|
|
Line 1: |
Line 1: |
| {{Adams|number = ML081020152}} | | {{Adams |
| | | number = ML082350298 |
| | | issue date = 09/24/2008 |
| | | title = IR 05000445-07-201, IR 05000446-07-201, Comanche Peak Steam Electric Station, Final Significance Determination for Security-Related Greater than Green Finding, NRC Security Baseline Inspection Report |
| | | author name = Westreich B C |
| | | author affiliation = NRC/NSIR/DSO |
| | | addressee name = Blevins M |
| | | addressee affiliation = Luminant Generation Co, LLC |
| | | docket = 05000445, 05000446 |
| | | license number = NPF-087, NPF-089 |
| | | contact person = |
| | | case reference number = EA-08-22 |
| | | document report number = IR-07-201 |
| | | document type = Letter, Inspection Report |
| | | page count = 3 |
| | }} |
|
| |
|
| {{IR-Nav| site = 05000445 | year = 2007 | report number = 201 }} | | {{IR-Nav| site = 05000445 | year = 2007 | report number = 201 }} |
Line 5: |
Line 20: |
| =Text= | | =Text= |
| {{#Wiki_filter: | | {{#Wiki_filter: |
| [[Issue date::April 10, 2008]] | | [[Issue date::September 17, 2008]] |
|
| |
|
| EA-08-022 | | EA-08-22 Mr. Mike Blevins Chief Nuclear Officer and Executive Vice President Luminant Generation Company, LLC Attn: Regulatory Affairs Department P.O. Box 1002 Glen Rose, TX 76043 |
|
| |
|
| Mr. Mike Blevins Chief Nuclear Officer and Executive Vice President Luminant Generating Corporation, LLC Attn: Regulatory Affairs Department P.O. Box 1002 Glen Rose, TX 76043
| | SUBJECT: FINAL SIGNIFICANCE DETERMINATION FOR A SECURITY-RELATED GREATER THAN GREEN FINDING; NRC SECURITY BASELINE INSPECTION REPORT NOS. 05000445/2007201 AND 05000446/2007201 FOR COMANCHE PEAK STEAM ELECTRIC STATION |
| | |
| SUBJECT: COMANCHE PEAK STEAM ELECTRIC STATION, UNITS 1 AND 2 SECURITY INSPECTION 05000445/2007201 AND 05000446/2007201 | |
|
| |
|
| ==Dear Mr. Blevins:== | | ==Dear Mr. Blevins:== |
| On October 19, 2007, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at the Comanche Peak Steam Electric Station, Units 1 and 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRC=s Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed during a preliminary exit meeting on [[Exit meeting date::October 19, 2007]], and a final exit meeting on February 21, 2008, with you and other members of your staff.
| | The purpose of this letter is to provide you the final results of our significance determination for the potentially Greater than Green finding identified in the subject inspection report. The inspection finding was assessed using the Physical Protection Significance Determination Process and was preliminarily characterized as more than very low security significance. On April 10, 2008, you were presented with a Choice Letter which afforded you the opportunity of participating in a Regulatory Conference to mitigate the finding or provide new information to be considered in reaching the final determination. |
| | |
| The inspection examined activities conducted under your license as they relate to security and compliance with the Commission=s rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
| |
|
| |
|
| This letter discusses a finding that appears to have greater than green security significance, as described in Section 3.26 of this report. This finding was assessed based on the best available information, including influential assumptions, using the Physical Protection Significance Determination Process. The final resolution of this finding will convey the increment in the importance to security by assigning the corresponding color, which may require additional NRC inspection. The deficiency was promptly compensated for, and the site was in compliance with applicable physical protection and security requirements within the scope of the inspection before the inspectors left the site. The finding also had a cross-cutting aspect in the area of Human Performance because personnel failed to conduct an adequate effectiveness review. The finding is also associated with a violation of NRC requirements that are being considered for escalated enforcement action in accordance with NRC Enforcement Policy. The current Enforcement Policy is included on the NRC=s Web site at http://www.nrc.gov/reading-rm/adams.html.
