ML20207T642: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 1: | Line 1: | ||
{{Adams | |||
| number = ML20207T642 | |||
| issue date = 03/05/1987 | |||
| title = Forwards Summary of 870226 Enforcement Conference Re Findings Discussed in Insp Rept 50-083/87-01.Attendance at Conference & Subjs Discussed Described in Encl Summary | |||
| author name = Grace J | |||
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) | |||
| addressee name = Tulenko J | |||
| addressee affiliation = FLORIDA, UNIV. OF, GAINESVILLE, FL | |||
| docket = 05000083 | |||
| license number = | |||
| contact person = | |||
| document report number = NUDOCS 8703240206 | |||
| document type = CORRESPONDENCE-LETTERS, NRC TO EDUCATIONAL INSTITUTION, OUTGOING CORRESPONDENCE | |||
| page count = 12 | |||
}} | |||
See also: [[see also::IR 05000083/1987001]] | |||
=Text= | |||
{{#Wiki_filter:_ | |||
- - - - - - _ - - - - _ _ _ _ _ - - _ - _ - _ _ _ _ _ _ - _ - - _ _ - - _ | |||
' | |||
.. NAR 0 5 E97 | |||
Docket Nos. 50-83 | |||
. License Nos. R-56 | |||
I | |||
: University of Florida | |||
ATTN: Mr. J. S. Tulenko | |||
Chairman, Nuclear | |||
Engineering Sciences Department , | |||
202 Nuclear Sciences Center | |||
Gainesville, FL 32611 | |||
Gentlemen: | |||
SUBJECT: ENFORCEMENT CONFERENCE | |||
(NRC INSPECTION REPORT NO. 50-83/87-02) | |||
This refers to the Enforcement Conference held at the University of Florida on | |||
February 26, 1987. This Enforcement Conference concerned activities authorized | |||
by .<RC License No. R-56 for your Training Reactor facility. The conference | |||
related to findings discussed in Inspection Report No. 50-83/87-01 which was | |||
l forwarded to you on February 20, 1987. | |||
Attendance at the Enforcement Conference and the subjects discussed are | |||
described in the enclosed Enforcement Conference Summary. | |||
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," Part 2, | |||
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure | |||
will be placed in the NRC's Public Document Room. | |||
Should you have any questions concerning this matter, please contact us. | |||
Sincerely, | |||
0?iG!NAL SIG?iED BYi | |||
J. NELSON GRACE | |||
J. Nelson Grace | |||
Regional Administrator | |||
Enclosure: | |||
Enforcement Conference Summary | |||
cc,w/ encl: | |||
p.W.G.Vernetson, Director | |||
of Nuclear Facilities | |||
bec w/ encl: '(See page 2) | |||
8703240206 870305 | |||
PDR ADOCK 05000083 | |||
G PDR | |||
_ _ _ _ _ _ _ _ _ _ _ _ | |||
=E oi | |||
--_ _ _ - _ | |||
' | |||
. | |||
. | |||
University of Florida 2 | |||
'' | |||
bec w/o encl: | |||
cense Fee Management Branch | |||
bec w/ encl: | |||
Document Control Desk | |||
State of Florida | |||
R RII RI RII RII - | |||
RI N | |||
.BRevsin CFFosey DCollins PF Ldrickson DVerrelli TEWE 5~ | |||
2/J//87 2/p'\/87 2/rJ/87 JPk(ti5hr | |||
2/y /87 . /y/87 | |||
s J/v/87 3 /2[O | |||
RII RII | |||
R es rnst | |||
/'v/87 Sq/87 | |||
. | |||
.. | |||
. _ _ _ _ - _ _ _ _ _ _ _ _ - | |||
_. . .__ _. _. .. - | |||
t | |||
<, | |||
.. | |||
. | |||
( | |||
ENCLOSURE | |||
Enforcenent Conference Summary | |||
Licensee: University of Florida | |||
Facility: . Training Reactor | |||
License No.: R-56 | |||
Docket No.: 50-83 | |||
Subject: Program for Transportation of Radioactive Materials - Inspection | |||
