ML11227A162: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML11227A162
| number = ML11227A162
| issue date = 08/10/2011
| issue date = 08/10/2011
| title = IR 05000456-11-005, 05000457-11-005 (DRS), on 11/28 Through 12/2/2011, Braidwood Station - Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information Inspection
| title = IR 05000456-11-005, 05000457-11-005 (Drs), on 11/28 Through 12/2/2011, Braidwood Station - Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information Inspection
| author name = Stone A M
| author name = Stone A
| author affiliation = NRC/RGN-III/DRS/EB2
| author affiliation = NRC/RGN-III/DRS/EB2
| addressee name = Pacilio M J
| addressee name = Pacilio M
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| docket = 05000456, 05000457
| docket = 05000456, 05000457
Line 14: Line 14:
| page count = 9
| page count = 9
}}
}}
See also: [[followed by::IR 05000456/2011005]]
See also: [[see also::IR 05000456/2011005]]


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITED STATES
[[Issue date::August 10, 2011]]
                          NUCLEAR REGULATORY COMMISSION
                                              REGION III
                                2443 WARRENVILLE ROAD, SUITE 210
                                        LISLE, IL 60532-4352
                                          August 10, 2011
Mr. Michael J. Pacilio
Senior Vice President, Exelon Generation Company, LLC
President and Chief Nuclear Officer (CNO), Exelon Nuclear
4300 Winfield Road
Warrenville, IL 60555
SUBJECT:         BRAIDWOOD STATION - NOTIFICATION OF AN NRC TRIENNIAL HEAT
                SINK PERFORMANCE INSPECTION AND REQUEST FOR INFORMATION
                INSPECTION REPORT 05000456/2011005; 05000457/2011005 (DRS)
Dear Mr. Pacilio:
On Monday, November 28, 2011, the U. S. Nuclear Regulatory Commission (NRC) will begin
the on-site portion of the Triennial Heat Sink Performance Inspection Braidwood Station. This
inspection will be performed in accordance with NRC baseline inspection procedure (IP)
71111.07T.
In order to minimize the impact that the inspection has on the site and to ensure a productive
inspection, we have enclosed a request for documents needed for the inspection. The
documents have been divided into three groups.
*  The first group lists information necessary for our initial inspection scoping activities. This
    information should be available to the lead inspector no later than October 17, 2011. By
    October 20, 2011, the inspector will communicate the initial selected set of approximately
    2-3 risk significant heat exchangers.
*  The second group of documents requested is those items needed to support our in-office
    preparation activities. This set of documents, including the calculations associated with the
    selected heat exchangers, should be available at the Regional Office no later than
    November 14, 2011. This information should be separated for each selected component,
    especially if provided electronically (e.g., folder with component name that includes
    calculations, condition reports, maintenance history, etc.). During the in-office preparation
    activities, the inspector may identify additional information needed to support the
    inspection.
*  The last group includes the additional information above, as well as plant specific reference
    material. This information should be available onsite to the inspector on Monday,
    November 28, 2011. It is also requested that corrective action documents and/or questions
    developed during the inspection be provided to the inspector as the documents are
    generated.


Mr. Michael Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
M. Pacilio                                    -2-
The lead inspector for this inspection is Mr. Gerard ODwyer. If there are questions about the
material requested, or the inspection, please call Mr. ODwyer at (630) 829-9624. Please send
the information to the following e-mail address Gerard.ODwyer@nrc.gov. A hard-copy with the
required information is also an acceptable option.
It is important that these documents be as complete as possible in order to minimize the
number of documents requested during the preparation week or during the onsite inspection.
All requested documents are to be for the time period from the onsite inspection period back to
the documents that were provided in response to the previous heat sink performance
inspection. If no activities were accomplished in that time period, then the request applies to
the last applicable document in the previous time period.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, control number 3150-
0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a
request for information or an information collection requirement unless the requesting
document displays a currently valid Office of Management and Budget control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRC's document system
(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
(the Public Electronic Reading Room).
                                              Sincerely,
                                              /RA by A. Dunlop For/
                                              Ann Marie Stone, Chief,
                                              Engineering Branch 2
                                              Division of Reactor Safety
Docket No. 50-456; 50-457
License No. NPF-72; NPF-77
Enclosure:      TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT
                REQUEST
cc w/encl:      Distribution via ListServ