| | During a telephone call on April 28, 2008, Mr. Tim Hope of your staff informed us that Comanche Peak Steam Electric Station contested the characterization of the significance of the finding, and requested the opportunity to discuss these issues in a Regulatory Conference that was conducted on May 19, 2008, in Arlington, Texas, at the Regional Office. |
|
| |
|
| Before we make a final decision on this matter, we are providing you an opportunity to:
| | After considering the information developed during the inspection and additional information provided during the Regulatory Conference, the NRC has concluded that no finding existed. We noted that during the period that the significance of this issue was being discussed, the licensee had taken corrective action to address the concerns. See enclosed Regulatory Conference Summary, which is Safeguards Information for specific details on the issues and the Final Determination. |
| (1) present to the NRC your perspectives on the facts and assumptions, used by the NRC to arrive at the finding and its significance, at a Regulatory Conference; or (2) submit your position on the finding to the NRC in writing. If you request a Regulatory Conference, it should be held within 30 days of the receipt of this letter and we encourage you to submit supporting documentation at least one week prior to the conference in an effort to make the conference more efficient and effective. If a Regulatory Conference is held, it will be closed to public observation due to the discussion of security related Information. If you decide to submit only a written response, such submittal should be sent to the NRC within 30 days of the receipt of this letter. Please contact Ronald J. Albert, Chief, Security Performance Evaluation Branch at 301-415-
| |
| 6986 within 10 business days of the date of your receipt of this letter to notify the NRC of your intentions.
| |
|
| |
|
| Since the NRC has not made a final determination in this matter, no Notice of Violation is being issued for the inspection finding at this time. In addition, please be advised that the number and characterization of apparent violation described in the enclosed inspection report may change as a result of further NRC review.
| | Enclosures Contains Safeguards Information. Upon separation, this page is decontrolled. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosures, and in accordance with 10 CFR 2.390, a copy of this letter's enclosures will not be available for public inspection. |
|
| |
|
| In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS)
| | Sincerely,/RA/ Barry C. Westreich, Deputy Director Division of Security Oversight Office of Nuclear Security and Incident Response Docket Nos.: 50-445, 50-446 License Nos.: NPF-87, NPF89 Nonpublic Enclosures ( ): 1. Regulatory Conference |
| component of NRC's Agencywide Documents Access and Management System (ADAMS),
| |
| accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosures, and in accordance with 10 CFR 2.390, a copy of this letter=s enclosures will not be available for public inspection.
| |
|
| |
|
| Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
| | cc: Site Vice President - Comanche Peak Steam Electric Station Plant Manager - Comanche Peak Steam Electric Station Director of Oversight and Regulatory Affairs - Comanche Peak Steam Electric Station Chief Operating Officer and Vice President - Comanche Peak Steam Electric Vice President - Luminant Generation Company, LLC Comptroller of Accounts - State Energy Conservation Office, Austin, Texas Deputy Attorney General - Austin, Texas In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosures, and in accordance with 10 CFR 2.390, a copy of this letter's enclosures will not be available for public inspection. |
|
| |
|
| Sincerely,Enclosure Contain Safeguards Information. Upon separation, this page is decontrolled. Richard P. Correia /RA/ | | Sincerely,/RA/ Barry C. Westreich, Deputy Director Division of Security Oversight Office of Nuclear Security and Incident Response Docket Nos.: 50-445, 50-446 License Nos.: NPF-87, NPF89 Nonpublic Enclosures ( ): 1. Regulatory Conference |