Report No. 50-83/87-01 | |||
An Enforcement Conference was held at the University of-Florida, Gainesville, | |||
Florida on February 26, 1987, to discuss-the adequacy of the licensee's program | |||
for transportation of licensed radioactive material. | |||
The attendance list is attached as Attachment A to this Summary. A copy of the | |||
outline used for the licensee's presentation is attached as Attachment B. | |||
Licensee representatives discussed the conditions and events leading to the | |||
' | |||
transportation incident and the meetings held by the Reactor Safety Review | |||
. | |||
Subcommittee (RSRS) in response to the apparent transportation violation | |||
' | |||
identified in Inspection Report No. 50-83/87-01. ' Licensee concluded that | |||
shipments across campus had not met Department of Transportation requirements | |||
due to a misinterpretation of the site boundary designation for waste | |||
shipments. To insure adherence to 19 CFR 71.5(a) the licensee proposed that | |||
- prior to any further waste shipments a Standard Operating Procedure (S0P) with | |||
appropriate. checklists would be developed and approved by the RSRS, and | |||
training on this S0P would be conducted for reactor staff and appropriate | |||
Radiation Control perrennel. | |||
NRC representatives discussed the NRC Enforcement Policy in general and | |||
expressed the opinion that the University of Florida staff evaluation of the | |||
incident had served to clarify and promote a common understanding of the issue. | |||
, | |||
. | |||
ATTACHMENT A | |||
Enforcement Conference Attendees | |||
- University of Florida | |||
M. J. 0hanian, Associate-Dean for Research, College of Engineering and | |||
Chairman, Reactor Safety Review Subcommittee | |||
J. S. Tulenko, Chairman and Professor, Nuclear Engineering Sciences Departnent | |||
W. A. Vernetson, Director of Nuclear Facilities | |||
W. S. Properzio, Director, Environmental Health and Safety | |||
C. E. Roessler, Chairman, Radiation Control Committee and Professor of | |||
Environmental Engineering Science | |||
D. L. Munroe, Radiation Control Officer, Environmental Health and Safety | |||
Nuclear Regulatory Commission | |||
J. P. Stchr, Director, Division of Radiation Safety and Safeguards (DRSS) | |||
G. R. Jenkins, Director, Enforcement and Investigation Coordination Staff | |||
C. M. Hosey, Section Chief, Facilities Radiation Protection Section, DRSS | |||
P. Fredrickson, Section Chief, Projects Section 2A, Research Reactors | |||
B. K. Revsin, Radiation Specialist, DRSS | |||
i | |||
4 | |||
, , . , - - - , . . ,,,----c - - . , . - . , - , , ,,y-. r -- - - - - , - - - , - - - 3-e- , - .-- , , - - - - - . -- --.-, ,-----v., , -- -- ,, , = w -- - | |||
. | |||
. | |||
-ATTACHMENT B , | |||
PRESENTATION AT | |||
, | |||
NRC ENFORCEMENT CONFERENCE | |||
ROOM 202 NUCLEAR SCIENCE CENTER | |||
UNIVERSITY OF FLORIDA | |||
9 | |||
26 FEBRUARY 1987 | |||
, | |||
f | |||
, - - - , - - - - - | |||
_ | |||
. | |||
. | |||
RESPONSE ACTIONS / PLANS TO DATE | |||
IMMEDIATE: | |||
o CORRECTED 10 CFR 19.11 VIOLATION | |||
e CORRECTED TECH SPEC VIOLATIONS RELATIVE | |||
TO SOP-D.2 FOR RADIATION WORK PERMITS | |||
CONTINUING FOLLOWUP: | |||
e INCORPORATING SURVEILLANCE INTO S0P-0.5 | |||
(QA PROGRAM) TO ASSURE POSTING REQUIREMENTS | |||
ARE MET | |||
e CONDUCTED TRAINING ON USE OF SOP-D.2 (RWP) - | |||
VERBATIM COMPLIANCE | |||
e REVISING SOP-D.2 TO ASSURE COMPATIBILITY | |||
OF TEXT AND FORM FORMAT | |||
, | |||
o | |||
_ . _ _ . _ _ _ _ _ . _ _ . _ . . _ | |||
___ | |||
' | |||
l | |||
- | |||
WASTE SHIPMENT SCENARIO | |||
e MIDDLE OF EXTENDED OUTAGE TO REPLACE /0VERHAUL ALL | |||
CONTROL BLADE DRIVE SYSTEMS; WORKING CLOSELY WITH | |||
i | |||
RADIATION CONTROL | |||
e UNIVERSITY WASTE SHIPMENT SCHEDULED FOR 10 DEC 1985 | |||
e TWO WASTE DRUMS PACKAGED IN CELL ON 9 DEC 1985 | |||
- | |||
REACTOR / RADIATION CONTROL PERSONNEL | |||
-- | |||
RADIATION WORK PERMIT | |||
-- | |||
RADIATION SURVEYS TAKEN- | |||
e TWO DRUMS MOVED TO WASTE AREA WIT'lIN UNDERSTOOD | |||
UNIVERSITY SITE B0UNDARY ON 10 DEC 1985 (150 MR/HR | |||
I AND 800 MR/HR ON CONTACT) | |||
-- | |||
OPEN RADIATION CONTROL WASTE PICKUP TRUCK | |||
-- | |||
TWO RADIATION CONTROL PERSONNEL | |||
e ONE DRUM SHIPPED VIA ADC0 (150-210 MR/HR) | |||
e SECOND DRUM REJECTED FOR SHIPMENT DUE TO LOCALIZED | |||
RADIATION LEVEL AB0VE 1000 MR/HR; RETURNED TO UFTR | |||
, | |||
- . - _ | |||
.. - - . - - . . - - _ . - . - . - - - - . - . - . - . - . . - | |||
i | |||
i | |||
. | |||
l | |||
! l | |||
: | |||
. | |||
t | |||
CONCLUSIONS ON SCENARIO | |||
e VARIATION IN RADIATION LEVELS | |||
(REACTOR CELL VS WASTE SITE) | |||
-- | |||
NOT EXCESSIVE FOR HAND HELD INSTRUMENTS | |||
-- | |||
PROBABLY NOT DUE TO SHIFTING 0F CONTENTS | |||
e MISINTERPRETATION OF SITE BOUNDARY DESIGNATION | |||
FOR WASTE SHIPMENTS | |||
l | |||
- , . - - . - . . . - . - , , - , - - - - - . _ - - - . - - - - - - - . - . - , - - - . - . . - - . - . . . - , - - - - - - - - . . - . . . . . - - . | |||
_. | |||
. | |||
. | |||
. | |||
4 | |||
MEETINGS RELATIVE TO 10 CFR 71.5(a) FINDING | |||
., | |||
' | |||
s RSRS MEETING TO EVALUATE 10 CFR 71.5(a) | |||
FINDING (MONDAY, FEBRUARY 16) | |||
e SPECIAL MEETING TO RECONSTRUCT OCCURRENCE | |||
(THURSDAY, FEBRUARY 19) | |||
e SPECIAL MEETING TO REVIEW PRESENTATION | |||
4 | |||
(WEDNESDAY, FEBRUARY 25) | |||
l | |||
l | |||
l | |||
. | |||
I | |||
. _ . . . _ . --. _._......,.,,,..___._-.._.._,___...-..,...-_.,..~.,,,___.._..-_-.-._.,_..,_,._,_,,__,...y__ | |||
_ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ _ - | |||
. | |||
. | |||
I | |||
CORRECTIVE / PREVENTIVE MEASURES (10 CFR 71.5) | |||
e GENERATE S0P TO ASSURE ADHERENCE TO PART 71.5 | |||
-- | |||
PRIOR TO FURTHER WASTE SHIPMENTS | |||
-- | |||
l | |||
FULL REVIEW BY RSRS | |||
-- | |||
PRIOR REVIEW BY NRC REGION II | |||
e CONDUCT TRAINING ON THIS S0P | |||
-- | |||
FOR ALL UFTR STAFF RELATIVE TO USING | |||
CHECKLISTS ' | |||
-- | |||
FOR UFTR AND RAD CON MANAGEMENT | |||
PERSONNEL RELATIVE TO INTERFACES | |||
FOR S0P IMPLEMENTATION | |||
. | |||
, _ _ _ | |||
_ _ _ _ _ _ _ _ - - _ - - - - - - - - - - - - - | |||
. | |||
. . | |||
. | |||
. | |||
PURPOSE OF CORRECTIVE / PREVENTIVE MEASURE'S | |||
e ASSURE NRC REGULATIONS ARE FOLLOWED | |||
.......... | |||
e DEFINE COGNIZANT RESPONSIBILITY | |||
FOR SHIPPING REACTOR WASTE | |||
e ASSURE ALL WASTE SHIPMENTS ARE MADE IN A | |||
SAFE AND CONTROLLED MANNER WITH FULL | |||
DOCUMENTATION AND WITH PROPER RESPONSIBILITY | |||
l | |||
. | |||
- - - .n. - -,> -, - -a- - - - , . , , - - ~ ~ , , , - . --, - , - - - - , - - . , . , - - w- ,,-n,-,.. .,n , -e.,-e-,. , , . ,- ---re | |||
