Forwards Rev 10 to Univ of Fl Training Reactor SAR Dtd Jan 1981 Submitted as Part of Last Relicensing Effort.Rev Consists of Changes to Single Pp,Initiated as Result of Comments from Staff Member Checking Matls Re Training
ML20137D636
Person / Time
Site: 05000083
Issue date: 03/17/1997
From: Vernetson W
FLORIDA, UNIV. OF, GAINESVILLE, FL
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9703260244
Download: ML20137D636 (3)


Text

__ _ .__ _ _

UNIVERSITY OF i -FLORIDA Nuclear Reactor Facility 202 Nuclear Sciences Corner Department of Nuclear and Radiological Engineering gg*,1183#

g,. ,

Tel: (352)392-1429 Fax: (352)392-3380 E mail: vernet @ server.nuceng.ufl.edu I

March 17,1997 I I

Document Control Desk UFFR Safety Analysis Report )

U.S. Nuclear Regulatory Commission Revision 10,3/97  ;

Washington, DC 20555 l

Dear Sir / Madam:

Re: University of Florida Training Reactor (UFTR)

Facility License R-56; Docket No. 50-83 1

Enclosed is Revision 10 to the UFrR Safety Analysis Report (SAR) dated January 1981 submitted as part of our last relicensing effort. Revision 10 consists of changes to a single page. The revision was initiated as a result of comments from a staff member checking material for training purposes. This change has been reviewed by UFTR management and the UFrR Safety Review Subcommittee and is not considered to involve any unreviewed safety question or to impact the UFTR Safety Analysis as outlined below. l Essentially, the change was made because Figure 7-2 (Operating Range of UFTR i Neutron / Power Level Detectors) on page 7-5 was noted to be inconsistent. The figure has two  ;

scales-Power level (Percent) on the left-side axis and Power Ixvel (Watts) on the right-side axis-but the two axes did not agree for the four detectors noted. Basically, the power level (percent) on the left axis had been mistyped so it disagreed with the actual power level (Watts) by an order of magnitude. This error was apparently made during the drawing production i process for the SAR submitted in 1981; since references to the figure are usually for power level purposes, the obvious error was not previously noted. The reworked computer-generated figure is now stored for easy incorporation elsewhere and is better set up for user reference.

As indicated, this Revision 10 change has been fully reviewed by UFTR management and by the Reactor Safety Review Subcommittee to assure no unreviewed safety questions were involved and so is not considered to relax the requirements for assuring protection of the health and safety of the public and of the reactor facility. The change simply updates the Safety Analysis Report to reflect the existing facility and its operations by correcting an incorrect figure.

0 l 9703260244 970317 7 PDR ADOCK 05000083 lll[l{@%$lll$Ell[lll V PDR '- ,

1 EqualOpportunity/Afrutnative ActionInstitution

._, .- . . . . . . - . = . . _ . . . - _ . . - . . - . _ - . _ _ . - . - . . .-

  • l 1

USNRC March 17,1997 The entire transmittal consists of one signed original letter with enclosure plus ten copies of the  :

entire set. If further information is required, please advise.

j Sincerely, i

William G. Vernetson j

Director of Nuclear Facilities L
WGV/dms Enclosures Copies
USNRC Region II

.i T. Michaels, NRC Senior Project Manager.

j Reactor Safety Review Subcommittee i D. Cronin, UFI'R Reactor Manager l

1 Sworn and subscribed this l@ day of March 1997.

4 h

i . _ _ _ . _

Ctkhn b_, bn '

my

,g Notary Public  ; 91.s#

4  % T-Q i

i l

i i

<- FISSION ->

i CHAMBER UNCOMPENSATED ,

ION CHAMBER COMPENSATED  !

100 -  ; L  ; L ;L ION CHAMBER - 10

L

! 4 10 l

_ to i

1 if 1 r 3 4

1 -

10 i SAFETY SAFETY 10-1 CHANNEL 1 CHANNEL 2 2  ;

i .

l k 10-2 1 26 10 Z

, L

. W i 0 -3 0 i W 10

- 10 i M J 10 - PROPORTIONAL -

10

-I g COUNTER j l

W -5 ;L

-2 M a 10 -

10

( W 4

lg 10

-6

^

-3 g

10
O 1

A -4

-7 10 10 i

! 1 r 1r 1 r

-8 10-5

] 10 l

WIDE EXTENDED MULTIRANGE E LINEAR 10-9 WIDE RANGE - -6 10 l

10-7 i

i i

Figure 7-2. Operating Range of UFTR Neutron / Power Level Detectors.