SUBJECT: BRAIDWOOD STATION - NOTIFICATION OF AN NRC TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND REQUEST FOR INFORMATION INSPECTION REPORT 05000456/2011005; 05000457/2011005 (DRS)
      TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
Inspection Report:            05000456/2011005; 05000457/2011005(DRS)
Inspection Dates:              November 28 thru December 2, 2011
Inspection Procedures:        IP 71111.07, Heat Sink Performance
Lead Inspector:                Gerard ODwyer
                              (630) 829-9624
                              Gerard.odwyer@nrc.gov
I.    Information Requested By October 17, 2011
      1. List of the Generic Letter (GL) 89-13, Service Water System Problems Affecting
          Safety-Related Equipment, heat exchangers in order of risk significance.
      2. Copy of heat exchanger performance trending data tracked for each GL 89-13 heat
          exchanger.
      3. List of corrective action program documents (with a short description) associated
          with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, or heat
          exchanger testing, for the previous three years or since the last corrective action
          program document list was sent to the NRC for the previous heat sink performance
          inspection. The list should include all corrective action program documents not on
          the last corrective action program document list.
      4. Copy of any self-assessment done on any of GL 89-13 heat exchangers.
      5. Last two system health report(s) and maintenance rule system notebooks for all the
          GL 89-13 heat exchangers.
      6. List of engineering-related operator workarounds (with a short description)
          associated with GL 89-13 heat exchangers. The requested documents are to be for
          the time period from the onsite inspection period back to the documents that were
          provided in response to the previous heat sink performance inspection.
      7. List of permanent and temporary modifications (with a short description) associated
          with GL 89-13 heat exchangers. The requested documents are to be for the time
          period from the onsite inspection period back to the documents that were provided in
          response to the previous heat sink performance inspection.
                                                1                                        Enclosure


==Dear Mr. Pacilio:==
    TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
On Monday, November 28, 2011, the U. S. Nuclear Regulatory Commission (NRC) will begin the on-site portion of the Triennial Heat Sink Performance Inspection Braidwood Station. This inspection will be performed in accordance with NRC baseline inspection procedure (IP)
II. Information Requested By November 14, 2011
71111.07T. In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a request for documents needed for the inspection. The documents have been divided into three groups. The first group lists information necessary for our initial inspection scoping activities. This information should be available to the lead inspector no later than October 17, 2011. By October 20, 2011, the inspector will communicate the initial selected set of approximately 2-3 risk significant heat exchangers. The second group of documents requested is those items needed to support our in-office preparation activities. This set of documents, including the calculations associated with the selected heat exchangers, should be available at the Regional Office no later than November 14, 2011. This information should be separated for each selected component, especially if provided electronically (e.g., folder with component name that includes calculations, condition reports, maintenance history, etc.). During the in-office preparation activities, the inspector may identify additional information needed to support the inspection. The last group includes the additional information above, as well as plant specific reference material. This information should be available onsite to the inspector on Monday, November 28, 2011. It is also requested that corrective action documents and/or questions developed during the inspection be provided to the inspector as the documents are generated. The lead inspector for this inspection is Mr. Gerard O'Dwyer. If there are questions about the material requested, or the inspection, please call Mr. O'Dwyer at (630) 829-9624. Please send the information to the following e-mail address Gerard.ODwyer@nrc.gov. A hard-copy with the required information is also an acceptable option. It is important that these documents be as complete as possible in order to minimize the number of documents requested during the preparation week or during the onsite inspection. All requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous heat sink performance inspection. If no activities were accomplished in that time period, then the request applies to the last applicable document in the previous time period. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
    1.  Copy of the Updated Final Safety Analysis Report (UFSAR) section applicable to
          the GL 89-13 Heat Exchanger Program.
    2.   Copies of procedures developed to implement the recommendations of GL 89-13
          (e.g., the GL 89-13 Heat Exchanger Program description).
    3.  For the specific heat exchangers selected:
          a. Copies of the applicable UFSAR sections for each heat exchanger.
          b. Copy of system description and design basis document for the heat
              exchangers (as applicable).
          c. Provide a list of calculations (with a short description) which currently apply to
              each heat exchanger.
          d. Copy of any operability determinations or other documentation of degradation
              associated with the heat exchangers or the systems that support the operation
              for the selected heat exchangers.
    4.   For the ultimate heat sink (UHS) and the safety-related service water system (or
          equivalent):
          a.   Copies of the applicable UFSAR sections.
          b.   Copy of system description and design basis document (as applicable).
          c.   Copy of any operability determinations or other documentation of degradation
                associated with the UHS and the safety-related service water system.
          d.   Copy of the document (e.g. UFSAR or Technical Requirements Manual)
                that states the maximum cooling water system inlet temperature limit that
                still allows full licensed power operation of the nuclear reactor.
    5.   A schedule of all inspections, cleanings, maintenance, or testing of any
          safety-related plant heat exchanger to be performed during the on-site portion of
          the inspection.
    6.   Copies of Corrective Action Program implementing procedures.
    7.  If available, electronic copies of the current Technical Specifications, Technical
          Specifications Basis, Final Safety Analysis Report, and Technical Report Manual.
                                                2                                    Enclosure


