IR 05000261/2011001: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML110630060
| number = ML110630060
| issue date = 03/04/2011
| issue date = 03/04/2011
| title = H. B. Robinson Steam Electric Plant, Unit 2, Annual Assessment Letter (Report 05000261/2011001)
| title = Annual Assessment Letter (Report 05000261/2011001)
| author name = McCree V M
| author name = Mccree V
| author affiliation = NRC/RGN-I/ORA
| author affiliation = NRC/RGN-I/ORA
| addressee name = Duncan R J
| addressee name = Duncan R
| addressee affiliation = Carolina Power & Light Co
| addressee affiliation = Carolina Power & Light Co
| docket = 05000261
| docket = 05000261
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:Inspection / Activity PlanPage 1 of 203/04/201106:53:11Report 2203/01/2011-06/30/2012UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteRobinson95002-95002 SUPPLEMENTAL INSPECTION8 2 IPSupplemental Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Perfor9500205/31/201106/10/201195001-95001 SUPPLEMENTAL INSPECTION2 2 IPSupplemental Inspection for One or Two White Inputs in a Strategic Performance Area9500103/21/201103/25/2011PSB1-RP-RP PUBLIC RADIATION SAFETY INSP5 2 IPVerification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS2515/17905/23/201105/27/2011 2 IPOccupational Dose Assessment71124.0405/23/201105/27/2011 2 IPRadiation Monitoring Instrumentation71124.0505/23/201105/27/2011 2 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0605/23/201105/27/2011 2 IPPerformance Indicator Verification7115105/23/201105/27/2011PSB1EP-EMERGENCY PREPAREDNESS EXERCISE3 2 IPExercise Evaluation711140105/23/201105/27/2011 2 IPEmergency Action Level and Emergency Plan Changes711140405/23/201105/27/2011 2 IPPerformance Indicator Verification7115105/23/201105/27/2011OL EXAM-INITIAL EXAM PREP4 2 ROBINSON / NOVEMBER 2011 EXAM AT POWER FACILITIESV2336311/07/201111/11/2011OL EXAM-INITIAL EXAM - WEEK 14 2 ROBINSON / NOVEMBER 2011 EXAM AT POWER FACILITIESV2336311/28/201112/02/2011OL EXAM-INITIAL EXAM - WEEK 24 2 ROBINSON / NOVEMBER 2011 EXAM AT POWER FACILITIESV2336312/05/201112/09/2011PSB1-RP-OCCUPATIONAL RP BASELINE WK13 2 IPRadiological Hazard Assessment and Exposure Controls71124.0101/23/201201/27/2012 2 IPOccupational ALARA Planning and Controls71124.0201/23/201201/27/2012 2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0301/23/201201/27/2012 2 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0801/23/201201/27/2012 2 IPPerformance Indicator Verification7115101/23/201201/27/2012EB3 ISI-UNIT 2 IN-SERVICE INSPECTION1 2 IPInservice Inspection Activities - PWR7111108P01/30/201202/03/2012PSB1-RP-OCCUPATIONAL RP BASELINE WK24 2 IPRadiological Hazard Assessment and Exposure Controls71124.0102/06/201202/10/2012 2 IPOccupational ALARA Planning and Controls71124.0202/06/201202/10/2012 2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0302/06/201202/10/2012 2 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0802/06/201202/10/2012 2 IPPerformance Indicator Verification7115102/06/201202/10/2012This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedure Inspection / Activity PlanPage 2 of 203/04/201106:53:11Report 2203/01/2011-06/30/2012UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteRobinsonPI&R-PROBLEM IDENTIFICATION AND RESOLUTION5 2 IPIdentification and Resolution of Problems71152B05/07/201205/11/2012 2 IPIdentification and Resolution of Problems71152B05/21/201205/25/2012PSB1EP-EMERGENCY PREPAREDNESS INSPECTION1 2 IPAlert and Notification System Testing711140205/21/201205/25/2012 2 IPEmergency Preparedness Organization Staffing and Augmentation System711140305/21/201205/25/2012 2 IPEmergency Action Level and Emergency Plan Changes711140405/21/201205/25/2012 2 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140505/21/201205/25/2012 2 IPPerformance Indicator Verification7115105/21/201205/25/2012EB3 HS-TRIENNIAL HEAT SINK INSPECTION1 2 IPHeat Sink Performance7111107T06/04/201206/08/2012This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
