(3 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML110630060 | | | number = ML110630060 |
| | issue date = 03/04/2011 | | | issue date = 03/04/2011 |
| | title = H. B. Robinson Steam Electric Plant, Unit 2, Annual Assessment Letter (Report 05000261/2011001) | | | title = Annual Assessment Letter (Report 05000261/2011001) |
| | author name = McCree V M | | | author name = Mccree V |
| | author affiliation = NRC/RGN-I/ORA | | | author affiliation = NRC/RGN-I/ORA |
| | addressee name = Duncan R J | | | addressee name = Duncan R |
| | addressee affiliation = Carolina Power & Light Co | | | addressee affiliation = Carolina Power & Light Co |
| | docket = 05000261 | | | docket = 05000261 |
Line 19: |
Line 19: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:Inspection / Activity PlanPage 1 of 203/04/201106:53:11Report 2203/01/2011-06/30/2012UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteRobinson95002-95002 SUPPLEMENTAL INSPECTION8 2 IPSupplemental Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Perfor9500205/31/201106/10/201195001-95001 SUPPLEMENTAL INSPECTION2 2 IPSupplemental Inspection for One or Two White Inputs in a Strategic Performance Area9500103/21/201103/25/2011PSB1-RP-RP PUBLIC RADIATION SAFETY INSP5 2 IPVerification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS2515/17905/23/201105/27/2011 2 IPOccupational Dose Assessment71124.0405/23/201105/27/2011 2 IPRadiation Monitoring Instrumentation71124.0505/23/201105/27/2011 2 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0605/23/201105/27/2011 2 IPPerformance Indicator Verification7115105/23/201105/27/2011PSB1EP-EMERGENCY PREPAREDNESS EXERCISE3 2 IPExercise Evaluation711140105/23/201105/27/2011 2 IPEmergency Action Level and Emergency Plan Changes711140405/23/201105/27/2011 2 IPPerformance Indicator Verification7115105/23/201105/27/2011OL EXAM-INITIAL EXAM PREP4 2 ROBINSON / NOVEMBER 2011 EXAM AT POWER FACILITIESV2336311/07/201111/11/2011OL EXAM-INITIAL EXAM - WEEK 14 2 ROBINSON / NOVEMBER 2011 EXAM AT POWER FACILITIESV2336311/28/201112/02/2011OL EXAM-INITIAL EXAM - WEEK 24 2 ROBINSON / NOVEMBER 2011 EXAM AT POWER FACILITIESV2336312/05/201112/09/2011PSB1-RP-OCCUPATIONAL RP BASELINE WK13 2 IPRadiological Hazard Assessment and Exposure Controls71124.0101/23/201201/27/2012 2 IPOccupational ALARA Planning and Controls71124.0201/23/201201/27/2012 2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0301/23/201201/27/2012 2 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0801/23/201201/27/2012 2 IPPerformance Indicator Verification7115101/23/201201/27/2012EB3 ISI-UNIT 2 IN-SERVICE INSPECTION1 2 IPInservice Inspection Activities - PWR7111108P01/30/201202/03/2012PSB1-RP-OCCUPATIONAL RP BASELINE WK24 2 IPRadiological Hazard Assessment and Exposure Controls71124.0102/06/201202/10/2012 2 IPOccupational ALARA Planning and Controls71124.0202/06/201202/10/2012 2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0302/06/201202/10/2012 2 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0802/06/201202/10/2012 2 IPPerformance Indicator Verification7115102/06/201202/10/2012This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedure Inspection / Activity PlanPage 2 of 203/04/201106:53:11Report 2203/01/2011-06/30/2012UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteRobinsonPI&R-PROBLEM IDENTIFICATION AND RESOLUTION5 2 IPIdentification and Resolution of Problems71152B05/07/201205/11/2012 2 IPIdentification and Resolution of Problems71152B05/21/201205/25/2012PSB1EP-EMERGENCY PREPAREDNESS INSPECTION1 2 IPAlert and Notification System Testing711140205/21/201205/25/2012 2 IPEmergency Preparedness Organization Staffing and Augmentation System711140305/21/201205/25/2012 2 IPEmergency Action Level and Emergency Plan Changes711140405/21/201205/25/2012 2 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140505/21/201205/25/2012 2 IPPerformance Indicator Verification7115105/21/201205/25/2012EB3 HS-TRIENNIAL HEAT SINK INSPECTION1 2 IPHeat Sink Performance7111107T06/04/201206/08/2012This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures. | | {{#Wiki_filter:Page 1 of 2 Robinson 03/04/2011 06:53:11 Inspection / Activity