| Deputy Director for Security Oversight, Division of Security Operations Office of Nuclear Security and Incident Response Docket Nos.: 50-445, 50-446 License Nos.: NPF-87, NPF-89 | |
|
| |
|
| ===Enclosure:===
| | cc: Site Vice President - Comanche Peak Steam Electric Station Plant Manager - Comanche Peak Steam Electric Station Director of Oversight and Regulatory Affairs - Comanche Peak Steam Electric Station Chief Operating Officer and Vice President - Comanche Peak Steam Electric Vice President - Luminant Generation Company, LLC Comptroller of Accounts - State Energy Conservation Office, Austin, Texas Deputy Attorney General - Austin, Texas Distribution: |
| NRC Inspection Report No. 05000445/2007201, 05000446/2007201 (SGI)
| | D. Riffle, NSIR/DSO/DDSO R. Barnes, OE B. Singal, NRR C. Grisby SPEB R/F H. Harrington, OPA D. Detker, OCA M. Shannon, Region IV |
|
| |
|
| cc w/encl: Mr. Michael Tate Security Manager Comanche Peak Steam Electric Station, Units 1 & 2 Luminant Generation Company LLC 6322 Highway 56 North Glen Rose, TX 76043 cc w/o encl: Mr. Roger Mulder State Energy Conservation Office Comptroller of Public Accounts P.O. Box 13528 Austin, TX 78711 Mr. Jay Kimbrough Deputy Attorney General P.O. Box 12428 Austin, TX 78711
| | ACCESSION NO.: |
| | ML082350298 Log#2021 OFFICE NSIR/DSO/SPEB BC:RIV/DRS/PSBBC:DSO/SPEB DD:NSIR:DSO NAME DCornelius MShannon(Via email) RAlbert BWestreich DATE 08/22/08 09/16 /08 09/17 /08 OFFICIAL RECORD COPY |
| }} | | }} |
|
---|
Category:Letter
MONTHYEARCP-202400030, License Renewal Application Revision 0 - Supplement 3, Revision 12024-01-31031 January 2024 License Renewal Application Revision 0 - Supplement 3, Revision 1 IR 05000445/20230042024-01-29029 January 2024 Integrated Inspection Report 05000445/2023004 and 05000446/2023004 CP-202400034, (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 1)2024-01-29029 January 2024 (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 1) ML24024A2102024-01-29029 January 2024 Summary of Regulatory Audit Regarding a License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML24025A0052024-01-25025 January 2024 Review of the Spring 2023 Steam Generator Tube Inspection Report ML24023A0242024-01-24024 January 2024 Correction to Amendment Nos. 185 and 185 Regarding Implementation of Full Spectrum Loss-of-Coolant Accident Methodology ML24018A1072024-01-18018 January 2024 Notification of Commercial Grade Dedication Inspection (05000445/2024012 and 05000446/2024012) and Request for Information ML23159A2082023-12-20020 December 2023 Request for Withholding Information from Public Disclosure ML23319A3872023-12-20020 December 2023 Issuance of Amendment Nos. 185 and 185 Regarding Implementation of Full Spectrum Loss-of-Coolant Accident (Fsloca) Methodology ML23348A2392023-12-19019 December 2023 Nonacceptance of License Amendment Request to Relocate Technical Specification 3.9.3, Nuclear Instrumentation, to the Technical Requirements Manual CP-202300575, (Cpnpp), License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Supplement 22023-12-13013 December 2023 (Cpnpp), License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Supplement 2 ML23333A0872023-12-13013 December 2023 Transmittal of Dam Safety Inspection Report - Public CP-202300566, (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation2023-12-12012 December 2023 (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation CP-202300494, License Renewal Application Revision 0, Supplement 32023-12-0606 December 2023 License Renewal Application Revision 0, Supplement 3 ML23313A0732023-12-0606 December 2023 Issuance of Amendment Nos. 184 and 184 Regarding Revision to Technical Specifications to Implement WCAP-17661-P-A, Rev. 1, Improved Roac and CAOC Fq Surveillance Technical Specifications ML23291A4382023-11-30030 November 2023 Notice of Availability of the Draft Plant-Specific Supplement 60, to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Comanche Peak Nuclear Power Plant, Unit Numbers 1 and 2, License Renewal Applica ML23325A0182023-11-30030 November 2023 Schedule Revision for the License Renewal Application Review IR 05000445/20234022023-11-30030 November 2023 NRC Security Inspection Report 05000445/2023402 and 05000446/2023402 CP-202300349, License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation2023-11-20020 November 2023 License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation ML23308A0032023-11-17017 November 2023 Letter to R. Nelson, Executive Director; Achp; Re., Comanche Peak Draft Environmental Impact Statement ML23308A0022023-11-17017 November 2023 Letter to M. Wolfe, Executive Director; Shpo; Re., Comanche Peak Draft Environmental Impact Statement ML23317A3002023-11-13013 November 2023 Letter to R. Sylestine, Chairman, Alabama-Coushatta Tribe of Texas Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2972023-11-13013 November 2023 Letter to R. Martin, President, Tonkawa Tribe of Oklahoma Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2872023-11-13013 November 2023 Letter to J. Garza, Chairman, Kickapoo Traditional Tribe of Texas Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2832023-11-13013 November 2023 Letter to D. Dotson, President, Delaware Nation Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2852023-11-13013 November 2023 Letter to E. Martinez, President, Mescalero Apache Tribe Regarding Comanche Peak Draft Environmental Impact Statement ML23306A0302023-11-13013 November 2023 Letter to J. Cernek, Chairman; Coushatta Tribe of Louisiana Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2902023-11-13013 November 2023 Letter to M. Pierite, Chairman, Tunica Biloxi Tribe of Louisiana Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2982023-11-13013 November 2023 Letter to R. Morrow, Town King, Thlopthlocco Tribal Town Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2842023-11-13013 November 2023 Letter to D. Kaskaske, Chairman, Kickapoo Tribe of Oklahoma Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2822023-11-13013 November 2023 Letter to D. Cooper, Chairman, Apache Tribe of Oklahoma Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2962023-11-13013 November 2023 Letter to M. Woommavovah, Chairman, Comanche Nation Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2812023-11-13013 November 2023 Letter to C. Hoskin, Principal Chief, Cherokee Nation; Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2862023-11-13013 November 2023 Letter to J. Bunch, Chief, United Keetoowah Band of Cherokee Indians Regarding Comanche Peak Draft Environmental Impact Statement ML23317A3032023-11-13013 November 2023 Letter to W. Yargee, Chief, Alabama-Quassarte Tribal Town Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2882023-11-13013 November 2023 Letter to L. Johnson, Chief, Seminole Nation of Oklahoma Regarding Comanche Peak Draft Environmental Impact Statement ML23317A3012023-11-13013 November 2023 Letter to S. Yahola, Mekko, Kialegee Tribal Town Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2792023-11-13013 November 2023 Letter to B. Gonzalez, Chairman, Caddo Nation Regarding Comanche Peak Draft Environmental Impact Statement ML23317A3022023-11-13013 November 2023 Letter to T. Parton, President, Wichita and Affiliated Tribes Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2892023-11-13013 November 2023 Letter to L. Spottedbird, Chairman, Kiowa Indian Tribe Regarding Comanche Peak Draft Environmental Impact Statement ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23360A6312023-10-26026 October 2023 FEMA, Submittal of Radiological Emergency Preparedness Final Report for the Comanche Peak Nuclear Power Plant Medical Services Drill Evaluated on August 23, 2023 CP-202300416, Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements2023-10-12012 October 2023 Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements CP-202300432, Response to Request for Additional Information Regarding the Safety Review of the License Renewal Application - Set 42023-10-0404 October 2023 Response to Request for Additional Information Regarding the Safety Review of the License Renewal Application - Set 4 ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23263A0242023-09-21021 September 2023 Revision of Schedule for the Environmental Review of the Comanche Peak Nuclear Power Plant Units 1 and 2 License Renewal Application 2024-01-31
