MONTHYEARML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 ML20203F3531997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for North Anna Power Station,Units 1 & 2 ML20199C6871997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for North Anna Power Station,Units 1 & 2 ML20217H9201997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for North Anna Power Station,Units 1 & 2 ML20216H9141997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for North Anna Power Station,Units 1 & 2 ML20210K5501997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for North Anna Power Station,Units 1 & 2 ML20210K5581997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for North Anna Power Station,Units 1,correcting Error Found on Shutdowns & Power Reductions Summary ML20140E5371997-05-31031 May 1997 Monthly Operating Repts for May 1997 for North Anna Power Station Units 1 & 2 ML20148B3771997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20141E2681997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20140D7551997-03-31031 March 1997 Monthly Operating Repts for North Anna Power Station,Units 1 & 2 ML20135F3111997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for North Anna Power Station,Units 1 & 2 ML20134H2961997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for North Anna Power Station Units 1 & 2 ML20133G5291996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for North Anna Power Station Units 1 & 2 ML20135E4961996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for North Anna Power Station Units 1 & 2 ML20134K5811996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for North Anna Power Station Unit 1 & 2 ML20128N1301996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for North Anna Power Station Unit 1 & 2 ML20117M0781996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for North Anna Power Station Units 1 & 2 ML20116J6431996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for North Anna Power Station Units 1 & 2 ML20115G2341996-06-30030 June 1996 Monthly Operating Repts for June 1996 for North Anna Power Station Units 1 & 2 ML20117M1811996-05-31031 May 1996 Monthly Operating Rept for May 1996 for North Anna 1 ML20117E7501996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for North Anna Power Station Units 1 & 2 ML20107C2951996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for North Anna Power Station Units 1 & 2 ML20106H0631996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for NAPS ML20097D5661996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for North Anna Power Station Units 1 & 2 ML20096C3041995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for North Anna Power Station,Units 1 & 2 ML20095D8611995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for North Anna Power Station ML20094H3601995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for North Anna Power Station ML20093D8781995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for North Anna Power Station Units 1 & 2 ML20092F5571995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for North Anna Power Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N9281999-10-20020 October 1999 Special Rept:On 991003,PZR PORV Actuation Mitigated RCS low- Temp Overpressure Transient.Caused by a RCP Facilitating Sweeping of Entrained Air Out of RCS Loops.Operating Procedure 2-OP-5.1 Will Be Revised ML20217H3631999-10-14014 October 1999 Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su ML18152A2811999-10-12012 October 1999 Technical Basis for Elimination of Nozzle Inner Radius Insps (for Nozzles Other than Reactor Vessel),Technical Basis for ASME Section XI Code Case N-619. ML20212J9251999-10-0101 October 1999 Safety Evaluation Accepting Licensee Relief Request IWE-3 for Second 10-year ISI for Plant ML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20211N2611999-09-0808 September 1999 Safety Evaluation Concluding That Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit & Clarification of Terminology with Respect to Reconstituted Fuel Assemblies Acceptable ML20211J2561999-08-31031 August 1999 Safety Evaluation Accepting Elimination of Augmented ISI Program for Pressurizer Spray Lines at North Anna Unit 2 ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20211J2421999-08-31031 August 1999 Safety Evaluation Supporting Removal of Augmented Insp Program on RCS Bypass Lines from Licensing Basis of North Anna,Units 1 & 2 ML20210T0791999-08-13013 August 1999 Safety Evaluation Concluding That Revised Withdrawal Schedules for North Anna Units 1 & 2 Satisfy Requirements of App H to 10CFR50 & Therefore Acceptable ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20210Q9931999-07-31031 July 1999 Rev 1 to COLR for North Anna Power Station,Unit 2 Cycle 13 Pattern Ud ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206L4831999-05-10010 May 1999 SER Accepting Request to Delay Submitting Plant,Unit 1 Class 1 Piping ISI Program for Third Insp Interval Until 010430, to Permit Development of Risk Informed ISI Program for Class 1 Piping ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205S0391999-04-21021 April 1999 SER Accepting Request for Relief IWE5,per 10CFR50.55a(a)(3) & Proposed