{{#Wiki_filter:Page 1 of 2      Robinson 03/04/2011 06:53:11    Inspection / Activity Plan Report 22    03/01/2011 - 06/30/2012 Unit Planned Dates        No. of Staff Number Start End Inspection Activity    Title  on Site 95002 - 95002 SUPPLEMENTAL INSPECTION      8 2 05/31/2011 06/10/2011 IP 95002  Supplemental Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Perfor 95001 - 95001 SUPPLEMENTAL INSPECTION      2 2 03/21/2011 03/25/2011 IP 95001 Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area PSB1-RP - RP PUBLIC RADIATION SAFETY INSP      5 2 05/23/2011 05/27/2011 IP 2515/179 Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 2 05/23/2011 05/27/2011 IP 71124.04 Occupational Dose Assessment 2 05/23/2011 05/27/2011 IP 71124.05 Radiation Monitoring Instrumentation 2 05/23/2011 05/27/2011 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 2 05/23/2011 05/27/2011 IP 71151  Performance Indicator Verification PSB1EP - EMERGENCY PREPAREDNESS EXERCISE      3 2 05/23/2011 05/27/2011 IP 7111401 Exercise Evaluation 2 05/23/2011 05/27/2011 IP 7111404 Emergency Action Level and Emergency Plan Changes 2 05/23/2011 05/27/2011 IP 71151  Performance Indicator Verification OL EXAM - INITIAL EXAM PREP      4 2 11/07/2011 11/11/2011 V23363 ROBINSON / NOVEMBER 2011 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 1      4 2 11/28/2011 12/02/2011 V23363 ROBINSON / NOVEMBER 2011 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 2       4 2 12/05/2011 12/09/2011 V23363 ROBINSON / NOVEMBER 2011 EXAM AT POWER FACILITIES PSB1-RP - OCCUPATIONAL RP BASELINE WK1      3 2 01/23/2012 01/27/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2 01/23/2012 01/27/2012 IP 71124.02 Occupational ALARA Planning and Controls 2 01/23/2012 01/27/2012 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2 01/23/2012 01/27/2012 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 2 01/23/2012 01/27/2012 IP 71151  Performance Indicator Verification EB3 ISI - UNIT 2 IN-SERVICE INSPECTION      1 2 01/30/2012 02/03/2012 IP 7111108P Inservice Inspection Activities - PWR PSB1-RP - OCCUPATIONAL RP BASELINE WK2      4 2 02/06/2012 02/10/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2 02/06/2012 02/10/2012 IP 71124.02 Occupational ALARA Planning and Controls 2 02/06/2012 02/10/2012 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2 02/06/2012 02/10/2012 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 2 02/06/2012 02/10/2012 IP 71151  Performance Indicator Verification This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure Page 2 of 2      Robinson 03/04/2011 06:53:11    Inspection / Activity Plan Report 22 03/01/2011 - 06/30/2012 Unit Planned Dates      No. of Staff Number Start End Inspection Activity    Title on Site PI&R - PROBLEM IDENTIFICATION AND RESOLUTION    5 2 05/07/2012 05/11/2012 IP 71152B Identification and Resolution of Problems 2 05/21/2012 05/25/2012 IP 71152B Identification and Resolution of Problems PSB1EP - EMERGENCY PREPAREDNESS INSPECTION    1 2 05/21/2012 05/25/2012 IP 7111402 Alert and Notification System Testing 2 05/21/2012 05/25/2012 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 2 05/21/2012 05/25/2012 IP 7111404 Emergency Action Level and Emergency Plan Changes 2 05/21/2012 05/25/2012 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 2 05/21/2012 05/25/2012 IP 71151  Performance Indicator Verification EB3 HS - TRIENNIAL HEAT SINK INSPECTION    1 2 06/04/2012 06/08/2012 IP 7111107T Heat Sink Performance This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedures.