[Table view] Category:Inspection Report
MONTHYEARIR 05000445/20230042024-01-29029 January 2024 Integrated Inspection Report 05000445/2023004 and 05000446/2023004 ML24018A1072024-01-18018 January 2024 Notification of Commercial Grade Dedication Inspection (05000445/2024012 and 05000446/2024012) and Request for Information IR 05000445/20234022023-11-30030 November 2023 NRC Security Inspection Report 05000445/2023402 and 05000446/2023402 IR 05000445/20230052023-08-23023 August 2023 Updated Inspection Plan for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2023005 and 05000446/2023005)- Mid Cycle Letter 2023 IR 05000445/20233012023-08-21021 August 2023 NRC Examination Report 05000445/2023301 and 05000446/2023301 IR 05000445/20230112023-07-20020 July 2023 Fire Protection Team Inspection Report 05000445/2023011 and 05000446/2023011 IR 05000445/20230022023-07-14014 July 2023 Integrated Inspection Report 05000445/2023002 and 05000446/2023002 IR 05000445/20230012023-04-13013 April 2023 Integrated Inspection Report 05000445/2023001 and 05000446/2023001 IR 05000445/20234012023-03-29029 March 2023 NRC Security Inspection Report 050004452023401 and 050004462023401 (Cover Letter Only) IR 05000445/20230102023-03-24024 March 2023 Biennial Problem Identification and Resolution Inspection Report 05000445/2023010 and 05000446/2023010 IR 05000445/20220062023-03-0101 March 2023 Annual Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2022006 and 05000446/2022006) IR 05000445/20220042023-01-26026 January 2023 Integrated Inspection Report 05000445/2022004 and 05000446/2022004 IR 05000445/20220102023-01-23023 January 2023 TI-194 Report 05000445/2022010 and 05000446/2022010 IR 05000445/20224012022-12-19019 December 2022 Cyber Security Inspection Report 05000445/2022401 and 05000446/2022401 (Cover Letter Only) IR 05000445/20224202022-12-0707 December 2022 Security Baseline Inspection Report Cover Letter 05000445/2022420 and 05000446/2022420 ML22319A0732022-11-15015 November 2022 Review of the Fall 2021 Steam Generator Tube Inspection Report IR 05000445/20220032022-11-0101 November 2022 Integrated Inspection Report 05000445/2022003 and 05000446/2022003 and Notice of Violation ML22299A0562022-11-0101 November 2022 Integrated Inspection Report 05000445/2022003 and 05000446/2022003 and Notice of Violation IR 05000445/20220052022-08-22022 August 2022 Updated Inspection Plan for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2022005 and 05000446/2022005) IR 05000445/20224032022-08-0909 August 2022 NRC Security Inspection Report 05000445/2022403 and 05000446/2022403 (Full Report) IR 05000445/20220022022-08-0505 August 2022 2nd Quarter 2022 Integrated Inspection Report 05000445/2022002 and 05000446/2022002 ML22174A2792022-06-22022 June 2022 Notification of NRC Evaluations of Changes, Tests and Experiments Inspection (05000445/2022003 and 05000446/2022003) and Request for Information IR 05000445/20220012022-04-26026 April 2022 Integrated Inspection Report 05000445/2022001 and 05000446/2022001 IR 05000445/20224022022-04-25025 April 2022 Security Baseline Inspection Report 05000445/2022402 and 05000446/2022402 IR 05000445/20210062022-03-0202 March 2022 Annual Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2021006 and 05000446/2021006) IR 05000445/20200112022-02-0707 February 2022 Amended - Comanche Peak Nuclear Power Plant - Triennial Fire Protection Inspection Report 05000445/2020011 and 05000446/2020011 and Notice of Violation IR 05000445/20210042022-01-25025 January 2022 Integrated Inspection Report 05000445/2021004 and 05000446/2021004 IR 05000445/20210122022-01-13013 January 2022 TI-194 Report 05000445/2021012 and 05000446/2021012 IR 05000445/20214052021-12-15015 December 2021 Security Baseline Inspection Report 05000445/2021405 and 05000446/2021405 IR 05000445/20214032021-12-0909 