Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217F8231999-10-13013 October 1999 Informs That on 990930,NRC Completed mid-cycle PPR of Catawba Nuclear Station.Based on Review,Nrc Did Not Identify Any New Areas That Warranted More than Core Insp Program Over Next Five Months.Historical Listing of Issues,Encl ML20217H0041999-10-13013 October 1999 Forwards MOR for Sept 1999 & Revised MOR for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217F1301999-10-0707 October 1999 Forwards Rev 1 to Request for Relief 99-03 from Requirements of ASME B&PV Code,In Order to Seek Relief from Performing Individual Valve Testing for Certain Valves in DG Starting (Vg) Sys ML20212J3011999-10-0101 October 1999 Forwards Exemption from Certain Requirements of 10CFR54.17(c) Re Schedule for Submitting Application for Operating License Renewal.Se Also Encl ML20217K2651999-10-0101 October 1999 Forwards Retake Exams Repts 50-413/99-302 & 50-414/99-302 on 990921-23.Two of Three ROs & One SRO Who Received Administrative Section of Exam Passed Retake Exam, Representing 75 Percent Pass Rate 05000414/LER-1999-004, Forwards LER 99-004-01,providing Correction to Info Previously Provided in Rev 0 of Rept.Planned Corrective Actions Contain Commitments1999-09-27027 September 1999 Forwards LER 99-004-01,providing Correction to Info Previously Provided in Rev 0 of Rept.Planned Corrective Actions Contain Commitments 05000413/LER-1999-015, Forwards LER 99-015-00 Re Inoperability of Auxiliary Bldg Ventilation Sys That Exceeded TS Limits Due to Improperly Positioned Vortex Damper.Commitments Are Contained in Corrective Actions Section of Encl Rept1999-09-27027 September 1999 Forwards LER 99-015-00 Re Inoperability of Auxiliary Bldg Ventilation Sys That Exceeded TS Limits Due to Improperly Positioned Vortex Damper.Commitments Are Contained in Corrective Actions Section of Encl Rept ML20217A7911999-09-24024 September 1999 Forwards Insp Repts 50-413/99-05 & 50-414/99-05 on 990718- 0828 at Catawba Facility.Nine NCVs Identified Involving Inadequate Corrective Actions Associated with Degraded Svc Water Supply Piping to Auxiliary Feedwater Sys ML20212E6471999-09-24024 September 1999 Discusses GL 98-01 Issued by NRC on 980511 & DPC Responses for Catawba NPP & 990615.Informs That NRC Reviewed Response for Catawba & Concluded That All Requested Info Provided.Considers GL 98-01 to Be Closed for Catawba ML20212F0941999-09-21021 September 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals for Cns,Units 1 & 2 ML20212M2001999-09-20020 September 1999 Confirms 990913 Telcon Between M Purser & R Carroll Re Management Meeting to Be Conducted on 991026 in Atlanta,Ga to Discuss Operator Licensing Issues 05000414/LER-1999-005, Forwards LER 99-005-00 Re Missed EDG TS Surveillance Concerning Verification of Availability of Offsite Power Sources Resulted from Defective Procedure.Planned Corrective Actions Stated in Rept Represent Regulatory Commitments1999-09-20020 September 1999 Forwards LER 99-005-00 Re Missed EDG TS Surveillance Concerning Verification of Availability of Offsite Power Sources Resulted from Defective Procedure.Planned Corrective Actions Stated in Rept Represent Regulatory Commitments ML20212D5321999-09-15015 September 1999 Informs That Duke Energy Corp Agrees to Restrict Max Fuel Rod Average Burnup to 60,000 Mwd/Mtu,In Order to Support NRC Final Approval & Issuance of Requested Amend ML20212B4641999-09-14014 September 1999 Forwards Monthly Operating Repts for Aug 1999 & Revised Monthly Operating Rept for Catawba Nuclear Station,Units 1 & 2 ML20212A4131999-09-14014 September 1999 Informs That TR DPC-NE-2009P Submitted in 990817 Affidavit, Marked Proprietary,Will Be Withheld from Public Disclosure, Pursuant to 10CFR2.709(b) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20212M1931999-09-13013 September 1999 Refers to 990909 Meeting Conducted at Region II Office Re Presentation of Licensee self-assessment of Catawba Nuclear Station Performance.List of Attendees & Licensee Presentation Handout Encl ML20212A3751999-09-10010 September 1999 Informs That Postponing Implementation of New Conditions Improved by RG 1.147,rev 12,acceptable Since Evaluation on Relief Based on Implementation Code Case for Duration of Insp Interval ML20212A5191999-09-0808 September 1999 Requests NRC Approval for Relief from Requirements of ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,App VI,VI-2430(c) & 2440(b).Approval of 99-GO-002 Is Requested by 000301 05000413/LER-1999-014, Forwards LER 99-014-00, Missed Surveillance & Operation Prohibited by TS Occurred as Result of Defective Procedures or Program & Inappropriate TS Requirements. Planned Corrective Action Stated in Rept Represents Commitment1999-09-0101 September 1999 Forwards LER 99-014-00, Missed Surveillance & Operation Prohibited by TS Occurred as Result of Defective Procedures or Program & Inappropriate TS Requirements. Planned Corrective Action Stated in Rept Represents Commitment 05000414/LER-1999-003, Forwards LER 99-003-01, Unplanned Actuation of ESFAS Due to a SG High Level Caused by Inadequate Procedural Guidance. Suppl Rept Provides Info Re Root Cause & Corrective Actions Associated with Event Developed Subsequent to Rev1999-08-31031 August 1999 Forwards LER 99-003-01, Unplanned Actuation of ESFAS Due to a SG High Level Caused by Inadequate Procedural Guidance. Suppl Rept Provides Info Re Root Cause & Corrective Actions Associated with Event Developed Subsequent to Rev 0 of LER ML20211H1741999-08-30030 August 1999 Forwards Comments on Catawba Nuclear Station Units 1 & 2 & McGuire Nuclear Station,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid.Ltr Dtd 990107,rept ATI-98-012-T005 & Partial marked-up Rept WCAP-14995 Encl ML20211M4451999-08-30030 August 1999 Forwards Summary of Util Conclusions Re Outstanding Compliance Issue Re Staff Interpretation of TS SR 3.0.1,per Insp Repts 50-369/99-03 & 50-370/99-03,as Discussed with NRC During 990618 Meeting 05000413/LER-1999-013, Forwards LER 99-013-00,re RHR Heat Exchanger Bypass Valves Not Verified Per TS Surveillance.Surveillance Procedures Have Been Revised & There Are No Further Planned Corrective Actions or Commitments in LER1999-08-25025 August 1999 Forwards LER 99-013-00,re RHR Heat Exchanger Bypass Valves Not Verified Per TS Surveillance.Surveillance Procedures Have Been Revised & There Are No Further Planned Corrective Actions or Commitments in LER ML20211M8191999-08-25025 August 1999 Confirms 990825 Telcon Between G Gilbert & R Carroll Re Mgt Meeting to Be Held on 990909 in Atlanta,Ga,To Allow Licensee to Present self-assessment of Catawba Nuclear Station Performance ML20211A9641999-08-20020 August 1999 Forwards SE Authorizing Licensee 990118 Request for Approval of Proposed Relief from Volumetric Exam Requirements of ASME B&PV Code,Section XI for Plant,Units 2 ML20211C1191999-08-18018 August 1999 Forwards ISI Rept Unit 1 Catawba 1999 RFO 11, Providing Results of ISI Effort Associated with End of Cycle 11 ML20211B9471999-08-18018 August 1999 Forwards Request for Relief 99-02,associated with Limited Exam Results for Welds Which Were Inspected During Unit 1 End of Cycle 11 RFO ML20211C3651999-08-17017 August 1999 Forwards Rev 25 to Catawba Nuclear Station Units 1 & 2 Pump & Valve Inservice Testing Program, Which Includes Reformatting of Manual & Addl Changes as Noted in Attached Summary of Changes ML20211F2971999-08-17017 August 1999 Forwards non-proprietary & Proprietary Updated Pages for DPC-NE-2009,submitted 980722.Pages Modify Fuel Design & thermal-hydraulic Analysis Sections of DPC-NE-2009. Proprietary Page 2-4 Withheld,Per 10CFR2.790 05000413/LER-1999-011, Forwards LER 99-011-00,re Missed Surveillance on Both Trains of CR Area Ventilation Sys Resulting in TS Violation.Planned Corrective Actions Stated in LER Represent Regulatory Commitment1999-08-16016 August 1999 Forwards LER 99-011-00,re Missed Surveillance on Both Trains of CR Area Ventilation Sys Resulting in TS Violation.Planned Corrective Actions Stated in LER Represent Regulatory Commitment ML20211B1121999-08-16016 August 1999 Forwards Topical Rept DPC-NE-2012, Dynamic Rod Worth Measurement Using Casmo/Simulate, Describing Results of Six Drwm Benchmark Cycles at Catawba & McGuire & Discusses Qualification to Use Drwm at Catawba & McGuire ML20210V0321999-08-13013 August 1999 Forwards Insp Repts 50-413/99-04 & 50-414/99-04 on 990606- 0717.Six Violations of NRC Requirements Identified & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20210S2751999-08-12012 August 1999 Forwards Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2.Revised Rept for June 1999,encl ML20210Q3751999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Authorized Representative of Facility Must Submit Ltr as Listed,Thirty Days Before Exam Date,In Order to Register Individuals for Exam ML20210N9521999-08-0404 August 1999 Forwards Changes to Catawba Nuclear Station Selected Licensee Commitments Manual.Documents Constitutes Chapter 16 of Ufsar.With List of Effective Pages IR 05000413/19980131999-08-0202 August 1999 Discusses Integrated Insp Repts 50-413/98-13,50-414/98-13, 50-413/98-16,50-414/98-16 & NRC Special Repts 50/413/99-11 & 50-414/99-11 Conducted Between Aug 1998 & May 1999.Six Violations Occurred,Based on OI Investigation & Insp ML20210M6411999-07-29029 July 1999 Forwards Request for Relief 99-03 from Requirements of ASME Boiler & Pressure Vessel Code,In Order to Seek Relief from Performing Individual Valve Testing for Certain Valves in DG Starting Air (Vg) Sys 05000413/LER-1999-010, Forwards LER 99-010-01 Which Replaces LER 99-002.Rept Number Has Been Changed in Order to Conform to Numbering Convention Specified in NUREG-1022,since Primary Event Involved Both Units1999-07-22022 July 1999 Forwards LER 99-010-01 Which Replaces LER 99-002.Rept Number Has Been Changed in Order to Conform to Numbering Convention Specified in NUREG-1022,since Primary Event Involved Both Units IR 05000413/19990101999-07-22022 July 1999 Discusses Insp Rept 50-413/99-10 & 50-414/99-10 on 990314- 0424 & Forwards Notice of Violation Re Failure to Comply with TS 3.7.13,when Misalignment of Two Electrical Breakers Rendered SSS Inoperable from 981216-29 ML20217G5241999-07-20020 July 1999 Forwards Exam Repts 50-413/99-301 & 50-414/99-301 on 990524- 27,0603,07-10 & 16.Of Fourteen SRO & RO Applicants Who Received Written Exams & Operating Tests,Eight Applicants Passed & Six Failed Exam 05000413/LER-1999-009, Forwards LER 99-009-00,re Inoperability of Containment Valve Injection Water Sys Valve in Excess of TS Limits.Root Cause & Corrective Actions Associated with Event Are Being Finalized & Will Be Provided in Supplement to Rept1999-07-19019 July 1999 Forwards LER 99-009-00,re Inoperability of Containment Valve Injection Water Sys Valve in Excess of TS Limits.Root Cause & Corrective Actions Associated with Event Are Being Finalized & Will Be Provided in Supplement to Rept 05000414/LER-1999-001, Forwards LER 99-001-01 Re Unanalyzed Condition Associated with Relay Failure in Auxiliary Feedwater Sys,Due to Inadequate Single Failure Analysis.Rev Is Being Submitted to Include Results of Failure Analysis Which Was Performed1999-07-15015 July 1999 Forwards LER 99-001-01 Re Unanalyzed Condition Associated with Relay Failure in Auxiliary Feedwater Sys,Due to Inadequate Single Failure Analysis.Rev Is Being Submitted to Include Results of Failure Analysis Which Was Performed ML20209H4431999-07-14014 July 1999 Forwards Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2.Revised Rept for May 1999 on Unit Shutdowns Also Encl ML20210A5771999-07-14014 July 1999 Forwards Revsied Catawba Nuclear Station Selected Licensee Commitments Manual, Per 10CFR50.71(e),changing Sections 16.7-5,16.8-5,16.9-1,16.9-3,16.9-5 & 16.11-7.Manual Constitute Chapter 16 of UFSAR ML20216D3941999-07-14014 July 1999 Forwards Revs to Catawba Nuclear Station Selected Licensee Commitments Manual NUREG-1431, Forwards SER Agreeing with Util General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation1999-07-0909 July 1999 Forwards SER Agreeing with Util General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation ML20196L0371999-07-0808 July 1999 Approves Requested Schedule Change of Current two-year Requalification Examinations to non-outage dates.Two-year Cycle Will Start on 991001 & Will End on 020930 05000413/LER-1999-008, Forwards LER 99-008-00,re Operation Prohibited by TS 3.5.2. Rev to LER Will Be Submitted by 990812 Which Will Include All Required Info About Ventilation Sys Pressure Boundry Breach1999-07-0808 July 1999 Forwards LER 99-008-00,re Operation Prohibited by TS 3.5.2. Rev to LER Will Be Submitted by 990812 Which Will Include All Required Info About Ventilation Sys Pressure Boundry Breach ML20196J9001999-07-0606 July 1999 Informs That 990520 Submittal of Rept DPC-NE-3004-PA,Rev 1, Mass & Energy Release & Containment Response Methodology, Marked Proprietary Will Be Withheld Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 IR 05000413/19990031999-07-0101 July 1999 Discusses Insp Repts 50-413/99-03 & 50-414/99-03 Completed on 990605 & Transmitted by Ltr .Results of Delibrations for Violation Re Discovery of Potentially More Limiting Single Failure Affecting SGTS Analysis Provided 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217H0041999-10-13013 October 1999 Forwards MOR for Sept 1999 & Revised MOR for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217F1301999-10-0707 October 1999 Forwards Rev 1 to Request for Relief 99-03 from Requirements of ASME B&PV Code,In Order to Seek Relief from Performing Individual Valve Testing for Certain Valves in DG Starting (Vg) Sys 05000414/LER-1999-004, Forwards LER 99-004-01,providing Correction to Info Previously Provided in Rev 0 of Rept.Planned Corrective Actions Contain Commitments1999-09-27027 September 1999 Forwards LER 99-004-01,providing Correction to Info Previously Provided in Rev 0 of Rept.Planned Corrective Actions Contain Commitments 05000413/LER-1999-015, Forwards LER 99-015-00 Re Inoperability of Auxiliary Bldg Ventilation Sys That Exceeded TS Limits Due to Improperly Positioned Vortex Damper.Commitments Are Contained in Corrective Actions Section of Encl Rept1999-09-27027 September 1999 Forwards LER 99-015-00 Re Inoperability of Auxiliary Bldg Ventilation Sys That Exceeded TS Limits Due to Improperly Positioned Vortex Damper.Commitments Are Contained in Corrective Actions Section of Encl Rept 05000414/LER-1999-005, Forwards LER 99-005-00 Re Missed EDG TS Surveillance Concerning Verification of Availability of Offsite Power Sources Resulted from Defective Procedure.Planned Corrective Actions Stated in Rept Represent Regulatory Commitments1999-09-20020 September 1999 Forwards LER 99-005-00 Re Missed EDG TS Surveillance Concerning Verification of Availability of Offsite Power Sources Resulted from Defective Procedure.Planned Corrective Actions Stated in Rept Represent Regulatory Commitments ML20212D5321999-09-15015 September 1999 Informs That Duke Energy Corp Agrees to Restrict Max Fuel Rod Average Burnup to 60,000 Mwd/Mtu,In Order to Support NRC Final Approval & Issuance of Requested Amend ML20212B4641999-09-14014 September 1999 Forwards Monthly Operating Repts for Aug 1999 & Revised Monthly Operating Rept for Catawba Nuclear Station,Units 1 & 2 ML20212A5191999-09-0808 September 1999 Requests NRC Approval for Relief from Requirements of ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,App VI,VI-2430(c) & 2440(b).Approval of 99-GO-002 Is Requested by 000301 05000413/LER-1999-014, Forwards LER 99-014-00, Missed Surveillance & Operation Prohibited by TS Occurred as Result of Defective Procedures or Program & Inappropriate TS Requirements. Planned Corrective Action Stated in Rept Represents Commitment1999-09-0101 September 1999 Forwards LER 99-014-00, Missed Surveillance & Operation Prohibited by TS Occurred as Result of Defective Procedures or Program & Inappropriate TS Requirements. Planned Corrective Action Stated in Rept Represents Commitment 05000414/LER-1999-003, Forwards LER 99-003-01, Unplanned Actuation of ESFAS Due to a SG High Level Caused by Inadequate Procedural Guidance. Suppl Rept Provides Info Re Root Cause & Corrective Actions Associated with Event Developed Subsequent to Rev1999-08-31031 August 1999 Forwards LER 99-003-01, Unplanned Actuation of ESFAS Due to a SG High Level Caused by Inadequate Procedural Guidance. Suppl Rept Provides Info Re Root Cause & Corrective Actions Associated with Event Developed Subsequent to Rev 0 of LER ML20211H1741999-08-30030 August 1999 Forwards Comments on Catawba Nuclear Station Units 1 & 2 & McGuire Nuclear Station,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid.Ltr Dtd 990107,rept ATI-98-012-T005 & Partial marked-up Rept WCAP-14995 Encl ML20211M4451999-08-30030 August 1999 Forwards Summary of Util Conclusions Re Outstanding Compliance Issue Re Staff Interpretation of TS SR 3.0.1,per Insp Repts 50-369/99-03 & 50-370/99-03,as Discussed with NRC During 990618 Meeting 05000413/LER-1999-013, Forwards LER 99-013-00,re RHR Heat Exchanger Bypass Valves Not Verified Per TS Surveillance.Surveillance Procedures Have Been Revised & There Are No Further Planned Corrective Actions or Commitments in LER1999-08-25025 August 1999 Forwards LER 99-013-00,re RHR Heat Exchanger Bypass Valves Not Verified Per TS Surveillance.Surveillance Procedures Have Been Revised & There Are No Further Planned Corrective Actions or Commitments in LER ML20211B9471999-08-18018 August 1999 Forwards Request for Relief 99-02,associated with Limited Exam Results for Welds Which Were Inspected During Unit 1 End of Cycle 11 RFO ML20211C1191999-08-18018 August 1999 Forwards ISI Rept Unit 1 Catawba 1999 RFO 11, Providing Results of ISI Effort Associated with End of Cycle 11 ML20211C3651999-08-17017 August 1999 Forwards Rev 25 to Catawba Nuclear Station Units 1 & 2 Pump & Valve Inservice Testing Program, Which Includes Reformatting of Manual & Addl Changes as Noted in Attached Summary of Changes ML20211F2971999-08-17017 August 1999 Forwards non-proprietary & Proprietary Updated Pages for DPC-NE-2009,submitted 980722.Pages Modify Fuel Design & thermal-hydraulic Analysis Sections of DPC-NE-2009. Proprietary Page 2-4 Withheld,Per 10CFR2.790 05000413/LER-1999-011, Forwards LER 99-011-00,re Missed Surveillance on Both Trains of CR Area Ventilation Sys Resulting in TS Violation.Planned Corrective Actions Stated in LER Represent Regulatory Commitment1999-08-16016 August 1999 Forwards LER 99-011-00,re Missed Surveillance on Both Trains of CR Area Ventilation Sys Resulting in TS Violation.Planned Corrective Actions Stated in LER Represent Regulatory Commitment ML20211B1121999-08-16016 August 1999 Forwards Topical Rept DPC-NE-2012, Dynamic Rod Worth Measurement Using Casmo/Simulate, Describing Results of Six Drwm Benchmark Cycles at Catawba & McGuire & Discusses Qualification to Use Drwm at Catawba & McGuire ML20210S2751999-08-12012 August 1999 Forwards Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2.Revised Rept for June 1999,encl ML20210N9521999-08-0404 August 1999 Forwards Changes to Catawba Nuclear Station Selected Licensee Commitments Manual.Documents Constitutes Chapter 16 of Ufsar.With List of Effective Pages ML20210M6411999-07-29029 July 1999 Forwards Request for Relief 99-03 from Requirements of ASME Boiler & Pressure Vessel Code,In Order to Seek Relief from Performing Individual Valve Testing for Certain Valves in DG Starting Air (Vg) Sys 05000413/LER-1999-010, Forwards LER 99-010-01 Which Replaces LER 99-002.Rept Number Has Been Changed in Order to Conform to Numbering Convention Specified in NUREG-1022,since Primary Event Involved Both Units1999-07-22022 July 1999 Forwards LER 99-010-01 Which Replaces LER 99-002.Rept Number Has Been Changed in Order to Conform to Numbering Convention Specified in NUREG-1022,since Primary Event Involved Both Units 05000413/LER-1999-009, Forwards LER 99-009-00,re Inoperability of Containment Valve Injection Water Sys Valve in Excess of TS Limits.Root Cause & Corrective Actions Associated with Event Are Being Finalized & Will Be Provided in Supplement to Rept1999-07-19019 July 1999 Forwards LER 99-009-00,re Inoperability of Containment Valve Injection Water Sys Valve in Excess of TS Limits.Root Cause & Corrective Actions Associated with Event Are Being Finalized & Will Be Provided in Supplement to Rept 05000414/LER-1999-001, Forwards LER 99-001-01 Re Unanalyzed Condition Associated with Relay Failure in Auxiliary Feedwater Sys,Due to Inadequate Single Failure Analysis.Rev Is Being Submitted to Include Results of Failure Analysis Which Was Performed1999-07-15015 July 1999 Forwards LER 99-001-01 Re Unanalyzed Condition Associated with Relay Failure in Auxiliary Feedwater Sys,Due to Inadequate Single Failure Analysis.Rev Is Being Submitted to Include Results of Failure Analysis Which Was Performed ML20216D3941999-07-14014 July 1999 Forwards Revs to Catawba Nuclear Station Selected Licensee Commitments Manual ML20209H4431999-07-14014 July 1999 Forwards Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2.Revised Rept for May 1999 on Unit Shutdowns Also Encl ML20210A5771999-07-14014 July 1999 Forwards Revsied Catawba Nuclear Station Selected Licensee Commitments Manual, Per 10CFR50.71(e),changing Sections 16.7-5,16.8-5,16.9-1,16.9-3,16.9-5 & 16.11-7.Manual Constitute Chapter 16 of UFSAR 05000413/LER-1999-008, Forwards LER 99-008-00,re Operation Prohibited by TS 3.5.2. Rev to LER Will Be Submitted by 990812 Which Will Include All Required Info About Ventilation Sys Pressure Boundry Breach1999-07-0808 July 1999 Forwards LER 99-008-00,re Operation Prohibited by TS 3.5.2. Rev to LER Will Be Submitted by 990812 Which Will Include All Required Info About Ventilation Sys Pressure Boundry Breach ML20196G7461999-06-22022 June 1999 Requests Exemption from Requirements of 10CFR54.17(c) That Application for Renewed Operating License Not Be Submitted to NRC Earlier than 20 Yrs Before Expiration of Operating License Currently in Effect ML20196E9541999-06-18018 June 1999 Forwards SG Tube Insp Conducted During Unit 1 End of Cycle 11 Refueling Outage.Attachments 1,2,3 & 4 Identify Tubes with Imperfections in SGs A,B,C & D,Respectively ML20195K4571999-06-14014 June 1999 Forwards MORs for May 1999 & Revised MORs for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20195J1691999-06-10010 June 1999 Forwards Written Documentation of Background & Technical Info Supporting Catawba Unit 1,notice of Enforcement Discretion Request Re TS 3.5.2 (ECCS-Operating),TS 3.7.12 (Auxiliary Bldg Filtered Ventilation Exhaust Sys) ML20217G5771999-06-0909 June 1999 Forwards Post Exam Comments & Supporting Reference Matls for Written Exams Administered at Catawba Nuclear Station on 990603 05000414/LER-1999-002, Forwards Abstract of LER 99-002-00 Re Forced Shutdown of Plant as Result of Flow Restriction Caused by Corrosion of Afs Assured Suction Source Piping Due to Inadequate Testing. Final LER Will Be Submitted No Later than 9907081999-06-0303 June 1999 Forwards Abstract of LER 99-002-00 Re Forced Shutdown of Plant as Result of Flow Restriction Caused by Corrosion of Afs Assured Suction Source Piping Due to Inadequate Testing. Final LER Will Be Submitted No Later than 990708 ML20207F2381999-06-0101 June 1999 Forwards Copy of Catawba Nuclear Station Units 1 & 2 1998 10CFR50.59 Rept, for NRC Files ML20195J1131999-05-26026 May 1999 Requests Approval to Change Cycle Dates for Two Year Requalification Training Program Required by 10CFR55.59,to Improve Scheduling of Requalification Exams to non-outage Periods 05000413/LER-1999-007, Forwards LER 99-007-00,re Operation Prohibited by TS 3.4.7. Commitments Identified in LER Are Listed in Planned Corrective Actions Section1999-05-26026 May 1999 Forwards LER 99-007-00,re Operation Prohibited by TS 3.4.7. Commitments Identified in LER Are Listed in Planned Corrective Actions Section ML20195B4751999-05-24024 May 1999 Forwards Rev 7 to UFSAR Chapter 2 & Chapter 3 from 1998 UFSAR for Catawba Nuclear Station.List of Instructions on Insertion Encl ML20196L1851999-05-20020 May 1999 Forwards Proprietary & non-proprietary Version of Rev 1 to TR DPC-NE-3004, Mass & Energy Release & Containment Response Methodology, Consisting of Finer Nodalization of Ice Condenser Region.Proprietary Info Withheld ML20196L1791999-05-20020 May 1999 Communicates Util Licensing Position Re Inoperable Snubbers. Licensee Has Determined That Structure of ITS Has Resulted in Certain Confusion Re Treatment of Inoperable Snubbers 05000413/LER-1997-009, Forwards LER 97-009-02, Unanalyzed Postulated Single Failure Affecting SG Tube Rupture Analysis, Suppl Revises Planned C/A Described in Suppl 1 to Ler.Current Status of C/As & Addl C/As Planned,Provided in Rept1999-05-17017 May 1999 Forwards LER 97-009-02, Unanalyzed Postulated Single Failure Affecting SG Tube Rupture Analysis, Suppl Revises Planned C/A Described in Suppl 1 to Ler.Current Status of C/As & Addl C/As Planned,Provided in Rept ML20206T4481999-05-13013 May 1999 Forwards Rev 3 to Topical Rept DPC-NE-3002-A, UFSAR Chapter 15 Sys Transient Analysis Methodology, IAW Guidance Contained in NUREG-0390 ML20206R1721999-05-13013 May 1999 Forwards Monthly Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 & Revised Monthly Operating Repts for Mar 1999 ML20206T0281999-05-12012 May 1999 Forwards Changes to Catawba Nuclear Station Selected Licensee Commitments Manual. Document Constitutes Chapter 16 of UFSAR 05000413/LER-1999-006, Forwards LER 99-006-00,re CR Ventilation Sys Inoperability. Root Cause & Corrective Actions for Occurence Are Being Finalized & Will Be Reported in Supplement Rept on 9906071999-05-10010 May 1999 Forwards LER 99-006-00,re CR Ventilation Sys Inoperability. Root Cause & Corrective Actions for Occurence Are Being Finalized & Will Be Reported in Supplement Rept on 990607 ML20206N8201999-05-10010 May 1999 Forwards Revs 15 & 16 to Catawba Unit 1 Cycle 12 COLR, Per TS 5.6.5.Rev 15 Updates Limits for New Catawba 1 Cycle 12 Reload Core & Rev 16 Revises Values Re Min Boron Concentrations for Rwst,Cla & SFP ML20206J4431999-05-0303 May 1999 Forwards Changes to Catawba Nuclear Station Selected Licensee Commitments Manual, Per 10CFR50.71(e).Document Constitutes Chapter 16 of UFSAR ML20206D2141999-04-29029 April 1999 Forwards 1998 Annual Radioactive Effluent Release Rept for Catawba Nuclear Station,Units 1 & 2, Per Plant TS 5.6.3. Rept Contains Listed Documents ML20206E4101999-04-26026 April 1999 Forwards Four Copies of Rev 9 Todpc Nuclear Security & Contingency Plan,Per 10CFR50.54(p)(2).Changes Do Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 1999-09-08
[Table view] Category:UTILITY TO NRC
MONTHYEARML20059L5491990-09-14014 September 1990 Forwards Proprietary Response to Question Re Scope of Review of Topical Rept, Safety Analysis Physics Parameter & Multidimensional Reactor Transients Methodology, Per & 900723 Meeting.Response Withheld ML20059L5521990-09-14014 September 1990 Forwards Response to 18 Questions Re Topical Rept DPC-NE-2004,per NRC 900802 Request for Addl Info.Encl Withheld (Ref 10CFR2.790) ML20059K2021990-09-12012 September 1990 Submits Supplemental Response to Generic Ltr 89-14, Svc Water Sys Problems Affecting Safety-Related Equipment. Intake Structure Insp Program Developed.Procedures for Insp Implemented & Intake Structures Sampled & Analyzed ML20064A8041990-09-0505 September 1990 Notifies NRC of Mod to 890301 Response to Violations Noted in Insp Repts 50-413/86-18-01 & 50-414/86-18-01 Re Valves. All Valve Locking Mechanisms Would Be Installed by End of Unit 2 Refueling Outage (Approx Aug 1990) ML20064A5741990-09-0404 September 1990 Discusses Re Info to Support Util Position Relative to Resolving Issue of Main Steam Line Breaks Inside Ice Condenser Containments & Requests That Info Be Withheld (Ref 10CFR2.790) ML20059G3011990-09-0404 September 1990 Forwards Response to NRC 900327 Request for Addl Info Re BAW-10174, Mark-BW Reload LOCA Analysis for Catawba & Mcguire ML20059G8321990-08-30030 August 1990 Withdraws 880726 Proposed Tech Spec Change,Clarifying Tech Spec 3/4.7.6 Re Emergency Power Requirements for Control Room Ventilation Sys ML20059D2011990-08-27027 August 1990 Forwards Piedmont Municipal Power Agency , Authorizing Use of Annual Rept for NRC Docket Requirements ML20059D2441990-08-24024 August 1990 Forwards Special Rept PIR-1-C90-0261 on 900725 Re Cathodic Protection Sys Failure to Pass Acceptance Criteria of 60-day Surveillance.Std Work Request Generated to Check Voltage Potential at Test Station TS-36 on Weekly Basis ML20056B4981990-08-22022 August 1990 Responds to NRC Request for Addl Info Re General Relief Request for Pump Vibration Submitted 900315.Relief Request Changed to Insure Data Taken Over Range That Encompasses All Main Potential Noise Contributors ML20056B5011990-08-22022 August 1990 Responds to Violation Noted in Insp Repts 50-413/90-17 & 50-414/90-17.Corrective Actions:Review Will Be Conducted to Determine Category of Infrequently Run Procedures Needing Addl Verification Controls ML16259A2391990-08-22022 August 1990 Forwards Public Version of Rev 27 to Company Crisis Mgt Implementing Procedure CMIP-2, News Group Plan. W/ Dh Grimsley 900906 Release Memo ML20056B4971990-08-20020 August 1990 Clarifies Info Submitted in 871207 & s Re Steam Generator Tube Rupture Analysis Demonstration Runs. Demonstration Runs Met plant-specific Requirements in Section D to NRC SER on WCAP-10698 ML20059C1201990-08-20020 August 1990 Forwards Rept Summarizing Util Findings Re Three False Negative Blind Performance Urine Drug Screens Which Occurred During Jan & Feb 1990.Recommends That NRC Consider Generic Communication to Clearly State Reporting Requirement ML20059B6581990-08-17017 August 1990 Responds to Violation Noted in Insp Repts 50-413/90-15 & 50-414/90-15.Corrective Actions:Present Methods of Testing Operability of CO2 Fire Protection Sys Will Be Evaluated by 910201 to Determine If Addl Testing Necessary ML20059C1591990-08-17017 August 1990 Suppls by Providing Addl Info to Support Util Position Re Anl Confirmatory Analysis of Main Steamline Breaks in Ice Condenser Plants.Encl Withheld ML20063Q0951990-08-15015 August 1990 Forwards Monthly Operating Rept for Jul 1990 for Catawba Nuclear Station Units 1 & 2 & Revised Rept for June 1990 ML20059C1231990-08-15015 August 1990 Advises That Util Submitting Special Rept Re Valid Failure of Diesel Generator 2B Would Be Delayed Until 880229 Had Incorrect Ltr Date.Date of Ltr Should Have Been 880204 Instead of 880104.Corrected Ltr Encl ML20063Q2671990-08-14014 August 1990 Forwards Public Version of Revised Crisis Mgt Implementing Procedures,Including Rev 36 to CMIP-1,Rev 32 to CMIP-4,Rev 36 to CMIP-5,Rev 41 to CMIP-6,Rev 40 to CMIP-7,Rev 27 to CMIP-8 & Rev 35 to CMIP-9.W/DH Grimsley 900821 Release Memo ML20059C2211990-08-13013 August 1990 Forwards Revised Chapter 16, Selected Licensee Commitments Manual, to Plant Updated Fsar,Per 10CFR50.4 & 50.71.Manual Contains Commitments Which Require Control But Not Appropriate in Tech Specs ML20063Q0261990-08-10010 August 1990 Forwards Rev 0 to Catawba Unit 2 Cycle 4 Core Operating Limits Rept, Per Tech Spec 6.9.1.9 ML20063Q0671990-08-10010 August 1990 Submits Revised Response to Violations Noted in Insp Rept 50-413/90-09.Procedure to Verify Test Inputs Modified to Verify Dummy Input Signal to Channel RTD Circuit ML20058N0181990-08-0808 August 1990 Forwards Response to Request for Addl Info Re BAW-10174, Mark-BW Reload LOCA Analysis for Catawba & Mcguire ML20081E1601990-08-0101 August 1990 Advises of Completion of 900330 Commitment Re Standing Work Request for Insp of Air Flow Monitors & Dampers,Per Violations Noted in Insp Rept 50-413/90-03 & 50-414/90-03 ML20058P3261990-08-0101 August 1990 Forwards Public Version of Rev 26 to Station Directive 3.8.4, Onsite Emergency Organization ML20081E0951990-07-27027 July 1990 Forwards Decommissioning Financial Assurance Certification Rept for Duke Power Co,co-owner of Catawba Nuclear Station Units 1 & 2 ML20055H9741990-07-26026 July 1990 Forwards end-of-cycle 3 Steam Generator Insp Rept.Nineteen Tubes Removed from Svc by Plugging W/Rolled Mechanical Plug ML20055H5231990-07-24024 July 1990 Discusses co-licensee Relationship & Obligations Re Decommissioning Financial Assurance for Facilities ML20055H4571990-07-19019 July 1990 Responds to NRC Re Violations Noted in Insp Repts 50-413/90-11 & 50-414/90-11.Corrective actions:I-beams/ Hoists Rolled to Ends of Ice Condenser & Securely Located on Rails to Prevent Any Movement ML20055H1741990-07-18018 July 1990 Withdraws 880527 & 0725 Amends Clarifying Requirements for Containment Pressure Control Sys ML20055J3441990-07-17017 July 1990 Advises That Commitment Re Procedure IP/O/A/3190/01,per Violation in Insp Repts 50-413/90-06 & 50-414/90-06, Completed on 900619 ML20055H4131990-07-16016 July 1990 Forwards Public Version of Epips,Including RP/0/A/5000/07 & HP/0/B/1009/04 ML20055F8991990-07-13013 July 1990 Forwards Monthly Repts for June 1990 for Catawba Nuclear Station Units 1 & 2 & Operating Status Rept for May 1990 ML20055G2311990-07-13013 July 1990 Withdraws 880311 Proposed Amend to Tech Spec Table 3.3-3, Item 8.f Re Number of Instrumentation Channels Associated W/ Main Feedwater Pumps.Util Determined That Change Unnecessary ML20055F8461990-07-12012 July 1990 Requests 14-day Extension Until 900802 to Submit LER 414/90-010 to Investigate Power Supply Realignment ML20058P1231990-07-0707 July 1990 Advises That Commitment to Revise Maint Mgt Procedure 1.12 to Include Functional Verification Requirements & to Develop Retest Manual to Address Retest Requirements for Any Maint Performed on Components Completed on 900614 ML20055F4131990-07-0505 July 1990 Forwards Inservice Insp Rept Unit 1 Catawba 1990 Refueling Outage 4, Per 10CFR50.55(a)(q) & Tech Spec 4.0.5.Insp Performed Per Section XI of ASME Boiler & Pressure Vessel Code & Applicable Addenda ML20055D4291990-06-29029 June 1990 Supplemental Response to Violations Noted in Insp Repts 50-413/89-13 & 50-414/89-13,per .Personnel Responsible for Maintaining Crisis Mgt Ctr Drawing Trained. Util Will Continue to Evaluate Changes Made to Program ML20055E2191990-06-29029 June 1990 Submits Revised Commitment Dates Re Implementation of Dept Guidance on post-maint Testing,Per Commitment Made in 891002 Response to Violations in Insp Repts 50-413/89-19 & 50-414/89-19.Completion Date Changed to 900701 ML20044B0621990-06-26026 June 1990 Forwards Public Version of Revised EPIP HP/0/B/1009/05, Personnel/Vehicle Monitoring for Emergency Conditions. W/Dh Grimsley 900716 Release Memo ML20043H6921990-06-18018 June 1990 Advises of Revised Completion Date for VA Ductwork Cleaning to 901231,per Insp Repts 50-413/90-03 & 50-414/90-03. Vendor Personnel Assigned to Task Unavailable to Complete Cleaning Until Late 1990 Due to Outage Support Needs ML20043G1691990-06-15015 June 1990 Forwards Monthly Operating Repts for May 1990 for Catawba Nuclear Station,Units 1 & 2 & Corrected Monthly Operating Repts for Apr 1990 Re Personnel Exposure ML20055C8041990-06-15015 June 1990 Responds to NRC Re Violations Noted in Insp Repts 50-413/90-10 & 50-414/90-10.Corrective Actions:Instrument Root Valves Unisolated & Analog Channel Operational Tests for Low Temp Overpressure Protection Completed ML20043G4331990-06-13013 June 1990 Withdraws 900423 Proposed Amend to Tech Spec 4.6.1.8 Re Lab Test of Carbon Samples from Annulus Ventilation Sys ML20043G3771990-06-13013 June 1990 Withdraws 900423 Proposed Amend to Tech Spec 4.7.7 Which Required That Lab Test of Carbon Samples from Auxiliary Bldg Filtered Exhaust Sys Be Tested for Methyl Iodide Penetration of 0.71% ML20043G2511990-06-12012 June 1990 Withdraws 900419 Suppl to 871221 Application for Amends to Licenses NPF-35 & NPF-32 Re Tech Specs 4.7.6 Re Control Room Area Ventilation Surveillance Requirements ML20043G1741990-06-0707 June 1990 Responds to Request for Addl Info Re BAW-10174, Mark-BW Reload LOCA Analysis for Catawba & Mcguire. Correct RCS Operating Pressure Would Be 2,250 Psia as Identified in Table 3-1 ML20043G3451990-06-0707 June 1990 Forwards Proprietary Response to Request for Addl Info Re Topical Rept BAW-10174, Mark-BW Reload Safety Analysis for Catawba & Mcguire. Response Withheld ML20043G0721990-06-0707 June 1990 Responds to NRC 900510 Ltr Re Violations Noted in Insp Repts 50-413/90-09 & 50-414/90-09.Corrective Actions:Vc/Yc Train a Returned to Svc W/Supply Power from 2ETA.Terminal Box 1TB0X0346 Inspected & Insured Operable ML20043F6111990-06-0606 June 1990 Advises That Response to Request for Addl Info Re Operator Response Times During Simulated Steam Generator Tube Rupture at Facility,Will Be Delayed Until 900630 1990-09-05
[Table view] |
Text
DUKE Pow 1m GOMPANY P.O. HOX 33180 CHARLOTrE. N.C. 28242 IIAL II. TUCKER TELEPHONE vn:n parmaarre (yo4) 373-4531 AMLEAR PRODtWOM October 19, 1983 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Ms. E. G. Adensam, Chief Licensing Branch No. 4 Re: Catawba Nuclear Station Docket Nos. 50-413 and 50-414
Dear Mr. Denton:
Section 4.4.3.4 of the Catawba Safety Evaluation Report discusses Open Item 6, Instrumentation for Inadequate Core Cooling Detection. This item was also identified as License Condition 5. As noted therein, the Staff required additional information on core exit thermocouples and reactor vessel level measurement. This information is provided in the attached FSAR pages.
Very truly yours, Ak e-c ,
Hal B. Tucker ROS/php Attachment cc: Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30303 NRC Resident Inspector Catawba Nuclear Station Mr. Robert Guild, Esq.
Attorney-at-Law P. O. Box 12097 Charleston, South Carolina 29412 Palmetto Alliance 213515 Devine Street Columbia, South Carolina 29205 8310280096 831019
{DRADOCK 05000413 PDR 8i
. Mr. Harold'R.'Denton, Director
' October 19,'1983-Page.2 cc: _Mr. Jesse L.-Riley
< Carolina Environmental Study Group
- '854 Henley Place Charlotte, North Carolina 28207 4
1 ,
4 t
f 1
o 1
I I
L' t.-.._. . _._. _ _ = . _ _ . _ _ - . . _ - - _ _ . . . . _ . . _ _ . . . . _ _ . . . _ _ _ , _ . - . _ . _ _ _ _ . . . . _ _ _ _ _ . _ . . . . - . _ . _
Table 1.9-1 (Page 11)
- , Response to TMI' Concerns I
margin to Psat, and the minimum allowable margins to P sat and T sat. Alarm
' - status is indicated by flashing the alarming parameter on the CRT graphic dis- ,
play, the Alarm CRT, and by printout on the Alarm Typer. Two alarm setpoints j are provided for both Tsat.and Psat. The alarm setpoints are dependent on re- l
' actor power. Further details on this subcooling monitor are provided in Table ,
! 1.9-2. '
. Normal' control board instrumentation for RCS temperature and pressure will be
- used in conjunction with a control room copy of the steam tables and a written i-procedure to determine margin to saturation as a backup to the computer cal-
- culation.
~
- This system for determining.the degree of subcooling will be fully operational l by fuel loading.
i Reactor Vessel Level Measurement
- The reactor vessel level instrumentation system (RVLIS) is of Westinghouse design. The RVLIS is of standard Westinghouse design for upper head injec-tion (UHI) reactor systems and utilizes a microprocessor for data processing.
. The RVLIS uses differential pressure (DP) transmitters to measure the pres-sure drops from the bottom of the reactor vessel to the hot legs for UHI plants and from the hot legs to the top of the reactor vessel.' Under natural-
~
i circulation or no-circulation conditions, these pressure drops will provide indication of the collapsed liquid level or relative void content in the i reactor vessel above and below the hot legs. Under forced-flow conditions, the pressure drops will provide indication of the vessel void content above the hot. legs and the relative void content of the circulating primary coolant system fluid. Automatic compensation for changes in the temperature of the impulse lines leading from the reactor vessel and not legs to the DP trans-mitters-is incorporated in the system. Strap-on RTD's are mounted on the vertical runs of the impluse lines for measuring impulse-line temperatures.
Automatic compensation for changes in the reactor coolant system fluid den-sities is also incorporated in the system. Following a hypothetical accident which causes a loss of primary coolant, the RVLIS will be used by the plant operators to assist in detecting a gas bubble or void in the reactor vessel and assist in detecting the approach to a condition of inadequate core cool-ing. If forced-flow conditions are maintained after the accident, the RVLIS will also be used-to assist in detecting the format'on of void in the cir-culating-primary coolant system fluid. The equipment which comprises the RVLIS includes the DP transmitters, impulse lines, impluse-line RTD's, in-containment sensor bellows units, out-of-containment hydraulic isolators, and all the necessary electronic signal conditioning, processing and display equipment. A technical description of the system appears in Westinghouse's manual entitled, "RVLIS -' Summary Report, December,1980."
An item-by-item discussion of NUREG-0737, II.F.2, is provided in Table 1.9-3.
t Rev. 8 l
Table 1.9-1 (Page lla)
Response tn TMI Concerns Incore Thermocouple System I. Present Design The present incore thermocouple system has 65 T/C's (thermocouples) positioned to sense exit flow temperature of selected fuel assemblies.
The T/C's penetrate the reactor vessel head in 5 locations known as instrument ports. Each instrument port has 13 T/C's. Electrical connection to the T/C's is made at the instrument ports by qualified connectors. The class 1E thermocouples are cabled to qualified thermo-couple penetrations. In accordance with NUREG-0737, the system will utilize 16 thermocouples per train and will be able to handle normal attrition. The non-safety thermocouples are cabled to reference junction boxes to allow transition to copper for the remainder of the cabling including the run to' an' instrument penetration. Outside containmbnt, the class 1E T/C's are cabled to reference junction boxes to allow the transition to copper wire. These cables are cabled to the backup display along with the non-safety T/C's. The backup display will display a T/C by use of push-to read switches. All T/C's are cabled from the backup display to the primary display, the plant computer.
A. Present System Capabilities (NUREG 0737 II.F.2 Attachment 1 format)
- 1. Core inlet temperature data is used with core exit temperature to give radial distribution of coolant enthalpy rise across the core. This is available to the operator via CRT or hard copy.
- 2. The plant computer via CRT is the operator's primary display having the following capabilities:
- a. A spatially oriented core map is available on demand indicating temperature and enthalpy rise at each core exit thermocouple location.
- b. The incore thermocouples are an input into the saturation monitor program to assist operator actions for inadequate core cooling procedures.
- c. Direct readout via CRT and hard copy print out capability is provided for all thermocouple temperatures. This read-out range extends from 200 degrees F. to 2300 degrees F.
- d. Trending of selected thermocouples to show temperature -
time history is available on demand.
- e. Alarm capabilities are provided thru the saturation monitor program.
- f. Addressed in the Control Room Design Review.
Rev. 8
Table 1.9-1 (Page 11b)
Response to TMI Concerns
- 3. A backup display is provided to read any of the thermocouples.
With push-to-read switches, readings can be taken well within the six minute time guidance. The range of this backup display extends from 200 degrees F. to 2300 degrees F.
- 4. A human factor analysis will be part of the ongoing Control Room Review (See Response to Supplement 1 to NUREG-0737 which was transmitted by letter dated June 1, 1983 from H. B. Tucker to H. R. Denton).
- 5. See Duke Power Company, Topical Report, Quality Assurance Program, Duke - 1A.
- 6. The primary and backup displays are electrically independent and are on separate highly reliable power systems. Isolation devices are not necessary in the present system as the backup display is not in the circuit until a push-to-read switch is used.
- 7. Documentation is unavailable regarding the environmental cap-abilities of the present system, but all readouts are located .
in a mild controlled environment.
- 8. Availability of the plant computer has been greater than 99%.
This documentation has previously been submitted via NUREG 0578/TMI Action Plan response.
- 9. QA provisions cited in Appendix B do not apply to the present system.
II. Incore Thermocouple System Upgrade The present incore T/C system will be upgraded in the following manner. From outside of containment the non-safety thermocouple cabling will not be altered. However, the class 1E T/C cables will be cabled to a class 1E backup display directly from the T/C penet-rations. These T/C's will be cabled to the primary display using qualified isolation devices. The backup display will be selected as part of the ongoing control board review.
The upgrade of the incore T/C system will be completed on Unit 1 by or during the first refueling and on Unit 2 prior to fuel load.
A. Upgraded System Capabilities (NUREG 0737 II.F.2 Attachment 1 format) ,
Display capabilities will be the same as the present design description with exceptions listed below. Exception numbers correspond to original design numbers.
Rev. 8
Table 1.9-1 (Page 11c)
Response to TMI Concerns 2(f) & 4 The control room review will be completed and all operator display devices will be human factor designed.
- 6. The prirr.ary and backup display will be energized from in-dependent battery backed power sources. The backup display and associated hardware will be on IE power. Separation as defined in Chapter 8 will be met from the refueling canal to the isolation device.
- 7. The device 1E T/C instrumentation (T/C qualification assumed) will be seismically and environmentally qualified up to and including the isolation device. Seismic quali-fication will be consistent with the methodologies descr~ib'ed in Section 3.10. Instrumentation subject to a harsh environment will be environmentally qualified consistent with the Duke Power Company position on the Category II Guidelines of NUREG 0588 as detailed in the Duke submittal of June 30, 1982. The isolation device will be in an accessible area following an accident.
- 8. Quality Assurance provisions cited in Duke Power's QA program for nuclear safety related equipment will be met for all equipment installed except the primary display and hardware beyond the isolation device.
Procedures See Section 13.5.
II.G EMERGENCY POWER FOR PRESSURIZER EQUIPMENT Pressurizer PORV The pressurizer power operated relief valves are air-operated with DC control solenoids. Power for the solenoid valves is supplied from the 125VDC Vital Instrumentation and Control Power System (See Section 8.3.2). The solenoid operators and their controls are safety-related.
Pressurizer PORV Block Valves The pressurizer PORV block valves are motor-operated valves with both motive and control power supplied from the 600VAC Ecsential Auxiliary Power System (See Section 8.3.1). The block valves including their power and control cir-cuits are safety-related.
Rev. 8
Table 1.9-1 (Page lid)
Response to THI Concerns Pressurizer Level Indication Three redundant channels of pressurizer level instrumentation are provided.
These channels are part of the safety-related portion of the Process Control System which receives its power from the Vital Instrumentation and Control Power System (See Section 8.3.2).
l "e
t l
Rev. 8 l
Table 1.9-3 (Page 1)
Reactor Vessel level Instrumentation System Reference Deviations
- 1. Description of the proposed final system including:
- a. a final design description of Items A, B Functionally, additional instrumentation and None displays; b, detailed description of existing Items H, I Functionally, instrumentation systems. None
- c. Description of completed or Same as 1(a) --------------
planned modifications.
- 2. A design analysis and evaluation of Items A,B,C, Functionally, inventory trend instrumentation, and D,E,F None test data to support design in item 1.
- 3. Description of tests planned and Items C,D,E,F None results of tests completed for evaluation, qualification,'and calibration of additional instru-mentation.
- 4. Provide a table or description Items G, K None covering the evaluation of con-formance with NUREG-0737: II.F.2, Attachment 1, and Appendix B (to be reviewed on a plant specific basis)
- 5. Describe computer, software and Items A, B None display functions associated with ICC monitoring in the plant.
- 6. Provide a proposed schedule for Item L None installation, testing, and cali-bration and implementation of any proposed new instrumentation or information displays.
- 7. Describe guidelines for use of Item J None reactor coolant inventory tracking system, and analyses used to develop procedures.
Rev. 8 New Page
Table 1.9-3 (Page 2)
Reactor Vessel Level Instrumentation System Reference Deviations
- 8. Operator instructions in emergency Item J, M None operating procedures for ICC and how these procedures will be modified when final monitoring system is implemented.
- 9. Provide a t'nedule for additional N/A submittals required.
Explicit confirmation of conformance to the Appendix B (NUREG-0737) items listed below for the Reactor Vessel Level Instrumentation System.
Confirmation Deviations
- 1. Environmental qualification Item K None
- 2. Single failure analysis Item G None
- 3. Class IE power source Yes None
- 4. Availability prior to an accident One channel None (Per Tech. Spec.)
- 5. Quality Assurance Yes, as described None in Duke Power Co.
Topical Report, Quality Assurance Program, Duke-1A
- 6. Continous indications Yes None
- 7. Recording of instrument outputs Yes (Single train) None
- 8. Identification of instruments Iter A None
- 9. Isolation Yes None For the Westinghouse Differential Pressure (dp) system a detailed response to the plant specific items stated below is provided.
Response
A. Westinghouse dp System
- 1. Describe the effect of instru- Item B ment uncertainties on the
- measurement of level.
Rev. 8 New Page
Table 1.9-3 (Page 3) -
Reactor Vessel Level Instrumentation System j Response
- 2. Are the differential pressure Yes transducers located outside containment?
- 3. Are hydraulic isolators and Yes sensors included in the impulse lines?
9 Rev. 8 New Page
i Table 1.9-3 (Page 4)
Reactor Vessel Level Instrumentation System REFERENCE ITEM A-
SUMMARY
REPORT Westinghouse Reactor Vessel Level. Instrumentation System -
for Monitoring Inadequate Core Cooling December, 1980.
Submittal Letter T. M. Anderson (W) to Darrell G.
Eisenhut (NRC)
NS-TMA-2358 of December 23, 1980.
REFERENCE ITEM B 25 RESPONSES TO NRC REQUEST FOR ADDITIONAL INFORMATION On the Westinghouse R.V.L.I.S. Summary Report REFERENCE ITEM C SUPPLEMENTARY INFORMATION Submittal Letter E. P. Rahe (W) to L. E. Phillips (NRC) NS-EPR-2579 of March 1971982.
REFERENCE ITEM D W EVALUATION OF TESTS S-UT-3, S-UT-6, S-UT-7, S-NC-2, S-NC-3, S-NC-8 Submittal Letter E. P. Rahe (W) to L. E. Phillips
-(NRC) NS-EPR-2526 of December 9, 1981.
REFERENCE ITEM E W EVALUATION OF TEST S-UT-8 Submittal Letter E. P. Rahe (W) to L. E. Phillips (NRC) NS-EPR-2542 of January 13, 1982.
REFERENCE ITEM F W EVALUATION OF TEST S-1B-1 AND FUNCTIONAL TEST Submittal Letter E. P. Rahe (W) to L. E. Phillips (NRC) SED-SA-0081 of June 28, 1982.
REFERENCE ITEM G RESPONSE TO REQUEST TO WOG FOR ADDITIONAL INFORMATION Submittal Letter E. P. Rahe (W) to Dennis M.
Crutchfield (NRC) NS-EPR-2597 of May 14, 1982.
REFERENCE ITEM H RCS WIDE RANGE PRESSURE INSTRUMENTATION
. Submittal Letter of E. P. Rahe (W) to R. C. Deyoung (NRC) NS-DPR-2586 of April 21, 1982.
REFERENCE ITEM I RELEVANT DRAWINGS OF EXISTING INSTRUMENTATION SYSTEMS 8757D55 Revision 4 W Process Block Diagrams. (See i Sheet for W. R. RCS7 HOT)
Rev. 8 New Page
Table 1.9-3 (Page 5)
Reactor Vessel Level Instrumentation System 1098E74 Sh 1 Rev 8 W RCS Flow Diagram i FSAR Fig. 5.1-3 RCS Flow Diagram.
Note that W Process Block Diagram which shows W. R.
RCS Pressure is not recommended as suitable inter-facing instrumentation. Refer to Item H.
REFERENCE ITEM J Critical safety function status trees for core cooling and system inventory volumes 1, 2, and 3 Emergency Response Guidelines (ERG) Developed by Westinghouse Owner's Grcup (WOG) Sections FR-C.1 and C.2, FR-I.3, FR-P.I.
Refer also E20.26 (which is a new section to be added, for natural circulation cooldown regarding depressurization in the upper head. Although this shows the use of the RVLIS instrumentation, it is not specifically for inadequate core cooling (ICC) monitoring.
Volume 1 and 2 was under cover of OG-64, 11/30/81
- 0. Kingsley (WOG) to D. Eisehut (NRC)
Volume'3 was under cover of OG-83, 1/4/83, O. Kingsley I (WOG) to D. Eisenhut (NRC)
All member utilities received copies under cover of letters:
WOG-81-235, 12/2/81 WOG-83-100, 1/4/83 REFERENCE ITEM K ENVIRONMENTAL QUALIFICATION (Note Various Equipment Data Qualification Packages)
- i.e., EQDP - for RVLIS instrumentation are sub-mittals as supplements to the Environmental Quali-fication topicals WCAP-8587, non proprietary (which provides summary EQDP-s) and WCAP-8687, proprietary (which provides detailed EQDP's).
EDQP References are as follows:
- 1. ESE-2 D/P Transmitters Outside Containment
- 2. ESE-42 Strap-on RTDs
- 3. ESE-48 High Volume Pressure Sensor
- 4. ESE-49 Differential Pressure Indicator Switches Rev. 8 New Page
Table 1.9-3 (Page 6)
Reactor Vessel Level Instrumentation System
- 5. ESE-50C RVLIS-86 Microprocessor
- 6. ESE-53 Plant Safety Monitoring System Electronics REFERENCE ITEM L IMPLEMENTATION SCHEDULE The RVLIS will be fully operational by fuel load.
REFERENCE ITEM M ICC OPERATING PROCEDURES Duke Power plans to upgrade the Catawba emergency operating procedures based upon the Emergency Response Guidelines (ERG) developed by the Westinghouse Owners Group. The RVLIS will be incorporated into procedures according to these guidelines.
9 Rev. 8 New Page