Sincerely,/RA by A. Dunlop For/
    TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
Ann Marie Stone, Chief, Engineering Branch 2 Division of Reactor Safety Docket No. 50-456; 50-457 License No. NPF-72; NPF-77
III.  Information Requested to be Available on First Day of Inspection, November 28,
      2011
      1.   For the specific heat exchangers selected:
          a.  Copy of the calculation which correlates surveillance testing results from these
                heat exchangers with design basis heat removal capability (e.g. basis for
                surveillance test acceptance criteria);
          b.  Copies of the two most recent completed tests and evaluation data confirming
                thermal performance for those heat exchangers which are performance tested;
          c.  Documentation and procedures that identify the types, accuracy, and location
                of any special instrumentation used for the two most recently completed
                thermal performance tests for the heat exchangers (e.g., high accuracy
                ultrasonic flow instruments or temperature instruments). Include calibration
                records for the instruments used during these tests;
          d.   Information regarding any alarms which monitor on-line performance;
          e.  Copy of the document describing the inspection results of each heat
                exchanger. The requested documents are to be for the time period from the
                onsite inspection period back to the documents that were provided in response
                to the previous heat sink performance inspection;
          f.  The cleaning and inspection maintenance schedule for each heat exchanger
                for the next 5 years;
          g.  Copy of the design specification and heat exchanger data sheets for each heat
                exchanger;
          h.  Copy of the vendor manuals including component drawings for each heat
                exchanger;
          i.  Copy of the calculation which establishes the limiting (maximum) design basis
                heat load which is required to be removed by each of these heat exchangers;
          j.  Copy of the operating procedure that ensures that the maximum cooling water
                system inlet temperature limit is not exceeded;
          k.  Copy of the calculations or documents which evaluate the potential for water
                hammer in each heat exchanger or associated piping;
          l.   Copy of the calculations that evaluate excessive tube vibration in each heat
                exchanger and the documents that describe the controls that prevent heat
                exchanger degradation due to excessive flow induced vibration during
                operation;
                                                3                                      Enclosure


===Enclosure:===
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST cc w/encl: Distribution via ListServ TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST Enclosure 1 Inspection Report: 05000456/2011005; 05000457/2011005(DRS) Inspection Dates: November 28 thru December 2, 2011 Inspection Procedures: IP 71111.07, "Heat Sink Performance" Lead Inspector(630) 829-9624 : Gerard O'Dwyer I. Information Requested By October 17, 2011 Gerard.odwyer@nrc.gov 1. List of the Generic Letter (GL) 89-13, "Service Water System Problems Affecting Safety-Related Equipment," heat exchangers in order of risk significance. 2. Copy of heat exchanger performance trending data tracked for each GL 89-13 heat exchanger. 3. List of corrective action program documents (with a short description) associated with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, or heat exchanger testing, for the previous three years or since the last corrective action program document list was sent to the NRC for the previous heat sink performance inspection. The list should include all corrective action program documents not on the last corrective action program document list. 4. Copy of any self-assessment done on any of GL 89-13 heat exchangers. 5. Last two system health report(s) and maintenance rule system notebooks for all the GL 89-13 heat exchangers. 6. List of engineering-related operator workarounds (with a short description) associated with GL 89-13 heat exchangers. The requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous heat sink performance inspection. 7. List of permanent and temporary modifications (with a short description) associated with GL 89-13 heat exchangers. The requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous heat sink performance inspection.
    m. Copy of the periodic flow testing at or near maximum design flow. The
          requested documents are to be for the time period from the onsite inspection
          period back to the documents that were provided in response to the previous
          heat sink performance inspection;
    n.   Copy of the document which identifies the current number of tubes in service
          for each heat exchanger and the supporting calculation which establishes the
          maximum number of tubes which can be plugged in each heat exchanger;
    o.   Copy of the document establishing the repair criteria (plugging limit) for
          degraded tubes which are identified in each heat exchanger;
    p.   Copies of the documents that verify the structural integrity of the heat
          exchanger (e.g., eddy current summary sheets, ultrasonic testing results, and
          visual inspection results); and
    q.    Copies of those documents that describe the methods taken to control water
          chemistry in the heat exchangers.
2. For the ultimate heat sink (UHS) and the safety-related service water system (or
    equivalent):
        a. Copies of any design change performed on the UHS. The requested
            documents are to be for the time period from the onsite inspection period
            back to the documents that were provided in response to the previous heat
            sink performance inspection;
        b. Copies of any design change performed on the safety-related service water
            system. The requested documents are to be for the time period from the
            onsite inspection period back to the documents that were provided in
            response to the previous heat sink performance inspection;
        c. Copies of procedures for a loss of UHS;
        d. Copies of procedures for a loss of service water system;
        e. Inspections and/or maintenance related to preventing macrofouling (e.g. silt,
            dead mussel shells, or debris) and biotic fouling (e.g., fish, algae, grass, or
            kelp). The requested documents are to be for the time period from the onsite
            inspection period back to the documents that were provided in response to
            the previous heat sink performance inspection;
        f.  Copies of documents associated with the monitoring of pump performance for
            potential strong-pump vs. weak-pump interaction; and
                                          4                                        Enclosure


TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST Enclosure 2 II. Information Requested By November 14, 2011 1. Copy of the Updated Final Safety Analysis Report (UFSAR) section applicable to the GL 89-13 Heat Exchanger Program. 2. Copies of procedures developed to implement the recommendations of GL 89-13 (e.g., the GL 89-13 Heat Exchanger Program description). 3. For the specific heat exchangers selected: a. Copies of the applicable UFSAR sections for each heat exchanger. b. Copy of system description and design basis document for the heat exchangers (as applicable). c. Provide a list of calculations (with a short description) which currently apply to each heat exchanger. d. Copy of any operability determinations or other documentation of degradation associated with the heat exchangers or the systems that support the operation for the selected heat exchangers. 4. For the ultimate heat sink (UHS) and the safety-related service water system (or equivalent): a. Copies of the applicable UFSAR sections. b. Copy of system description and design basis document (as applicable). c. Copy of any operability determinations or other documentation of degradation associated with the UHS and the safety-related service water system. d. Copy of the document (e.g. UFSAR or Technical Requirements Manual) that states the maximum cooling water system inlet temperature limit that still allows full licensed power operation of the nuclear reactor. 5. A schedule of all inspections, cleanings, maintenance, or testing of any6. Copies of Corrective Action Program implementing procedures. safety-related plant heat exchanger to be performed during the on-site portion of the inspection. 7. If available, electronic copies of the current Technical Specifications, Technical Specifications Basis, Final Safety Analysis Report, and Technical Report Manual.
        TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
                g. Copies of the testing, inspection, or monitoring program procedures for buried
                    or inaccessible piping and the associated results. The requested documents
                    are to be for the time period from the onsite inspection period back to the
                    documents that were provided in response to the previous heat sink
                    performance inspection.
                h. Copies of the procedures to monitor, assess, and disposition active thru wall
                    pipe leaks, including structural evaluations and/or planned corrective actions.
                i. History of any thru wall pipe leak on the system. The requested documents
                    are to be for the time period from the onsite inspection period back to the
                    documents that were provided in response to the previous heat sink
                    performance inspection.
                j. Copies of the documents associated with the periodic inspection program
                    used to detect protective coating failure, corrosion, and erosion.
                k. Copies of the documents associated with the monitoring, trending, and
                    remediation of silt accumulation at the service water pump bay.
                l. Copies of surveillance procedures and testing results performed on the
                    service water pump bay water level instruments. The requested documents
                    are to be for the time period from the onsite inspection period back to the
                    documents that were provided in response to the previous heat sink
                    performance inspection.
If the information requested above will not be available, please contact Gerard ODwyer as soon
as possible at (630) 829-9624, or email Gerard.ODwyer@nrc.gov.
                                                  5                                      Enclosure


TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST Enclosure 3 III. Information Requested to be Available on First Day of Inspection, November 28, 2011 1. For the specific heat exchangers selected: a. Copy of the calculation which correlates surveillance testing results from these heat exchangers with design basis heat removal capability (e.g. basis for surveillance test acceptance criteria); b. Copies of the two most recent completed tests and evaluation data confirming thermal performance for those heat exchangers which are performance tested; c. Documentation and procedures that identify the types, accuracy, and location of any special instrumentation used for the two most recently completed thermal performance tests for the heat exchangers (e.g., high accuracy ultrasonic flow instruments or temperature instruments). Include calibration records for the instruments used during these tests; d. Information regarding any alarms which monitor on-line performance; e. Copy of the document describing the inspection results of each heat exchanger. The requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous heat sink performance inspection; f. The cleaning and inspection maintenance schedule for each heat exchanger for the next 5 years; g. Copy of the design specification and heat exchanger data sheets for each heat exchanger; h. Copy of the vendor manuals including component drawings for each heat exchanger; i. Copy of the calculation which establishes the limiting (maximum) design basis heat load which is required to be removed by each of these heat exchangers; j. Copy of the operating procedure that ensures that the maximum cooling water system inlet temperature limit is not exceeded; k. Copy of the calculations or documents which evaluate the potential for water hammer in each heat exchanger or associated piping; l. Copy of the calculations that evaluate excessive tube vibration in each heat exchanger and the documents that describe the controls that prevent heat exchanger degradation due to excessive flow induced vibration during operation; TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST Enclosure 4 m. Copy of the periodic flow testing at or near maximum design flow. The requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous heat sink performance inspection; n. Copy of the document which identifies the current number of tubes in service for each heat exchanger and the supporting calculation which establishes the maximum number of tubes which can be plugged in each heat exchanger; o. Copy of the document establishing the repair criteria (plugging limit) for degraded tubes which are identified in each heat exchanger; p. Copies of the documents that verify the structural integrity of the heat exchanger (e.g., eddy current summary sheets, ultrasonic testing results, and visual inspection results); and q. Copies of those documents that describe the methods taken to control water chemistry in the heat exchangers. 2. For the ultimate heat sink (UHS) and the safety-related service water system (or equivalent): a. Copies of any design change performed on the UHS. The requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous heat sink performance inspection; b. Copies of any design change performed on the safety-related service water system. The requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous heat sink performance inspection; c. Copies of procedures for a loss of UHS; d. Copies of procedures for a loss of service water system; e. Inspections and/or maintenance related to preventing macrofouling (e.g. silt, dead mussel shells, or debris) and biotic fouling (e.g., fish, algae, grass, or kelp). The requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous heat sink performance inspection; f. Copies of documents associated with the monitoring of pump performance for potential strong-pump vs. weak-pump interaction; and TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST Enclosure 5 g. Copies of the testing, inspection, or monitoring program procedures for buried or inaccessible piping and the associated results. The requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous heat sink performance inspection. h. Copies of the procedures to monitor, assess, and disposition active thru wall pipe leaks, including structural evaluations and/or planned corrective actions. i. History of any thru wall pipe leak on the system. The requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous heat sink performance inspection. j. Copies of the documents associated with the periodic inspection program used to detect protective coating failure, corrosion, and erosion. k. Copies of the documents associated with the monitoring, trending, and remediation of silt accumulation at the service water pump bay. l. Copies of surveillance procedures and testing results performed on the service water pump bay water level instruments. The requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous heat sink performance inspection. If the information requested above will not be available, please contact Gerard O'Dwyer as soon as possible at (630) 829-9624, or email Gerard.ODwyer@nrc.gov.
M. Pacilio                                                                      -2-
The lead inspector for this inspection is Mr. Gerard ODwyer. If there are questions about the material
requested, or the inspection, please call Mr. ODwyer at (630) 829-9624. Please send the information to
the following e-mail address Gerard.ODwyer@nrc.gov. A hard-copy with the required information is also
an acceptable option.
It is important that these documents be as complete as possible in order to minimize the number of
documents requested during the preparation week or during the onsite inspection. All requested
documents are to be for the time period from the onsite inspection period back to the documents that
were provided in response to the previous heat sink performance inspection. If no activities were
accomplished in that time period, then the request applies to the last applicable document in the previous
time period.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements
were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not
conduct or sponsor, and a person is not required to respond to, a request for information or an
information collection requirement unless the requesting document displays a currently valid Office of
Management and Budget control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure
will be available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the
NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
                                                                                Sincerely,
                                                                                /RA by A. Dunlop For/
                                                                                Ann Marie Stone, Chief,
                                                                                Engineering Branch 2
                                                                                Division of Reactor Safety
Docket No. 50-456; 50-457
License No. NPF-72; NPF-77
Enclosure:                  TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
cc w/encl:                  Distribution via ListServ
DISTRIBUTION:
See next page
DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\Ltr. 081011 Braidwood HS RFI GFO.docx
Publicly Available                      Non-Publicly Available                        Sensitive                Non-Sensitive
To receive a copy of this document, indicate in the concurrence box C = Copy without attach/encl; E = Copy with attach/encl N = No copy
OFFICE                            RIII                              RIII
NAME                              GODwyer:ls                        AMStone
DATE                              8/ /11                            8/ /11
                                                              OFFICIAL RECORD COPY
 
