2021, the licensee failed to establish, implement, and maintain applicable procedures recommended in Appendix A of Regulatory Guide 1.33, Revision 2. Specifically, the licensee established procedures SOP-0009, Reactor Feedwater System (SYS #107), Revision 82, and OSP-0053, Emergency and Transient Response Support Procedure, Revision 28, to meet the Regulatory Guide 1.33 requirement, and the licensee failed to maintain these procedures for feedwater operation to include necessary precautions to prevent operation of the system in an improper lineup.

Enforcement Action: This violation is being cited because the licensee failed to restore compliance within a reasonable period of time after the violation was identified consistent with Section 2.3.2 of the Enforcement Policy.

Minor Performance Deficiency 71152B Minor Performance Deficiency: The inspectors identified six examples of a minor performance deficiency associated with the licensee failing to follow corrective action program procedures and appropriately classify six condition reports, which included issues with a safety-related containment cooler failing to start, a minor NRC identified violation, and other failures to follow quality-related procedures. Specifically, EN-LI-102, Corrective Action Program, Revision 42, Section 5.4, Step 8, requires, in part, that, The Performance Improvement Review Group (PRG) performs the following: Determines if the condition is [a]

significant condition adverse to quality, a condition adverse to quality, or non-adverse. EN-LI-102 defines an adverse condition to include a condition adverse to quality, and the licensee inappropriately classified condition reports CR-RBS-2013-1901; CR-RBS-2019-05538; CR-RBS-2019-5724; CR-RBS-2019-6383; CR-RBS-2020-00100; and CR-RBS-2020-2326 as non-adverse conditions. These classification issues were entered into the corrective action program as CR-RBS-2021-00466, CR-RBS-2021-00688, CR-RBS-2021-00782.

Screening: The inspectors determined the performance deficiency was minor. The inspectors determined the performance deficiency did not adversely affect a cornerstone objective, would not lead to a more significant safety concern if left uncorrected, and could not reasonably be viewed as a precursor to a significant event.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On February 12, 2021, the inspectors presented the biennial problem identification and resolution inspection results to Steven Vercelli and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection Type Designation Description or Title Revision or

Procedure Date

71152B Calculations PN-317 MELC - Max Flood Elevations for Moderate Energy Line Revision 2

Cracks in CAT 1 Structures

71152B Corrective Action Condition Reports 2018-00153; 2019-01617; 2020-00201; 2020-01416

Documents (CR)-HQN-YYYY-

NNNNN

71152B Corrective Action Condition Reports 2010-01587; 2013-01053; 2013-01901; 2013-02068; 2015-

Documents (CR)-RBS-YYYY- 03983; 2015-08476; 2016-04353; 2017-01151; 2017-01511;

NNNNN 2017-07237; 2017-07710; 2017-07728; 2017-08377; 2018-

00780; 2018-01917; 2018-02524; 2018-02592; 2018-02739;

2018-03804; 2018-03866; 2018-03938; 2018-03965; 2018-

04134; 2018-04419; 2018-04625; 2018-05213; 2018-05816;

2018-06018; 2018-06363; 2019-00399; 2019-01220; 2019-

258; 2019-01613; 2019-01723; 2019-01740; 2019-01787;

2019-01796; 2019-01805; 2019-01825; 2019-01895; 2019-

01976; 2019-02067; 2019-02260; 2019-02342; 2019-02496;

2019-02589; 2019-02643; 2019-02665; 2019-02799; 2019-

2861; 2019-02928; 2019-02985; 2019-02992; 2019-03014;

2019-03018; 2019-03019; 2019-03114; 2019-03118; 2019-

271; 2019-03391; 2019-03599; 2019-03600; 2019-03649;

2019-03727; 2019-03853; 2019-03871; 2019-03891; 2019-

03904; 2019-03961; 2019-04039; 2019-04087; 2019-04135;