December 2021 Powerplant, Units 1 and 2 - Security Baseline Inspection Report 05000445/2021403 and 05000446/2021403 IR 05000445/20210032021-11-0303 November 2021 Integrated Inspection Report 05000445/2021003 and 05000446/2021003 IR 05000445/20213012021-10-19019 October 2021 NRC Examination Report 05000445/2021301 and 05000446/2021301 IR 05000445/20210102021-10-0707 October 2021 Biennial Problem Identification and Resolution Inspection Report 05000445/2021010 and 05000446/2021010 IR 05000445/20214012021-09-0909 September 2021 Security Baseline Inspection Report 05000445/2021401 and 05000446/2021401 IR 05000445/20210052021-09-0101 September 2021 Mid-Cycle Inspection Plan Transmittal Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2021005 and 05000446/2021005) IR 05000445/20214022021-08-19019 August 2021 Security Baseline Inspection Report 05000445/2021402 and 05000446/2021402 IR 05000445/20210022021-08-10010 August 2021 Integrated Inspection Report 05000445/2021002 and 05000446/2021002 IR 05000445/20210012021-06-23023 June 2021 Revised Report - Comanche Peak Nuclear Plant, Units 1 and 2 - Integrated Inspection Report 05000445/2021001; 05000446/2021001 and Independent Spent Fuel Storage Inspection 07200074/2021001 IR 05000445/20214042021-06-17017 June 2021 Material Control and Accounting Program (Public) Inspection Report 05000445/2021404 05000446/2021404 ML21131A0952021-05-11011 May 2021 CP2021001-RP-JE, Comanche Peak Nuclear Power Plant, Units 1 and 2 - Integrated Inspection Report 05000445/2021001 and 05000446/2021001 IR 05000445/20210112021-05-0606 May 2021 Design Basis Assurance Inspection (Teams) Inspection Report 05000445/2021011 and 05000446/2021011 and Notice of Violation IR 07200074/20214012021-03-17017 March 2021 (CPNPP) Independent Spent Fuel Storage Installation (ISFSI) IR 07200074/2021401 3-3 IR 05000445/20200062021-03-0303 March 2021 Annual Assessment Letter for Comanche Peak, Units 1 and 2, (Inspection Report 05000445/2020006 and 05000446/2020006) IR 05000445/20200042021-02-0909 February 2021 Integrated Inspection Report 05000445/2020004 and 05000446/2020004 IR 05000445/20200012020-12-22022 December 2020 Revised Report - Comanche Peak Nuclear Power Plant, Units 1 and 2 -Integrated Inspection Report 05000445/2020001 and 05000446/2020001 IR 05000445/20200032020-11-10010 November 2020 Integrated Inspection Report 05000445/2020003 and 05000446/2020003 IR 05000445/20200102020-10-0606 October 2020 Design Basis Assurance Inspection (Programs) Inspection Report 05000445/2020010 and 05000446/2020010 ML20265A0422020-09-21021 September 2020 Commanche Peak Nuclear Power Plant - Triennial Fire Protection Inspection Report 05000445/2020011 and 05000446/2020011 and Notice of Violation IR 05000445/20204102020-09-10010 September 2020 Security Baseline Inspection Report 05000445/2020410 and 05000446/2020410 IR 05000445/20200052020-09-0101 September 2020 Updated Inspection Plan for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2020005 and 05000446/2020005) 2024-01-29
[Table view] |
Text
September 17, 2008
EA-08-22 Mr. Mike Blevins Chief Nuclear Officer and Executive Vice President Luminant Generation Company, LLC Attn: Regulatory Affairs Department P.O. Box 1002 Glen Rose, TX 76043
SUBJECT: FINAL SIGNIFICANCE DETERMINATION FOR A SECURITY-RELATED GREATER THAN GREEN FINDING; NRC SECURITY BASELINE INSPECTION REPORT NOS. 05000445/2007201 AND 05000446/2007201 FOR COMANCHE PEAK STEAM ELECTRIC STATION
Dear Mr. Blevins:
The purpose of this letter is to provide you the final results of our significance determination for the potentially Greater than Green finding identified in the subject inspection report. The inspection finding was assessed using the Physical Protection Significance Determination Process and was preliminarily characterized as more than very low security significance. On April 10, 2008, you were presented with a Choice Letter which afforded you the opportunity of participating in a Regulatory Conference to mitigate the finding or provide new information to be considered in reaching the final determination.