Alternatives for IWE2,IWE4,IWE6 & IWL2 Authorized Per 10CFR50.55a(a)(3)(ii) ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20207E1731999-02-18018 February 1999 Informs Commission of Status of Preparations of IAEA Osart Mission to North Anna Nuclear Power Plant Early Next Year ML20205A0241998-12-31031 December 1998 Summary of Facility Changes,Tests & Experiments,Including Summary of SEs Implemented at Plant During 1998,per 10CFR50.59(b)(2).With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20198H9541998-12-0303 December 1998 Safety Evaluation Authorizing Proposed Alternative for Remainder of Second 10-yr Insp Interval for Plant ML20198J5561998-12-0303 December 1998 ISI Summary Rept for North Anna Power Station,Unit 1 1998 Refueling Outage Owner Rept for Inservice Insps ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20196G1381998-11-0303 November 1998 Safety Evaluation Authorizing Rev to Relief Request NDE-32 for Remainder of Second 10-yr Insp Interval for Each Unit ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154L0691998-10-14014 October 1998 COLR for North Anna Power Station Unit 1 Cycle 14 Pattern Xy ML20155J6911998-10-0909 October 1998 Staff Response to Tasking Memorandum & Stakeholder Concerns ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151X8011998-09-10010 September 1998 Special Rept:On 980622,groundwater Level at Piezometer P-22 Was Again Noted to Be Above Max Water Level by 0.71 Feet. Increased Frequency of Piezometer Monitoring & Installed Addl Piezometers at Toe of Slope Along Southwest Section ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236V1251998-07-14014 July 1998 ISI Summary Rept for Naps,Unit 2,1998 Refueling Outage Owners Rept of Isis ML20236K5531998-07-0707 July 1998 SER Accepting Request for Change in ISI Commitment on Protection Against Pipe Breaks Outside Containment ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20248C8831998-05-29029 May 1998 SER Accepting Alternatives Proposed by Licensee for Use of Code Case N-535,pursuant to 10CFRa(a)(3)(i) in ASME Section XI Inservice Insp Program ML20247K9281998-05-15015 May 1998 Special Rept:On 980428,letdown PCV Exhibited Slow Response When C RCP Was Started.Cause to Be Determined.Review of Operating Procedure Will Be Performed to Determine If Enhancements Are Necessary ML20216A8971998-05-0606 May 1998 Rev 0 to Cycle 13 Pattern Ud COLR for North Anna Unit 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20217B5321998-04-20020 April 1998 Safety Evaluation Supporting Proposed Alternative to ASME Code for Surface Exam of Seal Welds on Threaded Caps for Plant Reactor Vessel Head Penetrations for part-length CRDMs ML20217H9611998-04-0707 April 1998 Special Rept:On 980216,groundwater Level at Piezometer P-22, Again Noted to Be Above Max Water Level by 0.41 Feet.Design Package for Installation of Addl Standpipe Piezometers at Toe of Slope Southeast Section,Developed ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E8801998-03-0606 March 1998 Safety Evaluation Authorizing Licensee Request for Relief from ASME Code Requirements,Paragraph IWA-2400(c) (Summer Edition W/Summer 1983 Addenda),For Upcoming Naps,Unit 1 Outage,Per 10CFR50.55a(a)(3)(ii) ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20199J6431998-02-0202 February 1998 Safety Evaluation Approving Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Code Class 3 SW Piping for North Anna,Unit 1,as Submitted in ISI Relief Request NDE-46 on 971218 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198S7571998-01-15015 January 1998 Safety Evaluation Accepting Licensee Request for Approval to Repair Flaws IAW GL-90-05 for ASME Code Class 3 Svc Water Piping ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 1999-09-08
[Table view] |
Text
. - . _ . _
o b
VinoINIA Ex.ecTRIC AND Powen COMPANY RIcnwonn, VIRGINIA 23261 January 8,1999 United States Nuclear Regulatory Commission Serial No.99-013 Attention: Document Control Desk NAPS /JHL Washington, D. C. 20555 Docket Nos. 50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NOS.1 AND 2 MONTHLY OPERATING REPORT Enclosed is the December 1998 Monthly Operating Report for North Anna Power ~
Station Units 1 and 2.
Very truly yours, duA?4/
W. R. Matthews Site Vice President Enclosure Commitments made in this letter: None.
cc: U. S. Nuclear Regulatory Commission Region ll Atlanta Federal Center ~~
61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303 glf ,
Mr. M. J. Morgan NRC Senior Resident inspector North Anna Power Station 9901190169 991231 PDR ADOCK 05000338 R PDR; ,, ,
c
w.
e l
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION ;
MONTHLY OPERATING REPORT !
DECEMBER 1998 ,
l I
(
l t
l l
l Approved; b / 7 p Site Vice President Date Q s i
l l
P s
r 8 l l
. i
' 1 l l OPERATING DATA REPORT i Docket No.: 50-338 i Date: 01/05/99 l
Contact:
W. R. Matthews Telephone: (540) 894-2101
- 1. Unit Namen .... North Anna Unit 1
- 2. Reporting Period:. .. December,1998
- 3. Licensed Thermal Power (MWt):. . 2,893 ,
- 4. Nameplate Rating (Gross MWe):... . 979.74 ;
- 5. Design Electrical Rating (Net MWe):: . 907
- 6. Maximum Dependable Capacity (Gross MWe): 940 '
- 7. Maximum Dependable Capacity (Net MWe): .. . 893 !
- 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Give Reasons:
N/A l
- 9. Power Level To Which Restricted, if Any (Net MWe): N/A
- 10. Reasons For Restrictions, if Any: N/A This Month Year-To-Date Cumulative i
- 11. Hours in Reporting Period 744.0 8,760.0 179,940.0 i
- 12. Hours Reactor Was Critical 744.0 8,170.2 141,425.2 ,
- 13. Reactor Reserve Shutdown Hours 0.0 39.2 7,134.2
- 14. Hours Generator On-Line 744.0 8,092.4 138,259.8 :
l
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 t' 16. Gross Thermal Energy Generated (MWH) 2,151,717.5 23,160,556.4 373,695,028.9
- 17. Gross Electrical Energy Generated (MWH) 715,835.0 7,587,217.0 159,757,870.0 t
- 18. Net Electrical Energy Generated (MWH) 682,440.0 7,217,055.0 116,361,238.0 *
- 19. Unit Service Factor 100.0 % 92.4 % 76.8 %
- 20. Unit Availability Factor 100 0% 92.4% 76.8 %
- l. 21. Unit Capacity Factor (Using MDC Net) 102.7 % 92.3 % 72.4 %
- 22. Unit Capacity Factor (Using DER Net) 101.1 % 90.8 % 71.3 %
- 23. Unit Forced Outage Rate 0.0% 0.7% 7.9%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A '
- 25. If Shut Down at End of Report Period, Estimated Date of Start-up:
l
- 26. Unit in Test Status (Prior to Commercial Operation):
FORECAST ACHIEVED l INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION j.
I _
i .
c AVERAGE DAILY UNIT POWER LEVEL {
Docket No.: 50-338 Unit Name: North Anna Unit 1 Date: 01/05/99
Contact:
W. R. Matthews Telephone: (540) 894-2101 MoWrH: December,1998 Average Daily Power Level Average Daily Power Level Day (MWe - Net) Day (MWe - Net) l 1 919 17 904 l
2 919 18 916 '
3 920 19 918 '
4 919 20 919 t 5 919 21 919 6 919' 22 918 7 918 23 918 8 918 24 918 I 9 918 25 918 I 10 918 26 918 I
11 919 27 918 i 12 919 28 918 l
13 919 29 915 14 912 30 915 t I
)
15 916 31 911 1 l
16 918 I
! i INSTRUCTIONS l
On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to !
the nearest whole megawatt.
4 i
l i
r ,
Docket No.: 50-338 Unit Name: Nortt Ama Unit i Date: 01/0N99
Contact:
W. F. t/httM.ws Telephone: (540,8344t01 NORTH ANNA POWER STATION
\
i UNIT NO.: _1 f.10 NTH December 1998
SUMMARY
OF OPERATING EXPERIENCE Page 1 of 2 !
Listed below in chronological sequence is a summary of operating experiences for this month which required load k reductions or resulted in significant non-load related incidents.
DAlf 3 22 ER!8 December 1,1998 0000 Began the month in Mode 1,100% power,964 MWe.
December 14,1998 0057 Ramped Unit 1 to 95% power,921 MWe for condenser water box maintenance.
0300 Condenser water box maintenance complete. Ramped Unit 1 to 100% power,959 MWe.
December 31,1998 2400 Ended month in Mode 1,100% power,963 MWe.
I i
l l
i i
I 1
. _ _ _ . ._. ~ _. . _. . ._ . . . . _ _ . _ . . . - . __ - - _ = _ _ _ . ._ _ _ .
. j l
l Docket No.: 50-338 '
Unit Name: North Anna Unit 1 l Date: 01/05/99 j
Contact:
W. R. Matthews Te'ephone: (540) 894-2101 l
UNIT SHUTDOWN AND POWER REDUCTION (EcuALTo OR GREATER THAN 20%)
REPORT MONTH: December,1998 ,
(1) (2) (3) (4) (5)
Method f Duration of LER No. System Component Cause & Corrective Action .
Date Type Hours Reason Shutting Code Code to Prevent Recurrence Down Reactor e
None during the reporting period. !
