March 3, 2021

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 (REPORT 05000445/2020006 AND 05000446/2020006)

Dear Mr. Peters:

The U.S. Nuclear Regulatory Commission (NRC) has completed its end-of-cycle performance assessment of Comanche Peak Nuclear Power Plant, Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2020 through December 31, 2020. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. The baseline inspection program was completed at your facility as defined in Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase.

The NRC determined the performance at Comanche Peak Nuclear Power Plant, Units 1 and 2, during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2022.

The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In response to the COVID-19 public health emergency (PHE), the NRC is adjusting inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the ROP. Each planned inspection is being carefully reviewed in order to determine if any portions of the inspection can be performed remotely, how best to perform on-site portions to minimize personnel health risks, and adjust inspection schedules if needed. This is done in accordance with guidance contained in the February 1, 2021 memo, Calendar Year 2021 Inspection Guidance During COVID-19 Telework Restrictions (Agency Documents Access and Management System (ADAMS) Accession Number ML21027A274). For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here:

https://www.nrc.gov/about-nrc/covid-19/security-ep/. Similarly, the NRC has developed guidance if force-on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID-19 PHE. These changes help ensure the health and safety of both NRC and licensee staff while maintaining the NRCs important safety and security mission during the COVID-19 PHE. The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID-19 PHE. NRC staff will contact your appropriate regulatory affairs staff in order to coordinate inspection planning and scheduling.

Additionally, during this period the NRC will schedule an additional inspection per a revised version of Temporary Instruction (TI) 2515/194, Inspection of the Licensees Implementation of Industry Initiative Associated with the Open Phase Condition Design Vulnerability in Electrical Power Systems (NRC Bulletin 2012-01) for any sites who elect to implement the guidance of the Industry Initiative on Open Phase Condition, Revision 3 (ADAMS Accession ML19163A176),

which included an option for relying on annunciation and operator manual actions instead of automatic protective features to isolate a power supply affected by an open phase condition. Licensees will be individually notified when the NRC schedules these inspections In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS)

component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (817) 200-1141 with any questions you have regarding this letter.

Sincerely, Cornelius F. Digitally signed by Cornelius F. O'Keefe O'Keefe Date: 2021.03.03 07:00:58-06'00'

Neil F. OKeefe, Chief Project Branch B Division of Reactor Projects Docket Nos. 50-445 and 50-446 License Nos. NPF-87 and NPF-89 Enclosure:

Inspection Plan cc w/ encl: Distribution LISTSERV

ML21055A005 SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: DLP Yes No Publicly Available Sensitive NRC-002 OFFICE SPE:DRP/B C:DRP/B NAME DProulx NOKeefe SIGNATURE DLP NFO DATE 02/18/2021 03/03/2021

IP 22 Inspection Activity Plan Report Comanche Peak 01/01/2021 - 12/31/2022 Unit Start End Activity CAC Title Staff Count Design Bases Assurance (Team) 21M - Comanche Peak 6 1, 2 02/08/2021 02/26/2021 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

Security FFD .08 1 1, 2 02/22/2021 02/26/2021 IP 71130.08 000740 Fitness For Duty Program CPNPP ISFSI Security, IP 81311 1 1 02/22/2021 02/24/2021 IP 81311 001006 Physical Security Requirements for Independent Spent Fuel Storage Installations Comanche Peak ISFSI Loading Inspection (1 week in March 2 1 03/01/2021 03/31/2021 IP 60855 001001 Operation Of An ISFSI 1 03/01/2021 03/31/2021 IP 60857 001004 Review of 10 CFR 72.48 Evaluations In-Office EP Exercise Scenario Review - CP 4 1, 2 04/07/2021 05/17/2021 IP 71114.08 000723 Exercise Evaluation  Scenario Review RP 2,4 2 1, 2 05/17/2021 05/21/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 05/17/2021 05/21/2021 IP 71124.04 000728 Occupational Dose Assessment MCA - Material Control & Accounting 1 1, 2 05/17/2021 05/21/2021 IP 71130.11 000742 Material Control and Accounting (MC&A)

TI 2515/194-CP 2 1, 2 05/24/2021 05/28/2021 TI 2515/194 000512 Inspection of the Licensees Implementation of Industry Initiative Associated With the Open Phase Condition Design Vulnerabilities In Electric Power Systems (NRC Bulletin 2012-01)

This report does not include INPO and OUTAGE activities. Page 1 of 4 This report shows only on-site and announced inspection procedures.

