IR 05000160/1992004: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML20128A877
| number = ML20128A877
| issue date = 01/20/1993
| issue date = 01/20/1993
| title = Ack Receipt of 921224 Ltr Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-160/92-04
| title = Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-160/92-04
| author name = Stohr J
| author name = Stohr J
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 9302020337
| document report number = NUDOCS 9302020337
| title reference date = 12-24-1992
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| page count = 2
| page count = 2
Line 18: Line 19:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:_
y
. , ,
, f    e,
      .. r    '
.-
JAN 2 0 1993  :
      .<
t Docket No. 50 160 License No. R-97 Georgia Institute of Technology ATTN: Dr. Ratib A. Karam, Director Neely Nuclear Research Center 225 North Avenue Atlanta, GA 30332 Gentlemen:
SUBJECT: NRC INSPECTION REPORT-N0. 50-160/92-04 Thank you for your response of December 24, 1992, to our Notice of Violation,
. issued on December 10, 1992, concerning activities conducted at your Neely Nuclear Research Center. - We have evaluated your response and found that -it; meets the requirements of 10 CFR 2,201, We will examine the implementation.of
.your corrective actions during future inspection We appreciate your cooperati_on'in this matter,
'
 
Sincerely,
.    \5  :
J. Philip Stohr, Director-Division of-. Radiation Safet '
and-Safeguards cc: Dr. G.- Poehlein, Vice President for Interdisciplinary Programs Georgia Institute of Technology 225 North Avenue Atlanta, GA 30332-Dr. William Vernetson Director of Nuclear facilities Department of- Nuclear Engineering-Sciences University of Florida    ..
202 Nuclear-Sciences Center    3 Gainesville, FL '32611-cc: (Cont'd on page.2)
9302020337 930120
.PDR .ADOCK 05000160 PDR    )
-.
3 oL
 
.. -- ..
:,; J
..    -
...
- Georgia Institute of Technology:  '2 (cc: cont'd)
Pedro B. Perez, Associate Director Nuclear Reactor Program North Carolina. State University P. O. Box 7909    ,
Raleigh,l NC 27695-7909 Dr. R. U. Mulder, Director Reactor Facility University of Virginia Charlottesville, VA 22901 Harold Reheis, Directo Department of Natural Resources 205 Butler Street, SE, Suite 1252 Atlanta, GA - 30334 Mayor of the City of Atlanta 55 Trinity Avenue, SW Suite 240 Atlanta, GA 30335 bcc: A.. Adams, NRR C. Bassett, RI_I Document Control Desk R ; SS .
RSS j I: SS RII: RSS RII RSS -
  #
eh
  / Barr Cline CBa sett BMallett
. g'
l/ /j/9 /gl/93 1 /93 1/g/93 '1/r/93
      ..
L
}}
}}

Latest revision as of 00:18, 22 August 2022

Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-160/92-04
ML20128A877
Person / Time
Site: Neely Research Reactor
Issue date: 01/20/1993
From: Stohr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Karam R
Neely Research Reactor, ATLANTA, GA
References
NUDOCS 9302020337
Download: ML20128A877 (2)


Text

_

y

. , ,

, f e,

.. r '

.-

JAN 2 0 1993  :

.<

t Docket No. 50 160 License No. R-97 Georgia Institute of Technology ATTN: Dr. Ratib A. Karam, Director Neely Nuclear Research Center 225 North Avenue Atlanta, GA 30332 Gentlemen:

SUBJECT: NRC INSPECTION REPORT-N0. 50-160/92-04 Thank you for your response of December 24, 1992, to our Notice of Violation,

. issued on December 10, 1992, concerning activities conducted at your Neely Nuclear Research Center. - We have evaluated your response and found that -it; meets the requirements of 10 CFR 2,201, We will examine the implementation.of

.your corrective actions during future inspection We appreciate your cooperati_on'in this matter,

'

Sincerely,

. \5  :

J. Philip Stohr, Director-Division of-. Radiation Safet '

and-Safeguards cc: Dr. G.- Poehlein, Vice President for Interdisciplinary Programs Georgia Institute of Technology 225 North Avenue Atlanta, GA 30332-Dr. William Vernetson Director of Nuclear facilities Department of- Nuclear Engineering-Sciences University of Florida ..

202 Nuclear-Sciences Center 3 Gainesville, FL '32611-cc: (Cont'd on page.2)

9302020337 930120

.PDR .ADOCK 05000160 PDR )

-.

3 oL

.. -- ..

,; J

.. -

...

- Georgia Institute of Technology: '2 (cc: cont'd)

Pedro B. Perez, Associate Director Nuclear Reactor Program North Carolina. State University P. O. Box 7909 ,

Raleigh,l NC 27695-7909 Dr. R. U. Mulder, Director Reactor Facility University of Virginia Charlottesville, VA 22901 Harold Reheis, Directo Department of Natural Resources 205 Butler Street, SE, Suite 1252 Atlanta, GA - 30334 Mayor of the City of Atlanta 55 Trinity Avenue, SW Suite 240 Atlanta, GA 30335 bcc: A.. Adams, NRR C. Bassett, RI_I Document Control Desk R ; SS .

RSS j I: SS RII: RSS RII RSS -

eh

/ Barr Cline CBa sett BMallett

. g'

l/ /j/9 /gl/93 1 /93 1/g/93 '1/r/93

..

L