k I
l 1
1 (1) (2) (3)
F: Forced REASON: METHOD:
S: Scheduled A- Equipment Failure (Explain) 1 - Manual B- Maintenance or Test 2- Manual Scram C- Refueling 3- Automatic Scram D- Regulatory Restriction 4 -
Other (Explain)
E- Operator Training & Licensing Examination F- Administrative G - - Operational Error (Explain)
(4) (5)
Exhibit G Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source for Licensee Event Report (LER) File (NUREG 0161)
I
- l. ,
f-
~
l
~
OPERATING DATA REPORT Docket No.: 50-339 Date: 01/05/99
Contact:
W. R. Matthews Telephone: (540) 894-2101
- 1. Unit Name:- . North Anna Unit 2
- 2. Reporting Period:- . . . . December,1998
- 3. Licensed Thermal Power (MWt):- 2,893
- 4. Nameplate Rating (Gross MWe): 979
- 5. Design Electrical Rating (Net MWe):: 907
- 6. Maximum Dependable Capacity (Gross MWe): . . 944
- 7. Maximum Dependable Capacity (Net MWe): . 897
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A f
- 9. Power Level To Which Restricted, if Any (Net MWe): N/A
- 10. Reasons For Restrictions,if Any: N/A This Month Year-To-Dalf Cumulative
- 11. Hours in Reporting Period 744.0 8,760.0 158,208.0
- 12. Hours Reactor Was Critical 744.0 0,073.0 133,788.2
- 13. Reactor Reserve Shutdown Hours 0.0 57.3 7,241.5
- 14. Hours Generator On-Line 744.0 8,051.1 132,573.3
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 2.151,182.6 22,933,515.7 363,726,695.7
'17. Gross Electrical Energy Generated (MWH) 701,755.0 7,454,402.0 118,956,916.0
- 18. Net Electrical Energy Generated (MWH) 668,434.0 7,086,105.0 113.614,073.0
- 19. Unit Service Factor 100.0 % 91.9 % 83.8 %
- 20. Unit Availability Factor 100.0 % 91.9 % 83.8 %
- 21. Unit Capacity Factor (Using MDC Net) - 100.2 % 90.2 % 79.9 %
- 22. Unit Capacity Factor (Using DER Net) 99.1 % 89.2 % 79.2 %
- 23. Unit Forced Outage Rate 0.0% 0.3% 4.8%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
None
- 25. If Shut Down at End of Report Period, Estimated Date of Start-up: N/A
- 26. Unit in Test Status (Prior to Commercial Operation):
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION I
l -
l l AVERAGE DAILY UNIT POWER LEVEL l Docket No.: 50-339 Unit Name: North Anna Unit 2 Date: 01/05/99
Contact:
W. R. Matthews Telephone: (540) 894-2101 MONTH: December,1998 I i
I
! Average Daily Power Level ~ Average Daily Power Level !
t Day (MWe - Net) Day (MWe Net)' '
i 1
1 900 17 898 ,
l 2 900 18 899 i
3 9N 19 899 i 4 900 20 899 l 5 900 21 899 j 1
6 900 22 890 1
7 899 _
23 897 !
8 899 24 898 )
i c 9 899 25 898 l l 10 899 26 897
]
11 900 27 898 l 12 900 28 898
( 13 900 29 897 14 899 30 897 l 15 897 31 898 16 898 l- INSTRUCTIONS -
l On this format, list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to l the nearest whole megawatt.
6
(. .
. _ ~ s
. \
.+
Docket No.: 50-339 Unit Name: North Anna Unit 2 Date: 01/05/99
Contact:
W. R. Matthews Telephone: (540) 894-2101 NORTH ANNA POWER STATION UNIT NO.:_2 MONTH: December 1998
SUMMARY
OF OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is a summary of operating experiences for the month which required load reductions or resulted in significant non-load related incidents.
Dalt Ilmt Etta December 1,1998 0000 Began the month in Mode 1,100% power,945 MWe, December 22,1998 1020 Ramped Unit 2 to 91% power,867 MWe for Turbine Valve Freedom Testing (TVFT).
1654 TVFT completed satisfactorily. Ramped Unit 2 to 100% power,942 MWe.
December 31,1998 2400 Ended the month in Modo 1,100% power,942 MWe.
. . _ _. . . . _ . _ _ _ . . . _ . _ . _ _ . m. - . _ . . - . _ . _ . .. . _ _
~
~e Docket No.: 50-339 1 Unit Name: North Anna Unit 2 r Date: 01/05/99
Contact:
W. R. Matthews Telephone: (540) 894-2101 UNIT SHUTDOWN AND POWER REDUCTION (EouALTo oR GREATER THAN 20%)
REPORT MONTH: December,1998 (1) (2) (3) (4) (5)
Method i Duration of LER No. System Component Cause & Corrective Action Date Type Hours Reason Shutting Code Code to Prevent Recurrence ,
Down Rx None during the reporting period. ;
i l
(1) (2) (3)
F: Forced REASON: METHOD:
S: Scheduled A- Equipment Failure (Explain) 1 -
Manual i B- Maintenance or Test 2- Manual Scram C- Refueling 3- Automatic Scram D- Regulatory Restriction 4- Other (Explain) j
, E- Operator Training & Licensing Examination
! F- Administrative G- Operational Error (Explain)
(4) (5)
- l. Exhibit G Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source j for Licensee Event Report (LER) File (NUREG 0161) j l-
,