Letter to Mr. Michael J. Pacilio from Ms. Ann Marie Stone dated August 10, 2011.
SUBJECT:      BRAIDWOOD STATION - NOTIFICATION OF AN NRC TRIENNIAL HEAT SINK
              PERFORMANCE INSPECTION AND REQUEST FOR INFORMATION
              INSPECTION REPORT 05000456/2011005; 05000457/2011005 (DRS)
DISTRIBUTION:
RidsNrrDorlLpl3-2 Resource
Daniel Merzke
RidsNrrPMBraidwood Resource
RidsNrrDirsIrib Resource
Cynthia Pederson
Steven Orth
Jared Heck
Allan Barker
DRPIII
DRSIII
Carole Ariano
Linda Linn
Patricia Buckley
Tammy Tomczak
ROPreports Resource
}}
}}

Latest revision as of 17:04, 12 November 2019

IR 05000456-11-005, 05000457-11-005 (Drs), on 11/28 Through 12/2/2011, Braidwood Station - Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information Inspection
ML11227A162
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 08/10/2011
From: Ann Marie Stone
NRC/RGN-III/DRS/EB2
To: Pacilio M
Exelon Generation Co, Exelon Nuclear
References
IR-11-005
Download: ML11227A162 (9)


See also: IR 05000456/2011005

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE ROAD, SUITE 210

LISLE, IL 60532-4352

August 10, 2011

Mr. Michael J. Pacilio

Senior Vice President, Exelon Generation Company, LLC

President and Chief Nuclear Officer (CNO), Exelon Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT: BRAIDWOOD STATION - NOTIFICATION OF AN NRC TRIENNIAL HEAT

SINK PERFORMANCE INSPECTION AND REQUEST FOR INFORMATION

INSPECTION REPORT 05000456/2011005; 05000457/2011005 (DRS)

Dear Mr. Pacilio:

On Monday, November 28, 2011, the U. S. Nuclear Regulatory Commission (NRC) will begin

the on-site portion of the Triennial Heat Sink Performance Inspection Braidwood Station. This

inspection will be performed in accordance with NRC baseline inspection procedure (IP)

71111.07T.

In order to minimize the impact that the inspection has on the site and to ensure a productive

inspection, we have enclosed a request for documents needed for the inspection. The

documents have been divided into three groups.

  • The first group lists information necessary for our initial inspection scoping activities. This

information should be available to the lead inspector no later than October 17, 2011. By

October 20, 2011, the inspector will communicate the initial selected set of approximately

2-3 risk significant heat exchangers.

  • The second group of documents requested is those items needed to support our in-office

preparation activities. This set of documents, including the calculations associated with the

selected heat exchangers, should be available at the Regional Office no later than

November 14, 2011. This information should be separated for each selected component,

especially if provided electronically (e.g., folder with component name that includes

calculations, condition reports, maintenance history, etc.). During the in-office preparation

activities, the inspector may identify additional information needed to support the

inspection.

  • The last group includes the additional information above, as well as plant specific reference

material. This information should be available onsite to the inspector on Monday,

November 28, 2011. It is also requested that corrective action documents and/or questions

developed during the inspection be provided to the inspector as the documents are

generated.

M. Pacilio -2-

The lead inspector for this inspection is Mr. Gerard ODwyer. If there are questions about the

material requested, or the inspection, please call Mr. ODwyer at (630) 829-9624. Please send

the information to the following e-mail address Gerard.ODwyer@nrc.gov. A hard-copy with the

required information is also an acceptable option.

It is important that these documents be as complete as possible in order to minimize the

number of documents requested during the preparation week or during the onsite inspection.

All requested documents are to be for the time period from the onsite inspection period back to

the documents that were provided in response to the previous heat sink performance

inspection. If no activities were accomplished in that time period, then the request applies to

the last applicable document in the previous time period.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number 3150-

0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting

document displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html

(the Public Electronic Reading Room).

Sincerely,

/RA by A. Dunlop For/

Ann Marie Stone, Chief,

Engineering Branch 2

Division of Reactor Safety

Docket No. 50-456; 50-457

License No. NPF-72; NPF-77

Enclosure: TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT

REQUEST

cc w/encl: Distribution via ListServ

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

Inspection Report: 05000456/2011005; 05000457/2011005(DRS)

Inspection Dates: November 28 thru December 2, 2011

Inspection Procedures: IP 71111.07, Heat Sink Performance

Lead Inspector: Gerard ODwyer

(630) 829-9624

Gerard.odwyer@nrc.gov

I. Information Requested By October 17, 2011

1. List of the Generic Letter (GL) 89-13, Service Water System Problems Affecting

Safety-Related Equipment, heat exchangers in order of risk significance.

2. Copy of heat exchanger performance trending data tracked for each GL 89-13 heat

exchanger.