2/18/2021 9:17:38 AM

IP 22 Inspection Activity Plan Report Comanche Peak 01/01/2021 - 12/31/2022 Unit Start End Activity CAC Title Staff Count Security Protective Strategy .05 w/Exercise 2 1, 2 05/24/2021 05/28/2021 IP 71130.05 000737 Protective Strategy Evaluation EP Exercise and PI Inspection - CP 4 1, 2 06/14/2021 06/18/2021 IP 71114.01 000716 Exercise Evaluation 1, 2 06/14/2021 06/18/2021 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1, 2 06/14/2021 06/18/2021 IP 71151 001397 Performance Indicator Verification CPSES 2021 INITIAL EXAM 4 1, 2 07/04/2021 07/10/2021 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1, 2 08/08/2021 08/14/2021 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

Security Access Authorization .01 and Access Control .02 w/PIV 2 1, 2 07/26/2021 07/30/2021 IP 71130.01 000733 Access Authorization 1, 2 07/26/2021 07/30/2021 IP 71130.02 000734 Access Control 1, 2 07/26/2021 07/30/2021 IP 71130.09 001656 Security Plan Changes 1, 2 07/26/2021 07/30/2021 IP 71151 001338 Performance Indicator Verification Biennial PI&R Inspection 4 1, 2 09/13/2021 09/17/2021 IP 71152B 000747 Problem Identification and Resolution 1, 2 09/27/2021 10/01/2021 IP 71152B 000747 Problem Identification and Resolution Inservice Inspection 2RF19 - CP 1 2 10/11/2021 10/22/2021 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP 1,2,PI 2 1, 2 10/18/2021 10/22/2021 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 10/18/2021 10/22/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls This report does not include INPO and OUTAGE activities. Page 2 of 4 This report shows only on-site and announced inspection procedures.

2/18/2021 9:17:38 AM

IP 22 Inspection Activity Plan Report Comanche Peak 01/01/2021 - 12/31/2022 Unit Start End Activity CAC Title Staff Count RP 5,8 2 1, 2 01/31/2022 02/04/2022 IP 71124.05 000729 Radiation Monitoring Instrumentation 1, 2 01/31/2022 02/04/2022 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, &

Transportation Security Access Control .02 1 1, 2 03/21/2022 03/25/2022 IP 71130.02 000734 Access Control 1, 2 03/21/2022 03/25/2022 IP 71151 001338 Performance Indicator Verification Inservice Inspection 1RF22 - CP 1 1 04/18/2022 04/29/2022 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP 1,2,PI 2 1, 2 04/25/2022 04/29/2022 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 04/25/2022 04/29/2022 IP 71124.02 000726 Occupational ALARA Planning and Controls Security Training/Equip Maint .07 and .04 2 1, 2 07/11/2022 07/15/2022 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1, 2 07/11/2022 07/15/2022 IP 71130.07 000739 Security Training FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - CP 6 1, 2 10/03/2022 10/07/2022 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1, 2 10/31/2022 11/04/2022 IP 71130.03 000735 Contingency Response - Force-On-Force Testing CP 2022 BRQ 3 1, 2 10/23/2022 10/29/2022 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance 1, 2 10/23/2022 10/29/2022 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance This report does not include INPO and OUTAGE activities. Page 3 of 4 This report shows only on-site and announced inspection procedures.

2/18/2021 9:17:38 AM

IP 22 Inspection Activity Plan Report Comanche Peak 01/01/2021 - 12/31/2022 Unit Start End Activity CAC Title Staff Count EP Program & PI Inspection - CP 1 1, 2 10/24/2022 10/28/2022 IP 71114.02 000717 Alert and Notification System Testing 1, 2 10/24/2022 10/28/2022 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1, 2 10/24/2022 10/28/2022 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1, 2 10/24/2022 10/28/2022 IP 71114.05 000720 Maintenance of Emergency Preparedness 1, 2 10/24/2022 10/28/2022 IP 71151 001397 Performance Indicator Verification This report does not include INPO and OUTAGE activities. Page 4 of 4 This report shows only on-site and announced inspection procedures.