Plan Report 22 03/01/2011 - 06/30/2012 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 95002 - 95002 SUPPLEMENTAL INSPECTION 8 2 05/31/2011 06/10/2011 IP 95002 Supplemental Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Perfor 95001 - 95001 SUPPLEMENTAL INSPECTION 2 2 03/21/2011 03/25/2011 IP 95001 Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area PSB1-RP - RP PUBLIC RADIATION SAFETY INSP 5 2 05/23/2011 05/27/2011 IP 2515/179 Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 2 05/23/2011 05/27/2011 IP 71124.04 Occupational Dose Assessment 2 05/23/2011 05/27/2011 IP 71124.05 Radiation Monitoring Instrumentation 2 05/23/2011 05/27/2011 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 2 05/23/2011 05/27/2011 IP 71151 Performance Indicator Verification PSB1EP - EMERGENCY PREPAREDNESS EXERCISE 3 2 05/23/2011 05/27/2011 IP 7111401 Exercise Evaluation 2 05/23/2011 05/27/2011 IP 7111404 Emergency Action Level and Emergency Plan Changes 2 05/23/2011 05/27/2011 IP 71151 Performance Indicator Verification OL EXAM - INITIAL EXAM PREP 4 2 11/07/2011 11/11/2011 V23363 ROBINSON / NOVEMBER 2011 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 1 4 2 11/28/2011 12/02/2011 V23363 ROBINSON / NOVEMBER 2011 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 2 4 2 12/05/2011 12/09/2011 V23363 ROBINSON / NOVEMBER 2011 EXAM AT POWER FACILITIES PSB1-RP - OCCUPATIONAL RP BASELINE WK1 3 2 01/23/2012 01/27/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2 01/23/2012 01/27/2012 IP 71124.02 Occupational ALARA Planning and Controls 2 01/23/2012 01/27/2012 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2 01/23/2012 01/27/2012 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 2 01/23/2012 01/27/2012 IP 71151 Performance Indicator Verification EB3 ISI - UNIT 2 IN-SERVICE INSPECTION 1 2 01/30/2012 02/03/2012 IP 7111108P Inservice Inspection Activities - PWR PSB1-RP - OCCUPATIONAL RP BASELINE WK2 4 2 02/06/2012 02/10/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2 02/06/2012 02/10/2012 IP 71124.02 Occupational ALARA Planning and Controls 2 02/06/2012 02/10/2012 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2 02/06/2012 02/10/2012 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 2 02/06/2012 02/10/2012 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure Page 2 of 2 Robinson 03/04/2011 06:53:11 Inspection / Activity Plan Report 22 03/01/2011 - 06/30/2012 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5 2 05/07/2012 05/11/2012 IP 71152B Identification and Resolution of Problems 2 05/21/2012 05/25/2012 IP 71152B Identification and Resolution of Problems PSB1EP - EMERGENCY PREPAREDNESS INSPECTION 1 2 05/21/2012 05/25/2012 IP 7111402 Alert and Notification System Testing 2 05/21/2012 05/25/2012 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 2 05/21/2012 05/25/2012 IP 7111404 Emergency Action Level and Emergency Plan Changes 2 05/21/2012 05/25/2012 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 2 05/21/2012 05/25/2012 IP 71151 Performance Indicator Verification EB3 HS - TRIENNIAL HEAT SINK INSPECTION 1 2 06/04/2012 06/08/2012 IP 7111107T Heat Sink Performance This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedures. |
| }} | | }} |
Latest revision as of 02:28, 13 November 2019
|
---|
Category:Inspection Plan
MONTHYEARIR 05000261/20240052024-08-22022 August 2024 Updated Inspection Plan for H.B. Robinson Steam Electric Plant - Report 05000261/2024005 ML24047A0162024-02-15015 February 2024 2024 Rpn - CGD Inspection Information Request ML23342A0902023-12-0808 December 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML23235A0552023-08-23023 August 2023 – Notification of an Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000261/2023010) and Request for Information (RFI) IR 05000261/20230052023-08-21021 August 2023 Updated Inspection Plan for H.B. Robinson Steam Electric Plant (Report 05000261/2023005) ML23131A4192023-05-10010 May 2023 003 Radiation Safety Baseline Inspection Information Request IR 05000261/20220062023-03-0101 March 2023 Annual Assessment Letter for H.B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2022006) IR 