ML20237L002: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 14: Line 14:
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 3
| page count = 3
| project = TAC:64210, TAC:64211
| stage = Other
}}
}}



Latest revision as of 13:15, 19 March 2021

Forwards Replacement Pages for Proprietary Rev 1 to WCAP 11178 & Nonproprietary Rev 1 to WCAP 11179 Re Steam Generator Tube Repair & Tubesheet Region Plugging Criterion. Proprietary Pages Withheld (Ref 10CFR2.790)
ML20237L002
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 08/25/1987
From: Mcdonald R
ALABAMA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML19292H703 List:
References
TAC-64210, TAC-64211, NUDOCS 8708270376
Download: ML20237L002 (3)


Text

_ - _ _ _ , _ _ _ _ _

l

'( .g Alabama Power Company' 600 North 18th S0eet Post Offico Box 2641 l Birmingham, Alabarna 352910400 l Telephone 205 250-1035 l

L nio ce President Alabama Power the t n systei n August 25, 1987 j Docket Nos. 50-348 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:

Joseph M. Farley Nuclear Plant - Units 1 and 2 Steam Generator Tube Repair and Tubesheet Region Plugging Criterion Proposed Technical Specification Changes By letters dated May 4,1987, Alabama Power Company submitted to the NRC proposed technical specification changes concerning steam generator tube repair and tubesheet region plugging criterion. The technical justification for the steam generator tube repair technical specification change is provided by Westinghouse Steam Generator report WCAP 11178 Rev.1 (proprietary) and WCAP 11179 Rev.1 (non-proprietary). Likewise, the technical justification for the tubesheet region plugging criterion is provided by Westinghouse report WCAP 11306 Rev. 2 (proprietary) and WCAP-11314 Rev. 2 (non-proprietary).

Subsequent review by Alabama Power Company has identified several minor editorial and typographical errors within the Westinghouse reports. These errors have no effect on the conclusions of the 10CFR50.92 evaluations for either proposed technical specification change. The changed pages associated with the tube repair technical specification change are provided in Enclosure 1 and the affected pages of the tubesheet region plugging criterion report are provided in Enclosure 2. Alabama Power requests that the enclosed replacement pages be inserted into the appropriate reports that were provided with the two May 4,1987 submittals. Please note that three proprietary and one non-proprietary (if applicable) versions of the replacement pages are being provided for each submittal. Some errors have no effect upon the non-proprietary reports since the corrected information is proprietary, and thus not shown.

0708270376 870825 PDR ADOCK 05000348 P PDR

  1. , ,I

(

U. S. Nuclear Regulatory Commission August 25, 1987 Page 2 In accordance with 10CFR2.790, Alabama Power Company is requesting that the enclosed proprietary information be withheld in whole from public disclosure. Provided with the enclosures to this letter are affidavits executed by Mr. R. A. Wiesemann, Manager, Regulatory and Legislative Affairs for Westinghouse Corporation. These affidavits contain the information discussed in 10CFR2.790.b.4.

Should you have any further questions, please advise.

Respectfully submitted, ALABAMA POWER C' A

/

/ /

R. P. Mcdonald  ;

RPM / BHW: dst-D-T .S.7 Enclosure cc: Mr. L. B. Long Dr. J. N. Grace Mr. E. A. Reeves Mr. W. H. Bradford i

l I

i

i i.

i i

l J

]

t

]

I ENCLOSURE 1 l l

1 Steam Generator Tube Repair Replacement Pages F

i 1

1 l

- _ - _ - _ _ _ _ - _ _ _ - _ _ _ _ - _ _ . _ 1