2019-04139; 2019-04203; 2019-04386; 2019-04480; 2019-

04541; 2019-04715; 2019-04936; 2019-05021; 2019-05056;

2019-05128; 2019-05199; 2019-05416; 2019-05652; 2019-

05709; 2019-05724; 2019-05861; 2019-06380; 2019-06383;

2019-06513; 2019-06521; 2019-06523; 2019-06525; 2019-

06526; 2019-06836; 2019-06871; 2019-06941; 2019-06990;

2019-07025; 2019-07040; 2019-07137; 2019-07281; 2019-

07312; 2019-07343; 2019-07454; 2019-07493; 2019-07531;

2019-07566; 2019-07844; 2019-07993; 2020-00100; 2020-

00136; 2020-00295; 2020-00470; 2020-00530; 2020-00724;

20-00748; 2020-00964; 2020-00965; 2020-01049; 2020-

Inspection Type Designation Description or Title Revision or

Procedure Date

264; 2020-01292; 2020-01311; 2020-01344; 2020-01548;

20-01535; 2020-01660; 2020-01712; 2020-01723; 2020-

01826; 2020-01861; 2020-01907; 2020-01928; 2020-02002;

20-02081; 2020-02095; 2020-02109; 2020-02301; 2020-

2326; 2020-02336; 2020-02385; 2020-02491; 2020-02502;

20-02689; 2020-02764; 2020-02858; 2020-02884; 2020-

03002; 2020-03014; 2020-03049; 2020-03050; 2020-03056;

20-03110; 2020-03196; 2020-03199; 2020-03272; 2020-

276; 2020-03309; 2020-03375; 2020-03445; 2020-03450;

20-03494; 2020-03497; 2020-03573; 2020-03599; 2020-

03601; 2020-03625; 2020-03649; 2020-03687; 2020-03729;

20-03746; 2020-03783; 2020-03785; 2020-03800; 2020-

03811; 2020-03817; 2020-03858; 2020-03886; 2020-03889;

20-03908; 2020-03929; 2020-03939; 2020-03950; 2020-

04019; 2020-04025; 2020-04031; 2020-04057; 2020-04063;

20-04064; 2020-04065; 2020-04105; 2020-04107; 2020-

232; 2020-04313; 2020-04400; 2020-04401; 2020-04415;

20-04446; 2020-04607; 2020-04773; 2020-05053; 2020-

263; 2020-05302; 2021-00268; 2021-00327; 2021-00329;

21-00334; 2021-00344; 2021-00350; 2021-00353; 2021-

00357; 2021-00376; 2021-00377; 2021-00378; 2021-00379;

21-00380; 2021-00392; 2021-00411; 2021-03599

71152B Corrective Action Condition Reports 2021-00403; 2021-00466; 2021-00482; 2021-00610; 2021-

Documents (CR)-RBS-YYYY- 00644; 2021-00688; 2021-00744; 2021-00782

Resulting from NNNNN

Inspection

71152B Engineering EC-84539 Connect Stainless Steel Tubing to B33-PC001A Bearing Revision 0

Changes Oilers Vent

71152B Engineering EC-84735 Temporary Modification to Install Backup SVV Compressor Revision 0

Changes

71152B Miscellaneous Site MRM River Bend October 5,

20

71152B Miscellaneous OSRC 2019-009 Meeting Minutes

71152B Miscellaneous OSRC 2019-013 Meeting Minutes

Inspection Type Designation Description or Title Revision or

Procedure Date

71152B Miscellaneous OSRC 2020-001 Meeting Minutes

71152B Miscellaneous OSRC 2020-010 Meeting Minutes

71152B Miscellaneous 2019-07 July 2019 DPRM-Maintenance

71152B Miscellaneous 2019-10 October 2019 DPRM-Maintenance

71152B Miscellaneous 2019-11 November RBS APRM

71152B Miscellaneous 2020-01 January 2020 DPRM-Maintenance

71152B Miscellaneous 2020-04 April 2020 DPRM-Maintenance

71152B Miscellaneous 2020-04 April Operations DPRM

71152B Miscellaneous 2020-04 April RP DPRM

71152B Miscellaneous 2020-04 April Training DPRM

71152B Miscellaneous 2020-07 July SPMS DPRM

71152B Miscellaneous 2020-10 October 2020 DPRM-Maintenance

71152B Miscellaneous Amendment No. Issuance of Amendments to Adopt TSTF-529, "Clarify Use 09/11/2019