_ _ . - _ _ | |||
i | |||
, | |||
. | |||
. | |||
: | |||
KEY POINTS ON EVALUATION OF TRANSPORTATION FINDING | |||
, | |||
e NOT INTENTIONAL | |||
-- | |||
STATE INSPECTOR AT Hl.NDLING AREA NOTED NO | |||
VIOLATIONS UNDER STATE LICENSE | |||
-- | |||
MISINTERPRETATION OF SITE BOUNDARY | |||
-- | |||
NO PROBLEM FOR FEBRUARY,1986 HEU SHIPMENT | |||
e OCCURRENCE INVOLVED NO HEALTH AND SAFETY | |||
CONSEQUENCES TO THE PUBLIC OR TO UNIVERSITY | |||
EMPLOYEES | |||
. | |||
-- | |||
l TRANSFER TO WASTE SITE DIRECT AND | |||
UNDER CONSTANT CONTROL | |||
i | |||
-- | |||
UNSHIPPED DRUM RETURNED TO CELL IN LESS | |||
l THAN 3 HOURS (hEVER UNATTENDED) | |||
. | |||
i | |||
, | |||
,r__, , , , . . _ _ , , _ . _ . _ . . _ ~ . , _ , _ _ , , , , , . . _ . , _ , . , _ . - - . _ _ | |||
-. | |||
_--,.7, . _ . _ . . _ , _ , _ - _ _ . . _ , _ _ ._.y__._ __. .-__ | |||
}} |
Latest revision as of 13:36, 19 December 2021
ML20207T642 | |
Person / Time | |
---|---|
Site: | 05000083 |
Issue date: | 03/05/1987 |
From: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
To: | Tulenko J FLORIDA, UNIV. OF, GAINESVILLE, FL |
References | |
NUDOCS 8703240206 | |
Download: ML20207T642 (12) | |
See also: IR 05000083/1987001
Text
_
- - - - - - _ - - - - _ _ _ _ _ - - _ - _ - _ _ _ _ _ _ - _ - - _ _ - - _
'
.. NAR 0 5 E97
Docket Nos. 50-83
. License Nos. R-56
I
- University of Florida
ATTN: Mr. J. S. Tulenko
Chairman, Nuclear
Engineering Sciences Department ,
202 Nuclear Sciences Center
Gainesville, FL 32611
Gentlemen:
SUBJECT: ENFORCEMENT CONFERENCE
(NRC INSPECTION REPORT NO. 50-83/87-02)
This refers to the Enforcement Conference held at the University of Florida on
February 26, 1987. This Enforcement Conference concerned activities authorized
by .<RC License No. R-56 for your Training Reactor facility. The conference
related to findings discussed in Inspection Report No. 50-83/87-01 which was
l forwarded to you on February 20, 1987.
Attendance at the Enforcement Conference and the subjects discussed are
described in the enclosed Enforcement Conference Summary.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC's Public Document Room.
Should you have any questions concerning this matter, please contact us.
Sincerely,
0?iG!NAL SIG?iED BYi
J. NELSON GRACE
J. Nelson Grace
Regional Administrator
Enclosure:
Enforcement Conference Summary
cc,w/ encl:
p.W.G.Vernetson, Director
of Nuclear Facilities
bec w/ encl: '(See page 2)
8703240206 870305
PDR ADOCK 05000083
G PDR
_ _ _ _ _ _ _ _ _ _ _ _
=E oi
--_ _ _ - _
'
.
.
University of Florida 2
bec w/o encl:
cense Fee Management Branch
bec w/ encl:
Document Control Desk
State of Florida
R RII RI RII RII -
RI N
.BRevsin CFFosey DCollins PF Ldrickson DVerrelli TEWE 5~
2/J//87 2/p'\/87 2/rJ/87 JPk(ti5hr
2/y /87 . /y/87
s J/v/87 3 /2[O
RII RII
R es rnst
/'v/87 Sq/87
.
..
. _ _ _ _ - _ _ _ _ _ _ _ _ -
_. . .__ _. _. .. -
t
<,
..
.
(
ENCLOSURE
Enforcenent Conference Summary
Licensee: University of Florida
Facility: . Training Reactor
License No.: R-56
Docket No.: 50-83
Subject: Program for Transportation of Radioactive Materials - Inspection
Report No. 50-83/87-01
An Enforcement Conference was held at the University of-Florida, Gainesville,
Florida on February 26, 1987, to discuss-the adequacy of the licensee's program
for transportation of licensed radioactive material.
The attendance list is attached as Attachment A to this Summary. A copy of the
outline used for the licensee's presentation is attached as Attachment B.
Licensee representatives discussed the conditions and events leading to the
'
transportation incident and the meetings held by the Reactor Safety Review
.
Subcommittee (RSRS) in response to the apparent transportation violation
'
identified in Inspection Report No. 50-83/87-01. ' Licensee concluded that
shipments across campus had not met Department of Transportation requirements
due to a misinterpretation of the site boundary designation for waste
shipments. To insure adherence to 19 CFR 71.5(a) the licensee proposed that
- prior to any further waste shipments a Standard Operating Procedure (S0P) with
appropriate. checklists would be developed and approved by the RSRS, and
training on this S0P would be conducted for reactor staff and appropriate
Radiation Control perrennel.
NRC representatives discussed the NRC Enforcement Policy in general and
expressed the opinion that the University of Florida staff evaluation of the
incident had served to clarify and promote a common understanding of the issue.
,
.
ATTACHMENT A
Enforcement Conference Attendees
- University of Florida
M. J. 0hanian, Associate-Dean for Research, College of Engineering and
Chairman, Reactor Safety Review Subcommittee
J. S. Tulenko, Chairman and Professor, Nuclear Engineering Sciences Departnent
W. A. Vernetson, Director of Nuclear Facilities
W. S. Properzio, Director, Environmental Health and Safety
C. E. Roessler, Chairman, Radiation Control Committee and Professor of
Environmental Engineering Science
D. L. Munroe, Radiation Control Officer, Environmental Health and Safety
Nuclear Regulatory Commission
J. P. Stchr, Director, Division of Radiation Safety and Safeguards (DRSS)
G. R. Jenkins, Director, Enforcement and Investigation Coordination Staff
C. M. Hosey, Section Chief, Facilities Radiation Protection Section, DRSS
P. Fredrickson, Section Chief, Projects Section 2A, Research Reactors
B. K. Revsin, Radiation Specialist, DRSS
i
4
, , . , - - - , . . ,,,----c - - . , . - . , - , , ,,y-. r -- - - - - , - - - , - - - 3-e- , - .-- , , - - - - - . -- --.-, ,-----v., , -- -- ,, , = w -- -
.
.
-ATTACHMENT B ,
PRESENTATION AT
,
NRC ENFORCEMENT CONFERENCE
ROOM 202 NUCLEAR SCIENCE CENTER
UNIVERSITY OF FLORIDA
9
26 FEBRUARY 1987
,
f
, - - - , - - - - -
_
.
.
RESPONSE ACTIONS / PLANS TO DATE
IMMEDIATE:
o CORRECTED 10 CFR 19.11 VIOLATION
e CORRECTED TECH SPEC VIOLATIONS RELATIVE
TO SOP-D.2 FOR RADIATION WORK PERMITS
CONTINUING FOLLOWUP:
e INCORPORATING SURVEILLANCE INTO S0P-0.5
(QA PROGRAM) TO ASSURE POSTING REQUIREMENTS
ARE MET
e CONDUCTED TRAINING ON USE OF SOP-D.2 (RWP) -
VERBATIM COMPLIANCE
e REVISING SOP-D.2 TO ASSURE COMPATIBILITY
OF TEXT AND FORM FORMAT
,
o
_ . _ _ . _ _ _ _ _ . _ _ . _ . . _
___
'
l
-
WASTE SHIPMENT SCENARIO
e MIDDLE OF EXTENDED OUTAGE TO REPLACE /0VERHAUL ALL
CONTROL BLADE DRIVE SYSTEMS; WORKING CLOSELY WITH
i
RADIATION CONTROL
e UNIVERSITY WASTE SHIPMENT SCHEDULED FOR 10 DEC 1985
e TWO WASTE DRUMS PACKAGED IN CELL ON 9 DEC 1985
-
REACTOR / RADIATION CONTROL PERSONNEL
--
RADIATION WORK PERMIT
--
RADIATION SURVEYS TAKEN-
e TWO DRUMS MOVED TO WASTE AREA WIT'lIN UNDERSTOOD
UNIVERSITY SITE B0UNDARY ON 10 DEC 1985 (150 MR/HR
I AND 800 MR/HR ON CONTACT)
--
OPEN RADIATION CONTROL WASTE PICKUP TRUCK
--
TWO RADIATION CONTROL PERSONNEL
e ONE DRUM SHIPPED VIA ADC0 (150-210 MR/HR)
e SECOND DRUM REJECTED FOR SHIPMENT DUE TO LOCALIZED
RADIATION LEVEL AB0VE 1000 MR/HR; RETURNED TO UFTR
,
- . - _
.. - - . - - . . - - _ . - . - . - - - - . - . - . - . - . . -
i
i
.
