Forwards Rev 4 to Univ of Fl Training Reactor Operator Requalification & Recertification Training Program Plan for July 1999 - June 2001. Changes,Discussed
ML20206U243
Person / Time
Site: 05000083
Issue date: 05/14/1999
From: Vernetson W
FLORIDA, UNIV. OF, GAINESVILLE, FL
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20206U247 List:
References
NUDOCS 9905250125
Download: ML20206U243 (2)


Text

r s.

UNIVERSITY OF FLORIDA Nuclear Reactor Facility 202 Nuclear Sciences Casar Department of Nuclear and Radiological Engineering jQ11e g,

3 Tel: (352)3921429 Fax: (352)392-3380 E mail: wwnet@nerverl.nucergufl.edu May 14,1999 Document Control Desk Requalification Training Program U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Sir / Madam:

Re: University of Florida Training Reactor Facility License R-56, Docket No. 50-83 The current operator requalification and recertification program training cycle for the University of Florida Training Reactor as submitted with a letter dated May 29,1997 is scheduled to end in June 1999. Therefore, we propose to renew the current plan with minor changes as well as new dates. In effect, the revised plan will be essentially the same as that currently being used for the two-year training cycle with the removal of the duplicate training on standard operating procedures the only significant change. In recent years the procedures for the UFTR have not changed significantly and when they do, special training is conducted to assure all operations staff are cognizant of the change. For this reason there is no need to have procedure training conducted in February of one year and then April of the next. Therefore, the second training lecture and examination on standard operating procedures (April) is deleted from Table 2 and from the second year (2000-01) of the training schedule in Appendix A. A copy of this revised plan is enclosed for reference purposes. This renewed plan as included here will cover the UFTR operator requalification and recertification program from July 1999 through June 2001.

As usual, we propose to continue using this proposed program beyond the next two-year cycle; that is, we will automatically restart the same two-year requalification and recertification program training cycle every two years beginning in July 2001.

$oe 0

('

~

990525o125 990514 PDR ADOCK C5000083

(

V PDR_

EqualOpportunity/Afrurnative ActionInstitution

)

1

._, NRC, Document Control Desk Page 2 May 14,1999 l

If you need further information on this plan or the proposed usage of it for all future two-year training cycles, please let us know.

Sincerely, William G. Vernetson Director of Nuclear Facilities WGV/dms Enclosure