ML20235J455

From kanterella
Jump to navigation Jump to search

Forwards Section 2.3 of Proprietary Version WCAP 11178,Rev 1 & Nonproprietary Version WCAP 11179,Rev 1 of Rept Applicability. Section Discusses Steam Generator Tube Repair.Encl for Insertion Into 870504 Tech Spec Change
ML20235J455
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 07/10/1987
From: Mcdonald R
ALABAMA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML19292H498 List:
References
TAC-64210, TAC-64211, NUDOCS 8707150574
Download: ML20235J455 (3)


Text

m. -

Alabama Power Company I'

  • 600 North 18th Street

- Post Office Box 2641

!. Birmin0 ham, Alabama 352910400 Telephone 205 250-1835

!.. )

j Alabarlia Power nio V ce Pr sident  !

the southern electnc system 10CFR50.90 July 10, 1987 Docket Nos. 50-348 1 50-364 U. S. Nuclear Regulatory Commission

' ATTN: Document Control Desk Washington, D.C. 20555 j l

Gentlemen:

l

. Joseph M. Farley Nuclear Plant - Units 1 and 2 Steam Generator Tube Repair Proposed Technical Specification Change I By letter dated May 4,1987, Alabama Power Company submitted to the NRC a proposed technical specification change to allow the repair of steam generator tubes that have indications of degradation by means of a mechanical sleeve. Provided as technical justification for this repair technique was Westinghouse Steam Generator Sleeving Report WCAP 11178 Rev.1 1 (three proprietary copies) and WCAP 11179 Rev.1 (one non-proprietary l copy). Subsequent to the submittal. of this proposed technical specification I change Alabama Power Company recognized- that Section 2.3 of the referenced report, " Report Applicability", had been inadvertently omitted during final printing of the report. This one paragraph section defines the particular length of sleeves for which the report is applicable. ,

Alabama Power Company requests that the replacement pages be inserted into the reports that were provided with the May 4,1987 submittal. Please note that three proprietary and one non-proprietary versions of the replacement pages are being provided.

In accordance with 10CFR2.790, Alabama Power Company is requesting that the enclosed proprietary information be withheld in whole from public disclosure. Provided as Enclosure 2 to this letter is an af fidavit executed by Mr. R. A. Wiesemann, Manager, Regulatory and Legislative Affairs for Westinghouse Corporation. This affidavit contains the information discussed

.in 10CFR2.790.b.4.

Or Enc l l E&t& n tMP

$ f M/

B'707150574 870710 PDR P

ADOCK0500g8

[

,J g

  • /N(4 Mvf C @

ggge

(

g f

M[

,g

l-l .

l U. S. Nuclear Regulatory Commission Page 2 If there are any questions, please advise.

Respectfully submitted, ALABAMA PO @ COMPANY

/

'[-

R. P. Mcdonald (

RPM /BHW: dst-D-T.S.4 Enclosures cc: Mr. L. B. Long Dr. J. N. Grace Mr. E. A. Reeves Mr. W. H. Bradford

I ENCLOSURE 1 Replacement Pages to Westinghouse Steam Generator Sleeving Report l

1

- - _ _ _ _ _