199 and Application Rules"

71152B Miscellaneous ECP Case Files

71152B Miscellaneous EN-NE-G-026 Engineering Guide Probabilistic Safety Assessment

71152B Miscellaneous EN-PL-161 Zero Tolerance for Unanticipated Equipment Issues Revision 0

71152B Miscellaneous EN-PL-161 Zero Tolerance for Unanticipated Equipment Issues Revision 1

71152B Miscellaneous EN-PL-161 Zero Tolerance for Unanticipated Equipment Issues Revision 2

71152B Miscellaneous Operating 2019-00130; 2019-00142; 2019-00147; 2019-00194; 2019-

Experience (OE)- 00206; 2019-00209; 2019-00221; 2019-00222; 2019-00238;

NOE-YYYY- 2020-00016; 2020-00041; 2020-00067; 2020-00087; 2020-

NNNNN 00093; 2020-00099; 2020-00142; 2020-00144; 2020-00154;

20-00180; 2020-00190; 2020-00199

71152B Miscellaneous QA-12-18-2019- Technical Specification Audit Report

RBS-1

71152B Miscellaneous QA-16-2020- Security Audit Report

RBS-1

71152B Miscellaneous QA-4-2020-RBS- Engineering Design Control Audit

71152B Miscellaneous QA-7-2019-RBS- Emergency Preparedness Audit Report

71152B Miscellaneous QA-7-2020-RBS- QA-7-2020-RBS-1

Inspection Type Designation Description or Title Revision or

Procedure Date

71152B Miscellaneous RLP-STM-0108- Moisture Separator Reheaters, Feedwater Heaters, Revision 1

LO Extraction Steam, and Drains

71152B Miscellaneous SDC-402/410 Control Building Chilled Water System/Ventilation Chilled Revision 5

Water System Design Criteria System Numbers 402 & 410

71152B Miscellaneous WT-WTRBS-

2019-00578

71152B Miscellaneous WTRBS-2019-

0032

71152B Procedures AOP-0006 Condensate/Feedwater Failures Revision 26

71152B Procedures AOP-0007 Loss of Feedwater Heating Revision 34

71152B Procedures EN-DC-115 Engineering Change Process Revision 30

71152B Procedures EN-DC-136 Temporary Modifications Revision 20

71152B Procedures EN-DC-144 System Health Reporting Revision 2

71152B Procedures EN-DC-153 Preventive Maintenance Component Classification Revision 19

71152B Procedures EN-DC-153 Preventive Maintenance Component Classification Revision 20

71152B Procedures EN-DC-153 Preventive Maintenance Component Classification Revision 21

71152B Procedures EN-DC-167 Classification of Structures, Systems, and Components Revision 11

71152B Procedures EN-DC-175 Single Point Vulnerability Process Review Revision 10

71152B Procedures EN-DC-204 Maintenance Rule Scope and Basis Revision 4

71152B Procedures EN-DC-205 Maintenance Rule Monitoring Revision 4

71152B Procedures EN-DC-324 Preventive Maintenance Program Revision 22

71152B Procedures EN-LI-102 Corrective Action Program Revision 37

71152B Procedures EN-LI-102 Corrective Action Program Revision 42

71152B Procedures EN-LI-113 Licensing Basis Document Change Process Revision 20

71152B Procedures EN-LI-118 Causal Analysis Process Revision 33

71152B Procedures EN-NS-231 Protected Area Search Revision 3

71152B Procedures EN-OP-104 Operability Determination Process Revision 15

71152B Procedures EN-OP-104 Operability Determination Process Revision 16

71152B Procedures EN-OP-115-01 Operator Watchstation Logs and Rounds Revision 4

71152B Procedures EN-OP-125 Fire Brigade Drills Revision 0

71152B Procedures EN-TQ-104 Engineering Support Personnel Training Program Revision 27