05000261/20220052022-08-26026 August 2022 Updated Inspection Plan for the H.B Robinson Steam Electric Plant - Report 05000261/2022005-Final ML22098A2262022-04-11011 April 2022 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000261/20210062022-03-0202 March 2022 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 (Report No. 05000261/2021006) ML22018A0292022-01-18018 January 2022 Region 2 RFI - 2022 Program Inspections ML21295A2992021-10-22022 October 2021 Document Request for Robinson Nuclear Plant - Radiation Protection Inspection - Inspection Report 2021004 IR 05000261/20200062021-03-0303 March 2021 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 Report 05000261/2020006 ML20191A2192020-07-0909 July 2020 Notification of Conduct of a Fire Protection Team Baseline Inspection U.S. Nuclear Regulatory Commission Inspection Report No. 05000261/2020012 ML19347D1072019-12-13013 December 2019 Plan - Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000261/20190052019-08-28028 August 2019 Updated Inspection Plan for H.B. Robinson Steam Electric Plant, Unit 2 - (Report 05000261/2019005) ML19232A4172019-08-20020 August 2019 Radiation Safety Baseline Inspection RFI 2019-004 IR 05000261/20180062019-03-0404 March 2019 Annual Assessment Letter for H. B. Robinson Steam Electric Plant, Unit 2 - Report 05000261/2018006, Report 05000261/2018402, Report 05000261/2018501 IR 05000261/20180052018-08-23023 August 2018 Updated Inspection Plan for H.B. Robinson Steam Electric Plant Unit 2 (Inspection Report 05000261/2018005) ML18215A1352018-08-0303 August 2018 U2 Baseline In-Service Inspection 2018003 Public ML18172A1142018-06-20020 June 2018 Radiation Safety Baseline Inspection Emailed Initial Information Request 2018003 ML18115A0512018-04-25025 April 2018 RP Inspect Info & Doc Request IR 05000261/20170062018-02-28028 February 2018 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 - Report 05000261/2017006, Report 05000261/2017402, Report 05000261/2017501 IR 05000261/20170052017-08-28028 August 2017 Updated Inspection Plan for H. B. Robinson Steam Electric Plant - NRC Inspection Report 05000261/2017005 IR 05000261/20160062017-03-0101 March 2017 Annual Assessment Letter for H. B. Robinson Steam Electric Plant - NRC Inspection Report 05000261/2016006 ML17021A0042017-01-20020 January 2017 Notification of Inspection and Request for Information IR 05000261/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for H.B Robinson Steam Electric Plant - NRC Inspection Report 05000261/2016005 ML16092A2002016-03-29029 March 2016 Notification of H.B. Robinson Steam Electric Plant - Component Design Bases Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000261/2016008 IR 05000261/20150062016-03-0202 March 2016 Annual Assessment Letter for H.B. Robinson Steam Electric Plant - NRC Inspection Report 05000261/2015006 IR 05000261/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for H.B. Robinson Steam Electric Plant - NRC Inspection Report 05000261/2015005 IR 05000261/20140012015-03-0404 March 2015 Annual Assessment Letter for H.B. Robinson Steam Electric Plant NRC Inspection Report 05000261/2014001 ML14245A1732014-09-0202 September 2014 Mid-Cycle Ltr 2014 ML14063A1832014-03-0404 March 2014 2013 Annual Assessment Letter for H.B. Robinson Steam Electric Plant ML13246A0682013-09-0303 September 2013 Mid Cycle Assessment Letter ML13224A3172013-08-12012 August 2013 Notification of Inspection and Request for Information ML13085A1272013-03-26026 March 2013 Notification of Inspection and Request for Information IR 05000261/20120012013-03-0404 March 2013 Annual Assessment Letter for H.B. Robinson Steam Electric Plant (NRC Inspection Report 05000261/2012001) ML12248A1642012-09-0404 September 2012 Mid Cycle Assessment Letter Robinson 2012 ML12209A3772012-07-27027 July 2012 IR 05000261-12-008, on 01/01/2012, H.B. Robinson Steam Electric Plant-Notification of Conduct of a Triennial Fire Protection Baseline Inspection ML1206504242012-03-0505 March 2012 End of Cycle Assessment Report 22 IR 05000261/20110012011-03-0404 March 2011 Annual Assessment Letter (Report 05000261/2011001) ML1024405952010-09-0101 September 2010 Report 22 - 2010 Mid