ML20210H917

From kanterella
Jump to navigation Jump to search
Lists Change in Telephone Number for H Bernard,Facility Project Manager,Due to NRR Reorganization.D Tondi New Nonpower Reactors & Safeguards Licensing Section Leader. Correspondence Should Be Sent to Listed Address
ML20210H917
Person / Time
Site: 05000083
Issue date: 03/27/1986
From: Berkow H
Office of Nuclear Reactor Regulation
To: Vernetzen W
FLORIDA, UNIV. OF, GAINESVILLE, FL
References
NUDOCS 8604030252
Download: ML20210H917 (3)


Text

-

MAR 2 71986 PDd Docket No. 50-83 Mr. William Vernetz'en Acting Director of Nuclear Facilities 102 Nuclear Reactor Building Department of Nuclear Engineering Sciences University of Florida Gainesville, Florida 32611

Dear Mr. Vernetzen:

SUBJECT:

RE0RGANIZATION OF THE OFFICE OF NUCLEAR REACTOR REGULATION

-As a result of the recent reorganization.of the Office of Nuclear Reactor Regulation, the telephone number of our Project Manager for your facilities,

-Harold Bernard, has been changed. Mr. Bernard can now be reached at (301) 492-8529.

~

Our new Section Leader for the Non-Power Reactors and Safeguards Licensing Section is Dominic Tondi. He can be reached at (301) 492-8251. If neither Mr. Bernard or Mr. Tondi can be reached, I can be contacted at (301) 492-8795.

All correspondence should still.be addressed as.follows:

U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Attn: Document Control Desk Sincerely, yngivna siswd 4a Herbe'rt N. Berkow, Director Standardization and Special Projects Directorate Division of PWR Licensing-B cc: See next page DISTRIBUTION:

? entral File J C

~

SSPD'Riading PNoonan HBernard DTondi HBerkow

-B:SSPD DPWi SPD DPWRL-B:SSPD D

SPD

ac HBe DTondig H

/86 03 6

03/0/85 03/

86 B604030252 860 3

PDR ADOCK O PDR P

r

\\

d UNITED STATES f

g NUCLEAR REGULATORY COMMISSION 4

5 j

WASHINGTON. D. C. 20555

%,....+/

MAR 271986 Docket No. 50-83 Mr. William Vernetzen

/,cting Director of Nuclear Facilities 102 Nuclear Reactor Building Department of Nuclear Engineering Sciences University of Florida Gainesville, Florida 32611

Dear Mr. Vernetzen:

SUBJECT:

RE0RGANIZATION OF THE OFFICE OF NUCLEAR REACTOR REGULATION As a result of the recent reorganization of the Office of Nuclear Reactor Regulation, the telephone number of our Project Manager for your facility, Harold Bernard, has.been changed. Mr. Bernard can now be reached at (301) 492-8529.

Our new Section Leader for the Non-Power Reactors and Safeguards Licensing Section is Dcminic Tondi. He can be reached at (301) 492-8251.

If neither Mr. Bernard or Mr. Tondi can be reached, I can be contacted at (301) 492-8795.

All correspondence should still be addressed as follows:

U.S. Nuclear Regulatory Comission Washington, D.C.

20555 Attn: Document Control Desk S c rely, j'

'l erbert N. Berkow, Director Standardization and Special Projects Directorate Division of PWR Licensing-B cc: See next page

e j

University of Florida Docket No. 50-83 r

cc: Dr. A. M. Jacobs, Chairman Department of Nuclear Engineering Sciences University of Florida College of Engineering 202 Nuclear Sciences Center Gainesville, Florida 32611 Bureau of Intergovernmental Relations 660 Apslachee Parkway Tallahassee,. Florida 32304 i

i I

t

.