{{#Wiki_filter:'E En tergy Entergy Nuclear Operations, Inc.Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 Ralph A. Dodds, III Director, Nuclear Safety Assurance December 21, 2011 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555  
{{#Wiki_filter:'E En tergy                                                                       Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 Ralph A. Dodds, III Director, Nuclear Safety Assurance December 21, 2011 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555


==SUBJECT:==
==SUBJECT:==
Entergy Nuclear Operations, Inc.Pilgrim Nuclear Power Station Docket 50-293 License No. DPR-35 Pilgrim Nuclear Power Station License Renewal Application 2011 Annual Update (TAC MC9669)
Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station Docket 50-293 License No. DPR-35 Pilgrim Nuclear Power Station License Renewal Application 2011 Annual Update (TAC MC9669)


==REFERENCE:==
==REFERENCE:==
Entergy letter to U.S. NRC, License Renewal Application, dated January 25, 2006 LETTER NUMBER:          2.11.074


Entergy letter to U.S. NRC, License Renewal Application, dated January 25, 2006 LETTER NUMBER: 2.11.074
==Dear Sir or Madam:==


==Dear Sir or Madam:==
By the referenced letter, Entergy Nuclear Operations, Inc. (Entergy) submitted the License Renewal Application (LRA) for Pilgrim Nuclear Power Station (PNPS) in January of 2006.
By the referenced letter, Entergy Nuclear Operations, Inc. (Entergy) submitted the License Renewal Application (LRA) for Pilgrim Nuclear Power Station (PNPS) in January of 2006.Entergy is required by 10 CFR 54.21(b) to report changes to the current licensing basis (CLB)that materially affect the content of the PNPS LRA, including the Safety Analysis Report (SAR)supplement.
Entergy is required by 10 CFR 54.21(b) to report changes to the current licensing basis (CLB) that materially affect the content of the PNPS LRA, including the Safety Analysis Report (SAR) supplement. In accordance with this requirement, Entergy has completed review of the changes to the CLB and concluded that the content of the LRA is not materially affected.
In accordance with this requirement, Entergy has completed review of the changes to the CLB and concluded that the content of the LRA is not materially affected.This letter contains no commitments.
This letter contains no commitments.
If you have any questions or require additional informration, please contact Mr. Joseph R. Lynch, Licensing Manager, at (508) 830-8403 I declare under penalty of perjury that the foregoing is true and correct.Executed on .- of December, 2011.Ralph A. Dodds, III Director, Nuclear Safety Assurance JRL/jI CC: Next page Entergy Nuclear Operations, Inc Pilgrim Nuclear Power Station cc: Nathaniel B. Ferrer Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Susan L. Uttal, Esq.Office of the General Counsel U.S. Nuclear Regulatory Commission Mail Stop 0-15 D21 Washington, DC 20555-0001 Mr. Richard Guzman Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Sheila Slocum Hollis, Esq.Duane Morris L.L.P.505 9th Street N.W., Suite 1000 Washington, DC 20004-2166 Catherine Haney, Director Office of Nuclear Material and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-00001 Mr. William Dean, Administrator Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Letter Number 2.11.074 Page 2 Mr. Matthew Brock, Esq.Commonwealth of Massachusetts Assistant Attorney General Environmental Protection Division One Ashburton Place Boston, MA 02108 Diane Curran, Esq.Harmon, Curran, and Eisenberg, L.L.P.1726 M Street N.W., Suite 600 Washington, DC 20036 Mr. Robert Gallaghar, Acting Director Massachusetts Department of Public Health Radiation Control Program Schrafft Center, Suite 1 M2A 529 Main Street Charlestown, MA 02129 Mr. John Giarrusso Jr.Planning, Preparedness
If you have any questions or require additional informration, please contact Mr. Joseph R. Lynch, Licensing Manager, at (508) 830-8403 I declare under penalty of perjury that the foregoing is true and correct.
& Nuclear Section Chief Mass. Emergency Management Agency 400 Worcester Road Framingham, MA 01702 Mr. Eric J. Leeds, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555-00001 NRC Resident Inspector Pilgrim Nuclear Power Station}}
Executed on .-           of December, 2011.
Ralph A. Dodds, III Director, Nuclear Safety Assurance JRL/jI CC: Next page
 