Cycle Inspection/Activity Plan ML1006209802010-03-0303 March 2010 Report 22 - 2010001 Inspection/Activity Plan ML0924405542009-09-0101 September 2009 Inspection/Activity Plan, Report 22, 09/01/2009 - 12/31/2010 RNP-RA/09-0067, Nickel-Alloy Nozzles and Penetrations Program Inspection Plan2009-07-29029 July 2009 Nickel-Alloy Nozzles and Penetrations Program Inspection Plan ML0824610022008-09-0202 September 2008 Inspection / Activity Plan, 09/01/2008 - 12/31/2009, Report 22 IR 05000261/20080012008-03-0303 March 2008 Annual Assessment Letter (IR 05000261-08-001) ML0724306772007-08-31031 August 2007 Mid-Cycle 2007 Report ML0724702262007-08-31031 August 2007 Mid-Cycle Performance Review and Inspection Plan - H.B. Robinson Steam Electric Plant Unit 2 ML0706001892007-03-0101 March 2007 Inspection / Activity Plan 03/01/2007 - 09/30/2008 - Report 22 2024-08-22
[Table view] |
Text
Page 1 of 2 Robinson 03/04/2011 06:53:11 Inspection / Activity Plan Report 22 03/01/2011 - 06/30/2012 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 95002 - 95002 SUPPLEMENTAL INSPECTION 8 2 05/31/2011 06/10/2011 IP 95002 Supplemental Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Perfor 95001 - 95001 SUPPLEMENTAL INSPECTION 2 2 03/21/2011 03/25/2011 IP 95001 Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area PSB1-RP - RP PUBLIC RADIATION SAFETY INSP 5 2 05/23/2011 05/27/2011 IP 2515/179 Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 2 05/23/2011 05/27/2011 IP 71124.04 Occupational Dose Assessment 2 05/23/2011 05/27/2011 IP 71124.05 Radiation Monitoring Instrumentation 2 05/23/2011 05/27/2011 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 2 05/23/2011 05/27/2011 IP 71151 Performance Indicator Verification PSB1EP - EMERGENCY PREPAREDNESS EXERCISE 3 2 05/23/2011 05/27/2011 IP 7111401 Exercise Evaluation 2 05/23/2011 05/27/2011 IP 7111404 Emergency Action Level and Emergency Plan Changes 2 05/23/2011 05/27/2011 IP 71151 Performance Indicator Verification OL EXAM - INITIAL EXAM PREP 4 2 11/07/2011 11/11/2011 V23363 ROBINSON / NOVEMBER 2011 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 1 4 2 11/28/2011 12/02/2011 V23363 ROBINSON / NOVEMBER 2011 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 2 4 2 12/05/2011 12/09/2011 V23363 ROBINSON / NOVEMBER 2011 EXAM AT POWER FACILITIES PSB1-RP - OCCUPATIONAL RP BASELINE WK1 3 2 01/23/2012 01/27/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2 01/23/2012 01/27/2012 IP 71124.02 Occupational ALARA Planning and Controls 2 01/23/2012 01/27/2012 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2 01/23/2012 01/27/2012 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 2 01/23/2012 01/27/2012 IP 71151 Performance Indicator Verification EB3 ISI - UNIT 2 IN-SERVICE INSPECTION 1 2 01/30/2012 02/03/2012 IP 7111108P Inservice Inspection Activities - PWR PSB1-RP - OCCUPATIONAL RP BASELINE WK2 4 2 02/06/2012 02/10/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2 02/06/2012 02/10/2012 IP 71124.02 Occupational ALARA Planning and Controls 2 02/06/2012 02/10/2012 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2 02/06/2012 02/10/2012 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 2 02/06/2012 02/10/2012 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure Page 2 of 2 Robinson 03/04/2011 06:53:11 Inspection / Activity Plan Report 22 03/01/2011 - 06/30/2012 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5 2 05/07/2012 05/11/2012 IP 71152B Identification and Resolution of Problems 2 05/21/2012 05/25/2012 IP 71152B Identification and Resolution of Problems PSB1EP - EMERGENCY PREPAREDNESS INSPECTION 1 2 05/21/2012 05/25/2012 IP 7111402 Alert and Notification System Testing 2 05/21/2012 05/25/2012 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 2 05/21/2012 05/25/2012 IP 7111404 Emergency Action Level and Emergency Plan Changes 2 05/21/2012 05/25/2012 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 2 05/21/2012 05/25/2012 IP 71151 Performance Indicator Verification EB3 HS - TRIENNIAL HEAT SINK INSPECTION 1 2 06/04/2012 06/08/2012 IP 7111107T Heat Sink Performance This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedures.