IR 05000277/2008006: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{Adams|number = ML081770238}}
{{Adams
| number = ML081770238
| issue date = 06/25/2008
| title = IR 05000277-08-006, and IR 05000278-08-006, on 04/28/2008 to 05/09/2008, Peach Bottom Atomic Power Station, Temporary Instruction (Ti) 2515/171, Verification of Site Specific Implementation of B.5.b Phase 2 & 3, Mitigating Strategies. Lette
| author name = Rogge J
| author affiliation = NRC/RGN-I/DRS/EB3
| addressee name = Pardee C
| addressee affiliation = Exelon Generation Co, LLC
| docket = 05000277, 05000278
| license number = DPR-044, DPR-056
| contact person =
| document report number = IR-08-006
| document type = Letter, Inspection Report
| page count = 5
}}


{{IR-Nav| site = 05000277 | year = 2008 | report number = 006 }}
{{IR-Nav| site = 05000277 | year = 2008 | report number = 006 }}


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:une 25, 2008
[[Issue date::June 25, 2008]]


Mr. Charles Chief Nuclear Officer (CNO) and Senior Vice President Exelon Generation Company, LLC 200 Exelon Way Kennett Square, PA 19348
==SUBJECT:==
 
PEACH BOTTOM ATOMIC POWER STATION - NRC TEAM INSPECTION REPORT 05000277/2008006 and 05000278/2008006
SUBJECT: PEACH BOTTOM ATOMIC POWER STATION - NRC TEAM INSPECTION REPORT 05000277/2008006 and 05000278/2008006


==Dear Mr. Pardee:==
==Dear Mr. Pardee:==
On May 16, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a team inspection of your Peach Bottom Atomic Power Station. The enclosed report documents the team's results, which were discussed, on site, on May 2, 2008, and then by telephone, on May 16, 2008 with Mr. Michael Massaro and other members of your staff. The inspection examined activities conducted under your license as they relate to the implementation of B.5.b Phase 2 and 3 mitigating strategies, your compliance with the Commission's rules and regulations, and with the condition of your operating license. Within these areas, the inspection involved examination of selected procedures and records, observation of activities, and interviews with station personnel.
On May 16, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a team inspection of your Peach Bottom Atomic Power Station. The enclosed report documents the teams results, which were discussed, on site, on May 2, 2008, and then by telephone, on May 16, 2008 with Mr. Michael Massaro and other members of your staff.
 
This report documents three NRC-identified findings of very low safety significance (Green), which were determined involve violations of NRC requirements. Because of the very low safety significance and because these violations were entered into your corrective action program, the NRC is treating these finding as non-cited violations (NCVs), in accordance with Section VI.A.1 of the NRC's Enforcement Policy. If you contest these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Peach Bottom Atomic Power Station.


When separated from the Enclosure, this document is DECONTROLLED. In accordance with 10 CFR 2.390 of the NRC "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of the NRC Agency-wide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.
The inspection examined activities conducted under your license as they relate to the implementation of B.5.b Phase 2 and 3 mitigating strategies, your compliance with the Commissions rules and regulations, and with the condition of your operating license. Within these areas, the inspection involved examination of selected procedures and records, observation of activities, and interviews with station personnel.


Sincerely,/RA/ John F. Rogge, Chief Engineering Branch 3 Division of Reactor Safety Docket No. 50-277, 50-278 License No. DPR-44, DPR-56
This report documents three NRC-identified findings of very low safety significance (Green),
which were determined involve violations of NRC requirements. Because of the very low safety significance and because these violations were entered into your corrective action program, the NRC is treating these finding as non-cited violations (NCVs), in accordance with Section VI.A.1 of the NRCs Enforcement Policy. If you contest these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Peach Bottom Atomic Power Station.


===Enclosure:===
When separated from the Enclosure, this document is DECONTROLLED. In accordance with 10 CFR 2.390 of the NRC Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of the NRC Agency-wide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.
Inspection Report 05000277/2008006 AND 05000278/2008006


===w/Attachment:===
Sincerely,
Supplemental Information
/RA/
John F. Rogge, Chief Engineering Branch 3 Division of Reactor Safety Docket No. 50-277, 50-278 License No. DPR-44, DPR-56 Enclosure: Inspection Report 05000277/2008006 AND 05000278/2008006 w/Attachment: Supplemental Information
}}
}}

Latest revision as of 15:33, 14 November 2019

IR 05000277-08-006, and IR 05000278-08-006, on 04/28/2008 to 05/09/2008, Peach Bottom Atomic Power Station, Temporary Instruction (Ti) 2515/171, Verification of Site Specific Implementation of B.5.b Phase 2 & 3, Mitigating Strategies. Lette
ML081770238
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 06/25/2008
From: Rogge J
Engineering Region 1 Branch 3
To: Pardee C
Exelon Generation Co
References
IR-08-006
Download: ML081770238 (5)


Text

une 25, 2008

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION - NRC TEAM INSPECTION REPORT 05000277/2008006 and 05000278/2008006

Dear Mr. Pardee:

On May 16, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a team inspection of your Peach Bottom Atomic Power Station. The enclosed report documents the teams results, which were discussed, on site, on May 2, 2008, and then by telephone, on May 16, 2008 with Mr. Michael Massaro and other members of your staff.

The inspection examined activities conducted under your license as they relate to the implementation of B.5.b Phase 2 and 3 mitigating strategies, your compliance with the Commissions rules and regulations, and with the condition of your operating license. Within these areas, the inspection involved examination of selected procedures and records, observation of activities, and interviews with station personnel.

This report documents three NRC-identified findings of very low safety significance (Green),

which were determined involve violations of NRC requirements. Because of the very low safety significance and because these violations were entered into your corrective action program, the NRC is treating these finding as non-cited violations (NCVs), in accordance with Section VI.A.1 of the NRCs Enforcement Policy. If you contest these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Peach Bottom Atomic Power Station.

When separated from the Enclosure, this document is DECONTROLLED. In accordance with 10 CFR 2.390 of the NRC Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of the NRC Agency-wide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

Sincerely,

/RA/

John F. Rogge, Chief Engineering Branch 3 Division of Reactor Safety Docket No. 50-277, 50-278 License No. DPR-44, DPR-56 Enclosure: Inspection Report 05000277/2008006 AND 05000278/2008006 w/Attachment: Supplemental Information