Entergy Nuclear Operations, Inc                                 Letter Number 2.11.074 Pilgrim Nuclear Power Station                                   Page 2 cc:
Nathaniel B. Ferrer                       Mr. Matthew Brock, Esq.
Project Manager                           Commonwealth of Massachusetts Office of Nuclear Reactor Regulation     Assistant Attorney General U.S. Nuclear Regulatory Commission       Environmental Protection Division Washington, DC 20555-0001                 One Ashburton Place Boston, MA 02108 Susan L. Uttal, Esq.                     Diane Curran, Esq.
Office of the General Counsel             Harmon, Curran, and Eisenberg, L.L.P.
U.S. Nuclear Regulatory Commission       1726 M Street N.W., Suite 600 Mail Stop 0-15 D21                       Washington, DC 20036 Washington, DC 20555-0001 Mr. Richard Guzman                       Mr. Robert Gallaghar, Acting Director Office of Nuclear Reactor Regulation     Massachusetts Department of Public Health U.S. Nuclear Regulatory Commission       Radiation Control Program Washington, DC 20555-0001                 Schrafft Center, Suite 1 M2A 529 Main Street Charlestown, MA 02129 Sheila Slocum Hollis, Esq.               Mr. John Giarrusso Jr.
Duane Morris L.L.P.                       Planning, Preparedness & Nuclear Section Chief 505 9th Street N.W., Suite 1000         Mass. Emergency Management Agency Washington, DC 20004-2166                 400 Worcester Road Framingham, MA 01702 Catherine Haney, Director                Mr. Eric J. Leeds, Director Office of Nuclear Material and Safeguards Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission       U.S. Nuclear Regulatory Commission Washington, DC 20555-00001                Washington, DC 20555-00001 Mr. William Dean, Administrator           NRC Resident Inspector Region I                                 Pilgrim Nuclear Power Station U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406}}

Latest revision as of 11:03, 12 November 2019

License Renewal Application 2011 Annual Update
ML12003A197
Person / Time
Site: Pilgrim
Issue date: 12/21/2011
From: Dodds R
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
TAC MC9669
Download: ML12003A197 (2)


Text

'E En tergy Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 Ralph A. Dodds, III Director, Nuclear Safety Assurance December 21, 2011 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station Docket 50-293 License No. DPR-35 Pilgrim Nuclear Power Station License Renewal Application 2011 Annual Update (TAC MC9669)

REFERENCE:

Entergy letter to U.S. NRC, License Renewal Application, dated January 25, 2006 LETTER NUMBER: 2.11.074

Dear Sir or Madam:

By the referenced letter, Entergy Nuclear Operations, Inc. (Entergy) submitted the License Renewal Application (LRA) for Pilgrim Nuclear Power Station (PNPS) in January of 2006.

Entergy is required by 10 CFR 54.21(b) to report changes to the current licensing basis (CLB) that materially affect the content of the PNPS LRA, including the Safety Analysis Report (SAR) supplement. In accordance with this requirement, Entergy has completed review of the changes to the CLB and concluded that the content of the LRA is not materially affected.

This letter contains no commitments.

If you have any questions or require additional informration, please contact Mr. Joseph R. Lynch, Licensing Manager, at (508) 830-8403 I declare under penalty of perjury that the foregoing is true and correct.

Executed on .- of December, 2011.

Ralph A. Dodds, III Director, Nuclear Safety Assurance JRL/jI CC: Next page

Entergy Nuclear Operations, Inc Letter Number 2.11.074 Pilgrim Nuclear Power Station Page 2 cc:

Nathaniel B. Ferrer Mr. Matthew Brock, Esq.

Project Manager Commonwealth of Massachusetts Office of Nuclear Reactor Regulation Assistant Attorney General U.S. Nuclear Regulatory Commission Environmental Protection Division Washington, DC 20555-0001 One Ashburton Place Boston, MA 02108 Susan L. Uttal, Esq. Diane Curran, Esq.

Office of the General Counsel Harmon, Curran, and Eisenberg, L.L.P.

U.S. Nuclear Regulatory Commission 1726 M Street N.W., Suite 600 Mail Stop 0-15 D21 Washington, DC 20036 Washington, DC 20555-0001 Mr. Richard Guzman Mr. Robert Gallaghar, Acting Director Office of Nuclear Reactor Regulation Massachusetts Department of Public Health U.S. Nuclear Regulatory Commission Radiation Control Program Washington, DC 20555-0001 Schrafft Center, Suite 1 M2A 529 Main Street Charlestown, MA 02129 Sheila Slocum Hollis, Esq. Mr. John Giarrusso Jr.

Duane Morris L.L.P. Planning, Preparedness & Nuclear Section Chief 505 9th Street N.W., Suite 1000 Mass. Emergency Management Agency Washington, DC 20004-2166 400 Worcester Road Framingham, MA 01702 Catherine Haney, Director Mr. Eric J. Leeds, Director Office of Nuclear Material and Safeguards Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-00001 Washington, DC 20555-00001 Mr. William Dean, Administrator NRC Resident Inspector Region I Pilgrim Nuclear Power Station U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406