3. List of corrective action program documents (with a short description) associated

with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, or heat

exchanger testing, for the previous three years or since the last corrective action

program document list was sent to the NRC for the previous heat sink performance

inspection. The list should include all corrective action program documents not on

the last corrective action program document list.

4. Copy of any self-assessment done on any of GL 89-13 heat exchangers.

5. Last two system health report(s) and maintenance rule system notebooks for all the

GL 89-13 heat exchangers.

6. List of engineering-related operator workarounds (with a short description)

associated with GL 89-13 heat exchangers. The requested documents are to be for

the time period from the onsite inspection period back to the documents that were

provided in response to the previous heat sink performance inspection.

7. List of permanent and temporary modifications (with a short description) associated

with GL 89-13 heat exchangers. The requested documents are to be for the time

period from the onsite inspection period back to the documents that were provided in

response to the previous heat sink performance inspection.

1 Enclosure

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

II. Information Requested By November 14, 2011

1. Copy of the Updated Final Safety Analysis Report (UFSAR) section applicable to

the GL 89-13 Heat Exchanger Program.

2. Copies of procedures developed to implement the recommendations of GL 89-13

(e.g., the GL 89-13 Heat Exchanger Program description).

3. For the specific heat exchangers selected:

a. Copies of the applicable UFSAR sections for each heat exchanger.

b. Copy of system description and design basis document for the heat

exchangers (as applicable).

c. Provide a list of calculations (with a short description) which currently apply to

each heat exchanger.

d. Copy of any operability determinations or other documentation of degradation

associated with the heat exchangers or the systems that support the operation

for the selected heat exchangers.

4. For the ultimate heat sink (UHS) and the safety-related service water system (or

equivalent):

a. Copies of the applicable UFSAR sections.

b. Copy of system description and design basis document (as applicable).

c. Copy of any operability determinations or other documentation of degradation

associated with the UHS and the safety-related service water system.

d. Copy of the document (e.g. UFSAR or Technical Requirements Manual)

that states the maximum cooling water system inlet temperature limit that

still allows full licensed power operation of the nuclear reactor.

5. A schedule of all inspections, cleanings, maintenance, or testing of any

safety-related plant heat exchanger to be performed during the on-site portion of

the inspection.

6. Copies of Corrective Action Program implementing procedures.

7. If available, electronic copies of the current Technical Specifications, Technical

Specifications Basis, Final Safety Analysis Report, and Technical Report Manual.

2 Enclosure

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

III. Information Requested to be Available on First Day of Inspection, November 28,

2011

1. For the specific heat exchangers selected:

a. Copy of the calculation which correlates surveillance testing results from these

heat exchangers with design basis heat removal capability (e.g. basis for

surveillance test acceptance criteria);

b. Copies of the two most recent completed tests and evaluation data confirming

thermal performance for those heat exchangers which are performance tested;

c. Documentation and procedures that identify the types, accuracy, and location

of any special instrumentation used for the two most recently completed

thermal performance tests for the heat exchangers (e.g., high accuracy

ultrasonic flow instruments or temperature instruments). Include calibration

records for the instruments used during these tests;

d. Information regarding any alarms which monitor on-line performance;

e. Copy of the document describing the inspection results of each heat

exchanger. The requested documents are to be for the time period from the

onsite inspection period back to the documents that were provided in response

to the previous heat sink performance inspection;

f. The cleaning and inspection maintenance schedule for each heat exchanger

for the next 5 years;

g. Copy of the design specification and heat exchanger data sheets for each heat

exchanger;

h. Copy of the vendor manuals including component drawings for each heat

exchanger;

i. Copy of the calculation which establishes the limiting (maximum) design basis

heat load which is required to be removed by each of these heat exchangers;

j. Copy of the operating procedure that ensures that the maximum cooling water

system inlet temperature limit is not exceeded;

k. Copy of the calculations or documents which evaluate the potential for water

hammer in each heat exchanger or associated piping;

l. Copy of the calculations that evaluate excessive tube vibration in each heat

exchanger and the documents that describe the controls that prevent heat

exchanger degradation due to excessive flow induced vibration during

operation;

3 Enclosure

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

m. Copy of the periodic flow testing at or near maximum design flow. The

requested documents are to be for the time period from the onsite inspection

period back to the documents that were provided in response to the previous

heat sink performance inspection;

n. Copy of the document which identifies the current number of tubes in service

for each heat exchanger and the supporting calculation which establishes the

maximum number of tubes which can be plugged in each heat exchanger;

o. Copy of the document establishing the repair criteria (plugging limit) for

degraded tubes which are identified in each heat exchanger;

p. Copies of the documents that verify the structural integrity of the heat

exchanger (e.g., eddy current summary sheets, ultrasonic testing results, and

visual inspection results); and

q. Copies of those documents that describe the methods taken to control water

chemistry in the heat exchangers.

