ML20010A279: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
Line 45: Line 45:
* Serial 12068                                                                                                                                                                                          2 79-12 #9 Another report, either interin or final, vill be sent on or before October 30, 1981.
* Serial 12068                                                                                                                                                                                          2 79-12 #9 Another report, either interin or final, vill be sent on or before October 30, 1981.
3,g /A4 /F/L WRB/1r CC: Director of Office of Inspection & Enforcement Att Mr Victor Stello, USNRC (15)
3,g /A4 /F/L WRB/1r CC: Director of Office of Inspection & Enforcement Att Mr Victor Stello, USNRC (15)
Director, Office of Management
Director, Office of Management Information & Program Control, USNRC (1) l RJCook, USNRC Resident Inspector, Midland (1)
;
Information & Program Control, USNRC (1) l RJCook, USNRC Resident Inspector, Midland (1)
CBechhoefer, ASLB Panel RSDecker, ASLB Panel FPCowan, ASLB Panel AS&L Appeal Panel MMCherry, Esq MSinclair BStamiris CRStephens, USNRC WDPaton, Esq, USNBC FJKelly, Zsq, Attorney General SHFreeman, Esq, Asst Attorney General WHMarshall CJMerritt, TNK&J
CBechhoefer, ASLB Panel RSDecker, ASLB Panel FPCowan, ASLB Panel AS&L Appeal Panel MMCherry, Esq MSinclair BStamiris CRStephens, USNRC WDPaton, Esq, USNBC FJKelly, Zsq, Attorney General SHFreeman, Esq, Asst Attorney General WHMarshall CJMerritt, TNK&J
                                                                   -    . . , -      . _ . . , _ _ _ _ _ . , _ .                                                                                                _ _ _ .                        _ _ - - _ . . _ _}}
                                                                   -    . . , -      . _ . . , _ _ _ _ _ . , _ .                                                                                                _ _ _ .                        _ _ - - _ . . _ _}}

Latest revision as of 10:40, 17 February 2020

Interim Deficiency Rept Re Containment Internal Structures Coating Deficiency,Initially Reported on 791213. Nonconforming Coatings Are Being Removed.Statistical Testing Program Initiated for Remaining Coating
ML20010A279
Person / Time
Site: Midland
Issue date: 07/31/1981
From: Jackie Cook
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, 79-12, 79-12-#9, NUDOCS 8108110273
Download: ML20010A279 (2)


Text

-

&ffG66(s Consumers power m.

C0mpany via na,uant - n+ta.s.,a, and Constmetion o.n.r.1 ofta : 194s weet Pernesi need, Jeckson. Mi 49201 + (si7) 7sso4ss 79-12 #9 July 31, 1981 k? I

\  ;

Mr J G Keppler, Regional Director Office of Inspection and Enforcement d~ g\)G #g# 7) .8 p

US Huclear Regulatory Commission s Region III ' Os,N

')

799 Roosevelt Road Glen Ellyn, IL 60137

\h3p '

MIDLAND PROJECT -

DOCKET NOS 50-329, 50-330 COIt"aINMENT INTERNAL STRUCTURES COATING DEFICIENCY FILE: 0.h.9 37 SERIAL: 12068

Reference:

CPC0 letters to J G Keppler; Same

Subject:

1) Serial Hove-309-79; dated December 13, 1979
2) Serial Hove-26-80; dated February 7, 1980
3) Serial Hove-75-80; dated April 15, 1980 h) Serial 9125; dated June 11, 1980
5) Serial 8823; dated September 9, 1980
6) Serial 10051; dated October 31, 1980
7) Serial 11199; dated February 23, 1981
8) Serial 12009; dated May 29, 1981 This letter, as were the referenced letters, is an interim 50.55(e) report on the containment internal structures coating deficiency.Section V(a)(2) of the enclosure to Reference 8 provided the testing program to evaluate the previously applied System 9 coating. The coatings that have been identified to be nonconforming are presently beira removed. The statistical testing program to do the testing of the remaining coating is being initiated.

Specification 7220-A-56(Q) (Reference 8,Section V(b)) for the System 9 g y/

coating repair has not been issued pending review of the requirement for a maximum allowable humidity level at the time of application. A testing program is being developed to define this parameter. 3 l I 8100110273 810731 PDR ADOCK 05000329 S PDR AU6! 5 1981

e

  • Serial 12068 2 79-12 #9 Another report, either interin or final, vill be sent on or before October 30, 1981.

3,g /A4 /F/L WRB/1r CC: Director of Office of Inspection & Enforcement Att Mr Victor Stello, USNRC (15)

Director, Office of Management Information & Program Control, USNRC (1) l RJCook, USNRC Resident Inspector, Midland (1)

CBechhoefer, ASLB Panel RSDecker, ASLB Panel FPCowan, ASLB Panel AS&L Appeal Panel MMCherry, Esq MSinclair BStamiris CRStephens, USNRC WDPaton, Esq, USNBC FJKelly, Zsq, Attorney General SHFreeman, Esq, Asst Attorney General WHMarshall CJMerritt, TNK&J