During a telephone call on April 28, 2008, Mr. Tim Hope of your staff informed us that Comanche Peak Steam Electric Station contested the characterization of the significance of the finding, and requested the opportunity to discuss these issues in a Regulatory Conference that was conducted on May 19, 2008, in Arlington, Texas, at the Regional Office.
After considering the information developed during the inspection and additional information provided during the Regulatory Conference, the NRC has concluded that no finding existed. We noted that during the period that the significance of this issue was being discussed, the licensee had taken corrective action to address the concerns. See enclosed Regulatory Conference Summary, which is Safeguards Information for specific details on the issues and the Final Determination.
Enclosures Contains Safeguards Information. Upon separation, this page is decontrolled. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosures, and in accordance with 10 CFR 2.390, a copy of this letter's enclosures will not be available for public inspection.
Sincerely,/RA/ Barry C. Westreich, Deputy Director Division of Security Oversight Office of Nuclear Security and Incident Response Docket Nos.: 50-445, 50-446 License Nos.: NPF-87, NPF89 Nonpublic Enclosures ( ): 1. Regulatory Conference
cc: Site Vice President - Comanche Peak Steam Electric Station Plant Manager - Comanche Peak Steam Electric Station Director of Oversight and Regulatory Affairs - Comanche Peak Steam Electric Station Chief Operating Officer and Vice President - Comanche Peak Steam Electric Vice President - Luminant Generation Company, LLC Comptroller of Accounts - State Energy Conservation Office, Austin, Texas Deputy Attorney General - Austin, Texas In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosures, and in accordance with 10 CFR 2.390, a copy of this letter's enclosures will not be available for public inspection.
Sincerely,/RA/ Barry C. Westreich, Deputy Director Division of Security Oversight Office of Nuclear Security and Incident Response Docket Nos.: 50-445, 50-446 License Nos.: NPF-87, NPF89 Nonpublic Enclosures ( ): 1. Regulatory Conference
cc: Site Vice President - Comanche Peak Steam Electric Station Plant Manager - Comanche Peak Steam Electric Station Director of Oversight and Regulatory Affairs - Comanche Peak Steam Electric Station Chief Operating Officer and Vice President - Comanche Peak Steam Electric Vice President - Luminant Generation Company, LLC Comptroller of Accounts - State Energy Conservation Office, Austin, Texas Deputy Attorney General - Austin, Texas Distribution:
D. Riffle, NSIR/DSO/DDSO R. Barnes, OE B. Singal, NRR C. Grisby SPEB R/F H. Harrington, OPA D. Detker, OCA M. Shannon, Region IV
ACCESSION NO.:
ML082350298 Log#2021 OFFICE NSIR/DSO/SPEB BC:RIV/DRS/PSBBC:DSO/SPEB DD:NSIR:DSO NAME DCornelius MShannon(Via email) RAlbert BWestreich DATE 08/22/08 09/16 /08 09/17 /08 OFFICIAL RECORD COPY