ML20210H917

From kanterella
Jump to navigation Jump to search
Lists Change in Telephone Number for H Bernard,Facility Project Manager,Due to NRR Reorganization.D Tondi New Nonpower Reactors & Safeguards Licensing Section Leader. Correspondence Should Be Sent to Listed Address
ML20210H917
Person / Time
Site: 05000083
Issue date: 03/27/1986
From: Berkow H
Office of Nuclear Reactor Regulation
To: Vernetzen W
FLORIDA, UNIV. OF, GAINESVILLE, FL
References
NUDOCS 8604030252
Download: ML20210H917 (3)


Text

-

MAR 2 71986 PDd Docket No. 50-83 Mr. William Vernetz'en Acting Director of Nuclear Facilities 102 Nuclear Reactor Building Department of Nuclear Engineering Sciences University of Florida Gainesville, Florida 32611

Dear Mr. Vernetzen:

SUBJECT:

RE0RGANIZATION OF THE OFFICE OF NUCLEAR REACTOR REGULATION

-As a result of the recent reorganization.of the Office of Nuclear Reactor Regulation, the telephone number of our Project Manager for your facilities,

-Harold Bernard, has been changed. Mr. Bernard can now be reached at (301) 492-8529.

' ~

Our new Section Leader for the Non-Power Reactors and Safeguards Licensing Section is Dominic Tondi. He can be reached at (301) 492-8251. If neither Mr. Bernard or Mr. Tondi can be reached, I can be contacted at (301) 492-8795.

All correspondence should still.be addressed as.follows:

U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attn: Document Control Desk Sincerely, yngivna siswd 4a Herbe'rt N. Berkow, Director Standardization and Special Projects Directorate Division of PWR Licensing-B cc: See next page DISTRIBUTION:

?C entral File J~

SSPD'Riading PNoonan HBernard DTondi HBerkow

-B:SSPD DPWi SPD DPWRL-B:SSPD D SPD

ac HBe DTondig H

/86 03 6 03/0/85 03/ 86 B604030252 ADOCK O 860 3 PDR PDR P

r \

d UNITED STATES

, f g NUCLEAR REGULATORY COMMISSION 4 5 j WASHINGTON. D. C. 20555

%,....+/ MAR 271986 Docket No. 50-83 Mr. William Vernetzen

/,cting Director of Nuclear Facilities 102 Nuclear Reactor Building Department of Nuclear Engineering Sciences University of Florida Gainesville, Florida 32611

Dear Mr. Vernetzen:

SUBJECT:

RE0RGANIZATION OF THE OFFICE OF NUCLEAR REACTOR REGULATION As a result of the recent reorganization of the Office of Nuclear Reactor Regulation, the telephone number of our Project Manager for your facility,

, Harold Bernard, has.been changed. Mr. Bernard can now be reached at (301) 492-8529.

Our new Section Leader for the Non-Power Reactors and Safeguards Licensing Section is Dcminic Tondi. He can be reached at (301) 492-8251. If neither Mr. Bernard or Mr. Tondi can be reached, I can be contacted at (301) 492-8795.

All correspondence should still be addressed as follows:

U.S. Nuclear Regulatory Comission Washington, D.C. 20555 Attn: Document Control Desk S c rely, j'

- erbert N. Berkow, Director

'l Standardization and Special Projects Directorate Division of PWR Licensing-B cc: See next page

e j  !

University of Florida Docket No. 50-83 r

cc: Dr. A. M. Jacobs, Chairman Department of Nuclear Engineering Sciences University of Florida College of Engineering 202 Nuclear Sciences Center Gainesville, Florida 32611 Bureau of Intergovernmental Relations 660 Apslachee Parkway Tallahassee,. Florida 32304 i

i I

t