2. For the ultimate heat sink (UHS) and the safety-related service water system (or

equivalent):

a. Copies of any design change performed on the UHS. The requested

documents are to be for the time period from the onsite inspection period

back to the documents that were provided in response to the previous heat

sink performance inspection;

b. Copies of any design change performed on the safety-related service water

system. The requested documents are to be for the time period from the

onsite inspection period back to the documents that were provided in

response to the previous heat sink performance inspection;

c. Copies of procedures for a loss of UHS;

d. Copies of procedures for a loss of service water system;

e. Inspections and/or maintenance related to preventing macrofouling (e.g. silt,

dead mussel shells, or debris) and biotic fouling (e.g., fish, algae, grass, or

kelp). The requested documents are to be for the time period from the onsite

inspection period back to the documents that were provided in response to

the previous heat sink performance inspection;

f. Copies of documents associated with the monitoring of pump performance for

potential strong-pump vs. weak-pump interaction; and

4 Enclosure

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

g. Copies of the testing, inspection, or monitoring program procedures for buried

or inaccessible piping and the associated results. The requested documents

are to be for the time period from the onsite inspection period back to the

documents that were provided in response to the previous heat sink

performance inspection.

h. Copies of the procedures to monitor, assess, and disposition active thru wall

pipe leaks, including structural evaluations and/or planned corrective actions.

i. History of any thru wall pipe leak on the system. The requested documents

are to be for the time period from the onsite inspection period back to the

documents that were provided in response to the previous heat sink

performance inspection.

j. Copies of the documents associated with the periodic inspection program

used to detect protective coating failure, corrosion, and erosion.

k. Copies of the documents associated with the monitoring, trending, and

remediation of silt accumulation at the service water pump bay.

l. Copies of surveillance procedures and testing results performed on the

service water pump bay water level instruments. The requested documents

are to be for the time period from the onsite inspection period back to the

documents that were provided in response to the previous heat sink

performance inspection.

If the information requested above will not be available, please contact Gerard ODwyer as soon

as possible at (630) 829-9624, or email Gerard.ODwyer@nrc.gov.

5 Enclosure

M. Pacilio -2-

The lead inspector for this inspection is Mr. Gerard ODwyer. If there are questions about the material

requested, or the inspection, please call Mr. ODwyer at (630) 829-9624. Please send the information to

the following e-mail address Gerard.ODwyer@nrc.gov. A hard-copy with the required information is also

an acceptable option.

It is important that these documents be as complete as possible in order to minimize the number of

documents requested during the preparation week or during the onsite inspection. All requested

documents are to be for the time period from the onsite inspection period back to the documents that

were provided in response to the previous heat sink performance inspection. If no activities were

accomplished in that time period, then the request applies to the last applicable document in the previous

time period.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements

were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not

conduct or sponsor, and a person is not required to respond to, a request for information or an

information collection requirement unless the requesting document displays a currently valid Office of

Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure

will be available electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the

NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA by A. Dunlop For/

Ann Marie Stone, Chief,

Engineering Branch 2

Division of Reactor Safety

Docket No. 50-456; 50-457

License No. NPF-72; NPF-77

Enclosure: TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

cc w/encl: Distribution via ListServ

DISTRIBUTION:

See next page

DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\Ltr. 081011 Braidwood HS RFI GFO.docx

Publicly Available Non-Publicly Available Sensitive Non-Sensitive

To receive a copy of this document, indicate in the concurrence box C = Copy without attach/encl; E = Copy with attach/encl N = No copy

OFFICE RIII RIII

NAME GODwyer:ls AMStone

DATE 8/ /11 8/ /11

OFFICIAL RECORD COPY

Letter to Mr. Michael J. Pacilio from Ms. Ann Marie Stone dated August 10, 2011.

SUBJECT: BRAIDWOOD STATION - NOTIFICATION OF AN NRC TRIENNIAL HEAT SINK

PERFORMANCE INSPECTION AND REQUEST FOR INFORMATION

INSPECTION REPORT 05000456/2011005; 05000457/2011005 (DRS)

DISTRIBUTION:

RidsNrrDorlLpl3-2 Resource

Daniel Merzke

RidsNrrPMBraidwood Resource

RidsNrrDirsIrib Resource

Cynthia Pederson

Steven Orth

Jared Heck

Allan Barker

DRPIII

DRSIII

Carole Ariano

Linda Linn

Patricia Buckley

Tammy Tomczak

ROPreports Resource