ML20217B239

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-083/97-201 on 970630-0703.No Violations Noted
ML20217B239
Person / Time
Site: 05000083
Issue date: 09/09/1997
From: Weiss S
NRC (Affiliation Not Assigned)
To: Vernetson W
FLORIDA, UNIV. OF, GAINESVILLE, FL
Shared Package
ML20217B242 List:
References
50-083-97-201, 50-83-97-201, NUDOCS 9709230278
Download: ML20217B239 (3)


See also: IR 05000083/1997201

Text

'

.

September 9, 1997

Dr. William G. Vemetson

Director of Nuclear Facilities

202 Nuclear Sciences Center

Gainesville, Florida 32611

SUBJECT: NRC INSPECTION REPORT NO. 50 83/97 201

Dear Dr, Vernetson:

A United States Nuclear Regulatory Commission (NRC) inspection was conducted from

June 30 through July 3,1997 at your University of Florida Test Reactor facility. The enclosed

report represents the results of that inspection.

No significant safety issues were identified. No reply is required.

Your cooperation wl:h us is appreciated.

- Sincerely,

Original signed by:

Seymour H. Weiss, Director

Non Power Reactors and Decommissioning

Project Directorate

Division of Reactor Program Management

Office of Nuclear Reactor Regulation

Docket No, 50-83

'

License No. R 120

Enclosure: NRC Inspection Report No. 50 8797 201

cc w/ enclosure:

See next page l

DISTRIBUTION:

1 Docket File 54431 MMendonca

PUBLIC TDragoun RI

CBassett, Ril TBurdick, Rlli

SHolmes EHylton

DScrenci, Public Affairs Officer (2) WDean, OEDO

VMcCree, OEDO SWeiss

Nuclear Safety information Center (NSIC) - AAdams

JRoe

PDND:PM PD 1A PD D:D

SHolmes, h6 ton SWeiss

9//r/97 h 9/8 /97 9/ T/97

DOCUMENT NAME: A:\lR5083

OFFICIAL RECORD COPY

~

75P"28823?8383e3

G

IU!C FRE CENTER COPY

PDR

!I .II pilllll!I

x

_ _ _

. _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ - _ _ - - _ -

.

em#8009

[ *k UNITE 3 STATES

g ) T.1

.}

't

NUCLEAR REGULATORY COMMISSION

WASHINGTON. D.C. 30666 4 001

%...../ September 9, 1997

Dr. William G. Vemetson

Director of Nuclear Facilities

202 Nuclear Sciences Center

Gainesville, Florida 32611

1

SUBJECT: NRC INSPECTION REPORT NO. 50-83/97 201

Dear Dr. Vemetson:

A United States Nuclear Regulatory Commission (NRC) Inspection was conducted from

June 30 through July 3,1997 at your University of Florida Test Reactor facility. The enclosed

report represents the results of that inspection.

No significant safety issues were identified. No reply is required.

Your cooperation with us is appreciated.

Sincerely,

f .

.

W fl, W

Se our H. Weiss, Director

Non Power Reactors and Decommissioning

Project Directorate

Division of Reactor Program Management

Office of Nuclear Reactor Regulation

Docket No. 50-83

License No. R 120

Enclosure: NRC Inspection Report No. 50-83/97-201

cc w/ enc!c:urc:

See next page

'

,

University of Florida Docket No, 50 83

(NRC INSPECTION REPORT)

Dr. D. Dudziek, Head

Nuclear Engineering Department

North Carolina State University

P. O. Box 790g

Raleigh, NC 27695-790g

Nelson W. Couch

Radiation Safety Officer

North Carolina State University

P. O. Box 7909

Raleigh, NC 27695 7909

Dr. Ratib A. Karam, Director

Neely Nuclear Research Center

Georgia Institute of Technology

900 Atlantic Drive, NW

Atlanta, GA 30332

Dr. R. U. Mulder, Director

Reactor Facility

University of Virginia

Charlottesville, VA 22901

Dayne H. Brown, Director

Division of Radiation Protection

Department of Environment,

Health, and Natural Resources

P. O. Box 27687

Raleigh, NC 27611 7687

.