Forwards Univ of Fl Training Reactor Operator Requalification & Recertification Training Program Plan, Jul 1997-June 1999
ML20148G332
Person / Time
Site: 05000083
Issue date: 05/29/1997
From: Vernetson W
FLORIDA, UNIV. OF, GAINESVILLE, FL
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20148G337 List:
References
NUDOCS 9706050285
Download: ML20148G332 (2)


Text

,

' &. UNIVERSITY OF l

W. FLORIDA Nuclear Reactor Facility 202 Nuclear Sciences Canar Department of Nuclear and Radiological Engmeering g ,;,,,yi,,,,, ] g*1,,, Q Tel: (352)392-1429 Far (352)392-3380 Fanail: vemet@scrver.nuceng.ufl.edu May 29,1997 Document Control Desk Requalification Training Program U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Sir / Madam:

Re: University of Florida Training Reactor Facility License R-56, Docket No. 50-83 The current operator requalification and rccertification program training cycle for the University of Florida Training Reactor as submitted with a letter dated May 31,1995 is scheduled to end in June 1997. Therefore, we propose to renew the current plan with minor changes as well as new dates. In effect, the revised plan will be essentially the same as that currently being used for the two-year training cycle with only the name of the Department of Nuclear Engineering Sciences l

changed to Department of Nuclear and Radiological Engineering in paragraph 3 on page 1 to i reflect a department name change in 1996, and the two training sessions on Annual Reports being l moved from November to the following February in each year in the Schedules in Appendix A l to account for a change in UFTR Tech Specs delaying required submittal of UFTR Annual Reports. A copy of this revised plan is enclosed for reference purposes. This renewed plan as l included here will cover the UFTR operator requalification and recertification program from July j 1997 through June 1999.

As usual, we propose to continue using this proposed program beyond the next two-year cycle; I

l that is, we will automatically restalt the same two-year requalification and recertification program training cycle every two years beginning in July 1999. [

a

/ tn3 1

l 9706050285 970529 PDR ADOCK 05000083 lill$h$hlII)lllIlll!IIIIkkk!!

V PDR i

i 1

I EqualOppottunity/Afrumative ActionInstitution

I Document Control Desk l Page 2 May 29,1997 If you need further information on this plan or the proposed usage ofit for all future two-year i training cycles, please let us know.

Sincerely, l

@ (',$.-

William G. Vernetson Director of Nuclear Facilities WGV/dms l Enclosure Copies: USNRC Region II Reactor Safety Review Subcommittee l J. Powers  !