}}
}}

Latest revision as of 02:28, 13 November 2019

Annual Assessment Letter (Report 05000261/2011001)
ML110630060
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 03/04/2011
From: Mccree V
Region 1 Administrator
To: Duncan R
Carolina Power & Light Co
Shared Package
ML110630051 List:
References
IR-11-001
Download: ML110630060 (2)


Text

Page 1 of 2 Robinson 03/04/2011 06:53:11 Inspection / Activity Plan Report 22 03/01/2011 - 06/30/2012 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 95002 - 95002 SUPPLEMENTAL INSPECTION 8 2 05/31/2011 06/10/2011 IP 95002 Supplemental Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Perfor 95001 - 95001 SUPPLEMENTAL INSPECTION 2 2 03/21/2011 03/25/2011 IP 95001 Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area PSB1-RP - RP PUBLIC RADIATION SAFETY INSP 5 2 05/23/2011 05/27/2011 IP 2515/179 Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 2 05/23/2011 05/27/2011 IP 71124.04 Occupational Dose Assessment 2 05/23/2011 05/27/2011 IP 71124.05 Radiation Monitoring Instrumentation 2 05/23/2011 05/27/2011 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 2 05/23/2011 05/27/2011 IP 71151 Performance Indicator Verification PSB1EP - EMERGENCY PREPAREDNESS EXERCISE 3 2 05/23/2011 05/27/2011 IP 7111401 Exercise Evaluation 2 05/23/2011 05/27/2011 IP 7111404 Emergency Action Level and Emergency Plan Changes 2 05/23/2011 05/27/2011 IP 71151 Performance Indicator Verification OL EXAM - INITIAL EXAM PREP 4 2 11/07/2011 11/11/2011 V23363 ROBINSON / NOVEMBER 2011 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 1 4 2 11/28/2011 12/02/2011 V23363 ROBINSON / NOVEMBER 2011 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 2 4 2 12/05/2011 12/09/2011 V23363 ROBINSON / NOVEMBER 2011 EXAM AT POWER FACILITIES PSB1-RP - OCCUPATIONAL RP BASELINE WK1 3 2 01/23/2012 01/27/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2 01/23/2012 01/27/2012 IP 71124.02 Occupational ALARA Planning and Controls 2 01/23/2012 01/27/2012 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2 01/23/2012 01/27/2012 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 2 01/23/2012 01/27/2012 IP 71151 Performance Indicator Verification EB3 ISI - UNIT 2 IN-SERVICE INSPECTION 1 2 01/30/2012 02/03/2012 IP 7111108P Inservice Inspection Activities - PWR PSB1-RP - OCCUPATIONAL RP BASELINE WK2 4 2 02/06/2012 02/10/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2 02/06/2012 02/10/2012 IP 71124.02 Occupational ALARA Planning and Controls 2 02/06/2012 02/10/2012 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2 02/06/2012 02/10/2012 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 2 02/06/2012 02/10/2012 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure Page 2 of 2 Robinson 03/04/2011 06:53:11 Inspection / Activity Plan Report 22 03/01/2011 - 06/30/2012 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5 2 05/07/2012 05/11/2012 IP 71152B Identification and Resolution of Problems 2 05/21/2012 05/25/2012 IP 71152B Identification and Resolution of Problems PSB1EP - EMERGENCY PREPAREDNESS INSPECTION 1 2 05/21/2012 05/25/2012 IP 7111402 Alert and Notification System Testing 2 05/21/2012 05/25/2012 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 2 05/21/2012 05/25/2012 IP 7111404 Emergency Action Level and Emergency Plan Changes 2 05/21/2012 05/25/2012 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 2 05/21/2012 05/25/2012 IP 71151 Performance Indicator Verification EB3 HS - TRIENNIAL HEAT SINK INSPECTION 1 2 06/04/2012 06/08/2012 IP 7111107T Heat Sink Performance This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedures.