Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23310A03213 November 2023Integrated Inspection Report 05000458/2023003Time of Discovery
Reactor Vessel Water Level
Ultimate heat sink
Mission time
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Temporary Modification
Functionality Assessment
Incorporated by reference
Significance Determination Process
Process Control Program
Operability Determination
Time Critical Operator Action
Maintenance Rule Program
Fire Protection Program
Substantial potential for an overexposure
Downpower
Overexposure
IR 05000458/202300313 November 2023Integrated Inspection Report 05000458/2023003Time of Discovery
Reactor Vessel Water Level
Ultimate heat sink
Mission time
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Temporary Modification
Functionality Assessment
Incorporated by reference
Condition Adverse to Quality
Significance Determination Process
Process Control Program
Operability Determination
Time Critical Operator Action
Maintenance Rule Program
Fire Protection Program
Substantial potential for an overexposure
Downpower
Overexposure
IR 05000458/202309215 August 2023Final Significance Determination of a White Finding, Notice of Violation, and Follow-Up Assessment Letter; NRC Inspection Report 05000458/2023092Significance Determination Process
Preliminary White Finding
IR 05000458/202309120 July 2023Final Significance Determination of a White Finding, Notice of Violation, and Follow-Up Assessment Letter; NRC Inspection Report 05000458/2023091Significance Determination Process
Preliminary White Finding
IA-21-034, Notice of Violation, NRC Investigation Report 4-2020-00814 October 2021Notice of Violation, NRC Investigation Report 4-2020-008Nondestructive Examination
Cyber Security
Coronavirus
COVID-19
IR 05000458/202109130 September 2021Notice of Violation and Proposed Imposition of $150,000 Civil Penalty, NRC Inspection Report 05000458/2021091 and Investigation Reports 4-2020-008, 4-2020-009, and 4-2020-019Cyber Security
Coronavirus
COVID-19
IR 05000458/202101018 March 20212021 River Bend Station - Biennial Problem Identification and Resolution Inspection Report 05000458/2021010 and Notice of ViolationTemporary Modification
Condition Adverse to Quality
FLEX
Significance Determination Process
Operability Determination
Coronavirus
COVID-19
Substantial potential for overexposure
Overexposure
ML20273A23529 September 2020NRC Inspection Report 05000458/2020012, Investigation Report 4-2019-013 and Notice of ViolationSignificance Determination Process
IR 05000458/202001229 September 2020NRC Inspection Report 05000458/2020012, Investigation Report 4-2019-013 and Notice of ViolationSignificance Determination Process
IR 05000458/201901419 April 2019Notice of Violation; NRC Inspection Report 05000458/2019014 and Investigation Report 4-2017-025Enforcement Discretion
Significance Determination Process
ML17160A4019 June 2017NRC Problem Identification and Resolution Inspection Report 05000458/2017009 and Notice of ViolationEnforcement Discretion
Condition Adverse to Quality
Significance Determination Process
IR 05000458/201500910 September 2015IR 05000458/2015009, and Notice Violation, January 26, 2015 Through June 29, 2015, River Bend, Final Significance Determination for a White FindingSignificance Determination Process
Preliminary White Finding
IR 05000458/201300712 May 2014IR 05000458-13-007; on 04/15/2013 - 12/30/2013; River Bend Station; Triennial Fire Protection Team InspectionHot Short
Safe Shutdown
Fire Barrier
Stroke time
Water Inventory Control
Enforcement Discretion
Operator Manual Action
Multiple Spurious Operation
Emergency Lighting
B.5.b
Significance Determination Process
Large early release frequency
Maintenance Rule Program
Fire Protection Program
ML14002A4372 January 2014IR 05000458-13-007; 04/15/2013 - 12/30/2013; River Bend Station; Triennial Fire Protection Team InspectionHot Short
Safe Shutdown
Fire Barrier
Stroke time
Water Inventory Control
Enforcement Discretion
Operator Manual Action
Multiple Spurious Operation
Emergency Lighting
Significance Determination Process
Large early release frequency
B.5.b Mitigating Strategies
Maintenance Rule Program
Fire Protection Program
Fire Watch
ML12095A3466 February 2012Reply to Notice of Violation; Payment of Civil Penalty, EA-11-159
IR 05000333/201100926 January 2012EA-10-090, EA10-248, EA-11-106 Fitzpatrick/Entergy - Confirmatory Order (Effective Immediately) and Notice of Violation, Investigation Report Nos. 1-2009-041, 1-2010-019 and 1-2010-031, Inspection Repot No. 05000333-11-009
ML12009A0025 January 2012Notice of Violation - NRC Investigation Report - 4-2010-064
ML12009A0035 January 2012IA-11-040, Linton, Notice of Violation - NRC Investigation Report 4-2010-064
ML12009A0105 January 2012IA-11-046 - Notice of Violation - NRC Investigation Report 4-2010-064
IR 05000458/201000617 June 2010IR 05000458-10-006; Entergy Operations, Inc.,; 04/05/2010 - 06/02/2010; River Bend Station, NRC Triennial Fire Protection Inspection and Notice of ViolationHot Short
Safe Shutdown
Unanalyzed Condition
Fire Barrier
Past operability
Fire impairment
Operator Manual Action
Temporary Modification
Multiple Spurious Operation
Emergency Lighting
B.5.b
Significance Determination Process
Thermoset
Large early release frequency
Operability Determination
Fire Protection Program
Fire Watch
ML10169016417 June 2010IR 05000458-10-006; Entergy Operations, Inc.,; 04/05/2010 - 06/02/2010; River Bend Station, NRC Triennial Fire Protection Inspection and Notice of ViolationHot Short
Safe Shutdown
Unanalyzed Condition
Fire Barrier
Past operability
Fire impairment
Operator Manual Action
Temporary Modification
Multiple Spurious Operation
Emergency Lighting
Significance Determination Process
Thermoset
Large early release frequency
B.5.b Mitigating Strategies
Fire Protection Program
Fire Watch
ML03364002629 December 2003River Bend Station - Final Significance Determination for a White Finding and Notice of Violation (NRC Inspection Report 05000458-02-007)Safe Shutdown
High winds
Internal Flooding
Significance Determination Process
Preliminary White Finding
ML02212058331 July 2002EA-02-036: Entergy Operations, Inc, River Bend Station, Final Significance Determination for a White Finding and Notice of Violation (IR 05000458-02-005)Significance Determination Process
Backfit