l
! l
.
t
CONCLUSIONS ON SCENARIO
e VARIATION IN RADIATION LEVELS
(REACTOR CELL VS WASTE SITE)
--
NOT EXCESSIVE FOR HAND HELD INSTRUMENTS
--
PROBABLY NOT DUE TO SHIFTING 0F CONTENTS
e MISINTERPRETATION OF SITE BOUNDARY DESIGNATION
FOR WASTE SHIPMENTS
l
- , . - - . - . . . - . - , , - , - - - - - . _ - - - . - - - - - - - . - . - , - - - . - . . - - . - . . . - , - - - - - - - - . . - . . . . . - - .
_.
.
.
.
4
MEETINGS RELATIVE TO 10 CFR 71.5(a) FINDING
.,
'
s RSRS MEETING TO EVALUATE 10 CFR 71.5(a)
FINDING (MONDAY, FEBRUARY 16)
e SPECIAL MEETING TO RECONSTRUCT OCCURRENCE
(THURSDAY, FEBRUARY 19)
e SPECIAL MEETING TO REVIEW PRESENTATION
4
(WEDNESDAY, FEBRUARY 25)
l
l
l
.
I
. _ . . . _ . --. _._......,.,,,..___._-.._.._,___...-..,...-_.,..~.,,,___.._..-_-.-._.,_..,_,._,_,,__,...y__
_ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ _ -
.
.
I
CORRECTIVE / PREVENTIVE MEASURES (10 CFR 71.5)
e GENERATE S0P TO ASSURE ADHERENCE TO PART 71.5
--
PRIOR TO FURTHER WASTE SHIPMENTS
--
l
FULL REVIEW BY RSRS
--
PRIOR REVIEW BY NRC REGION II
e CONDUCT TRAINING ON THIS S0P
--
FOR ALL UFTR STAFF RELATIVE TO USING
CHECKLISTS '
--
FOR UFTR AND RAD CON MANAGEMENT
PERSONNEL RELATIVE TO INTERFACES
FOR S0P IMPLEMENTATION
.
, _ _ _
_ _ _ _ _ _ _ _ - - _ - - - - - - - - - - - - -
.
. .
.
.
PURPOSE OF CORRECTIVE / PREVENTIVE MEASURE'S
e ASSURE NRC REGULATIONS ARE FOLLOWED
..........
e DEFINE COGNIZANT RESPONSIBILITY
FOR SHIPPING REACTOR WASTE
e ASSURE ALL WASTE SHIPMENTS ARE MADE IN A
SAFE AND CONTROLLED MANNER WITH FULL
DOCUMENTATION AND WITH PROPER RESPONSIBILITY
l
.
- - - .n. - -,> -, - -a- - - - , . , , - - ~ ~ , , , - . --, - , - - - - , - - . , . , - - w- ,,-n,-,.. .,n , -e.,-e-,. , , . ,- ---re
_ _ . - _ _
i
,
.
.
KEY POINTS ON EVALUATION OF TRANSPORTATION FINDING
,
e NOT INTENTIONAL
--
STATE INSPECTOR AT Hl.NDLING AREA NOTED NO
VIOLATIONS UNDER STATE LICENSE
--
MISINTERPRETATION OF SITE BOUNDARY
--
NO PROBLEM FOR FEBRUARY,1986 HEU SHIPMENT
e OCCURRENCE INVOLVED NO HEALTH AND SAFETY
CONSEQUENCES TO THE PUBLIC OR TO UNIVERSITY
EMPLOYEES
.
--
l TRANSFER TO WASTE SITE DIRECT AND
UNDER CONSTANT CONTROL
i
--
UNSHIPPED DRUM RETURNED TO CELL IN LESS
l THAN 3 HOURS (hEVER UNATTENDED)
.
i
,
,r__, , , , . . _ _ , , _ . _ . _ . . _ ~ . , _ , _ _ , , , , , . . _ . , _ , . , _ . - - . _ _
-.
_--,.7, . _ . _ . . _ , _ , _ - _ _ . . _ , _ _ ._.y__._ __. .-__