71152B Procedures EN-TQ-125 Fire Brigade Drills Revision 10

Inspection Type Designation Description or Title Revision or

Procedure Date

71152B Procedures LO-RLO-2018- Maintenance and Technical Training Self-Assessment 12/18/2019

24

71152B Procedures OSP-0053 Emergency and Transient Response Procedure Revision 28

71152B Procedures RLO-2018-0154 Integrity Willful Misconduct Audit - DCRM 04/11/2019

71152B Procedures SOP-0007 Condensate System (Sys#104) Revision 311

71152B Procedures SOP-0007 Condensate System (Sys#104) Revision 313

71152B Procedures SOP-0009 Reactor Feedwater System (Sys#107) Revision 82

71152B Procedures STP-209-6310 RCIC Quarterly Pump and Valve Operability Test Revision 41

71152B Self-Assessments HQN-LO-2020- Integrity Audit Report 07/22/2020

0013

71152B Self-Assessments HQN-LO-2020- Integrity Audit Report 10/17/2020

0014

71152B Self-Assessments LAR-2019-0170 Integrity Audit Report 01/21/2020

71152B Self-Assessments LO-HQNLO- Integrity Audit Report 08/19/2019

20-00005

71152B Self-Assessments LO-RLO-2017- CR-RBS-2015-07532 Effectiveness Review 02/17/2017

013

71152B Self-Assessments LO-RLO-2018- CR-RBS-2018-3969 Effectiveness Review 12/18/2018

0100

71152B Self-Assessments LO-RLO-2018- Equipment Reliability Operating Experience Assessment 02/15/2019

0138

71152B Self-Assessments LO-RLO-2019- Assessment of RBS Monthly Status Report Dashboard 11/12/2019

0153

71152B Self-Assessments QS-2020-RBS-

010

71152B Self-Assessments RLO-2018-0056 Operating Experience Self-Assessment 12/23/2018

71152B Self-Assessments RLO-2018-0108 2019 Pre-NRC Emergency Planning Program Inspection 03/18/2019

Assessment

71152B Self-Assessments RLO-2018-0112 Pre-NRC Self-Assessment: Radioactive Gaseous and Liquid 04/04/2019

Effluent Treatment IP 71124.06 Radioactive Environmental

Monitoring Program IP 71124.07

71152B Self-Assessments RLO-2018-0169 Equipment Database Assessment 06/11/2019

71152B Self-Assessments RLO-2018-0175 Operations Leadership Informal Self-Assessment 12/22/2019

71152B Self-Assessments RLO-2018-0186 Operations Field Verification Assessment 01/09/2020

Inspection Type Designation Description or Title Revision or

Procedure Date

71152B Self-Assessments RLO-2019-0115 B1 Operating Experience Review Self-Assessment 08/13/2020

71152B Self-Assessments RLO-2019-0132 Focused Crew Assessment - E Crew 08/05/2020

71152B Self-Assessments RLO-2019-0152 2020 Maintenance and Technical Training OJT/TPE Self- 09/10/2020

Assessment

71152B Self-Assessments RLO-2020-0017 2020 PI&R Readiness Assessment 09/24/2020

71152B Self-Assessments RLO-2020-0036 Annual Safeguards Self-Assessment per EN-NS-204, 10/20/2020

Protection of Unclassified Safeguards Info (Rev 17)

71152B Work Orders 366982; 521918;

27439; 527440;

27446; 527447;

27447; 527448;

27449; 527450;

27451; 532550;

541999; 542000;

19019054;

2613219;

200000683

21